Scope Management
5.1 Plan Scope Management: The process of creating scope management plan that documents how project scope will be defined, validated and controlled
# Requirement: Condition or capability that is required to be present in product, service or result to satisfy a contract or other formally imposed
specification
#Scope: The sum of the product, services and results to be provided as a project.
#Product scope: Features and function that characterize product, service, result.
#Project Scope: The work performed to deliver a product, service, result with specified features and functions.
Output
#Requirement Management Plan – A component of project management plan that describes how requirements should be analyzed documented and
managed. E.g. how to build traceability matrix etc.
# Scope Management Plan – what work will you do to define scope and control it? Scope management plan is one of the subsidiary plans of Project
management plan which is an input to the Control scope process. Scope management plan have the information about specific procedures for defining
the scope, breaking down the work, verifying the deliverables, and managing scope changes.
PLANNING
1. Project Management Plan 1. Expert Judgment 1. Scope Management Plan
2. Project Charter
3. EEF
4.OPA
2. Meetings 2. Requirements Management Plan
It is based on PMBOK 5. Please note that these are my personal notes and created using several books, online forums, already created notes by others. If you have any suggestions please feel free to drop an email to
shraddha.pmp@gmail.com. There is no liability assumed for damages resulting from the use of information.
5.2 Collect Requirements: The process of defining and documenting stakeholders' needs to meet the project objectives.
# TT1 Interviews: Project Manager or Business Analyst will do the Interviews with Subject matter expert and it is One-to-one meeting
# TT2 Focus Groups: (Brings together prequalified stakeholders and subject matter experts with trained Moderator)
# TT3 Facilitated Workshops: Defining cross-functional requirements and reconciling stakeholder differences Joint Application Development (JAD for SW
Industry) and Quality Function Deployment (QFD for Production Industry).
# TT4 Group Creativity Techniques: 1. Brainstorming 2. Nominal Group Technique: where brainstormed ideas are voted upon and sorted by priority 3.
Delphi Technique (anonymous responses) 4. Idea and Mind Mapping (Ideas created through individual brainstorming are consolidated into a single
map) 5. Affinity Diagram: large numbers of ideas to be sorted into groups
6. Multi Criteria Decision Analysis: Stakeholder quantifies requirements using decision matrix based on factors such as expected risk levels.
# TT5 Group Decision making techniques: • Unanimity: everyone agrees on single course of action • Majority: support from more than 50% of the
members of the group • Plurality: the largest block in a group decides even if a majority is not achieved • Dictatorship: one individual makes the
decision for the group.
# TT8 Prototyping: Obtaining early feedback on requirements by providing a working model
#TT9 Benchmarking: Measuring organization performance against that of other organizations in same industry.
#TT10 Context Diagrams: context level data flow diagram - Context Diagrams is the visual depiction of the product scope showing a business system,
and how people and other systems (actors) interact with it and is used for requirements collection.
#TT11 Document Analysis: elicit requirement by analyzing existing requirements
Output 1. Requirement Documentation - i) Business Requirements ii) Stakeholder Requirements iii) Solution Requirement (Functional, Non-functional,
quality, Technology, and Compliance) iv) Project Requirement (Acceptance criteria) v) Transition Requirement vi) Requirement assumptions,
dependency, assumptions etc.
Output 2. Requirements Traceability Matrix – a grid that links requirements to its origin to the deliverables
PLANNING
1. Scope Management Plan 1. Interviews 1. Requirements Documentation
2. Requirement Management Plan 2. Focus Groups (WHAT needs to be performed and WHY each
requirement is important on the project)3. Stakeholder Management Plan (strategy) 3. Facilitated Workshops
4. Project Charter 4. Group Creativity Techniques
5. Stakeholder Register (people) 5. Group Decision Making Techniques
6. Questionnaires and Surveys 2. Requirements Traceability Matrix
(Requirements and its source, WHO OWNS and
the Status). Matrix depicts as Requirements
(Rows) against Deliverables (Columns).
7. Observations ('Job Shadowing' by Observer)
8. Prototypes (providing a working model)
9. Benchmarking
10.Context Diagrams
11. Document Analysis
It is based on PMBOK 5. Please note that these are my personal notes and created using several books, online forums, already created notes by others. If you have any suggestions please feel free to drop an email to
shraddha.pmp@gmail.com. There is no liability assumed for damages resulting from the use of information.
5.3 Define Scope: The process of developing a detailed description of the Project and Product. Process describes the project; service or result boundaries by
defining which requirements will be included in and excluded from the project scope.
Project Scope statement includes: 1. Product scope description and Project goals 2. Acceptance criteria 3. Deliverables
4. Project exclusions 5. Constraints 6. Assumptions
TT2: Product Analysis includes * Product Breakdown * Systems Analysis * Requirements Analysis * Systems Engineering * Value Engineering / Value
Analysis (performing the same work at lesser cost).PMI advocates Project Objectives that follow the SMART guideline. S - Specific; M - Measurable; A -
Assignable; R - Realistic; T - Timely. # Difference in Charter and PSS pg 124 PMBOK
PLANNING
1. Scope Management Plan 1. Expert Judgement 1. Project Scope Statement (PSS)
2. Project Charter 2. Product Analysis 2. Project Document Updates
3. Requirement Documentation 3. Alternative generation 3. Stakeholder Register,
4.OPA 4. Facilitated Workshop 4. Req.Traceability Matrix
5.4 Create WBS: The process of subdividing project deliverables and project work into smaller, more manageable components. After creation; it becomes a
HUB OF INFORMATION for the project. It is a primary tool for verifying and controlling the project's scope. Every level in WBS is the detailed explanation
of the level above it. WBS is a graphical, hierarchical chart, logically organized from top to bottom.
#Work Package - The planned work contained within the lowest level of WBS component
# Control Account (Management Control Points): Where the integration of scope, schedule, and cost take place and where performance is measured.
# Planning packages (Set of work) are between Control Accounts and Work Packages. WBS component within a control account that is identified and
budgeted in early planning but it is not yet subdivided into work package
# Code of account is used to name the WBS (Unique Identification) – any numbering system used to uniquely identify each component. Hooking WBS
into your company’s accounting system
# WBS isn’t time based # WBS does form the Scope Baseline # WBS is a communication tool # Created by the entire Project Team
#The WBS is focused on deliverables, whereas activity definition is focused on the tasks to create those deliverables.
WBS Dictionary might include 1. Number of the node 2. Name of the node 3. The written requirements for the node 4. To whom it is assigned 5. Time
(Date Assigned and Date Due) 6. Cost and 7. Accounting information.
Advantages: 1. EV Calculation take place 2. It is the building block of Performance Measurement 3. The sum of the control accounts will add up to the
total project value . Control Account may include one or more Work Packages; each Work Package represents only one Control Account.
PLANNING
1. Scope Management Plan 1. Decomposition 1. Scope Baseline
2. Project Scope Statement 2. Expert Judgement 2. Project Document Updates
3. Requirements Documentation
3. EEF
4. OPA
It is based on PMBOK 5. Please note that these are my personal notes and created using several books, online forums, already created notes by others. If you have any suggestions please feel free to drop an email to
shraddha.pmp@gmail.com. There is no liability assumed for damages resulting from the use of information.
5.5 Validate Scope: The process of formalizing acceptance of the completed project deliverables. Formal process to verify and obtain stakeholder
acceptance of the completed project scope and deliverables. Usually performed after Quality Control.
# Validate Scope happens at the end of each phase and the project and upon delivery of Product/Service/Result.
# Validate Scope is concerned with completeness and acceptance, and Quality Control is concerned with correctness.
# Quality Control generally performed before Validate Scope
# If the project is cancelled / terminated before completion, Validate Scope is performed to show where the Project was in relation to the Scope when it
ended. # Validate Scope is all about comparing the Deliverables with the documented Scope to ensure that everything was completed.
# Validate Scope is typically performed by the PM, the Sponsor, the Customer, and the Functional Managers, and the result is a formal, written
acceptance by the appropriate stakeholders. # If we don't receive a final sign off from our customer; we have to escalate the issue to our Management.
#TT1 - (It involves a point-by-point review of the Scope and the associated Deliverable). Examine the deliverables, Measure it, Inspect it, and Weigh it.
Points to remember
#It can be done at the end of each project phase in project life cycle and as a part of Monitoring and controlling process to get formal acceptance any
deliverables that require approval in the middle of the phase or project.
#Validate Scope Vs. Close Project – validate scope results in the formal acceptance of interim deliverables, close project is to get sign off from the
customer for the project or phase as a whole
#Validate Scope (customer checks and accepts the deliverables) Vs. Control Quality (the quality control department checks to see if the requirements
specified for the deliverables are met and makes sure work is correct)
M&C
1. Project Management Plan 1. Inspection 1. Change Requests
2. Requirements Documentation 2. Group-decision making Techniques 2. Work Performance Information
3. Requirements Traceability Matrix 3. Project Document Updates
4. Verified Deliverables
5. Work Performance Data
Direct and
Manage project
work
Deliverables
Control
Quality
Verified
Deliverables
Validate
Scope
Accepted
deliverables
Close Project
and Phase
Final product and
Services
It is based on PMBOK 5. Please note that these are my personal notes and created using several books, online forums, already created notes by others. If you have any suggestions please feel free to drop an email to
shraddha.pmp@gmail.com. There is no liability assumed for damages resulting from the use of information.
5.6 Control Scope: The process of monitoring the status of the project and product scope and managing changes to the scope baseline. Scope Creep will be
eliminated. Proactive process. PM to measure work completed (Work Performance Data) against scope baseline to analyze any variance (Scope
Management plan and Requirement Management plan will tell how such analysis to be done). If necessary you would submit CR to Perform Integrated
Change Control
M&C
1. Project Management Plan (Scope Baseline) 1. Variance analysis 1. Change Requests
2. Work Performance Data VA can be used to measure differences between
what was defined in the Scope Baseline & what
was created. It is useful in this process as a way
to investigate and understand the root causes
behind these differences.
2. Project Management Plan Updates
3. Requirements Documentation 3. Project Document Updates
4. Requirements Traceability Matrix 4. Organizational Process Assets Updates
5. Organizational Process Assets

More Related Content

What's hot

It2403 spm
It2403 spmIt2403 spm
It2403 spm
contactgsiva
 
05 project scope management
05 project scope management05 project scope management
05 project scope management
Omer Alsayed PhD,MBA, PMP®
 
Artifacts
ArtifactsArtifacts
Artifacts
Mayuresh Wadekar
 
Pmp chapter(5) Scope Management
Pmp chapter(5) Scope ManagementPmp chapter(5) Scope Management
Pmp chapter(5) Scope Management
Hisham Ali,PMP
 
Project scope and requirements management
Project scope and requirements managementProject scope and requirements management
Project scope and requirements management
tictactoe123
 
PMBOK® Guide 5th edition Processes Flow in English - Simplified Version
PMBOK® Guide 5th edition Processes Flow in English - Simplified VersionPMBOK® Guide 5th edition Processes Flow in English - Simplified Version
PMBOK® Guide 5th edition Processes Flow in English - Simplified Version
Ricardo Viana Vargas
 
Mg6088 spm unit-5
Mg6088 spm unit-5Mg6088 spm unit-5
Mg6088 spm unit-5
SIMONTHOMAS S
 
Spm unit 3
Spm unit 3Spm unit 3
Spm unit 3
Naga Dinesh
 
Project Scope Management -
Project Scope Management - Project Scope Management -
Project Scope Management -
dyaksa hanindito
 
PMBOK-5th ed: PMP- Flashcards Part1/5
PMBOK-5th ed: PMP- Flashcards Part1/5PMBOK-5th ed: PMP- Flashcards Part1/5
PMBOK-5th ed: PMP- Flashcards Part1/5
Anand Bobade
 
Project charter and plan document for millennium upgrade
Project charter and plan document for millennium upgradeProject charter and plan document for millennium upgrade
Project charter and plan document for millennium upgrade
Theodore Van Patten, Jr.
 
PMP Preparation - 03 Framework
PMP Preparation - 03 FrameworkPMP Preparation - 03 Framework
PMP Preparation - 03 Framework
Mohamed ElSaadany, PMP, CCP, PMI-RMP, SCE-PE
 
Project Scope Statement
Project Scope StatementProject Scope Statement
Project Scope Statement
brittanyjespersen
 
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
JustAcademy
 
Scope management
Scope managementScope management
Scope management
Siddharth Janakiram
 
PM Flashcards
PM FlashcardsPM Flashcards
PM Flashcards
eliza_efendi
 
Software Project Management
Software Project ManagementSoftware Project Management
Software Project Management
asim78
 
PMP Training, Chapter 1-2-3- framework
PMP Training, Chapter 1-2-3- framework PMP Training, Chapter 1-2-3- framework
PMP Training, Chapter 1-2-3- framework
Monzir Elamin , PMP
 
Project management: defining the project
Project management: defining the projectProject management: defining the project
Project management: defining the project
Oscar Vadillo
 

What's hot (19)

It2403 spm
It2403 spmIt2403 spm
It2403 spm
 
05 project scope management
05 project scope management05 project scope management
05 project scope management
 
Artifacts
ArtifactsArtifacts
Artifacts
 
Pmp chapter(5) Scope Management
Pmp chapter(5) Scope ManagementPmp chapter(5) Scope Management
Pmp chapter(5) Scope Management
 
Project scope and requirements management
Project scope and requirements managementProject scope and requirements management
Project scope and requirements management
 
PMBOK® Guide 5th edition Processes Flow in English - Simplified Version
PMBOK® Guide 5th edition Processes Flow in English - Simplified VersionPMBOK® Guide 5th edition Processes Flow in English - Simplified Version
PMBOK® Guide 5th edition Processes Flow in English - Simplified Version
 
Mg6088 spm unit-5
Mg6088 spm unit-5Mg6088 spm unit-5
Mg6088 spm unit-5
 
Spm unit 3
Spm unit 3Spm unit 3
Spm unit 3
 
Project Scope Management -
Project Scope Management - Project Scope Management -
Project Scope Management -
 
PMBOK-5th ed: PMP- Flashcards Part1/5
PMBOK-5th ed: PMP- Flashcards Part1/5PMBOK-5th ed: PMP- Flashcards Part1/5
PMBOK-5th ed: PMP- Flashcards Part1/5
 
Project charter and plan document for millennium upgrade
Project charter and plan document for millennium upgradeProject charter and plan document for millennium upgrade
Project charter and plan document for millennium upgrade
 
PMP Preparation - 03 Framework
PMP Preparation - 03 FrameworkPMP Preparation - 03 Framework
PMP Preparation - 03 Framework
 
Project Scope Statement
Project Scope StatementProject Scope Statement
Project Scope Statement
 
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
 
Scope management
Scope managementScope management
Scope management
 
PM Flashcards
PM FlashcardsPM Flashcards
PM Flashcards
 
Software Project Management
Software Project ManagementSoftware Project Management
Software Project Management
 
PMP Training, Chapter 1-2-3- framework
PMP Training, Chapter 1-2-3- framework PMP Training, Chapter 1-2-3- framework
PMP Training, Chapter 1-2-3- framework
 
Project management: defining the project
Project management: defining the projectProject management: defining the project
Project management: defining the project
 

Viewers also liked

earned schedule v5
earned schedule v5earned schedule v5
earned schedule v5
Elearning-UTN
 
Cómo Java afecta nuestros Diseños
Cómo Java afecta nuestros DiseñosCómo Java afecta nuestros Diseños
Cómo Java afecta nuestros Diseños
Hernan Wilkinson
 
Introducción a la Gestión de Proyectos
Introducción a la Gestión de ProyectosIntroducción a la Gestión de Proyectos
Introducción a la Gestión de Proyectos
David de Francisco Marcos
 
Project management - Predimensionado de Costes de Proyecto
Project management - Predimensionado de Costes de ProyectoProject management - Predimensionado de Costes de Proyecto
Project management - Predimensionado de Costes de Proyecto
Ruben Navarro Sanchez
 
Yessica [autoguardado]
Yessica [autoguardado]Yessica [autoguardado]
Yessica [autoguardado]
Yessica Moreno Vargas
 
Project management bootcamp method for pmp & capm - 21 octubre 2013
Project management bootcamp   method for pmp & capm - 21 octubre 2013Project management bootcamp   method for pmp & capm - 21 octubre 2013
Project management bootcamp method for pmp & capm - 21 octubre 2013
Dagoberto Chacon
 
Introducción a Earned Value Magement
Introducción a Earned Value MagementIntroducción a Earned Value Magement
Introducción a Earned Value Magement
David de Francisco Marcos
 
F costos 2012 - 02
F costos 2012 - 02F costos 2012 - 02
F costos 2012 - 02
dochoaq_1981
 
Gestion del tiempo proyecto parte i
Gestion del tiempo proyecto   parte iGestion del tiempo proyecto   parte i
Gestion del tiempo proyecto parte i
dochoaq_1981
 
Gestion del costo parte ii
Gestion del costo   parte iiGestion del costo   parte ii
Gestion del costo parte ii
dochoaq_1981
 
Gestion del costo parte i
Gestion del costo   parte iGestion del costo   parte i
Gestion del costo parte i
dochoaq_1981
 
Gestion de proyectos
Gestion de proyectosGestion de proyectos
Gestion de proyectos
Aitor Bediaga
 
Cap 6 costos
Cap 6   costosCap 6   costos
Cap 6 costos
Jorge Villa
 
Gestión de riesgos en proyectos
Gestión de riesgos en proyectosGestión de riesgos en proyectos
Gestión de riesgos en proyectos
Guillermo Montero Fdez-Vivancos
 
Cost management
Cost managementCost management
Cost management
shkadry
 
PMP Chap 7 - Project Cost Management - Part 2
PMP Chap 7 - Project Cost Management - Part 2PMP Chap 7 - Project Cost Management - Part 2
PMP Chap 7 - Project Cost Management - Part 2
Anand Bobade
 
Cost management
Cost managementCost management
Cost management
Abhi Kalyan
 
Project cost management PMBOK 5th Edition
Project cost management PMBOK 5th EditionProject cost management PMBOK 5th Edition
Project cost management PMBOK 5th Edition
pankajsh10
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
mohamed elashri
 
PMP Chap 7 - Project Cost Management - Part 1
PMP Chap 7 - Project Cost Management - Part 1PMP Chap 7 - Project Cost Management - Part 1
PMP Chap 7 - Project Cost Management - Part 1
Anand Bobade
 

Viewers also liked (20)

earned schedule v5
earned schedule v5earned schedule v5
earned schedule v5
 
Cómo Java afecta nuestros Diseños
Cómo Java afecta nuestros DiseñosCómo Java afecta nuestros Diseños
Cómo Java afecta nuestros Diseños
 
Introducción a la Gestión de Proyectos
Introducción a la Gestión de ProyectosIntroducción a la Gestión de Proyectos
Introducción a la Gestión de Proyectos
 
Project management - Predimensionado de Costes de Proyecto
Project management - Predimensionado de Costes de ProyectoProject management - Predimensionado de Costes de Proyecto
Project management - Predimensionado de Costes de Proyecto
 
Yessica [autoguardado]
Yessica [autoguardado]Yessica [autoguardado]
Yessica [autoguardado]
 
Project management bootcamp method for pmp & capm - 21 octubre 2013
Project management bootcamp   method for pmp & capm - 21 octubre 2013Project management bootcamp   method for pmp & capm - 21 octubre 2013
Project management bootcamp method for pmp & capm - 21 octubre 2013
 
Introducción a Earned Value Magement
Introducción a Earned Value MagementIntroducción a Earned Value Magement
Introducción a Earned Value Magement
 
F costos 2012 - 02
F costos 2012 - 02F costos 2012 - 02
F costos 2012 - 02
 
Gestion del tiempo proyecto parte i
Gestion del tiempo proyecto   parte iGestion del tiempo proyecto   parte i
Gestion del tiempo proyecto parte i
 
Gestion del costo parte ii
Gestion del costo   parte iiGestion del costo   parte ii
Gestion del costo parte ii
 
Gestion del costo parte i
Gestion del costo   parte iGestion del costo   parte i
Gestion del costo parte i
 
Gestion de proyectos
Gestion de proyectosGestion de proyectos
Gestion de proyectos
 
Cap 6 costos
Cap 6   costosCap 6   costos
Cap 6 costos
 
Gestión de riesgos en proyectos
Gestión de riesgos en proyectosGestión de riesgos en proyectos
Gestión de riesgos en proyectos
 
Cost management
Cost managementCost management
Cost management
 
PMP Chap 7 - Project Cost Management - Part 2
PMP Chap 7 - Project Cost Management - Part 2PMP Chap 7 - Project Cost Management - Part 2
PMP Chap 7 - Project Cost Management - Part 2
 
Cost management
Cost managementCost management
Cost management
 
Project cost management PMBOK 5th Edition
Project cost management PMBOK 5th EditionProject cost management PMBOK 5th Edition
Project cost management PMBOK 5th Edition
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
PMP Chap 7 - Project Cost Management - Part 1
PMP Chap 7 - Project Cost Management - Part 1PMP Chap 7 - Project Cost Management - Part 1
PMP Chap 7 - Project Cost Management - Part 1
 

Similar to 05.scope management updated

04.integration management updated
04.integration management updated04.integration management updated
04.integration management updated
Shraddha PMP
 
MOM on BA
MOM on BAMOM on BA
Pmp scope chapter 5
Pmp scope chapter 5Pmp scope chapter 5
Pmp scope chapter 5
Ahmed Elshaboury,PMP,LEED GA
 
Project Management (2).pdf
Project Management (2).pdfProject Management (2).pdf
Project Management (2).pdf
ShivareddyGangam
 
PMP PMBok 5th ch 5 scope management
PMP PMBok 5th ch 5 scope managementPMP PMBok 5th ch 5 scope management
PMP PMBok 5th ch 5 scope management
Abdullah Ahmed, PMP, RMP
 
1 2. project management
1 2. project management1 2. project management
1 2. project management
akashsaini8
 
4 integration
4 integration4 integration
4 integration
Waseem Siddique
 
Project scope management 1
Project scope management 1Project scope management 1
Project scope management 1
Mohammad Ashraf Khan, PMP
 
2.05 scope management 1
2.05 scope management 12.05 scope management 1
2.05 scope management 1
reddvise
 
projectscopemanagement1-140220062122-phpapp01 (1).pdf
projectscopemanagement1-140220062122-phpapp01 (1).pdfprojectscopemanagement1-140220062122-phpapp01 (1).pdf
projectscopemanagement1-140220062122-phpapp01 (1).pdf
AbdiqadirOsman
 
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docxVoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
jessiehampson
 
Presentation - Scope and Schedule Management of Business Analytics Project
Presentation - Scope and Schedule Management of Business Analytics ProjectPresentation - Scope and Schedule Management of Business Analytics Project
Presentation - Scope and Schedule Management of Business Analytics Project
Sharad Srivastava
 
223417 Diploma_Sem4_software_engg-chap-05.ppt
223417 Diploma_Sem4_software_engg-chap-05.ppt223417 Diploma_Sem4_software_engg-chap-05.ppt
223417 Diploma_Sem4_software_engg-chap-05.ppt
Deepgaichor1
 
2. project scope management
2. project scope management2. project scope management
2. project scope management
Mohamed Salah Eldien Mohamed Ali
 
Project Management.pdf
Project Management.pdfProject Management.pdf
Project Management.pdf
ShivareddyGangam
 
Session 2 gdas pmp study group presentation
Session 2   gdas pmp study group presentationSession 2   gdas pmp study group presentation
Session 2 gdas pmp study group presentation
Tu Nguyen, PMP®,PMI-RMP®
 
Project Scope Management Chapter 05.pptx
Project Scope Management Chapter 05.pptxProject Scope Management Chapter 05.pptx
Project Scope Management Chapter 05.pptx
KareemBullard1
 
6. mba 206 project management assignment 2nd semester
6. mba 206 project management assignment 2nd semester6. mba 206 project management assignment 2nd semester
6. mba 206 project management assignment 2nd semester
GIEDEEAM SOLAR and Gajanana Publications, LIC
 
RajeevGautam_PeopleSoft Technology Lead_Infosys
RajeevGautam_PeopleSoft Technology Lead_InfosysRajeevGautam_PeopleSoft Technology Lead_Infosys
RajeevGautam_PeopleSoft Technology Lead_Infosys
Rajeev Gautam
 
5 scope
5 scope5 scope

Similar to 05.scope management updated (20)

04.integration management updated
04.integration management updated04.integration management updated
04.integration management updated
 
MOM on BA
MOM on BAMOM on BA
MOM on BA
 
Pmp scope chapter 5
Pmp scope chapter 5Pmp scope chapter 5
Pmp scope chapter 5
 
Project Management (2).pdf
Project Management (2).pdfProject Management (2).pdf
Project Management (2).pdf
 
PMP PMBok 5th ch 5 scope management
PMP PMBok 5th ch 5 scope managementPMP PMBok 5th ch 5 scope management
PMP PMBok 5th ch 5 scope management
 
1 2. project management
1 2. project management1 2. project management
1 2. project management
 
4 integration
4 integration4 integration
4 integration
 
Project scope management 1
Project scope management 1Project scope management 1
Project scope management 1
 
2.05 scope management 1
2.05 scope management 12.05 scope management 1
2.05 scope management 1
 
projectscopemanagement1-140220062122-phpapp01 (1).pdf
projectscopemanagement1-140220062122-phpapp01 (1).pdfprojectscopemanagement1-140220062122-phpapp01 (1).pdf
projectscopemanagement1-140220062122-phpapp01 (1).pdf
 
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docxVoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
 
Presentation - Scope and Schedule Management of Business Analytics Project
Presentation - Scope and Schedule Management of Business Analytics ProjectPresentation - Scope and Schedule Management of Business Analytics Project
Presentation - Scope and Schedule Management of Business Analytics Project
 
223417 Diploma_Sem4_software_engg-chap-05.ppt
223417 Diploma_Sem4_software_engg-chap-05.ppt223417 Diploma_Sem4_software_engg-chap-05.ppt
223417 Diploma_Sem4_software_engg-chap-05.ppt
 
2. project scope management
2. project scope management2. project scope management
2. project scope management
 
Project Management.pdf
Project Management.pdfProject Management.pdf
Project Management.pdf
 
Session 2 gdas pmp study group presentation
Session 2   gdas pmp study group presentationSession 2   gdas pmp study group presentation
Session 2 gdas pmp study group presentation
 
Project Scope Management Chapter 05.pptx
Project Scope Management Chapter 05.pptxProject Scope Management Chapter 05.pptx
Project Scope Management Chapter 05.pptx
 
6. mba 206 project management assignment 2nd semester
6. mba 206 project management assignment 2nd semester6. mba 206 project management assignment 2nd semester
6. mba 206 project management assignment 2nd semester
 
RajeevGautam_PeopleSoft Technology Lead_Infosys
RajeevGautam_PeopleSoft Technology Lead_InfosysRajeevGautam_PeopleSoft Technology Lead_Infosys
RajeevGautam_PeopleSoft Technology Lead_Infosys
 
5 scope
5 scope5 scope
5 scope
 

Recently uploaded

BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
Nguyen Thanh Tu Collection
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
TechSoup
 
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
GeorgeMilliken2
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
Nicholas Montgomery
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Fajar Baskoro
 
South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)
Academy of Science of South Africa
 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
iammrhaywood
 
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdfANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
Priyankaranawat4
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
Leveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit InnovationLeveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit Innovation
TechSoup
 
PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.
Dr. Shivangi Singh Parihar
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
RAHUL
 
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
National Information Standards Organization (NISO)
 
Cognitive Development Adolescence Psychology
Cognitive Development Adolescence PsychologyCognitive Development Adolescence Psychology
Cognitive Development Adolescence Psychology
paigestewart1632
 
clinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdfclinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdf
Priyankaranawat4
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
Nguyen Thanh Tu Collection
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
Nicholas Montgomery
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
Jyoti Chand
 
Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
amberjdewit93
 
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptxBeyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
EduSkills OECD
 

Recently uploaded (20)

BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
 
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
 
South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)
 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
 
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdfANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
 
Leveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit InnovationLeveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit Innovation
 
PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
 
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
 
Cognitive Development Adolescence Psychology
Cognitive Development Adolescence PsychologyCognitive Development Adolescence Psychology
Cognitive Development Adolescence Psychology
 
clinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdfclinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdf
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
 
Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
 
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptxBeyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
 

05.scope management updated

  • 1. It is based on PMBOK 5. Please note that these are my personal notes and created using several books, online forums, already created notes by others. If you have any suggestions please feel free to drop an email to shraddha.pmp@gmail.com. There is no liability assumed for damages resulting from the use of information. Scope Management 5.1 Plan Scope Management: The process of creating scope management plan that documents how project scope will be defined, validated and controlled # Requirement: Condition or capability that is required to be present in product, service or result to satisfy a contract or other formally imposed specification #Scope: The sum of the product, services and results to be provided as a project. #Product scope: Features and function that characterize product, service, result. #Project Scope: The work performed to deliver a product, service, result with specified features and functions. Output #Requirement Management Plan – A component of project management plan that describes how requirements should be analyzed documented and managed. E.g. how to build traceability matrix etc. # Scope Management Plan – what work will you do to define scope and control it? Scope management plan is one of the subsidiary plans of Project management plan which is an input to the Control scope process. Scope management plan have the information about specific procedures for defining the scope, breaking down the work, verifying the deliverables, and managing scope changes. PLANNING 1. Project Management Plan 1. Expert Judgment 1. Scope Management Plan 2. Project Charter 3. EEF 4.OPA 2. Meetings 2. Requirements Management Plan
  • 2. It is based on PMBOK 5. Please note that these are my personal notes and created using several books, online forums, already created notes by others. If you have any suggestions please feel free to drop an email to shraddha.pmp@gmail.com. There is no liability assumed for damages resulting from the use of information. 5.2 Collect Requirements: The process of defining and documenting stakeholders' needs to meet the project objectives. # TT1 Interviews: Project Manager or Business Analyst will do the Interviews with Subject matter expert and it is One-to-one meeting # TT2 Focus Groups: (Brings together prequalified stakeholders and subject matter experts with trained Moderator) # TT3 Facilitated Workshops: Defining cross-functional requirements and reconciling stakeholder differences Joint Application Development (JAD for SW Industry) and Quality Function Deployment (QFD for Production Industry). # TT4 Group Creativity Techniques: 1. Brainstorming 2. Nominal Group Technique: where brainstormed ideas are voted upon and sorted by priority 3. Delphi Technique (anonymous responses) 4. Idea and Mind Mapping (Ideas created through individual brainstorming are consolidated into a single map) 5. Affinity Diagram: large numbers of ideas to be sorted into groups 6. Multi Criteria Decision Analysis: Stakeholder quantifies requirements using decision matrix based on factors such as expected risk levels. # TT5 Group Decision making techniques: • Unanimity: everyone agrees on single course of action • Majority: support from more than 50% of the members of the group • Plurality: the largest block in a group decides even if a majority is not achieved • Dictatorship: one individual makes the decision for the group. # TT8 Prototyping: Obtaining early feedback on requirements by providing a working model #TT9 Benchmarking: Measuring organization performance against that of other organizations in same industry. #TT10 Context Diagrams: context level data flow diagram - Context Diagrams is the visual depiction of the product scope showing a business system, and how people and other systems (actors) interact with it and is used for requirements collection. #TT11 Document Analysis: elicit requirement by analyzing existing requirements Output 1. Requirement Documentation - i) Business Requirements ii) Stakeholder Requirements iii) Solution Requirement (Functional, Non-functional, quality, Technology, and Compliance) iv) Project Requirement (Acceptance criteria) v) Transition Requirement vi) Requirement assumptions, dependency, assumptions etc. Output 2. Requirements Traceability Matrix – a grid that links requirements to its origin to the deliverables PLANNING 1. Scope Management Plan 1. Interviews 1. Requirements Documentation 2. Requirement Management Plan 2. Focus Groups (WHAT needs to be performed and WHY each requirement is important on the project)3. Stakeholder Management Plan (strategy) 3. Facilitated Workshops 4. Project Charter 4. Group Creativity Techniques 5. Stakeholder Register (people) 5. Group Decision Making Techniques 6. Questionnaires and Surveys 2. Requirements Traceability Matrix (Requirements and its source, WHO OWNS and the Status). Matrix depicts as Requirements (Rows) against Deliverables (Columns). 7. Observations ('Job Shadowing' by Observer) 8. Prototypes (providing a working model) 9. Benchmarking 10.Context Diagrams 11. Document Analysis
  • 3. It is based on PMBOK 5. Please note that these are my personal notes and created using several books, online forums, already created notes by others. If you have any suggestions please feel free to drop an email to shraddha.pmp@gmail.com. There is no liability assumed for damages resulting from the use of information. 5.3 Define Scope: The process of developing a detailed description of the Project and Product. Process describes the project; service or result boundaries by defining which requirements will be included in and excluded from the project scope. Project Scope statement includes: 1. Product scope description and Project goals 2. Acceptance criteria 3. Deliverables 4. Project exclusions 5. Constraints 6. Assumptions TT2: Product Analysis includes * Product Breakdown * Systems Analysis * Requirements Analysis * Systems Engineering * Value Engineering / Value Analysis (performing the same work at lesser cost).PMI advocates Project Objectives that follow the SMART guideline. S - Specific; M - Measurable; A - Assignable; R - Realistic; T - Timely. # Difference in Charter and PSS pg 124 PMBOK PLANNING 1. Scope Management Plan 1. Expert Judgement 1. Project Scope Statement (PSS) 2. Project Charter 2. Product Analysis 2. Project Document Updates 3. Requirement Documentation 3. Alternative generation 3. Stakeholder Register, 4.OPA 4. Facilitated Workshop 4. Req.Traceability Matrix 5.4 Create WBS: The process of subdividing project deliverables and project work into smaller, more manageable components. After creation; it becomes a HUB OF INFORMATION for the project. It is a primary tool for verifying and controlling the project's scope. Every level in WBS is the detailed explanation of the level above it. WBS is a graphical, hierarchical chart, logically organized from top to bottom. #Work Package - The planned work contained within the lowest level of WBS component # Control Account (Management Control Points): Where the integration of scope, schedule, and cost take place and where performance is measured. # Planning packages (Set of work) are between Control Accounts and Work Packages. WBS component within a control account that is identified and budgeted in early planning but it is not yet subdivided into work package # Code of account is used to name the WBS (Unique Identification) – any numbering system used to uniquely identify each component. Hooking WBS into your company’s accounting system # WBS isn’t time based # WBS does form the Scope Baseline # WBS is a communication tool # Created by the entire Project Team #The WBS is focused on deliverables, whereas activity definition is focused on the tasks to create those deliverables. WBS Dictionary might include 1. Number of the node 2. Name of the node 3. The written requirements for the node 4. To whom it is assigned 5. Time (Date Assigned and Date Due) 6. Cost and 7. Accounting information. Advantages: 1. EV Calculation take place 2. It is the building block of Performance Measurement 3. The sum of the control accounts will add up to the total project value . Control Account may include one or more Work Packages; each Work Package represents only one Control Account. PLANNING 1. Scope Management Plan 1. Decomposition 1. Scope Baseline 2. Project Scope Statement 2. Expert Judgement 2. Project Document Updates 3. Requirements Documentation 3. EEF 4. OPA
  • 4. It is based on PMBOK 5. Please note that these are my personal notes and created using several books, online forums, already created notes by others. If you have any suggestions please feel free to drop an email to shraddha.pmp@gmail.com. There is no liability assumed for damages resulting from the use of information. 5.5 Validate Scope: The process of formalizing acceptance of the completed project deliverables. Formal process to verify and obtain stakeholder acceptance of the completed project scope and deliverables. Usually performed after Quality Control. # Validate Scope happens at the end of each phase and the project and upon delivery of Product/Service/Result. # Validate Scope is concerned with completeness and acceptance, and Quality Control is concerned with correctness. # Quality Control generally performed before Validate Scope # If the project is cancelled / terminated before completion, Validate Scope is performed to show where the Project was in relation to the Scope when it ended. # Validate Scope is all about comparing the Deliverables with the documented Scope to ensure that everything was completed. # Validate Scope is typically performed by the PM, the Sponsor, the Customer, and the Functional Managers, and the result is a formal, written acceptance by the appropriate stakeholders. # If we don't receive a final sign off from our customer; we have to escalate the issue to our Management. #TT1 - (It involves a point-by-point review of the Scope and the associated Deliverable). Examine the deliverables, Measure it, Inspect it, and Weigh it. Points to remember #It can be done at the end of each project phase in project life cycle and as a part of Monitoring and controlling process to get formal acceptance any deliverables that require approval in the middle of the phase or project. #Validate Scope Vs. Close Project – validate scope results in the formal acceptance of interim deliverables, close project is to get sign off from the customer for the project or phase as a whole #Validate Scope (customer checks and accepts the deliverables) Vs. Control Quality (the quality control department checks to see if the requirements specified for the deliverables are met and makes sure work is correct) M&C 1. Project Management Plan 1. Inspection 1. Change Requests 2. Requirements Documentation 2. Group-decision making Techniques 2. Work Performance Information 3. Requirements Traceability Matrix 3. Project Document Updates 4. Verified Deliverables 5. Work Performance Data Direct and Manage project work Deliverables Control Quality Verified Deliverables Validate Scope Accepted deliverables Close Project and Phase Final product and Services
  • 5. It is based on PMBOK 5. Please note that these are my personal notes and created using several books, online forums, already created notes by others. If you have any suggestions please feel free to drop an email to shraddha.pmp@gmail.com. There is no liability assumed for damages resulting from the use of information. 5.6 Control Scope: The process of monitoring the status of the project and product scope and managing changes to the scope baseline. Scope Creep will be eliminated. Proactive process. PM to measure work completed (Work Performance Data) against scope baseline to analyze any variance (Scope Management plan and Requirement Management plan will tell how such analysis to be done). If necessary you would submit CR to Perform Integrated Change Control M&C 1. Project Management Plan (Scope Baseline) 1. Variance analysis 1. Change Requests 2. Work Performance Data VA can be used to measure differences between what was defined in the Scope Baseline & what was created. It is useful in this process as a way to investigate and understand the root causes behind these differences. 2. Project Management Plan Updates 3. Requirements Documentation 3. Project Document Updates 4. Requirements Traceability Matrix 4. Organizational Process Assets Updates 5. Organizational Process Assets