TOTAL QUALITY
MANAGEMENT
(Continuous Quality
Improvement)
QUALITYPLANNING
Whoiscustomer?
Whatdotheyneed?
QUALITYCONTROL
Evaluate,compare,act
QUALITY
IMPROVEMENT
Establishinfrastructure
Who is customer?
What Level of Quality do they need?
Are they purchasing to Some Quality Specification?
Any Safety Considerations?
Future Litigation?
Ethical Issues?
QUALITYPLANNING
Whoiscustomer?
Whatdotheyneed?
QUALITYCONTROL
Evaluate,compare,act
QUALITY
IMPROVEMENT
Establishinfrastructure
QUALITY CONTROL
Inspection
• Destructive
• Non-destructive
• Sampling
Process Control
• Monitoring Process (relates to inspection)
• Feedback Control
• Statistical Process Control (knowing when the process is
out of control)
Correction
• Knowing what to correct when process is out of control
Cost of Quality Before & After
Improvement
0
10
20
30
40
50
60
70
80
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Time
Series
1
Tools for Quality
Control
Check Sheets
Pareto Charts
Why-Why Diagrams
Cause & Effect Diagrams
Flowcharts
Histograms
Scatter Diagram
Control Charts
Problem
Solving
Steps
Plan
Do
Study
Act
Link these
Two in
Quality
Circle
CHECK SHEETS
Used to keep a record
of the number and type
of discontinuities over a
specified period of time
or within a certain
batch of product.
PARETO CHART
A graphical representation ranking
discontinuities from the most to
least significant. Used to help
brainstorm what discontinuities, if
worked upon first, would be the
most likely to produce the greatest
improvement in quality.
Class Example
Our manufacturing procedure is composed of several steps. Several of these
procedures have lead to discontinuities noticed upon inspection. The steps causing
defectives are as follows:
∀• Caulking 198 defectives
∀• Fitting 25 defectives
∀• Connections 103 defectives
∀• Torque 18 defectives
∀• Gapping 72 defective
A Pareto Diagram will be developed.
WHY-WHY DIAGRAMS
A systematic representation of causes of why some
occurrence happens. Used to guide brainstorming sessions.
FLOW CHARTS
Flow charts are graphical representations of the steps involved
in a process. Constructing a flow chart helps give a better
understanding of the systems involved.
Process
DecisionData
Process
Process
Terminator
Yes
No
Control
transfer
CAUSE AND EFFECT DIAGRAMS (Fishbone Diagram)
Used in brainstorming session to help identify the causes of quality
losses. This diagram is particularly useful after the flow chart and
the Pareto diagrams have been developed.
QUALITY
(Effect)Cause
Step 1:Decide on the quality characteristic {e.g. Reduction of
wobble during machine rotation}
Step 2:Set up the fish bone backbone
Step 3:Identify main factors causing effect {e.g. Workers,
Materials, Inspection, Tools}
Step 4: Add Cause to each branch
Benefits of Cause and Effect Diagram
• Making diagram is educational in itself
• Outline relationship
• Note what samples need to be taken
• Guide for discussion
• Causes are actively sought and results written on diagram
• Appropriate data collected - no time wasted
• Shows level of technology
Problem
Solving
Steps
Plan
Do
Study
Act
Link these
Two in
Quality
Circle
CONTROL CHARTS
• Used to test if the process is in control
• Used to see if significant changes have occurred in the
process over time
“Indiscreet” or
“Continuous Data
Chart” or “X-R Chart”
Measurement at time intervals
Measurements compared -
control over time.
Examples:
Length (mm) Volume (cc)
Weight (gm) Power (kwh)
Time (sec) Pressure (psi)
Voltage (v)
“Discrete Data Charts” or
“pn-p charts”
Inspection on lot or batch
Note # good/defective
# of parts inspected in the lot = n
Fraction of defective in lot = p
Number of defectives = pn
- R CHART CONSTRUCTIONX
In the manufacturing process for this example parts are being
machined with a nominal diameter of 13 mm. Samples are
taken at the following times of day: 6:00, 10:00, 14:00, 18:00
and 22:00, for 25 consecutive days. The diameter
measurements from these samples are presented on the table in
the next slide.
Class Example
Step 1: Collect Data
Step 2: Sort data into subgroups (i.e. lots, order #, days, etc.)
n = size of the subgroup {in this example 5 times per day)
k = number of subgroups {in this example 25 days}
Step 3: Find the mean for each subgroup ( X )
X =
X X X X
n
n1 2 3+ + +.....
Step 4: Find Range for each subgroup ( R )
R = X largest value - X smallest value
Step 5: Find Overall Mean ( X )
X =
X X X X
k
k1 2 3+ + +...
Step 6: Find average value of range ( R ) R =
R R R R
k
k1 2 3+ + +...
Step 7: Complete control limits using attached table
For X Control Chart
Central Line - CL = X
Upper Control Limit - UCL = X +A2 R
Lower Control Limit - LCR = X - A2 R
For R Control Chart
Central Line - CL = R
Upper Control Limit - UCL = D4 R
Lower Control Limit - LCR = D3 R
Step 8:Plot Chart
P CONTROL CHART CONSTRUCTION
An inspector at the end of the manufacturing line for the
production of car wheel rims, at the end of each shift,
inspects the lot of wheel rims made during that shift. On
good days when the welder is running properly, over 400
wheels are made per batch. On poor days, as low as 50 to 60
wheels are made per batch. The inspector marks on his/her
“check sheet” for each batch the total number of wheels
inspected and the number of defects returned for rework in
each lot.
Class Example
Step 1: Collect Data
Step 2: Divide data into subgroups (usually days or lot). Subgroup size should be
greater than 50 units.
n = number in each subgroup
pn = number of defects in each subgroup
Step 3: Compute fraction of defectives (for %, multiply by 100)
p = pn/n
Step 4: Find the Average Fraction of Defectives ( p )
p =
( )
( )
total defectives
total inspected
=
pn
n
∑
∑
Step 5: Compute the Control Limits for each Lot
Central Line CL = p
Upper Control Limit UCL = p + 3
p p
n
( )1−
Lower Control Limit LCR = p - 3
p p
n
( )1−
Step 6:Draw P Control Chart
PN CONTROL CHART CONSTRUCTION
Class Example
On an assembly line of windshield wiper motors, the inspector selects
randomly 100 motors per hour to examine. The inspector notes on the
“check sheet” the number of defective motors in each 100 selected.
Step 1: Collect Data (lot size set constant)
Step 2: Calculate Values p =
∑
∑
n
pn
CL = p n
UCL = p n + 3 pn p( )1−
LCL = p n - 3 pn p( )1−
Step 3: Plot Chart
QUALITYPLANNING
Whoiscustomer?
Whatdotheyneed?
QUALITYCONTROL
Evaluate,compare,act
QUALITY
IMPROVEMENT
Establishinfrastructure
ISO
9000
1b7 quality control
1b7 quality control

More Related Content

What's hot

15 statistical quality control
15  statistical quality control15  statistical quality control
15 statistical quality control
Jithin Aj
 
Ppt On S.Q.C.
Ppt On S.Q.C.Ppt On S.Q.C.
Ppt On S.Q.C.
dvietians
 

What's hot (20)

Meaning &significance of spc
Meaning &significance of spcMeaning &significance of spc
Meaning &significance of spc
 
An introduction to x-BAR chart
An introduction to x-BAR chartAn introduction to x-BAR chart
An introduction to x-BAR chart
 
Statistical process control ppt @ doms
Statistical process control ppt @ doms Statistical process control ppt @ doms
Statistical process control ppt @ doms
 
Statistical quality control
Statistical quality controlStatistical quality control
Statistical quality control
 
Spc
SpcSpc
Spc
 
6 control charts
6 control charts6 control charts
6 control charts
 
Six Sigma Statistical Process Control (SPC) Training Module
Six Sigma Statistical Process Control (SPC) Training ModuleSix Sigma Statistical Process Control (SPC) Training Module
Six Sigma Statistical Process Control (SPC) Training Module
 
Final notes on s1 qc
Final notes on s1 qcFinal notes on s1 qc
Final notes on s1 qc
 
Control chart for variables
Control chart for variablesControl chart for variables
Control chart for variables
 
Statistical Process Control in Detail
Statistical Process Control in Detail Statistical Process Control in Detail
Statistical Process Control in Detail
 
Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process Control
 
Attribute MSA
Attribute MSAAttribute MSA
Attribute MSA
 
Control chart ppt
Control chart pptControl chart ppt
Control chart ppt
 
C chart
C chartC chart
C chart
 
5. spc control charts
5. spc   control charts5. spc   control charts
5. spc control charts
 
6 statistical quality control
6   statistical quality control6   statistical quality control
6 statistical quality control
 
statistical quality control
statistical quality controlstatistical quality control
statistical quality control
 
15 statistical quality control
15  statistical quality control15  statistical quality control
15 statistical quality control
 
Ppt On S.Q.C.
Ppt On S.Q.C.Ppt On S.Q.C.
Ppt On S.Q.C.
 
Statistical Process control
Statistical Process controlStatistical Process control
Statistical Process control
 

Viewers also liked (6)

Pp chapter 6
Pp chapter 6Pp chapter 6
Pp chapter 6
 
Pp chapter8
Pp chapter8Pp chapter8
Pp chapter8
 
Nota Bab 1 JF608
Nota Bab 1 JF608Nota Bab 1 JF608
Nota Bab 1 JF608
 
Pengurusan kualiti menyeluruh
Pengurusan kualiti menyeluruhPengurusan kualiti menyeluruh
Pengurusan kualiti menyeluruh
 
Kawalan kualiti
Kawalan kualitiKawalan kualiti
Kawalan kualiti
 
7qc Tools 173
7qc Tools 1737qc Tools 173
7qc Tools 173
 

Similar to 1b7 quality control

Statistical process control
Statistical process controlStatistical process control
Statistical process control
jsembiring
 
Quality management system course
Quality management system courseQuality management system course
Quality management system course
selinasimpson2101
 
Measure Phase
Measure PhaseMeasure Phase
Measure Phase
jay68
 

Similar to 1b7 quality control (20)

Quality and statistical process control ppt @ bec doms
Quality and statistical process control ppt @ bec domsQuality and statistical process control ppt @ bec doms
Quality and statistical process control ppt @ bec doms
 
Statistical process control
Statistical process controlStatistical process control
Statistical process control
 
Spc
SpcSpc
Spc
 
Qc tools
Qc toolsQc tools
Qc tools
 
Qc tools
Qc toolsQc tools
Qc tools
 
7qc Tools 173
7qc Tools 1737qc Tools 173
7qc Tools 173
 
Statistical Process Monitoring using R Software
Statistical Process Monitoring using R SoftwareStatistical Process Monitoring using R Software
Statistical Process Monitoring using R Software
 
Quality_Tools1.ppt
Quality_Tools1.pptQuality_Tools1.ppt
Quality_Tools1.ppt
 
quality_and_statistical_process_control.ppt
quality_and_statistical_process_control.pptquality_and_statistical_process_control.ppt
quality_and_statistical_process_control.ppt
 
Statstical process control
Statstical process controlStatstical process control
Statstical process control
 
WEI_ZHENGTAI_SPC
WEI_ZHENGTAI_SPCWEI_ZHENGTAI_SPC
WEI_ZHENGTAI_SPC
 
Quality management system course
Quality management system courseQuality management system course
Quality management system course
 
Measure Phase
Measure PhaseMeasure Phase
Measure Phase
 
C O N T R O L L P R E S E N T A T I O N
C O N T R O L L  P R E S E N T A T I O NC O N T R O L L  P R E S E N T A T I O N
C O N T R O L L P R E S E N T A T I O N
 
Final notes on s1 qc
Final notes on s1 qcFinal notes on s1 qc
Final notes on s1 qc
 
100018718.ppt
100018718.ppt100018718.ppt
100018718.ppt
 
Quality management syllabus
Quality management syllabusQuality management syllabus
Quality management syllabus
 
Seven Quality Tools.pptx
Seven Quality Tools.pptxSeven Quality Tools.pptx
Seven Quality Tools.pptx
 
CHAPTER 4 SQC.pptx
CHAPTER 4 SQC.pptxCHAPTER 4 SQC.pptx
CHAPTER 4 SQC.pptx
 
Chap0 10.pptx
Chap0                                              10.pptxChap0                                              10.pptx
Chap0 10.pptx
 

More from AHMED NADIM JILANI

More from AHMED NADIM JILANI (20)

Scaffolding by vn prabhu source facebook group survey & engineering de...
Scaffolding  by  vn prabhu source facebook group survey  & engineering de...Scaffolding  by  vn prabhu source facebook group survey  & engineering de...
Scaffolding by vn prabhu source facebook group survey & engineering de...
 
Nanotechnology in civil engineering0
Nanotechnology in civil engineering0Nanotechnology in civil engineering0
Nanotechnology in civil engineering0
 
Staadpresentation1 159
Staadpresentation1 159Staadpresentation1 159
Staadpresentation1 159
 
Pres staadpro
Pres staadproPres staadpro
Pres staadpro
 
Corenet montreal 2_13_08_nanotech_materials
Corenet montreal 2_13_08_nanotech_materialsCorenet montreal 2_13_08_nanotech_materials
Corenet montreal 2_13_08_nanotech_materials
 
DESIGN OF STEEL STRUCTURE
DESIGN OF STEEL STRUCTUREDESIGN OF STEEL STRUCTURE
DESIGN OF STEEL STRUCTURE
 
Ccna day5
Ccna day5Ccna day5
Ccna day5
 
Ccna day4
Ccna day4Ccna day4
Ccna day4
 
Ccna day3
Ccna day3Ccna day3
Ccna day3
 
Ccna day2
Ccna day2Ccna day2
Ccna day2
 
Ccna day1
Ccna day1Ccna day1
Ccna day1
 
What is nanotechnology
What is nanotechnologyWhat is nanotechnology
What is nanotechnology
 
Nanotechnology in civil engineering by shahid
Nanotechnology in  civil engineering by shahidNanotechnology in  civil engineering by shahid
Nanotechnology in civil engineering by shahid
 
What is nanotechnology
What is nanotechnologyWhat is nanotechnology
What is nanotechnology
 
Nanotechnology in civil engineering by shahid
Nanotechnology in  civil engineering by shahidNanotechnology in  civil engineering by shahid
Nanotechnology in civil engineering by shahid
 
Corenet montreal 2_13_08_nanotech_materials
Corenet montreal 2_13_08_nanotech_materialsCorenet montreal 2_13_08_nanotech_materials
Corenet montreal 2_13_08_nanotech_materials
 
Carbon nanotubes
Carbon nanotubesCarbon nanotubes
Carbon nanotubes
 
Nanotechnology in civil engineering
Nanotechnology in civil engineeringNanotechnology in civil engineering
Nanotechnology in civil engineering
 
electrical engineering
electrical engineeringelectrical engineering
electrical engineering
 
Water balance & management
Water balance & managementWater balance & management
Water balance & management
 

Recently uploaded

Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systems
meharikiros2
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 

Recently uploaded (20)

UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata Model
 
Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systems
 
Introduction to Geographic Information Systems
Introduction to Geographic Information SystemsIntroduction to Geographic Information Systems
Introduction to Geographic Information Systems
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 

1b7 quality control

  • 2. QUALITYPLANNING Whoiscustomer? Whatdotheyneed? QUALITYCONTROL Evaluate,compare,act QUALITY IMPROVEMENT Establishinfrastructure Who is customer? What Level of Quality do they need? Are they purchasing to Some Quality Specification? Any Safety Considerations? Future Litigation? Ethical Issues?
  • 3. QUALITYPLANNING Whoiscustomer? Whatdotheyneed? QUALITYCONTROL Evaluate,compare,act QUALITY IMPROVEMENT Establishinfrastructure QUALITY CONTROL Inspection • Destructive • Non-destructive • Sampling Process Control • Monitoring Process (relates to inspection) • Feedback Control • Statistical Process Control (knowing when the process is out of control) Correction • Knowing what to correct when process is out of control
  • 4. Cost of Quality Before & After Improvement 0 10 20 30 40 50 60 70 80 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Time Series 1
  • 5. Tools for Quality Control Check Sheets Pareto Charts Why-Why Diagrams Cause & Effect Diagrams Flowcharts Histograms Scatter Diagram Control Charts
  • 7. CHECK SHEETS Used to keep a record of the number and type of discontinuities over a specified period of time or within a certain batch of product. PARETO CHART A graphical representation ranking discontinuities from the most to least significant. Used to help brainstorm what discontinuities, if worked upon first, would be the most likely to produce the greatest improvement in quality. Class Example Our manufacturing procedure is composed of several steps. Several of these procedures have lead to discontinuities noticed upon inspection. The steps causing defectives are as follows: ∀• Caulking 198 defectives ∀• Fitting 25 defectives ∀• Connections 103 defectives ∀• Torque 18 defectives ∀• Gapping 72 defective A Pareto Diagram will be developed.
  • 8.
  • 9.
  • 10. WHY-WHY DIAGRAMS A systematic representation of causes of why some occurrence happens. Used to guide brainstorming sessions.
  • 11.
  • 12. FLOW CHARTS Flow charts are graphical representations of the steps involved in a process. Constructing a flow chart helps give a better understanding of the systems involved. Process DecisionData Process Process Terminator Yes No Control transfer
  • 13. CAUSE AND EFFECT DIAGRAMS (Fishbone Diagram) Used in brainstorming session to help identify the causes of quality losses. This diagram is particularly useful after the flow chart and the Pareto diagrams have been developed. QUALITY (Effect)Cause Step 1:Decide on the quality characteristic {e.g. Reduction of wobble during machine rotation} Step 2:Set up the fish bone backbone Step 3:Identify main factors causing effect {e.g. Workers, Materials, Inspection, Tools} Step 4: Add Cause to each branch
  • 14.
  • 15. Benefits of Cause and Effect Diagram • Making diagram is educational in itself • Outline relationship • Note what samples need to be taken • Guide for discussion • Causes are actively sought and results written on diagram • Appropriate data collected - no time wasted • Shows level of technology
  • 17. CONTROL CHARTS • Used to test if the process is in control • Used to see if significant changes have occurred in the process over time “Indiscreet” or “Continuous Data Chart” or “X-R Chart” Measurement at time intervals Measurements compared - control over time. Examples: Length (mm) Volume (cc) Weight (gm) Power (kwh) Time (sec) Pressure (psi) Voltage (v) “Discrete Data Charts” or “pn-p charts” Inspection on lot or batch Note # good/defective # of parts inspected in the lot = n Fraction of defective in lot = p Number of defectives = pn
  • 18. - R CHART CONSTRUCTIONX In the manufacturing process for this example parts are being machined with a nominal diameter of 13 mm. Samples are taken at the following times of day: 6:00, 10:00, 14:00, 18:00 and 22:00, for 25 consecutive days. The diameter measurements from these samples are presented on the table in the next slide. Class Example
  • 19.
  • 20. Step 1: Collect Data Step 2: Sort data into subgroups (i.e. lots, order #, days, etc.) n = size of the subgroup {in this example 5 times per day) k = number of subgroups {in this example 25 days} Step 3: Find the mean for each subgroup ( X ) X = X X X X n n1 2 3+ + +..... Step 4: Find Range for each subgroup ( R ) R = X largest value - X smallest value
  • 21. Step 5: Find Overall Mean ( X ) X = X X X X k k1 2 3+ + +... Step 6: Find average value of range ( R ) R = R R R R k k1 2 3+ + +... Step 7: Complete control limits using attached table For X Control Chart Central Line - CL = X Upper Control Limit - UCL = X +A2 R Lower Control Limit - LCR = X - A2 R For R Control Chart Central Line - CL = R Upper Control Limit - UCL = D4 R Lower Control Limit - LCR = D3 R
  • 23.
  • 24.
  • 25. P CONTROL CHART CONSTRUCTION An inspector at the end of the manufacturing line for the production of car wheel rims, at the end of each shift, inspects the lot of wheel rims made during that shift. On good days when the welder is running properly, over 400 wheels are made per batch. On poor days, as low as 50 to 60 wheels are made per batch. The inspector marks on his/her “check sheet” for each batch the total number of wheels inspected and the number of defects returned for rework in each lot. Class Example
  • 26.
  • 27. Step 1: Collect Data Step 2: Divide data into subgroups (usually days or lot). Subgroup size should be greater than 50 units. n = number in each subgroup pn = number of defects in each subgroup Step 3: Compute fraction of defectives (for %, multiply by 100) p = pn/n Step 4: Find the Average Fraction of Defectives ( p ) p = ( ) ( ) total defectives total inspected = pn n ∑ ∑ Step 5: Compute the Control Limits for each Lot Central Line CL = p Upper Control Limit UCL = p + 3 p p n ( )1− Lower Control Limit LCR = p - 3 p p n ( )1−
  • 28. Step 6:Draw P Control Chart
  • 29. PN CONTROL CHART CONSTRUCTION Class Example On an assembly line of windshield wiper motors, the inspector selects randomly 100 motors per hour to examine. The inspector notes on the “check sheet” the number of defective motors in each 100 selected.
  • 30. Step 1: Collect Data (lot size set constant) Step 2: Calculate Values p = ∑ ∑ n pn CL = p n UCL = p n + 3 pn p( )1− LCL = p n - 3 pn p( )1− Step 3: Plot Chart