1. P.O box 172 11106 Amman-Jordan Phone :+962-6-4127192
Mobile: +962-79-5140260
E-mail : imadjariri1979@gmail.com
Imad Zaki Al-jariri
Personal Profile Place of Birth: Amman/Jordan.
Date of Birth : 3/5/1979.
Marital Status: married.
Nationality : Jordanian.
Education 1997 - 2002 Mu'tah University Karak/ Jordan
B.Sc in mechanical engineering
Languages Excellent command in Arabic and English.
Work experience
March 2012- now Arabian Construction Company. Amman
Rotana Hotel
Job title:Construction Manager
The project site in Abdali with total build up area of ( 80000 ) m2. The
project consists of 46 floors and 7 basements .The project is a hotel tower
(425 room) with all facilities, kitchens, restaurants, laundaries,
management areas and parking areas.
Following up all daily site activities, material ordering and delivery to
site, progress on site and coordination with other trades and other
contractors, preparation of interim payments, attending all site progress
meetings and preparation of construction short term plans.
2002, July – march 2012 HUSSEIN ATIEH EST. Amman
The Galleria Mall
Job title: Project Engineer
The project site in Swaifieh with total area of (13000) m2. The project
consists of 12 floors, 6 of them under the ground level .The project is a
2. commercial mall consisting of cinemas, restaurants, recreational halls for
kids and adults, commercial shops, a big shopping center, an electrical
devices center and car parking.
Fully responsible for all mechanical systems, shop drawing, installation
and coordination ".
Following up all site works for air conditioning, firefighting, hot &
chilled networks, and domestic water supply system.
German Jordanian university "infra structure and landscape"
Job title: Project engineer
The project consists of carrying out all services and infrastructure works
for the proposed buildings and 600 m3
/day WWTP and two car parks.
Services includes
firefighting network and pumps room and sprinkler system for the car
parks the main firefighting pumps capacity is 1000 GPM @ 262 ft
installation of two underground LPG tank of capacity 12.5m 3
each and
all related evaporators and gas leak detection system and the piping
network and valves to serve all the buildings
domestic water network and irrigation network
waste water treatment of capacity 600 mm3
/day and all related mixers
,aerators ,lifting pumps and sludge pumps along with the irrigation
pumps
6th
circle high rise buildings (EMMAR TOWER)
Job title: Project engineer
Fully responsible for all mechanical systems "technical submittals,
negotiation with suppliers, shop drawing, installation and coordination ".
Following up all site works for all mechanical systems, air
conditioning, firefighting, and domestic water supply system.
The project consists of three adjacent buildings and three basements,
the side buildings are Ground +12 floors and the middle one is Ground +
17 floors with total area of 40000 m²including three basements.
Arab Bank Central Operation Unit (COU)
Job title: site & office engineer
Fully responsible for all mechanical systems, installation and
coordination ".
The total cooling load is 240 TR , distributed through a two pipe system
to 8 AHU that provides air flow of 2000 to 11000 l/s. through supply and
return duct network,
Firefighting system consists of wet riser for sprinklers and for landing
valves, the pumps capacities are 350GPM @ 3 bar for sprinklers and for
hydrants and landing valves 265 GPM @ 6.5 bar
Following up all site works for air conditioning, firefighting, hot &
chilled networks, domestic water supply system.
3. Operation and maintenance of the facilities and equipment
Prince Hamzeh Hospital
Job title: site engineer
Following up the construction of air duct and volume and fire
dampers according to tender specifications,
Balancing of the HVAC system according to required specification
Rehabilitation of Greater Amman Water system in the north western
area "C9"
Job title: site engineer
The project consists of two main pump stations Five booster stations,
ten ground reservoirs of capacities of 500 to 16000 m³ and ten
chlorination plants
Following up the erecting of pipelines ,pump stations and chlorination
system,
Commissioning and operating of pump stations and chlorination
plants
Testing and commissioning of ground and elevated reservoirs and
tanks” testing , disinfection, flushing and operating “
Coordination and operating of primary mains
Installing and testing and commissioning of surge tanks at the main
pump stations
Personal skills
1- Computer skills:
• Microsoft office 2010
• AutoCAD 2010
2- Project Management Using Computer " PRIMAVERA"
3- Heating and cooling system design using computer "Block
load"
"Carriere"