Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

C.V.constr. (1)

107 views

Published on

  • Be the first to comment

  • Be the first to like this

C.V.constr. (1)

  1. 1. Girgis Ayaad Abd El- Malak Dr.Lashein St.,from Faisal St ,Tawabik,Giza Egypt Mobile Number : +2 0122 268 7827 +966 59 857 44 82 george.ayaad@yahoo.com Construction Manager Education : B.Sc. In Civil Engineering , Faculty of Engineering Cairo University,1998 Project Grade : V. Good Courses: 1-The Professional Program In Project Management from The American University In Cairo (AUC). 2- Preparation of ( PMP). Languages: Arabic : Mother Tongue. English : Good (RW). Computer Skills : Office 2000,XP (word-Excel )-Internet Auto Cad. Personality skills: -Motivated - Hard worker -Cooperation - Fast learning -Spirit of team work Personal Information: • Marital status : Married • Nationality :Egyptian • Date of Birth :18-08-1975 Military Service : Exempted.
  2. 2. Work Experience : 1.Azmeel Contracting Company (Kingdom Of Saudia Arabia) Period : from December 2014 up till Now. Position : Construction Manager. Project : Construction of Family Apartments In Jalmudah (815-C16) Tasks : 1- Excuting the work items according the specifications and drawings. 2- Coordination with subcontractors about the priorities. 3- Excuting the work items for site development 4- Make a productivity for workers in the project. 2.Orascom Construction Industries OCI (Bridges Sector) Period : from January 2014 till November 2014. Position : Construction Manager. Projects : Ktamya Bridge for Armed Forces Tasks : 1- Excuting the work items according the specifications and drawings. 2- Coordination with subcontractors about the priorities. 3- Check the material need on site. 4- Finalizing and solving problems occured on site. Period : from January 2013 to January 2014. Position : Quality Control Manager. Projects : Bridges on the Cairo – Ismailia Desert Road and Ard El lewa Tasks : 1- Following-up the work items according the specifications and drawings. 2-Inspection the reinforcement and formwork items for all items (piles reinforcement ,pile cap reinf.and formwork and the other super structure items) . 3- Check the concrete tests (fresh and hard). 4- Check the tension for the pre-stressed beams. 5- Material inspection delivered on site . 6-Handing over the work items to the Consultant and the Owner 3.Orasqualia(Orascom Construction Industries and Aqualia join) Period : from April 2010 to January 2013. Position : Senior Quality Control Engineer . Project : New Cairo Waste Water Treatment Plant (750,000,000L.E.).
  3. 3. Tasks : 1-Following-up the work items according the specifications and drawings. 2-Inspection the reinforcement and formwork items for tanks &the PVC water stop& the Finishing works ,the insulation epoxy paint . 3- Preparing inspection plan & method statement procedures and check Quality Control implementation. 4- Inspection the delivered material. 5- Raisin NCR if the work item is not apply the specifications or drawings. 6- Finalizing the work items with the Owner . 4. Concord contracting company Period : from January 2009 to april 2010. Position : Deputy Project Manager . Project : Concordia office building (Smart Village) (75,000,000L.E.). Tasks : Owner Representative on site. 5. J.V.Besix Orascom: Period : from January 2007 to December 2008. Position : Q.C. Engineer . Project : FAIRMONT HOTEL. Tasks : 1-Following-up the work items according the specifications and drawings. 2-Inspection the finishing work items (masonry,plaster,painting,false ceiling, marble,wall paper and carpet…etc),and following-up the subcontractors, checking their progress & quality and quantities. 3-Handing over the work items to the owner. 6. El – Sherook Contracting Company (6 October city) Period : from first of December 1999 to May 2001 Position : site Engineer Project : 1- 6 October University Hotel (retrofitting of columns and footings) 2-Constructions of new extensions for the existing building by using Very good adhesive chemical matrials (Flat Slab System ) 3-The finishing works ( plastering , ceramic,paints,…etc ) 4- 6 October University Hospital (completing its all finishing works) .
  4. 4. 7. ALCATEL Bangladesh: Period : from November 2006 untill December 2006. Position : Site Engineering Department. Project : Aktel. Tasks : 1-Chek the site survey which presented from the subcontractors and discuss with them about these data . 2- supervision on the site survey documents and finish it to be presented to the customer. Ghana : Period : from July 2005 to March 2006& July 2006 to October 2006. Position : Site Engineering Department (Head Section) Project : Ghana Telecom. Tasks : 1-Interfacing with the customer. 2-Dealing with the subcontractors and discuss them about their Presented data and TSS. 3- Revision of TSS data presented from the subcontractors teams . 4-Supervision,revision,correction &responsible of all Auto-CAD Drawings presented in the documents. 5- Filling the Final Detail Engineering Design and As Built Documents &finalizing it to be without comments to presented to The customer. 8. ALAN DICK Company Period : from August 2004 to June 2005. Position : site Engineer in Construction department. Projects : Vodafone works. 1- New sites (roof top) supervision: (Towers, Poles, Shelters). 2- site installation works: antennas,feeders,clamps,earthing and cableTrays. 3- supervision on towers and monopoles bases reinforced concrete works. 4- Co-sites (existing sites)supervision : Changing the frequency 900 MHZ by 1800 MHZ to achieve high frequency for the network.
  5. 5. 9. Civitech (consulting Center of Civil Engineering ) Period : from first of June 2001 to April 2004 Position : site supervision Engineer Projects : 1- Mobinil Works ( Pylons –shelters- Masts ). 2- Check the structure systems of the bulidings which will carry Mobinil stations, If these buildings can carry the Mobinil Equipmetns safely, otherwise chosing the suitable solutions. 3-Supervision on Mobinil site works. 4-Supevision onVillage in Sheraton Heliopoils-Concrete works (Beam &H.B. Systems). 5-Supervision on Village in El Obour city - Concrete works(Beam- H.B.Systems ). 6-Supervision on the R.C.Mobinil Towers 45&55 m bases. 10. Mosahmet El –Behera Company (Toshka) Period : from July1999 to November 1999 Position : site works Engineer Projects : 1- El Shekh Zaaid Canal excavation &sand fixation and isollation works 2- Casting concrete using pumps and (Alkonz&Rahco ) machines. 3- Curing of concrete using a liquid material to protect the concrete
  6. 6. 9. Civitech (consulting Center of Civil Engineering ) Period : from first of June 2001 to April 2004 Position : site supervision Engineer Projects : 1- Mobinil Works ( Pylons –shelters- Masts ). 2- Check the structure systems of the bulidings which will carry Mobinil stations, If these buildings can carry the Mobinil Equipmetns safely, otherwise chosing the suitable solutions. 3-Supervision on Mobinil site works. 4-Supevision onVillage in Sheraton Heliopoils-Concrete works (Beam &H.B. Systems). 5-Supervision on Village in El Obour city - Concrete works(Beam- H.B.Systems ). 6-Supervision on the R.C.Mobinil Towers 45&55 m bases. 10. Mosahmet El –Behera Company (Toshka) Period : from July1999 to November 1999 Position : site works Engineer Projects : 1- El Shekh Zaaid Canal excavation &sand fixation and isollation works 2- Casting concrete using pumps and (Alkonz&Rahco ) machines. 3- Curing of concrete using a liquid material to protect the concrete

×