1. CURRICULUM VITAE
ERDELJANAC ZORAN
Personal data:
Family name: Erdeljanac
First name: Zoran
Date of birth: July 26, 1965
Sex: Male
Marital status: Married, one child
Address: Pancevo, Serbia
Cell phone number: +381 631968152
Driver’s license: B and C
E-mail: zoranerdeljanac@yahoo.com
Qualifications: Mechanical engineer for production mechanical engineering
Civil engineering technician
Availability: By agreement
Type of job: Contract or long term
Carrier Objectives:
Interested in position of WELDING TECHNOLOGIST or OPERATING/PIPING
MECHANICAL ENGINEER/ technician , as well as workshop section engineer.
Education:
2015 International welding technologist (IWT). Certificate issued by
Welding institute, Belgrade (Member of IIW)
2011 Training in the field of implementation of management system
SRPS ISO 9001: 2008. The certificate was issued by Q-EXPERT Co,
Belgrade, Serbia
1996 College of Mechanical engineering Zemun, Serbia
Qualification: Mechanical engineer for production mechanical
engineering.
1982–1984 Secondary civil engineering school, Pancevo, Serbia
Qualification: Civil engineering technician / majoring in carpentry.
Page 1 of 8
2. Professional Experience:
• Ability to plan, organize, monitor and if necessary take corrective action on project;
• Practical knowledge from the sites and be able to work from drawings;
• Familiar with International Design Codes, such as EN, ASME, ANSI, API;
• Familiar in preparing piping work specifications;
• Responsible for piping erection operations and pipe support installation in accordance
with schedule, procedures, specifications, priorities and availability of construction
drawings;
• Responsible for carrying out of mechanical clearance, conducting hydro/pneumatic
tests, fulfilling pre-commissioning requirements for the project;
• Coordinating with engineering and construction teams and liaise with the client on
detail engineering requirements;
• Monitoring the daily work activities and updating all progress reports;
• Preparation of “On Site” and “As Built” drawings;
• Always following strict safety procedures;
• Experience in work under extreme weather and ambient conditions (Desert of Sahara);
• Proven skills on isometric drawings, P&ID, piping & vessels, such as steel structures,
oil separators, desalters, crude oil and water tanks;
• Ability to take all necessary precautions to prevent damage during installation of
piping, vessels, equipment, etc;
• Proficient in making out various working procedures as follow:
- Safety Procedure,
- Painting Procedure,
- Cold Applied Plastic Tape Coating Procedure,
- Piping Installation Procedure,
- Welding Procedure Specification,
- Excavation Procedure,
- Crane Lifting Procedure (for a mobile crane up to 200t lifting capacity),
- Vessel Internal Cleaning Procedure
• Good knowledge of standard software packages (MS Word, EXCEL), AutoCAD;
• Good communication with knowledge of English language.
Page 2 of 8
3. Work Experience:
• PESSING Libya Co, for engineering, construction & maintenance, Belgrade, Serbia
Branch Offices in Libya, Tripoli/Benghazi
⃰ From September 2008 to March 2009:
Construction Site: Bomba Desalination Plant, Khalish Bomba, Libya
Project Title: Repair of Boilers A, B and C and replacement of Insulation and
Valves on Dearators and Feed Water Tanks at the Plant
Position: Site Manager
Job Description:
-Removal of the corrugated sheets, refractory mass and thermo wool from all
the boiler walls,
-Removal of all CS boilers’ walls and its replacement with new ones for high
temperature service,
- Replacement of damaged gas duct from the economizer area,
- Repair and put in operation the soot blowers,
For Dearators and Feed Water Tanks (Flow rate: 180 m3/hr, P = 3 bars):
- Removal of old insulation from the dearators and feed water tanks,
- Replacement of valves from the condensate return lines, make-up water inlet
lines, feed pumps suction lines,…
Duties:
- Ensuring Project and programs to be executed using agreed standards and process,
- Responsible for necessary material supplying,
- Obtain all permits and licenses,
- Directing and supervising the workers,
- Writing detailed and summarized project progress reports,
- Producing monthly progress reports.
⃰ From September 2008 to March 2009:
Construction Sites: Bomba Desalination Plant, Tobruk Oil Plant, Darnah Steam
Power Station (all in Libya)
Projects Title: At Bomba Plant: In-situ overhaul of the feed water pumps
(Q = 88 m³/hr, H = 30 m, P = 16.5 kW)
Page 3 of 8
4. Projects Title: At Tobruk Plant: In-situ overhaul of mixed flow pump (HA800/73-11)
(Q = 5873 m³/hr, H = 30 m, P = 576 kW)
At Darnah Plant: In-situ overhaul of the cooling water pump
(Q = 6250 m³/hr, H = 15.9 m, P = 576 kW)
Position: Site Manager
Duties:
- Ordering/supplying the spare parts when necessary for the overhauls, especially
for modification of the pump lubrication system,
- Responsible for accommodation of the workers and for the camp,
- Compiling all documents relevant to the jobs: schedule charts, overhead,
financial reports, certificates of proof, etc,
- Responsible for an acceptance of finished job.
⃰ From March 2008 to March 2011:
Construction Site: Messla Oil Field, GC-9 Area, Libya
Project Title: Replacement of the roof and PUR insulation for two oil tanks
Position: Site Manager
Job Description:
- Complete replacement of tanks roof plates,
- Complete replacement of PUR rigid insulation over the tanks external surfaces,
- Replacement of the tanks drain lines 4 in.
- Repair the tanks fuel gas outlet line 16 in.
- Re-installation of the tanks internal facilities/piping
Duties:
- Responsible for supplying material and importation to the site, assembly and
installation of the pipe lines and in-line equipment as well as the others,
- Responsible for accommodation of the workers and camp located at Sarir area,
- Compiling of all documents and drawings related to the project.
⃰ From March 2008 to March 2011:
Construction Site: Messla Oil Field, GC-9 Area, Libya
Project Title: Refurbishment of the potable, raw and fire water tanks
Position: Site Manager
Page 4 of 8
5. Job Description:
- Complete replacement of the tanks bottom plates,
- Complete replacement of the tanks concrete ring beam wall /foundation.
Duties:
- Compiling of necessary work procedures (welding, concrete work
and the others),
- Responsible for supplying material and importation to the site,
- Compiling of all documents and drawings related to the project,
- Responsible for accommodation of the workers and camp located at Sarir area.
⃰ From March 2008 to March 2011:
Construction Site: Messla Oil Field, GC-9 Area, Libya
Project Title: Repair of two water heaters
Position: Site Manager
Job Description:
- Replacement of refractory cement lining inside the heaters,
- Replacement of ceramic fiber insulation layers inside the upper
convection casing and stack branching section of the heaters.
⃰ From March 2008 to March 2011:
Construction Site: Az Zawiah Desalting Plant, Libya
Project Title: Construction and connection of 8 in. natural gas line to
the pressure control station at Az Zawiah Desalting Plant
Position: Site Manager
Job Description:
- Construction of 180 m underground seamless pipeline 8in. Sch.40,
- Construction of 120 m above-ground seamless pipeline 8in. Sch.40,
- Excavation of the piping trenches,
- Concreting the foundation of the gas pressure control station,
- Placing an order for the pressure control station, capacity 35396 Nm³/hr, and
its installation.
Page 5 of 8
6. ⃰ From December 2012 to June 2014:
Construction Sites: Nafoora Oil Field, GOSP 4 and 5 Area , Libya
Project Title: Replacement 3-phase production oil separators (4 pcs.)
Position: Site Manager
Job Description:
- Removal of existing separators, together with its piping and concrete
foundations,
- Fabrication of the new pipelines for connection of the new separators to
existing plant facility/piping headers,
- Placing the new separators on its concrete foundation preliminary made up,
and assembly the pipelines.
• SKELE-LOGISTIK, Limited liability co, Pancevo, Serbia
⃰ From March 2011 to December 2012:
Construction Sites: Oil Rafinery Pancevo, Pancevo & Thermal Power Plant
“Nikola Tesla – B”, Obrenovac, all in Serbia
Projects Title: Building the new oil refinery in Pancevo & Main overhaul of
the electrostatic precipitator in Thermal Power Plant “Nikola
Tesla B” in Obrenovac, Serbia
Position: Site Manager
Job Description:
- Assembly of scaffolding structures for the needs of the projects, according to work
orders by investors.
• HIP – Development & Engineering Company UNL ID for engineering, scientific,
research & development, Pancevo, Serbia
⃰ From March 2008 to September 2008:
Construction Sites: Ras Lanuf Oil & Gas Plant , Libya
Project Title: Refurbishment of Boiler B at Utility area (170 t/hr)
Position: Coordinator and Site Manager
Job Description:
- Replacement of all the boiler piping,
- Replacement of all the boiler structural metal sheets/plates, bottom and partition
walls.
Page 6 of 8
7. • FEROMONT OPREMA, Shareholding company for designing, manufacture,
sales & installment of thermo, processing, thermo technical and industrial
equipment, Pancevo, Serbia
⃰ During 2007:
Position: Head of production
Job Description:
- Piece-production of thermo-processing and production equipment made-to-order,
such as heat exchangers, combustion chambers (with a furnace), various steel
industrial structures (with a machining), crude and light oil tanks, etc.
Duties:
- Responsible for compliance of the following before inception of the job :
Schedule chart with method of procedure, daily orders of work, material
requisition with shortage list;
- During carrying out the job:
Permanent monitoring the job execution with checking a dimensional accuracy
and clearance faults (if necessary), up to the shipping of the product ex work.
- Making all necessary reports during the work, including the overhead.
• PAN FERO, Limited liability co, Pancevo, Serbia
⃰ From 1992 to 2007:
Position: Owner and General Manager
As the owner and general manager of my own workshop and company, I realized
the following main jobs for the investors:
- Investor: NIS – Oil Rafinery Pancevo
Type of job: Fabrication and laying underground steel pipelines
- Investor: United Nations Office for Project Services (UNOPS),
Branch in Zemun
Type of job: Repair pipeline Ø600mm from Oil Rafinery Pancevo
to Petrohemija in Pancevo
- Investor: HIP – Azotara, Pancevo
Type of job: Fabrication and installing pipelines and steel structures
- Investor: PC Agency for city planning of Pancevo, Pancevo
Type of job: Various locksmith work as well as reconstruction of residential
Buildings and business facilities, such as Old Brewery in
Pancevo, grain tanks and storages for hay at agricultural farms,
covered pool in Pancevo, etc.
Page 7 of 8
8. • OBLIK, Trade construction-locksmith workshop, Pancevo, Serbia
⃰ From 1989 to1992:
Position: Owner
INTERESTS:
- 2002: Qualification for diver SCUBA acknowledged by PADI
organization
- 1976 – 1986: Competitive tennis player ( tennis trainer)
Zoran Erdeljanac
Page 8 of 8