This CV summarizes the professional experience of Muhammed Nour Othman Al Mahmoud, a Syrian national and senior surveyor currently working in the UAE. It outlines his education in surveying from Albaath University in Syria, as well as his work history including current and previous roles as a senior surveyor for construction companies in the UAE and Syria. Key responsibilities involved daily surveying reports, setting coordinates and ensuring accuracy of construction layout according to plans.
1. Curriculum Vitae
Name : Muhammed Nour Othman Al
Mahmoud
Mobile : UAE 00971553377091
Tel :
E-mail : m.nour1983@yahoo.com
PERSONAL INFORMATION
Date of Birth : 1 April 1983
Place of Birth : Syria – Homs
Nationality : Syrian
Gender : Male
Marital status : Married
EDUCATION RECORD
Study : institute civil surveying - Albaath University - Homs - Syria.
Specialty : Surveying
Degree : Good.
Date of Graduation : 2006
WORK EXPERIENCE
United Arab Emirates:
COMPANY: al turath al aseel contracting
Position : Senior Surveyor
YAER: from 3/2/2014 up to now
1- PROJECT NAME AND LOCATION: 114 national house at Alriq – suhillah
With Ministry Of public Works building Department – UAE- DUBAI
2- PROJECT NAME AND LOCATION:pj10082 PROJECT NAME AND
LOCATION: emirats petroleum , EMARAT CENTRAL WORKSHOP
PROPOSED REDEVELOPMENT AT AL QUSAIS.
1
2. 3- DUBAI MUNICIPALITY, PUBLIC HEALTH SERVICES DEPARTMENT AL
QOUZ ABATTOIR (PJ- 10063)
4- PROJECT NAME AND LOCATION: DUBAI MUNICIPALITY,
ADMIN.BUILDING + BOUNDARYWALL-JUMEIRA ARCHAEOLOGICAL SITE
5- PROJECT NAME AND LOCATION: DUBAI MUNICIPALITY, ANIMALS AND
BIRDS QUARANTINE (AL AWIR FIRST – DUBAI)
6- PROJECT NAME AND LOCATION: emirates transport , bus station AND
WORKSHOP IN HATTA
7- PROJECT NAME AND LOCATION: 11villas in jema dubai
Title: type-1 villa (GR+1) first floor framing and roof framing plan
With road work and infrastructure inside the project
Client :dubai municiplity
8- -32villas in old hatta Neighbour Hood Client: Dubai Municipality
Title: type-1 villa (GR+1) first floor framing and roof framing plan
With road work and infrastructure inside the project
Client :dubai municiplity
Main responsibilities
- Daly survey report to give consultant al the information abut surveyor work in the site.
- Coordinate with the Site Engineers for the priority of the project with regards to
implementation, changes of plans or deviations unusual activities or non-conformances
rectification work and Coordinate with the Consultant for the Inspection & Approval
-Monitoring, inspection, documentations and ensure quality of work is maintained in the
implementation of work as per plan and specifications
-Giving reference elevations for the embedded plates as per design and setting out of
coordinates, levels of GRE Pipe and Stainless Pipes with a great accuracy and marking the
wall elevation that will be used as a baseline for the carpenter / mason work
-Setting out / Stake out of all the coordinates project boundary & property lines alignments
and elevations for roads, swales, ditches and manholes, design elevations, structure
position, drains, center line and offset reference using the functions in Total Stations
-Set, Check line and grade of vertical structures using laser of electronic total stations.
-Computing the correct coordinates of the traverse using AutoCAD and TopSurv on board
-Getting the elevation of the ground that will be used for checking the elevation of the
building
-Setting the columns and wall alignment and after concreting, set again the column
coordinates and wall for checking using Total Station
COMPANY: S.MOKBEL&PARTNERR.UAE
2
3. Position : land Surveyor
YEAR: from 10/10/2012 up to 2/2/4014
PROJECT NAME AND LOCATION: DEVELOPMENT OF PLOT#C38
Sector e-40 danet, ,Abu dhabi
PROJECT DESCRIPTION:
3B+ G+ M+ 21 TYPICAL FLOORS+ ROOF+ health clap
All the surveyor work in the tour from b1 up to last floor
Company : ACTCO General Contracting Co.
Position : shif Surveyor
Year : from February 7, 2008 up to 28 /9/2012
(1) Project : Jebel Ali Power and Desalination Station “M” - DUBAI
Consultant : Fichtner Consulting Engineers
Main Contractor : Doosan Heavy Industrial Construction Co.
Owner : Dubai Electricity & Water Authority
Responsibilities include:
Surveyor and building constructor for Civil works in all project which includes the
following:
• Local Electrical Building.
• Transformer and fire walls.
• Industrial tanks and it’s band walls
• Pipe rack foundation in all the project and it’s pedestal
• Local Electrical Building for D.F.O Forwarding Station.
• D.F.O Forwarding Station & Common Station.
• Waste Water Treatment Plant.
• Sewage Treatment Plant.
• Fire Fighting Foam Station.
• D.F.O Storage Tanks with Bund Walls
• Pipe Racks & Cable Trenches & Manhole & Electrical Duct Banks
• Transformer and fire walls.
• EDG (Emergency Diesel Generator).
• Fire Fighting Pipe Station
• Road works
• See water intaic (pump house)
• Out full
• Pipe line for gas
(2) project name : khalefa port in abu dhabi
Syria:
3
4. Company: ANBOBA FACTORIES
Position: Site surveyor
Year: From October 2006 to May 2007
Project: Oil Factories
Responsibilities include:
Site surveyor for works in the building which include the following works:
• All the concrete &structural works
• All the external and internal finishing works
ALBAATH UNIVERSITY
Topography surveyor to Homs City in Syria and Hama May2007 to Feb2008
Good computer skills, with knowledge of:AutoCAD , Word, Excel, Access, PowerPoint, E-
mail, Internet.
Total station (Leica ts02 ultra7- leica Ts09 - Topcon GTS-235N, sokkia set2x - nikon),
Level machine ( manual , laser )
LANGUAGES
• Arabic; (my mother tongue)
• English; very good (writing & reading & communication)
Valid UAE Driving License
4