SlideShare a Scribd company logo
1 of 9
CURRICULUM VITAE
Full name : Ibrahim A. A. Ebedallah
Nationality : Egyptian
Date of birth : 15 – 09 - 1960
Marital status : Married
Address in Egypt :3 Shabory Street, KobryElkoba -Cairo,
Rested Egypt : 202- 244990516
Address in Qatar : Doha – Alwakra -Ezdan 24.
Mobile Qatar : +974 -33039128
E-mail : ibmebed@yahoo.com
Qualifications : 1984 – B. Sc. Civil Engineering Zagazeg University, Egypt.
Registration : Registered by the Qatar Engineers &Consulting Offices
Accrediting Committee as Grade (A)
: Registered by the Egyptian Syndicate of Engineers.
Working Experience
I have more than 28 accumulative working years in infrastructure and superstructure.
I worked in contracting companies and in consultant offices.
I worked with local and international companies in Egypt, KSA and Qatar.
I am familiar with the international standards and codes covering QCS, ASTM, BS, and
Egyptian Codes.
October, 2014 - Recently: ITALCONSULT, Qatar Branch.
Position : Senior Utility Engineer.
Project : Improvement on C-Ring Road Junctions and Roundabouts IA13/14C036G.
Client : PWA (Public Work Authority) - Infrastructure Affairs.
Duties and Responsibilities
 Shop drawings review and approvals.
 Method statements review and approvals.
 Liaising with Client & Stakeholders and Contractors.
 HSE Management.
 Leading a team of site inspectors and land surveyors for supervising the construction of:
a. Surface water drainage system (Soakaways & Gullies).
b. TSE works including (construction of 400 mm main TSE line DI pipe with required valve
chamber).
c. Street lighting works including (Ducts –Cabling – Poles installation- high mast
installation - Feeder Pillars).
d. ITS & DSS works including (Ducts – Chambers).
e. Electrical works including (Ducts – Protection for the existing electrical cables).
f. Water works including (construction of 600 mm water line DI pipe with required air
valve chamber).
g. Traffic Signal works including (Ducts - Foundation – Chambers – Gantries – Poles –
Cabling – Feeder Pillar).
h. Protection works of existing Main water lines & SE lines and TSE lines including
Relocation / Adjusting works for the existing obstructing chambers.
i. Civil works for Q-Tel, including (Ducts – JRC Chambers).
January, 2014 – October, 2014: ITALCONSULT, Qatar Branch.
Position : Senior Utility Engineer.
Project : Extension of Highway 55 Temporary Truck Route – Section A &B.
Client : PWA (Public Work Authority) - Infrastructure Affairs.
Duties and Responsibilities
 Shop drawings review and approvals.
 Method statements review and approvals.
 Liaising with Client & Stakeholders and Contractors.
 HSE Management.
 Leading a team of site inspectors and land surveyors for supervising the construction of:
a. Protection works of existing Main water lines & SE lines and TSE lines including
Relocation / Adjusting works for the existing obstructing chambers.
b. Street lighting works including (Ducts –Cabling – Poles installation- Feeder Pillars).
c. ITS works including (Ducts –Cabling – Poles & Gantry installation - Feeder Pillars).
d. Civil works for Q-Tel, including (Ducts – JRC Chambers).
e. Electrical works including (Ducts – Relocation / Protection for the existing electrical
cables).
August, 2013 – Dec, 2013: TECHNITAL, Qatar Branch.
Position : Senior Utility Engineer.
Project : RA08 / 09 C 067 G - Development of roads in Bani Hajer – Zone 51.
Client : PWA (Public Work Authority) - Infrastructure Affairs.
Duties and Responsibilities
 Shop drawings review and approvals.
 Method statements review and approvals.
 Liaising with Client & Stakeholders and Contractors.
 HSE Management.
 Leading a team of site inspectors and land surveyors for supervising the construction of:
a. Main water lines work D.I. pipes (100mm - 200mm Dia.) including installations of Sluice
Valves & Fire hydrants and service water lines work.
b. Street lighting works including (Ducts –Cabling – Poles installation- Feeder Pillars).
c. Civil works for Q-Tel, including (Ducts – JRC Chambers).
d. Electrical works including (Laying Cables – Civil works of Electrical Substation -- Ducts
– Relocation / Protection for the existing electrical cables).
e. Traffic Signal works including (Ducts – Cabling – Chambers – Poles & Gantry
installations - Feeder Pillars).
Oct, 2010 – July 2013: ITALCONSULT, Qatar Branch.
Position : Senior Utility Engineer.
Project : RA09 / 10 C 081 G Development of roads in BLOCK 1300.
Client : PWA (Public Work Authority) - Infrastructure Affairs.
Duties and Responsibilities
 Review of tender/contract documents, drawings.
 Shop drawings review and approvals.
 Method statements review and approvals.
 Material submittals review and approvals.
 Liaising with Client, & Stakeholdersand Contractors.
 HSE Management.
 Leading a team of site inspectors and land surveyors for supervising the construction of:
a. Micro-tunneling foul sewer works main lines GRP pipes with concrete surround (200mm
- 400 mm Dia.).
b. Open trench foul sewer works main lines VCP pipes (200mm - 400 mm Dia.).
c. Foul sewer house connections works VCP pipes 150mm Dia.
d. Surface water drainage system (Soakaways &Gullies).
e. Main water lines work D.I. pipes (100mm - 200mm Dia.) including installations of Sluice
Valves & Fire hydrants and service water lines work.
f. Street lighting works including (Ducts –Cabling – Poles installation- Feeder Pillars).
g. Civil works for Q-Tel, including (Ducts – JRC Chambers).
h. Electrical works including (Ducts – Relocation / Protection for the existing electrical
cables).
Oct, 2009 - Oct, 2010: ITALCONSULT, Qatar Branch.
Position : Senior Drainage Engineer.
Project : RA06/07 C 003 G Mesaimeer Streets.
Client : PWA (Public Work Authority) - Infrastructure Affairs.
Duties and Responsibilities
 Leading a team of site inspectors and land surveyors for supervising the construction of:
a. Micro-tunneling for storm water drainage system works main lineRC pipes with HDPE
lining (3000 mm Dia.) including all concrete works for the access shafts with different
sizes( 10 m Dia.& 4m*6 m square ) and depths from (13m up to 30m )depth.
b. Surface water drainage system (Soakaways& Gullies).
c. Main water lineworks D.I. pipes (1400mm Dia.) including all required Valvechambers.
d. TSE sewer line works UPVC pipes 100mm dia. including installation of irrigation system
and soft & hard landscaping works.
 Review of tender/contract documents, drawings.
 Shop drawings review and approvals.
 Method statements review and approvals.
 Material submittals review and approvals.
 Liaising with Client, & Stakeholders and Contractors
 HSE Management.
Jan, 2009 - Oct, 2009:ITALCONSULT, Qatar Branch.
Position : Senior Utility Engineer.
Project : ERC1400/D20/C4 Doha Expressway/ D Ring Road Interchange.
Client : PWA (Public Work Authority) - Infrastructure Affairs.
Duties and Responsibilities
 Leading a team of site inspectors and land surveyors for supervising the construction of:
a. Micro-tunneling for storm water drainage system works main line RC pipes with HDPE
lining (2000 mm Dia.) including all concrete works for the access shafts with size
(4m*6 m square ) and depths from (11m up to 20m )depth.
b. Surface water drainage system (Soakaways& Gullies).
c. Main water line works D.I. pipes (100mm - 600mm Dia.) including all required Valve
chambers.
d. TSE sewer line works UPVC pipes 100mm dia. including installation of irrigation
system and soft & hard landscaping works.
 Review of tender/contract documents, drawings.
 Shop drawings review and approvals.
 Method statements review and approvals.
 Material submittals review and approvals.
 Liaising with Client, & Stakeholders and Contractors.
 HSE Management.
Nov, 2008 - Jan, 2009:ITALCONSULT, Qatar Branch.
Position : Temporary replacement to the existing Senior UtilityEngineer.
Project : ARC / 1412 / D1 / C1 / Development of roads in WAKRA North & South.
Client : PWA (Public Work Authority) –Infrastructure Affairs.
Duties and Responsibilities
 Leading a team of site inspectors and land surveyorsfor supervising the construction of:
a. Open trench foul sewer works main lines VCP pipes (200mm Dia.)Including all concrete
works for manholes.
b. Foul sewer house connections works VCP pipes 150mm Dia.
c. Surface water drainage system (Soakaways& Gullies).
d. Main water lines work D.I. pipes (100mm - 200mm Dia.) including installations of Sluice
Valves & Fire hydrants and service water lines work.
e. Civil works for Q-Tel, including (Ducts – JRC Chambers).
f. Electrical works including (Ducts–Relocation/Protection for the existing electrical
cables).
Dec, 2006 - Oct, 2008: Saudi Tumpane Company LTD., K.S.A.
Position : project Manager.
Project : Main pump station (T29) at EL-Madina EL-Munawarah.
Client : Ministry of Water & Electricity - K.S.A.
Duties and Responsibilities
 Leading a team of site engineers, site inspectors and land surveyor for constructing the
main pump station forfoul sewer, the works including:
a. Excavation works up to 22 m depth including supporting the sides of excavations and
installation of dewatering system (well points system).
b. Concrete works.
c. Water proofing for the external surfaces and internal surfaces.
d. Installation of inlet pipes lineof GRP with 1200 mm Diameter and outlet pipes two
lines of D.I. with 600 mm Diameter.
e. Manage the works of mechanical, electrical and instrumentation equipment
installations.
 Reviewing the contract documents.
 Preparing and submitting shop drawings, method statements material submittals for review
and approvals.
 Ensure strict control on resources, minimize wastage, and organize logistic movement of
resources.
 Liaising with Client, & Stakeholders and Consultant.
 HSE Management.
Feb. 2006– Nov. 2006:AL Huda Engineering, Qatar
Position : Project Manager
Project : Industrial Area sewerage – Phase 2 – Contract 505.
Client : PWA (Public Work Authority) – Drainage Affairs.
Duties and Responsibilities
 Leading a team of site engineers, site inspectors and land surveyor for constructing new
Sewerage network to Industrial Area of Doha, the works including:
a. Construction of 19,250 meter of trunk sewers ( VCP ) and branch sewers ranging from
200 mm to 800 mm .
b. Construction of 5370 meter (GRP) of micro tunneling.
c. Construction of a pumping station with all the required mechanical, electrical and
instrumentation equipment.
 Reviewing the contract documents.
 Preparing and submitting shop drawings, method statements material submittals for review
and approvals.
 Ensure strict control on resources, minimize wastage, and organize logistic movement of
resources.
 Liaising with Client, & Stakeholders and Consultant.
 HSE Management.
Dec. 2000 – Dec. 2005: Al-eid Engineering Consultants, K.S.A.
Position : Resident Engineer
Project : Development of Sewerage Networks in Tabuk – KSA.
Client : General Directorate for Water in Tabuk, KSA.
Duties and Responsibilities
 Leading a team of site inspectors and land surveyors for supervising the construction of:
a. 250,000 meter of gravity sewers (open trench excavation)ranging from 150 mm to 1000
mm different types of pipes (UPVC – GRP – RCP - HDP)
b. Manholes construction and house connection works.
c. Construction of 50 km water pipe line 100 Mm to 300 mm diameter (UPVC) including
the associated Valve Chambers and Thrust Blocks.
 Preparations, studies and tenders for new projects.
 Review of tender/contract documents, drawings.
 Shop drawings review and approvals.
 Method statements review and approvals.
 Material submittals review and approvals.
 Liaising with Client, & Stakeholders and Contractors.
 HSE Management.
Jan. 1998 – Oct. 2000:Elkhalyl Contracting, Egypt.
Position : Projects Manager
Projects : Renovation of existing Sewerage network and water pipe line at Ismailia
City also construction of private buildings
Client : Various, Egypt.
Duties and Responsibilities
 Studying tenders for new projects.
 Ensure strict control on resources, minimize wastage, and organize logistic movement of
resources
 Leading a team of site engineers, site inspectors and land surveyor for construction.
Nov. 1992 – Jan. 1998: AL-Baker Establishment for Cont. &Trad., Qatar.
Position :Projects manager.
Projects : Replacement and Renovation for existing Sewer lines,construction of
private buildings and maintenance works.
Client : various, Qatar.
Duties and Responsibilities
 Studying tenders for new projects.
 Ensure strict control on resources, minimize wastage, and organize logistic movement of
resources.
 Leading a team of site engineers, site inspectors and land surveyor for construction.
Aug. 1990 – Nov. 1992: AMBRIC (American British Consultants), Egypt.
Position : Grade 1 Engineer.
Project : Greater Cairo waste water project – west bank - Contract (24B) Emmbaba.
Client :The Organization for the Execution of the Greater Cairo Wastewater
Project, Egypt.
Duties and Responsibilities
 Supervising the construction of:
a. 65,000 meter of gravity sewers (open trench excavation)ranging from 150 mm to 1000
mm different types of pipes (UPVC – VCP – RCP ).
b. 3,440 meter of gravity sewers (micro tunneling system) 2400 mm Dia. (RCP) with PVC
lining.
c. Manholes and house connection works.
Mar. 1988 – Aug. 1990: ALNASR CO. for Utilities and Erections, Egypt.
Position :Site Engineer.
Project :Greater Cairo waste water project – west bank –contract (27) AL-Haram.
Client :The Organization for the Execution of the Greater Cairo Wastewater
Project, Egypt.
Duties and Responsibilities
 Construction of:
a. 20,000 meter of gravity sewers (open trench excavation) ranging from 150 mm to 400
mm different types of pipes (UPVC – VCP).
b. Manholes and house connection works.
Apr. 1986 – Mar. 1988: Private office, Egypt.
Position : Site Engineer.
Project :Rehabilitation and expansion of the Cairo water system.
Client : The Organization for the Execution of the Greater Cairo Wastewater
Project, Egypt.
Duties and Responsibilities
 Construction of 35 km water pipe line 100 Mm to 400 mm diameter (D.I) pipes including the
Associated Valve Chambers and Thrust Blocks.
Jan. 1985 – Apr. 1986: Military service, Egypt.
Position :Supervision Team Member for civil works.
Project :Concrete structures and surveying works.
Client : Egyptian military force.
Duties and Responsibilities
 Construction of some concrete works and some of surveying works.
Languages : Arabic-English
Skills : Computer (Microsoft Office, word & Excel - Auto cad – Internet).
Countries worked in : Egypt & K.S.A, and Qatar.
Driving license : Egypt & K.S.A, and Qatar.

More Related Content

What's hot

Resume Sivakumar SKTJ
Resume Sivakumar SKTJResume Sivakumar SKTJ
Resume Sivakumar SKTJSiva Kumar
 
- Nabil Resume - Civil - Construction-1 (3)( 2)
- Nabil Resume - Civil - Construction-1 (3)( 2)- Nabil Resume - Civil - Construction-1 (3)( 2)
- Nabil Resume - Civil - Construction-1 (3)( 2)NABIL NASSAR
 
Sean Mason CV 2016
Sean Mason  CV  2016Sean Mason  CV  2016
Sean Mason CV 2016Sean Mason
 
Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015???? ?????
 
TED_BEERY_RESUME
TED_BEERY_RESUMETED_BEERY_RESUME
TED_BEERY_RESUMETed Beery
 
Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad
 
Sandher Updated Resume15
Sandher Updated Resume15Sandher Updated Resume15
Sandher Updated Resume15Sandher Subayno
 
Marasigan Norvel Resume 2016
Marasigan Norvel Resume 2016Marasigan Norvel Resume 2016
Marasigan Norvel Resume 2016Norvel Marasigan
 
N137557385 Eben Van Dyk-CV
N137557385 Eben Van Dyk-CVN137557385 Eben Van Dyk-CV
N137557385 Eben Van Dyk-CVEben van Dyk
 
head quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exphead quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years expsameh todary
 

What's hot (20)

CV - RAMADAN 2016
CV - RAMADAN 2016CV - RAMADAN 2016
CV - RAMADAN 2016
 
NEMER- CV - 16
NEMER- CV - 16NEMER- CV - 16
NEMER- CV - 16
 
Resume Sivakumar SKTJ
Resume Sivakumar SKTJResume Sivakumar SKTJ
Resume Sivakumar SKTJ
 
- Nabil Resume - Civil - Construction-1 (3)( 2)
- Nabil Resume - Civil - Construction-1 (3)( 2)- Nabil Resume - Civil - Construction-1 (3)( 2)
- Nabil Resume - Civil - Construction-1 (3)( 2)
 
Sean Mason CV 2016
Sean Mason  CV  2016Sean Mason  CV  2016
Sean Mason CV 2016
 
Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015
 
TED_BEERY_RESUME
TED_BEERY_RESUMETED_BEERY_RESUME
TED_BEERY_RESUME
 
Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project Engineer
 
FAHD_CV
FAHD_CVFAHD_CV
FAHD_CV
 
bernie final cv update
bernie final cv updatebernie final cv update
bernie final cv update
 
EPC Solutions LLP_IN
EPC Solutions LLP_INEPC Solutions LLP_IN
EPC Solutions LLP_IN
 
modified cv khaled
modified  cv khaledmodified  cv khaled
modified cv khaled
 
Mahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCVMahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCV
 
Sandher Updated Resume15
Sandher Updated Resume15Sandher Updated Resume15
Sandher Updated Resume15
 
Revised Resume MSR
Revised Resume MSRRevised Resume MSR
Revised Resume MSR
 
Ahmed El- Kholy CV
Ahmed El- Kholy CVAhmed El- Kholy CV
Ahmed El- Kholy CV
 
Marasigan Norvel Resume 2016
Marasigan Norvel Resume 2016Marasigan Norvel Resume 2016
Marasigan Norvel Resume 2016
 
cv1
cv1cv1
cv1
 
N137557385 Eben Van Dyk-CV
N137557385 Eben Van Dyk-CVN137557385 Eben Van Dyk-CV
N137557385 Eben Van Dyk-CV
 
head quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exphead quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exp
 

Viewers also liked

Better Blended Learning with Moodle
Better Blended Learning with MoodleBetter Blended Learning with Moodle
Better Blended Learning with Moodlemetzy
 
Resultados de los estilos de aprendizaje
Resultados de los estilos de aprendizajeResultados de los estilos de aprendizaje
Resultados de los estilos de aprendizajelovecraft666
 
How to transform and optimise experiences
How to transform and optimise experiencesHow to transform and optimise experiences
How to transform and optimise experiencesProduct Anonymous
 
Guru pembelajar nia
Guru pembelajar niaGuru pembelajar nia
Guru pembelajar niaNia Piliang
 
Overview of Financial modeling
Overview of Financial modelingOverview of Financial modeling
Overview of Financial modelingYan Pronin
 
Product Anonymous - Our Product Future - November 2016
Product Anonymous - Our Product Future - November 2016Product Anonymous - Our Product Future - November 2016
Product Anonymous - Our Product Future - November 2016Product Anonymous
 
Leveraging Your LMS to Meet Organizational Goals
Leveraging Your LMS to Meet Organizational GoalsLeveraging Your LMS to Meet Organizational Goals
Leveraging Your LMS to Meet Organizational GoalsLambda Solutions
 
Jasmine flowers茉莉花
Jasmine flowers茉莉花Jasmine flowers茉莉花
Jasmine flowers茉莉花Pei Zhenquan
 
CRO PROS conversion forms and funnel best practice
CRO PROS conversion forms and funnel best practiceCRO PROS conversion forms and funnel best practice
CRO PROS conversion forms and funnel best practiceCatchi
 

Viewers also liked (16)

Mahmoud_khamies-up
Mahmoud_khamies-upMahmoud_khamies-up
Mahmoud_khamies-up
 
Socket set
Socket setSocket set
Socket set
 
Better Blended Learning with Moodle
Better Blended Learning with MoodleBetter Blended Learning with Moodle
Better Blended Learning with Moodle
 
Anonymous
AnonymousAnonymous
Anonymous
 
Ft round table
Ft round tableFt round table
Ft round table
 
Resultados de los estilos de aprendizaje
Resultados de los estilos de aprendizajeResultados de los estilos de aprendizaje
Resultados de los estilos de aprendizaje
 
How to transform and optimise experiences
How to transform and optimise experiencesHow to transform and optimise experiences
How to transform and optimise experiences
 
Guru pembelajar nia
Guru pembelajar niaGuru pembelajar nia
Guru pembelajar nia
 
Presentación
PresentaciónPresentación
Presentación
 
Presentación
PresentaciónPresentación
Presentación
 
Overview of Financial modeling
Overview of Financial modelingOverview of Financial modeling
Overview of Financial modeling
 
Product Anonymous - Our Product Future - November 2016
Product Anonymous - Our Product Future - November 2016Product Anonymous - Our Product Future - November 2016
Product Anonymous - Our Product Future - November 2016
 
Leveraging Your LMS to Meet Organizational Goals
Leveraging Your LMS to Meet Organizational GoalsLeveraging Your LMS to Meet Organizational Goals
Leveraging Your LMS to Meet Organizational Goals
 
CVupdatedNF
CVupdatedNFCVupdatedNF
CVupdatedNF
 
Jasmine flowers茉莉花
Jasmine flowers茉莉花Jasmine flowers茉莉花
Jasmine flowers茉莉花
 
CRO PROS conversion forms and funnel best practice
CRO PROS conversion forms and funnel best practiceCRO PROS conversion forms and funnel best practice
CRO PROS conversion forms and funnel best practice
 

Similar to Amended CV of Eng. Ibrahim A.A. march 2015

Jamsheer P_CV (1)
Jamsheer P_CV (1)Jamsheer P_CV (1)
Jamsheer P_CV (1)jamsheer p
 
Ramy Mikhail updated
Ramy Mikhail updatedRamy Mikhail updated
Ramy Mikhail updatedramy mikhail
 
C V ALAA AMMAR 2
C V   ALAA AMMAR 2 C V   ALAA AMMAR 2
C V ALAA AMMAR 2 Alaa Ammar
 
Engineer and Project management CV 'Ali Al Obaidy
Engineer and Project management  CV 'Ali Al ObaidyEngineer and Project management  CV 'Ali Al Obaidy
Engineer and Project management CV 'Ali Al ObaidyAli Alobaidy
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHesham Fathy, PMP
 
Mohamed Ahmed (2008)
Mohamed Ahmed  (2008)Mohamed Ahmed  (2008)
Mohamed Ahmed (2008)Mohamed Ahmed
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)amr mahrous
 
أغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWأغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWAhmed Senosy
 
mohamed salem cv final
mohamed salem cv finalmohamed salem cv final
mohamed salem cv finalmohamed salem
 
Mostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa Omar
 

Similar to Amended CV of Eng. Ibrahim A.A. march 2015 (20)

JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
Muhammad_Aslam_CV
Muhammad_Aslam_CVMuhammad_Aslam_CV
Muhammad_Aslam_CV
 
C.V
C.VC.V
C.V
 
Jamsheer P_CV (1)
Jamsheer P_CV (1)Jamsheer P_CV (1)
Jamsheer P_CV (1)
 
Mohamed Behiry CV
Mohamed Behiry CVMohamed Behiry CV
Mohamed Behiry CV
 
C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)
 
CV1
CV1CV1
CV1
 
CV Imtiaz Haider
CV Imtiaz HaiderCV Imtiaz Haider
CV Imtiaz Haider
 
Ramy Mikhail updated
Ramy Mikhail updatedRamy Mikhail updated
Ramy Mikhail updated
 
C V ALAA AMMAR 2
C V   ALAA AMMAR 2 C V   ALAA AMMAR 2
C V ALAA AMMAR 2
 
Engineer and Project management CV 'Ali Al Obaidy
Engineer and Project management  CV 'Ali Al ObaidyEngineer and Project management  CV 'Ali Al Obaidy
Engineer and Project management CV 'Ali Al Obaidy
 
Ahmed el gohary cv
Ahmed el gohary cvAhmed el gohary cv
Ahmed el gohary cv
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.M
 
Mohamed Ahmed (2008)
Mohamed Ahmed  (2008)Mohamed Ahmed  (2008)
Mohamed Ahmed (2008)
 
E&I Farukh
E&I FarukhE&I Farukh
E&I Farukh
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
 
أغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWأغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEW
 
mohamed salem cv final
mohamed salem cv finalmohamed salem cv final
mohamed salem cv final
 
Mostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cv
 
cv nour
cv nourcv nour
cv nour
 

Amended CV of Eng. Ibrahim A.A. march 2015

  • 1. CURRICULUM VITAE Full name : Ibrahim A. A. Ebedallah Nationality : Egyptian Date of birth : 15 – 09 - 1960 Marital status : Married Address in Egypt :3 Shabory Street, KobryElkoba -Cairo, Rested Egypt : 202- 244990516 Address in Qatar : Doha – Alwakra -Ezdan 24. Mobile Qatar : +974 -33039128 E-mail : ibmebed@yahoo.com Qualifications : 1984 – B. Sc. Civil Engineering Zagazeg University, Egypt. Registration : Registered by the Qatar Engineers &Consulting Offices Accrediting Committee as Grade (A) : Registered by the Egyptian Syndicate of Engineers. Working Experience I have more than 28 accumulative working years in infrastructure and superstructure. I worked in contracting companies and in consultant offices. I worked with local and international companies in Egypt, KSA and Qatar. I am familiar with the international standards and codes covering QCS, ASTM, BS, and Egyptian Codes. October, 2014 - Recently: ITALCONSULT, Qatar Branch. Position : Senior Utility Engineer. Project : Improvement on C-Ring Road Junctions and Roundabouts IA13/14C036G. Client : PWA (Public Work Authority) - Infrastructure Affairs. Duties and Responsibilities  Shop drawings review and approvals.  Method statements review and approvals.  Liaising with Client & Stakeholders and Contractors.  HSE Management.  Leading a team of site inspectors and land surveyors for supervising the construction of:
  • 2. a. Surface water drainage system (Soakaways & Gullies). b. TSE works including (construction of 400 mm main TSE line DI pipe with required valve chamber). c. Street lighting works including (Ducts –Cabling – Poles installation- high mast installation - Feeder Pillars). d. ITS & DSS works including (Ducts – Chambers). e. Electrical works including (Ducts – Protection for the existing electrical cables). f. Water works including (construction of 600 mm water line DI pipe with required air valve chamber). g. Traffic Signal works including (Ducts - Foundation – Chambers – Gantries – Poles – Cabling – Feeder Pillar). h. Protection works of existing Main water lines & SE lines and TSE lines including Relocation / Adjusting works for the existing obstructing chambers. i. Civil works for Q-Tel, including (Ducts – JRC Chambers). January, 2014 – October, 2014: ITALCONSULT, Qatar Branch. Position : Senior Utility Engineer. Project : Extension of Highway 55 Temporary Truck Route – Section A &B. Client : PWA (Public Work Authority) - Infrastructure Affairs. Duties and Responsibilities  Shop drawings review and approvals.  Method statements review and approvals.  Liaising with Client & Stakeholders and Contractors.  HSE Management.  Leading a team of site inspectors and land surveyors for supervising the construction of: a. Protection works of existing Main water lines & SE lines and TSE lines including Relocation / Adjusting works for the existing obstructing chambers. b. Street lighting works including (Ducts –Cabling – Poles installation- Feeder Pillars). c. ITS works including (Ducts –Cabling – Poles & Gantry installation - Feeder Pillars). d. Civil works for Q-Tel, including (Ducts – JRC Chambers). e. Electrical works including (Ducts – Relocation / Protection for the existing electrical cables). August, 2013 – Dec, 2013: TECHNITAL, Qatar Branch. Position : Senior Utility Engineer. Project : RA08 / 09 C 067 G - Development of roads in Bani Hajer – Zone 51. Client : PWA (Public Work Authority) - Infrastructure Affairs. Duties and Responsibilities
  • 3.  Shop drawings review and approvals.  Method statements review and approvals.  Liaising with Client & Stakeholders and Contractors.  HSE Management.  Leading a team of site inspectors and land surveyors for supervising the construction of: a. Main water lines work D.I. pipes (100mm - 200mm Dia.) including installations of Sluice Valves & Fire hydrants and service water lines work. b. Street lighting works including (Ducts –Cabling – Poles installation- Feeder Pillars). c. Civil works for Q-Tel, including (Ducts – JRC Chambers). d. Electrical works including (Laying Cables – Civil works of Electrical Substation -- Ducts – Relocation / Protection for the existing electrical cables). e. Traffic Signal works including (Ducts – Cabling – Chambers – Poles & Gantry installations - Feeder Pillars). Oct, 2010 – July 2013: ITALCONSULT, Qatar Branch. Position : Senior Utility Engineer. Project : RA09 / 10 C 081 G Development of roads in BLOCK 1300. Client : PWA (Public Work Authority) - Infrastructure Affairs. Duties and Responsibilities  Review of tender/contract documents, drawings.  Shop drawings review and approvals.  Method statements review and approvals.  Material submittals review and approvals.  Liaising with Client, & Stakeholdersand Contractors.  HSE Management.  Leading a team of site inspectors and land surveyors for supervising the construction of: a. Micro-tunneling foul sewer works main lines GRP pipes with concrete surround (200mm - 400 mm Dia.). b. Open trench foul sewer works main lines VCP pipes (200mm - 400 mm Dia.). c. Foul sewer house connections works VCP pipes 150mm Dia. d. Surface water drainage system (Soakaways &Gullies). e. Main water lines work D.I. pipes (100mm - 200mm Dia.) including installations of Sluice Valves & Fire hydrants and service water lines work. f. Street lighting works including (Ducts –Cabling – Poles installation- Feeder Pillars). g. Civil works for Q-Tel, including (Ducts – JRC Chambers). h. Electrical works including (Ducts – Relocation / Protection for the existing electrical cables).
  • 4. Oct, 2009 - Oct, 2010: ITALCONSULT, Qatar Branch. Position : Senior Drainage Engineer. Project : RA06/07 C 003 G Mesaimeer Streets. Client : PWA (Public Work Authority) - Infrastructure Affairs. Duties and Responsibilities  Leading a team of site inspectors and land surveyors for supervising the construction of: a. Micro-tunneling for storm water drainage system works main lineRC pipes with HDPE lining (3000 mm Dia.) including all concrete works for the access shafts with different sizes( 10 m Dia.& 4m*6 m square ) and depths from (13m up to 30m )depth. b. Surface water drainage system (Soakaways& Gullies). c. Main water lineworks D.I. pipes (1400mm Dia.) including all required Valvechambers. d. TSE sewer line works UPVC pipes 100mm dia. including installation of irrigation system and soft & hard landscaping works.  Review of tender/contract documents, drawings.  Shop drawings review and approvals.  Method statements review and approvals.  Material submittals review and approvals.  Liaising with Client, & Stakeholders and Contractors  HSE Management. Jan, 2009 - Oct, 2009:ITALCONSULT, Qatar Branch. Position : Senior Utility Engineer. Project : ERC1400/D20/C4 Doha Expressway/ D Ring Road Interchange. Client : PWA (Public Work Authority) - Infrastructure Affairs. Duties and Responsibilities  Leading a team of site inspectors and land surveyors for supervising the construction of: a. Micro-tunneling for storm water drainage system works main line RC pipes with HDPE lining (2000 mm Dia.) including all concrete works for the access shafts with size (4m*6 m square ) and depths from (11m up to 20m )depth. b. Surface water drainage system (Soakaways& Gullies). c. Main water line works D.I. pipes (100mm - 600mm Dia.) including all required Valve chambers. d. TSE sewer line works UPVC pipes 100mm dia. including installation of irrigation system and soft & hard landscaping works.
  • 5.  Review of tender/contract documents, drawings.  Shop drawings review and approvals.  Method statements review and approvals.  Material submittals review and approvals.  Liaising with Client, & Stakeholders and Contractors.  HSE Management. Nov, 2008 - Jan, 2009:ITALCONSULT, Qatar Branch. Position : Temporary replacement to the existing Senior UtilityEngineer. Project : ARC / 1412 / D1 / C1 / Development of roads in WAKRA North & South. Client : PWA (Public Work Authority) –Infrastructure Affairs. Duties and Responsibilities  Leading a team of site inspectors and land surveyorsfor supervising the construction of: a. Open trench foul sewer works main lines VCP pipes (200mm Dia.)Including all concrete works for manholes. b. Foul sewer house connections works VCP pipes 150mm Dia. c. Surface water drainage system (Soakaways& Gullies). d. Main water lines work D.I. pipes (100mm - 200mm Dia.) including installations of Sluice Valves & Fire hydrants and service water lines work. e. Civil works for Q-Tel, including (Ducts – JRC Chambers). f. Electrical works including (Ducts–Relocation/Protection for the existing electrical cables). Dec, 2006 - Oct, 2008: Saudi Tumpane Company LTD., K.S.A. Position : project Manager. Project : Main pump station (T29) at EL-Madina EL-Munawarah. Client : Ministry of Water & Electricity - K.S.A. Duties and Responsibilities  Leading a team of site engineers, site inspectors and land surveyor for constructing the main pump station forfoul sewer, the works including: a. Excavation works up to 22 m depth including supporting the sides of excavations and installation of dewatering system (well points system). b. Concrete works. c. Water proofing for the external surfaces and internal surfaces. d. Installation of inlet pipes lineof GRP with 1200 mm Diameter and outlet pipes two lines of D.I. with 600 mm Diameter. e. Manage the works of mechanical, electrical and instrumentation equipment installations.
  • 6.  Reviewing the contract documents.  Preparing and submitting shop drawings, method statements material submittals for review and approvals.  Ensure strict control on resources, minimize wastage, and organize logistic movement of resources.  Liaising with Client, & Stakeholders and Consultant.  HSE Management. Feb. 2006– Nov. 2006:AL Huda Engineering, Qatar Position : Project Manager Project : Industrial Area sewerage – Phase 2 – Contract 505. Client : PWA (Public Work Authority) – Drainage Affairs. Duties and Responsibilities  Leading a team of site engineers, site inspectors and land surveyor for constructing new Sewerage network to Industrial Area of Doha, the works including: a. Construction of 19,250 meter of trunk sewers ( VCP ) and branch sewers ranging from 200 mm to 800 mm . b. Construction of 5370 meter (GRP) of micro tunneling. c. Construction of a pumping station with all the required mechanical, electrical and instrumentation equipment.  Reviewing the contract documents.  Preparing and submitting shop drawings, method statements material submittals for review and approvals.  Ensure strict control on resources, minimize wastage, and organize logistic movement of resources.  Liaising with Client, & Stakeholders and Consultant.  HSE Management. Dec. 2000 – Dec. 2005: Al-eid Engineering Consultants, K.S.A. Position : Resident Engineer Project : Development of Sewerage Networks in Tabuk – KSA. Client : General Directorate for Water in Tabuk, KSA. Duties and Responsibilities
  • 7.  Leading a team of site inspectors and land surveyors for supervising the construction of: a. 250,000 meter of gravity sewers (open trench excavation)ranging from 150 mm to 1000 mm different types of pipes (UPVC – GRP – RCP - HDP) b. Manholes construction and house connection works. c. Construction of 50 km water pipe line 100 Mm to 300 mm diameter (UPVC) including the associated Valve Chambers and Thrust Blocks.  Preparations, studies and tenders for new projects.  Review of tender/contract documents, drawings.  Shop drawings review and approvals.  Method statements review and approvals.  Material submittals review and approvals.  Liaising with Client, & Stakeholders and Contractors.  HSE Management. Jan. 1998 – Oct. 2000:Elkhalyl Contracting, Egypt. Position : Projects Manager Projects : Renovation of existing Sewerage network and water pipe line at Ismailia City also construction of private buildings Client : Various, Egypt. Duties and Responsibilities  Studying tenders for new projects.  Ensure strict control on resources, minimize wastage, and organize logistic movement of resources  Leading a team of site engineers, site inspectors and land surveyor for construction. Nov. 1992 – Jan. 1998: AL-Baker Establishment for Cont. &Trad., Qatar. Position :Projects manager. Projects : Replacement and Renovation for existing Sewer lines,construction of private buildings and maintenance works. Client : various, Qatar. Duties and Responsibilities  Studying tenders for new projects.  Ensure strict control on resources, minimize wastage, and organize logistic movement of resources.  Leading a team of site engineers, site inspectors and land surveyor for construction.
  • 8. Aug. 1990 – Nov. 1992: AMBRIC (American British Consultants), Egypt. Position : Grade 1 Engineer. Project : Greater Cairo waste water project – west bank - Contract (24B) Emmbaba. Client :The Organization for the Execution of the Greater Cairo Wastewater Project, Egypt. Duties and Responsibilities  Supervising the construction of: a. 65,000 meter of gravity sewers (open trench excavation)ranging from 150 mm to 1000 mm different types of pipes (UPVC – VCP – RCP ). b. 3,440 meter of gravity sewers (micro tunneling system) 2400 mm Dia. (RCP) with PVC lining. c. Manholes and house connection works. Mar. 1988 – Aug. 1990: ALNASR CO. for Utilities and Erections, Egypt. Position :Site Engineer. Project :Greater Cairo waste water project – west bank –contract (27) AL-Haram. Client :The Organization for the Execution of the Greater Cairo Wastewater Project, Egypt. Duties and Responsibilities  Construction of: a. 20,000 meter of gravity sewers (open trench excavation) ranging from 150 mm to 400 mm different types of pipes (UPVC – VCP). b. Manholes and house connection works. Apr. 1986 – Mar. 1988: Private office, Egypt. Position : Site Engineer. Project :Rehabilitation and expansion of the Cairo water system. Client : The Organization for the Execution of the Greater Cairo Wastewater Project, Egypt. Duties and Responsibilities  Construction of 35 km water pipe line 100 Mm to 400 mm diameter (D.I) pipes including the Associated Valve Chambers and Thrust Blocks.
  • 9. Jan. 1985 – Apr. 1986: Military service, Egypt. Position :Supervision Team Member for civil works. Project :Concrete structures and surveying works. Client : Egyptian military force. Duties and Responsibilities  Construction of some concrete works and some of surveying works. Languages : Arabic-English Skills : Computer (Microsoft Office, word & Excel - Auto cad – Internet). Countries worked in : Egypt & K.S.A, and Qatar. Driving license : Egypt & K.S.A, and Qatar.