Saked Tech engineering company LTD provides project engineering and management services. Ron Mandelbaum has over 30 years of experience supervising large infrastructure projects including landfills, recycling plants, and industrial facilities. Some of the major projects he has managed involve earthworks, concrete structures, waste processing equipment installation, and coordinating international teams.
1. Saked Tech engineering company LTD.
Manager : Ron Mandelbaum
Moshav Misgav Dov 240, zipcod 76867 - Israel
Cellular phone: +972.52.3929226
ronproj@gmail.com
Areas of activity:
1980-2013: Site management and Project Engineering
1. Construction planning and on-site team supervision:
• Large-scale earth moving works.
• Landfill Soil Sealing works.
• Drainage and channeling works
• Infrastructure, foundation, and concrete works
• Large-scale steel structures
• Structures, equipment, and machinery projects.
2. Project Coordination:
• Between project planning and execution teams.
• Management of Surveyors
• Foreign and local planners & engineers of Israel based projects
• Coordination of electricity and control planning (PCIM).
• Preparation of timetables – MS PROJECT
3. Project Operations and Implementation:
• Implementation of water piping systems, compressed air, gases, fuel, etc.
• Assembly of structures, sheet-metal walling and roofing.
• Assembly of rotary equipment and various machines
• Purchasing of equipment and contractor services
• Direction and operation of industrial facilities.
• Hot and cold run-up tests.
• Project Budgeting.
Review of selected project's Carried out:
Company: M.M.M. United Landfill Industries (1998) Ltd.
Joint partnership: Taavura, Tovala, and Veolia companies
Project: National Solid Waste Landfill
Location: Dudaim, Beer Sheba, Israel
Project value: US$ 40,000,000
Position: Site management and project Engineering
• Coordination between foreign & Israeli planners, and on-site contractors.
• Excavation of 5,000,000 cubic meters
• Operation of soil sealing and drainage works
• Installation of landfill gas collection and treatment infrastructure
2. 2
• Assembly of pipes, pumps, valves, and tanks
• Planning and construction of administrative building
• Equipment purchasing and various construction services
• Run-up tests, employee training, and operation of the landfill facility
Company: K.M.M Recycling Plants
Project: MSW Recycling Facility
Location: Rishon Lezion, Israel
Project value: US$ 2,000,000
Position: Site management and project Engineering
• Planning and construction of machinery layout, including: sorting conveyor,
crushing and compacting of waste paper and cardboard.
• Management of original facility relocation
• Planning and construction of concrete and steel structures
Company: Veolia group
Project: Transfer and Recycling Station
Location: West Rishon Lezion, Israel
Project value: US$ 4,000,000
Position: Site management and project Engineering
• Consultant and coordinator of facility layout
• Planning coordination: machines, concrete and steel structures, electricity and control
• Tenders Management
• On-site construction management of: earth moving and foundation works,
concrete structures, steel structures, and solid waste processing machines
• Construction of waste leachate collection and treatment systems
Contractor: Ta'avura Company
Project: Trans-Israel Highway, Road no. 6.
Project Value: US$ 50,000,000
Position: Site management and project Engineering
• Quarrying and excavation: 5 million tons, planning work methods (inc. blasts)
• Management of work teams operating heavy earth moving machinery D-10, CAT
992, CAT 988, and 60-ton heavy haulage trucks.
• Operation of stone crushing system: 3 million ton capacity.
• Timetable planning and management
• Management of surveying, marking, and quantity calculation teams
• Coordination with the supervision staff of the franchisee, Derech Eretz Company,
the Israel Nature Reserve Authority, and the Israel Antiquities Authority
• Handling of claims, work diaries, and invoicing
3. 3
Company: Ramle Nesher
Project: Cement Dry Process, Line 1
Location: Ramle
Project value: US$ 80,000,000
Position: Site management
Construction Supervisor of the following structures:
• Preheater – steel structure, cyclones, refractory lining
• Transfer area – air ducts, pipes, support structures
• Electro filter – steel structure and internal systems
• Raw material mill – steel structure, mill, piping, cyclones, and air ducts
• Stacker / reclaimer – steel work construction
• 120m high steel structures with a total weight of about 15,000 tons
Company: Ashkelon Polymers
Project: Plant construction
Location: Ashkelon
Project Value: US$ 8,000,000
Position: Site management and project Engineering
Management and construction of a 7,500 m² plant
The "Turn-key" project included:
• Preparation of Sub-base and drainage system on a 12,000 m² area
• Coordination between production systems and structure planning
• Construction of a 7,500 m² steel structures with metal sheet walling and roofing
• Planning and supervision of the erection of tanks, piping, and pump systems
• Coordination electricity and control works
• Equipment assembly direction and supervision
• run-up tests and plant operation
Company: The National Coal Supply Company
Project: Coal-terminal construction and operation
Location: Ashdod terminal
Project Value: US$ 40,000,000
Position: Project engineering and operation management
• Construction supervision of steel structures (5000 tons), conveyor belts (2500 m),
and two stacker / reclaimer units (600 tons each)
• Terminal operation included:
- Recruiting and training of employees
- Routine operation and coordination between Israel Railways, Ashdod Port,
and Israel Electric Corporation
- Maintenance management
- Material Handling, storage and shipment (2 million tons of coal/ year)