2. Introduction
Hardly any substitute available for cement.
Second largest in the world with an installed capacity of
159.38 MTPA
Nearly 6% of the world production.
124 large plants and around 365 mini plants.
Production from large plants (with capacity above 1
MTPA) account for 85% of the total production.
3. Measure Areas selected for
Cost Reduction
1
• Input Cost
2
• Production Cost
3 • Transportation Cost
4. GUJRAT AMBUJA CEMENTS
ANALYSIS
Following are the key elements where AMBUJA CEMENTS is
trying to cut down its cost.
Raw material Procurement:-
Limestone & Coal
Production process:-
Electricity
Packaging and storage:-
Warehousing
Transportation:-
Flexibility in Distribution network