SlideShare a Scribd company logo
1 of 15
pg. 1
SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
BACHELOR OF QUANTITY SURVEYING (HONOURS)
QSB60103 - SITE SURVEYING
Field Work 1 Report
Levelling
NAME STUDENT ID MARKS
Nicholas Wong Chin Khai 0331773
Ngiam Lok Yee 0327695
Orlando Wong Kueng Khung 0331859
Khairi Fariz Bin Modh Fiesal 0331177
pg. 2
Table of Content
Content Page
Cover page 1
Table of content 2
Introduction 3-5
Objective 6
Raw data 7-9
Arithmetical check 10
Error of distribution 11
Adjusted data 12,13
Conclusion / Summary 14
pg. 3
INTRODUCTION
Surveying is the technique, profession, and science of determining the terrestrial or three-
dimensional positions of points and the distances and angles between them. Levelling is a branch
of surveying in which is used to obtain the measurement of geodetic height utilizing a numbered
level staff, and an optical levelling instrument mounted onto a tripod. The process of levelling
involves finding the elevation of a given point with respect to the given or assumed datum and to
establish a point at a given elevation with respect to the given or assumed datum. This allows
surveyors to determine the geological characteristics of an area. The methods of calculating the
reduced level are by height of collimation method and the rise and fall method; both of which
have been applied to obtain the calculation of the reduced level of the points in this fieldwork.
Figure 1 Automatic Level setup
As seen in Figure 1, an Automatic Level is mounted onto a tripod with the case and Level Staff
on the ground beside it. These instruments were provided to the students along with a thorough
lesson on a proper setup and instructions on how to operate it. A surveyor requires the
knowledge to operate various surveying instruments and the skills to process and analyse the
results obtained from the field.
pg. 4
Figure 2 Auto Level
Figure 3 Surveyor's Tripod
The Automatic Level is an optical instrument used to verify or establish points in the same
horizontal plane with a vertical staff to measure height differences and to measure, transfer and
set heights. It is to be mounted onto a tripod.
A surveyorโ€™s tripod is a three-legged device used to support surveying instruments such as the
Automatic Level, Theodolites and so on. Many of which are constructed of aluminium although
wooden legged tripods can still be found. The feet are either aluminium tipped with a steel point
or steel. The legs of the tripod can be adjusted to provide a convenient height and make it
roughly levelled.
pg. 5
Figure 4 A Bubble Level
A bullโ€™s eye level is a type of spirit level that allows for the levelling of planes in two dimensions
Figure 5 A Plumb Bob
A plumb bob is a weight with a pointed tip on the bottom, suspended from a string and used as a
vertical reference line. It is essentially the vertical equivalent of a water level.
pg. 6
Figure 6 Levelling Staff
The Level Staff is also known as a Levelling rod and it cannot be used without a levelling
instrument. They can be one piece or sectional and can be shortened for storing when necessary.
There are many types of staffs with markings in imperial or metric units. The markings can be on
one side of the staff or on both sides. If its marked on both sides, the markings can be similar or
can have imperial units on one side and metric on another.
There are various terms in surveying and we need to know and understand them such as
backsight, intermediate sight, foresight, datum and so on and they are defined as such in the
following:
Backsight (B.S.) is a point which elevation is to be determined. It is the reading taken after
setting up the instrument.
Intermediate sight (I.S.) is any reading taken on point of unknown elevation from the same
setup of the level. Readings taken between the backsight and foresight are intermediate sights.
Foresight (F.S.) is a reading on a point which elevation is to be determined or on a change point.
It is the last reading before shifting the instrument.
Datum is a reference system or an approximation of the Earthโ€™s surface against which positional
measurements are made for computing locations.
Line of collimation (H.I.) also known as the line of sight, is the line which intersects with the
crosshairs of the optical centre of the object glass.
Change Point (C.P.) is a transfer point of the levelling also known as a turning point (T.P.). The
point is taken from foresight and backsight. Any objects defined can be used as a change point as
well as a benchmark.
pg. 7
OBJECTIVE
The aim of this fieldwork is to obtain the horizontal line of sight in accordance to the vertical
distances of the points provided by the lecturer. There were no distances or indicator for the
points, so the positioning of the instrument and levelling staff was to be determined according to
the shape on the map beginning at the stated benchmark. The instruments were set up in between
each point; with the levelling staff placed at each point to obtain a reading. Students were
instructed to find the elevations of given points with respect to a given or assumed datum and
also establish points at a given or assumed datum.
Figure 7 Given Points - Taylors University Carpark
Figure 2 shows the plan with given points provided to the students. The points are within the
premises of Taylors University carpark.
This fieldwork is to enable students to have a hands-on experience in setting up the instruments
and work with the automatic level, tripod stand, levelling staff as well as other instruments to
collect the data of the relevant fieldwork. This allows students to learn the correct method in
performing levelling.
pg. 8
Figure 8 Points Are Highlighted in Green.
Raw Data
Levelling is a fundamental process in the surveying operation. This process allows surveyors to
determine the elevation level at different points of the location. The results obtained from the
field would be calculated using a known reference point called benchmark. Using the calculated
values, students can understand the basic characteristic of the location.
Levelling fieldwork
Location: Taylorโ€™s University Lakeside Campus Open Carpark
pg. 9
1. Height of collimation method
Backsight Intersight Foresight Height of Collimation Reduced Level Remark
s
1.340 101.340 100.000 BM1
1.458 3.600 99.198 97.740 TP1
1.215 1.430 98.983 97.768 TP2
1.160 1.313 98.830 97.670 TP3
1.405 1.200 99.035 97.630 TP4
1.140 1.123 99.052 97.912 TP5
1.173 1.183 99.042 97.869 TP6
1.288 1.418 98.912 97.624 TP7
1.320 1.323 98.909 97.589 TP8
3.512 1.095 101.326 97.814 TP9
1.208 1.258 101.276 100.068 TP10
1.295 99.981 BM1
16.219 16.238 99.981
16.238 100.00
(0.019) (0.019)
pg. 10
2. Rise and Fall Method
Backsight Intersight Foresight Rise Fall Reduced Level Remarks
1.340 100.000 BM1
1.458 3.600 2.260 97.740 TP1
1.215 1.430 0.028 97.768 TP2
1.160 1.313 0.098 97.670 TP3
1.405 1.200 0.040 97.630 TP4
1.140 1.123 0.282 97.912 TP5
1.173 1.183 0.043 97.869 TP6
1.288 1.418 0.245 97.624 TP7
1.320 1.323 0.035 97.589 TP8
3.512 1.095 0.225 97.814 TP9
1.208 1.258 2.254 100.068 TP10
1.295 0.087 99.981 BM1
16.219 16.238 2.789 2.808 99.981
16.238 2.808 100.000
(0.019) (0.019) (0.019)
pg. 11
Arithmetical Check
(a) Height of collimation method
The sum of each collimation height multiplied by the number of reduced levels obtained from it
is equal to the sum of all intermediate sights, foresight and reduced levels excluding first
reduced level.
OR
โˆ‘(BS) -โˆ‘(FS) = Last RL - First RL
(b) Rise and Fall Method
The sum of the back-sights minus the sum of the foresight is equal to the sum of the rises minus
the sum of the falls and is also equal to the first reduced level minus the last reduced level.
OR
โˆ‘(BS) -โˆ‘(FS) = โˆ‘R - โˆ‘F = Last RL - First RL
FIELDWORK READING
โˆ‘(BS) -โˆ‘(FS) = 16.219 - 16.238
= -0.019
โˆ‘Rise - โˆ‘Fall = 2.789 - 2.808
= -0.019
Last RL - First RL = 99.981 - 100.000
= -0.019
pg. 12
Error of Distribution
In this fieldwork, number of sets up is used instead of total length
Acceptable error of closure = ยฑ12โˆš๏ฟฝ
Where K represents :
a) The total length of the level circuit in kilometers
b) The number of sets up
Accuracy check
Mis-closure:
the error of closure for the line of levels is
99.981 - 100.000 = -0.019 (19 mm)
Maximum allowable error of closure =
= ยฑ12โˆš๏ฟฝ
= 12 โˆš(11) = 39.799mm
Hence, the accuracy of this work is acceptable.
pg. 13
Adjusted Data
Backsigh
t
Intersight Foresight Rise Fall Height of
Collimation
Reduce
d Level
Correction Final
Reduced
Level
Remarks
1.340 101.340 100.000
1.458 3.600 2.260 99.198 97.740 +0.00172 97.742
1.215 1.430 0.028 98.983 97.768 +0.00344 97.771
1.160 1.313 0.098 98.830 97.670 +0.00516 97.675
1.405 1.200 0.040 99.035 97.630 +0.00688 97.637
1.140 1.123 0.282 99.052 97.912 +0.0086 97.921
1.173 1.183 0.043 99.042 97.869 +0.01032 97.879
1.288 1.418 0.245 98.912 97.624 +0.01204 97.636
1.320 1.323 0.035 98.909 97.589 +0.01376 97.603
3.512 1.095 0.225 101.326 97.814 +0.01548 97.829
1.208 1.258 2.254 101.276 100.068 +0.0172 100.0852
1.295 0.087 99.981 +0.0189 99.999
16.219 16.238 2.789 2.808 99.981
16.238 2.808 100.000
(0.019) (0.019) (0.019)
pg. 14
Correction by using distance =
๐ถ๐ถ๐ถ๐ถ๐ถ๐ถ๐ถ๐ถ๐ถ๐ถ ๐ถ๐ถ๐ถ๐ถ๐ถ๐ถ๐ถ๐ถ
๐ถ๐ถ๐ถ๐ถ๐ถ ๐ถ๐ถ๐ถ๐ถ๐ถ๐ถ๐ถ๐ถ
X Error
However, when the distance is not given, correction by number of setup can be used.
Correction by number of setup =
๐น๐‘–๐‘›๐‘Ž๐‘™ ๐‘€๐‘–๐‘ ๐‘๐‘™๐‘œ๐‘ ๐‘ข๐‘Ÿ๐‘’
๐‘‡๐‘œ๐‘ก๐‘Ž๐‘™ ๐‘๐‘ข๐‘š๐‘๐‘’๐‘Ÿ ๐‘œ๐‘“ ๐‘†๐‘’๐‘ก๐‘ข๐‘๐‘ 
x Setup Number
In this field work, we are using correction by number of setup.
Mis-closure = 99.981 - 100.000
= -0.019
Correction by number of setup = (-0.019/11)
= -0.00172m
pg. 15
Figure 9 Group Photo
Conclusion / Summary
In conclusion, Levelling is to determine the difference in height between two points in an
area. Through this fieldwork, the group was able to learn how to setup the equipment, gather the
readings using the auto level and apply rise and fall method as well as height of collimation
method to obtain the misclosure and the reduce level of each points.
The process starts with obtaining the backsight of bench mark 1 and the foresight of
turning point 1. Then shifted the auto level to obtain the backsight of turning point and the
foresight of turning point 2. The process is repeated by shifting the auto level to obtain the
backsight and foresight of the following points. At last we went back to bench mark 1 to obtain
the last foresight in order to calculate the error of misclosure. After completed the levelling, we
decide to use both Height of collimation method and Rise and fall method to double confirm.
The error of misclosure is -0.019. According to the third order of accuracy, the maximum
allowance error of closure is ยฑ39.799 by using the formula of ยฑ12โˆšk, where k represents the
number of setups. Thus, our levelling result is acceptable.
Lastly, we had a great experience and thank to our lecturer Mr. Chai for giving us this
opportunity to learn and hands on in levelling. We are happy that we learn together and help each
other as a team.

More Related Content

What's hot

Theodolite lecture 1 1
Theodolite lecture 1 1Theodolite lecture 1 1
Theodolite lecture 1 1Tayyab Bin Arif
ย 
Tranverse report
Tranverse report Tranverse report
Tranverse report Wen Crystal
ย 
Profiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sectionsProfiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sectionsBahzad5
ย 
Types of level
Types of levelTypes of level
Types of levelSumit Meshram
ย 
Survey camp report(civil 3 rd year)
Survey camp report(civil 3 rd year) Survey camp report(civil 3 rd year)
Survey camp report(civil 3 rd year) ashishcivil098
ย 
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTSSURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTSVISHNU VIJAYAN
ย 
Fly Levelling
Fly LevellingFly Levelling
Fly LevellingBahzad5
ย 
levelling and contouring
 levelling and  contouring levelling and  contouring
levelling and contouringAbdul Majid
ย 
SITE SURVEYING LEVELING
SITE SURVEYING LEVELINGSITE SURVEYING LEVELING
SITE SURVEYING LEVELINGFarah Sham
ย 
Basics Of Surveying
Basics Of SurveyingBasics Of Surveying
Basics Of Surveyingstooty s
ย 
Road construction on mountain
Road construction on mountainRoad construction on mountain
Road construction on mountainMuhammad Adnan
ย 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-levelingXinYee Khoo
ย 
Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)Haziq1511
ย 
Tutor l1 setting out
Tutor l1 setting outTutor l1 setting out
Tutor l1 setting outLuke D'Arcy
ย 
Site Surveying Levelling
Site Surveying Levelling Site Surveying Levelling
Site Surveying Levelling Darren Lee
ย 
Setting out work
Setting out workSetting out work
Setting out workShivam Mehta
ย 
Theodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingTheodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingDolat Ram
ย 

What's hot (20)

Theodolite
TheodoliteTheodolite
Theodolite
ย 
Theodolite lecture 1 1
Theodolite lecture 1 1Theodolite lecture 1 1
Theodolite lecture 1 1
ย 
Tranverse report
Tranverse report Tranverse report
Tranverse report
ย 
Profiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sectionsProfiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sections
ย 
Types of level
Types of levelTypes of level
Types of level
ย 
Survey camp report(civil 3 rd year)
Survey camp report(civil 3 rd year) Survey camp report(civil 3 rd year)
Survey camp report(civil 3 rd year)
ย 
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTSSURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
ย 
Fly Levelling
Fly LevellingFly Levelling
Fly Levelling
ย 
levelling and contouring
 levelling and  contouring levelling and  contouring
levelling and contouring
ย 
SITE SURVEYING LEVELING
SITE SURVEYING LEVELINGSITE SURVEYING LEVELING
SITE SURVEYING LEVELING
ย 
Basics Of Surveying
Basics Of SurveyingBasics Of Surveying
Basics Of Surveying
ย 
Road construction on mountain
Road construction on mountainRoad construction on mountain
Road construction on mountain
ย 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-leveling
ย 
Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)
ย 
Total station
Total stationTotal station
Total station
ย 
Tutor l1 setting out
Tutor l1 setting outTutor l1 setting out
Tutor l1 setting out
ย 
Site Surveying Levelling
Site Surveying Levelling Site Surveying Levelling
Site Surveying Levelling
ย 
Setting out work
Setting out workSetting out work
Setting out work
ย 
Module 1 tacheometry
Module 1 tacheometryModule 1 tacheometry
Module 1 tacheometry
ย 
Theodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingTheodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversing
ย 

Similar to Site survey report 1

Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)Sheng Zhe
ย 
Site surveying report1
Site surveying report1Site surveying report1
Site surveying report1Est
ย 
Ss report 1
Ss report 1Ss report 1
Ss report 1Shen Sin
ย 
Ss report 1
Ss report 1Ss report 1
Ss report 1chloeesim
ย 
Assignment 1 - Levelling
Assignment 1 - LevellingAssignment 1 - Levelling
Assignment 1 - LevellingKai Yun Pang
ย 
Fieldwork 1 (leveling)
Fieldwork 1 (leveling)Fieldwork 1 (leveling)
Fieldwork 1 (leveling)Enoch Wong
ย 
Traversing
TraversingTraversing
TraversingArissa Loh
ย 
Project 1- Levelling
Project 1- Levelling Project 1- Levelling
Project 1- Levelling seenyee
ย 
Levelling final
Levelling finalLevelling final
Levelling finalseenyee
ย 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2Doreen Yeo
ย 
ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)Jing Chuang
ย 
Ss report 2
Ss report 2Ss report 2
Ss report 2Shen Sin
ย 
Ss report 1 ----levelling eport
Ss report 1 ----levelling eportSs report 1 ----levelling eport
Ss report 1 ----levelling eportMELVIN tan
ย 
Leveling report
Leveling reportLeveling report
Leveling reportWen Crystal
ย 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2Tee Joanne
ย 
Site surveying-report-2
Site surveying-report-2Site surveying-report-2
Site surveying-report-2Shane Ah
ย 
Ss report 1
Ss report 1Ss report 1
Ss report 1Pang Shuen
ย 
Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying Traversingashleyyeap
ย 
Ss report 1
Ss report 1Ss report 1
Ss report 1Hasif Alias
ย 
Assignment 2 - Traverse
Assignment 2 - TraverseAssignment 2 - Traverse
Assignment 2 - TraverseKai Yun Pang
ย 

Similar to Site survey report 1 (20)

Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)
ย 
Site surveying report1
Site surveying report1Site surveying report1
Site surveying report1
ย 
Ss report 1
Ss report 1Ss report 1
Ss report 1
ย 
Ss report 1
Ss report 1Ss report 1
Ss report 1
ย 
Assignment 1 - Levelling
Assignment 1 - LevellingAssignment 1 - Levelling
Assignment 1 - Levelling
ย 
Fieldwork 1 (leveling)
Fieldwork 1 (leveling)Fieldwork 1 (leveling)
Fieldwork 1 (leveling)
ย 
Traversing
TraversingTraversing
Traversing
ย 
Project 1- Levelling
Project 1- Levelling Project 1- Levelling
Project 1- Levelling
ย 
Levelling final
Levelling finalLevelling final
Levelling final
ย 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2
ย 
ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)
ย 
Ss report 2
Ss report 2Ss report 2
Ss report 2
ย 
Ss report 1 ----levelling eport
Ss report 1 ----levelling eportSs report 1 ----levelling eport
Ss report 1 ----levelling eport
ย 
Leveling report
Leveling reportLeveling report
Leveling report
ย 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2
ย 
Site surveying-report-2
Site surveying-report-2Site surveying-report-2
Site surveying-report-2
ย 
Ss report 1
Ss report 1Ss report 1
Ss report 1
ย 
Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying Traversing
ย 
Ss report 1
Ss report 1Ss report 1
Ss report 1
ย 
Assignment 2 - Traverse
Assignment 2 - TraverseAssignment 2 - Traverse
Assignment 2 - Traverse
ย 

More from Orlando Wong Khung

More from Orlando Wong Khung (6)

Cscm group assignment
Cscm group assignmentCscm group assignment
Cscm group assignment
ย 
Management science final
Management science finalManagement science final
Management science final
ย 
99% complete (4)
99% complete (4)99% complete (4)
99% complete (4)
ย 
Retaining wall (1)
Retaining wall (1)Retaining wall (1)
Retaining wall (1)
ย 
Site survey report 2
Site survey report 2Site survey report 2
Site survey report 2
ย 
Building services report
Building services reportBuilding services report
Building services report
ย 

Recently uploaded

Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
ย 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
ย 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
ย 
18-04-UA_REPORT_MEDIALITERAะกY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAะกY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAะกY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAะกY_INDEX-DM_23-1-final-eng.pdfssuser54595a
ย 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
ย 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
ย 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
ย 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
ย 
เคญเคพเคฐเคค-เคฐเฅ‹เคฎ เคตเฅเคฏเคพเคชเคพเคฐ.pptx, Indo-Roman Trade,
เคญเคพเคฐเคค-เคฐเฅ‹เคฎ เคตเฅเคฏเคพเคชเคพเคฐ.pptx, Indo-Roman Trade,เคญเคพเคฐเคค-เคฐเฅ‹เคฎ เคตเฅเคฏเคพเคชเคพเคฐ.pptx, Indo-Roman Trade,
เคญเคพเคฐเคค-เคฐเฅ‹เคฎ เคตเฅเคฏเคพเคชเคพเคฐ.pptx, Indo-Roman Trade,Virag Sontakke
ย 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
ย 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
ย 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
ย 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
ย 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerunnathinaik
ย 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxJiesonDelaCerna
ย 
โ€œOh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
โ€œOh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...โ€œOh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
โ€œOh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
ย 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitolTechU
ย 

Recently uploaded (20)

Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
ย 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
ย 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
ย 
Model Call Girl in Bikash Puri Delhi reach out to us at ๐Ÿ”9953056974๐Ÿ”
Model Call Girl in Bikash Puri  Delhi reach out to us at ๐Ÿ”9953056974๐Ÿ”Model Call Girl in Bikash Puri  Delhi reach out to us at ๐Ÿ”9953056974๐Ÿ”
Model Call Girl in Bikash Puri Delhi reach out to us at ๐Ÿ”9953056974๐Ÿ”
ย 
18-04-UA_REPORT_MEDIALITERAะกY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAะกY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAะกY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAะกY_INDEX-DM_23-1-final-eng.pdf
ย 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
ย 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
ย 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
ย 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
ย 
เคญเคพเคฐเคค-เคฐเฅ‹เคฎ เคตเฅเคฏเคพเคชเคพเคฐ.pptx, Indo-Roman Trade,
เคญเคพเคฐเคค-เคฐเฅ‹เคฎ เคตเฅเคฏเคพเคชเคพเคฐ.pptx, Indo-Roman Trade,เคญเคพเคฐเคค-เคฐเฅ‹เคฎ เคตเฅเคฏเคพเคชเคพเคฐ.pptx, Indo-Roman Trade,
เคญเคพเคฐเคค-เคฐเฅ‹เคฎ เคตเฅเคฏเคพเคชเคพเคฐ.pptx, Indo-Roman Trade,
ย 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
ย 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
ย 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
ย 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
ย 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
ย 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developer
ย 
Model Call Girl in Tilak Nagar Delhi reach out to us at ๐Ÿ”9953056974๐Ÿ”
Model Call Girl in Tilak Nagar Delhi reach out to us at ๐Ÿ”9953056974๐Ÿ”Model Call Girl in Tilak Nagar Delhi reach out to us at ๐Ÿ”9953056974๐Ÿ”
Model Call Girl in Tilak Nagar Delhi reach out to us at ๐Ÿ”9953056974๐Ÿ”
ย 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptx
ย 
โ€œOh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
โ€œOh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...โ€œOh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
โ€œOh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
ย 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptx
ย 

Site survey report 1

  • 1. pg. 1 SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN BACHELOR OF QUANTITY SURVEYING (HONOURS) QSB60103 - SITE SURVEYING Field Work 1 Report Levelling NAME STUDENT ID MARKS Nicholas Wong Chin Khai 0331773 Ngiam Lok Yee 0327695 Orlando Wong Kueng Khung 0331859 Khairi Fariz Bin Modh Fiesal 0331177
  • 2. pg. 2 Table of Content Content Page Cover page 1 Table of content 2 Introduction 3-5 Objective 6 Raw data 7-9 Arithmetical check 10 Error of distribution 11 Adjusted data 12,13 Conclusion / Summary 14
  • 3. pg. 3 INTRODUCTION Surveying is the technique, profession, and science of determining the terrestrial or three- dimensional positions of points and the distances and angles between them. Levelling is a branch of surveying in which is used to obtain the measurement of geodetic height utilizing a numbered level staff, and an optical levelling instrument mounted onto a tripod. The process of levelling involves finding the elevation of a given point with respect to the given or assumed datum and to establish a point at a given elevation with respect to the given or assumed datum. This allows surveyors to determine the geological characteristics of an area. The methods of calculating the reduced level are by height of collimation method and the rise and fall method; both of which have been applied to obtain the calculation of the reduced level of the points in this fieldwork. Figure 1 Automatic Level setup As seen in Figure 1, an Automatic Level is mounted onto a tripod with the case and Level Staff on the ground beside it. These instruments were provided to the students along with a thorough lesson on a proper setup and instructions on how to operate it. A surveyor requires the knowledge to operate various surveying instruments and the skills to process and analyse the results obtained from the field.
  • 4. pg. 4 Figure 2 Auto Level Figure 3 Surveyor's Tripod The Automatic Level is an optical instrument used to verify or establish points in the same horizontal plane with a vertical staff to measure height differences and to measure, transfer and set heights. It is to be mounted onto a tripod. A surveyorโ€™s tripod is a three-legged device used to support surveying instruments such as the Automatic Level, Theodolites and so on. Many of which are constructed of aluminium although wooden legged tripods can still be found. The feet are either aluminium tipped with a steel point or steel. The legs of the tripod can be adjusted to provide a convenient height and make it roughly levelled.
  • 5. pg. 5 Figure 4 A Bubble Level A bullโ€™s eye level is a type of spirit level that allows for the levelling of planes in two dimensions Figure 5 A Plumb Bob A plumb bob is a weight with a pointed tip on the bottom, suspended from a string and used as a vertical reference line. It is essentially the vertical equivalent of a water level.
  • 6. pg. 6 Figure 6 Levelling Staff The Level Staff is also known as a Levelling rod and it cannot be used without a levelling instrument. They can be one piece or sectional and can be shortened for storing when necessary. There are many types of staffs with markings in imperial or metric units. The markings can be on one side of the staff or on both sides. If its marked on both sides, the markings can be similar or can have imperial units on one side and metric on another. There are various terms in surveying and we need to know and understand them such as backsight, intermediate sight, foresight, datum and so on and they are defined as such in the following: Backsight (B.S.) is a point which elevation is to be determined. It is the reading taken after setting up the instrument. Intermediate sight (I.S.) is any reading taken on point of unknown elevation from the same setup of the level. Readings taken between the backsight and foresight are intermediate sights. Foresight (F.S.) is a reading on a point which elevation is to be determined or on a change point. It is the last reading before shifting the instrument. Datum is a reference system or an approximation of the Earthโ€™s surface against which positional measurements are made for computing locations. Line of collimation (H.I.) also known as the line of sight, is the line which intersects with the crosshairs of the optical centre of the object glass. Change Point (C.P.) is a transfer point of the levelling also known as a turning point (T.P.). The point is taken from foresight and backsight. Any objects defined can be used as a change point as well as a benchmark.
  • 7. pg. 7 OBJECTIVE The aim of this fieldwork is to obtain the horizontal line of sight in accordance to the vertical distances of the points provided by the lecturer. There were no distances or indicator for the points, so the positioning of the instrument and levelling staff was to be determined according to the shape on the map beginning at the stated benchmark. The instruments were set up in between each point; with the levelling staff placed at each point to obtain a reading. Students were instructed to find the elevations of given points with respect to a given or assumed datum and also establish points at a given or assumed datum. Figure 7 Given Points - Taylors University Carpark Figure 2 shows the plan with given points provided to the students. The points are within the premises of Taylors University carpark. This fieldwork is to enable students to have a hands-on experience in setting up the instruments and work with the automatic level, tripod stand, levelling staff as well as other instruments to collect the data of the relevant fieldwork. This allows students to learn the correct method in performing levelling.
  • 8. pg. 8 Figure 8 Points Are Highlighted in Green. Raw Data Levelling is a fundamental process in the surveying operation. This process allows surveyors to determine the elevation level at different points of the location. The results obtained from the field would be calculated using a known reference point called benchmark. Using the calculated values, students can understand the basic characteristic of the location. Levelling fieldwork Location: Taylorโ€™s University Lakeside Campus Open Carpark
  • 9. pg. 9 1. Height of collimation method Backsight Intersight Foresight Height of Collimation Reduced Level Remark s 1.340 101.340 100.000 BM1 1.458 3.600 99.198 97.740 TP1 1.215 1.430 98.983 97.768 TP2 1.160 1.313 98.830 97.670 TP3 1.405 1.200 99.035 97.630 TP4 1.140 1.123 99.052 97.912 TP5 1.173 1.183 99.042 97.869 TP6 1.288 1.418 98.912 97.624 TP7 1.320 1.323 98.909 97.589 TP8 3.512 1.095 101.326 97.814 TP9 1.208 1.258 101.276 100.068 TP10 1.295 99.981 BM1 16.219 16.238 99.981 16.238 100.00 (0.019) (0.019)
  • 10. pg. 10 2. Rise and Fall Method Backsight Intersight Foresight Rise Fall Reduced Level Remarks 1.340 100.000 BM1 1.458 3.600 2.260 97.740 TP1 1.215 1.430 0.028 97.768 TP2 1.160 1.313 0.098 97.670 TP3 1.405 1.200 0.040 97.630 TP4 1.140 1.123 0.282 97.912 TP5 1.173 1.183 0.043 97.869 TP6 1.288 1.418 0.245 97.624 TP7 1.320 1.323 0.035 97.589 TP8 3.512 1.095 0.225 97.814 TP9 1.208 1.258 2.254 100.068 TP10 1.295 0.087 99.981 BM1 16.219 16.238 2.789 2.808 99.981 16.238 2.808 100.000 (0.019) (0.019) (0.019)
  • 11. pg. 11 Arithmetical Check (a) Height of collimation method The sum of each collimation height multiplied by the number of reduced levels obtained from it is equal to the sum of all intermediate sights, foresight and reduced levels excluding first reduced level. OR โˆ‘(BS) -โˆ‘(FS) = Last RL - First RL (b) Rise and Fall Method The sum of the back-sights minus the sum of the foresight is equal to the sum of the rises minus the sum of the falls and is also equal to the first reduced level minus the last reduced level. OR โˆ‘(BS) -โˆ‘(FS) = โˆ‘R - โˆ‘F = Last RL - First RL FIELDWORK READING โˆ‘(BS) -โˆ‘(FS) = 16.219 - 16.238 = -0.019 โˆ‘Rise - โˆ‘Fall = 2.789 - 2.808 = -0.019 Last RL - First RL = 99.981 - 100.000 = -0.019
  • 12. pg. 12 Error of Distribution In this fieldwork, number of sets up is used instead of total length Acceptable error of closure = ยฑ12โˆš๏ฟฝ Where K represents : a) The total length of the level circuit in kilometers b) The number of sets up Accuracy check Mis-closure: the error of closure for the line of levels is 99.981 - 100.000 = -0.019 (19 mm) Maximum allowable error of closure = = ยฑ12โˆš๏ฟฝ = 12 โˆš(11) = 39.799mm Hence, the accuracy of this work is acceptable.
  • 13. pg. 13 Adjusted Data Backsigh t Intersight Foresight Rise Fall Height of Collimation Reduce d Level Correction Final Reduced Level Remarks 1.340 101.340 100.000 1.458 3.600 2.260 99.198 97.740 +0.00172 97.742 1.215 1.430 0.028 98.983 97.768 +0.00344 97.771 1.160 1.313 0.098 98.830 97.670 +0.00516 97.675 1.405 1.200 0.040 99.035 97.630 +0.00688 97.637 1.140 1.123 0.282 99.052 97.912 +0.0086 97.921 1.173 1.183 0.043 99.042 97.869 +0.01032 97.879 1.288 1.418 0.245 98.912 97.624 +0.01204 97.636 1.320 1.323 0.035 98.909 97.589 +0.01376 97.603 3.512 1.095 0.225 101.326 97.814 +0.01548 97.829 1.208 1.258 2.254 101.276 100.068 +0.0172 100.0852 1.295 0.087 99.981 +0.0189 99.999 16.219 16.238 2.789 2.808 99.981 16.238 2.808 100.000 (0.019) (0.019) (0.019)
  • 14. pg. 14 Correction by using distance = ๐ถ๐ถ๐ถ๐ถ๐ถ๐ถ๐ถ๐ถ๐ถ๐ถ ๐ถ๐ถ๐ถ๐ถ๐ถ๐ถ๐ถ๐ถ ๐ถ๐ถ๐ถ๐ถ๐ถ ๐ถ๐ถ๐ถ๐ถ๐ถ๐ถ๐ถ๐ถ X Error However, when the distance is not given, correction by number of setup can be used. Correction by number of setup = ๐น๐‘–๐‘›๐‘Ž๐‘™ ๐‘€๐‘–๐‘ ๐‘๐‘™๐‘œ๐‘ ๐‘ข๐‘Ÿ๐‘’ ๐‘‡๐‘œ๐‘ก๐‘Ž๐‘™ ๐‘๐‘ข๐‘š๐‘๐‘’๐‘Ÿ ๐‘œ๐‘“ ๐‘†๐‘’๐‘ก๐‘ข๐‘๐‘  x Setup Number In this field work, we are using correction by number of setup. Mis-closure = 99.981 - 100.000 = -0.019 Correction by number of setup = (-0.019/11) = -0.00172m
  • 15. pg. 15 Figure 9 Group Photo Conclusion / Summary In conclusion, Levelling is to determine the difference in height between two points in an area. Through this fieldwork, the group was able to learn how to setup the equipment, gather the readings using the auto level and apply rise and fall method as well as height of collimation method to obtain the misclosure and the reduce level of each points. The process starts with obtaining the backsight of bench mark 1 and the foresight of turning point 1. Then shifted the auto level to obtain the backsight of turning point and the foresight of turning point 2. The process is repeated by shifting the auto level to obtain the backsight and foresight of the following points. At last we went back to bench mark 1 to obtain the last foresight in order to calculate the error of misclosure. After completed the levelling, we decide to use both Height of collimation method and Rise and fall method to double confirm. The error of misclosure is -0.019. According to the third order of accuracy, the maximum allowance error of closure is ยฑ39.799 by using the formula of ยฑ12โˆšk, where k represents the number of setups. Thus, our levelling result is acceptable. Lastly, we had a great experience and thank to our lecturer Mr. Chai for giving us this opportunity to learn and hands on in levelling. We are happy that we learn together and help each other as a team.