1. PTSC Offshore Services JSC Page 1 of 7
PETROVIETNAM TECHNICAL SERVICES CORPORATION
PTSC OFFSHORE SERVICES JOINT STOCK COMPANY
PTSC Downstream Port, No. 65A 30-4 Road, Thang Nhat Ward,
Vung Tau City, Viet Nam S.R
Tel: +84.64.3515 758 Fax: +84.64.3515 759
CURRICULUM VITAE
PERSONAL DATA
Full Name : NGUYEN MANH CHIEN
Date of Birth : 16/12/1988
Nationality : Vietnamese
Permanent Address : Nghia Chau Commune, Nghia Hung District, Nam Dinh
Province
Sex : Male
Marital Status : Married
Health Status : Good
Passport No. : B6279425
Date of Issue : 05/03/2012
Date of Expire : 05/03/2020
Language : Vietnamese, English
Computer Skill : Microsoft Word, Excel, Outlook, MS Project, Primavera P6,
Power Point, Photoshop and AutoCad
Interests : Sport, Reading, Music
EDUCATION
School Name : Ha Noi University of Civil Engineering
Period : From 2007 to 2012
Major : Offshore Construction
Certificate : Bachelor of Engineering
TRAINING
October 2014 : Project Management in Oracle Primavera P6 at head office of
PTSC, 1-5 Le Duan, 1 District, Ho Chi Minh City.
September 2011 : Trainee engineer (04 months) at Project and Marine Department
of PTSC Offshore Services JSC.
August 2011 : Trainee engineer (01 month) at Engineering Department of
PTSC Mechanical and Construction JSC.
PROFESSIONAL EXPERIENCE
* Good knowledge and hands-on experience of onshore fabrication and offshore installation.
* Good experience in supervision at onshore and offshore site including steel structure
fabrication, heavy cargo transportation, fixed, subsea and floating structure installation (e.g.
jacket, topside, pipeline, PLEM, mooring system), hook-up and commissioning.
2. CURRICULUM VITAE Nguyen Manh Chien
PTSC Offshore Services JSC Page 2 of 7
* Good knowledge and experience of review the structural design.
* Good experience in coordination, interface, supervision all issues in transportation &
installation (T&I) project.
* Good understanding in bid proposal preparation for T&I project.
* Be able to compose, generate project documents & associated scopes of work.
* Good hands-on experience of developing project schedule, manpower-loading, project
progress monitoring, project report, coordinate of oil & gas construction project.
EMPLOYMENT HISTORY
Organization : PTSC Offshore Services Joint Stock Company
(a subsidiary of PetroVietnam Technical Services
Corporation)
Period : From March 2012 to now
Position : Project Engineer of Project & Marine Department
Responsibility &
Duties
: In charge of coordination, planning, interface, supervision all
issues of transportation & installation (T&I) project
MAJOR PROJECTS PARTICIPATED
No. Details Description
1. Project Ca Mau Gas Processing Plant Project (2016 – 20117)
(Provision of Onshore Construction Engineering, Installation of
Piping System & Equipment Erection for Petroviet nam Gas)
Task Planning/scheduling/managing/monitoring project works and
progress as planned to meet Client PV Gas’s requirement.
Including: Overall schedule, 2 weeks look ahead schedule and
others detail schedule for critical woks.
Risk analyze (material, equipment, tools, consumable…) which
shall be effected to project’s progress, warning/highlight to
project management.
Project status updating and reporting sush as: Daily progress
report, Construction works’s diary…etc….
Position Project Planning Manager.
2. Project LCP-Badamyar Modification Project (2015 – 2016)
(Provision of Offshore Manpower Services and Consumables,
Tools & Equipment for Hyundai Heavy Industries Co., Ltd)
Task Participate to offshore modification SOW comprises
structure/mechanical/E&IT/piping for Production Platform,
Medium Pressure Compression Platform, Quarter Platfrom 2,
Bridge (MCP-PP) and Bridge (PP-QP2) in Yadana offshore
complex for Hyundai Heavy Industries/ Total E&P Myanmar.
Assist Offshore Construliction Manager in preparing of work
notification for job execution at offshore work site.
3. CURRICULUM VITAE Nguyen Manh Chien
PTSC Offshore Services JSC Page 3 of 7
Monitor the progress of project including monitor material
status and vessel movement, issue Daily Progress Report.
Position Project planner.
3. Project Thai Binh – Ham Rong Gas Distribution and Gathering
System Project, Block 102 & 106, Phase 01 (2015)
(Provision of Engineering, Procurement, Construction and
Installation for Petroviet nam Gas)
Task Participate to onshore preparation work (pre-installation/post
survey of pipeline route and pre-trenching/post-trenching – back
filling of pipeline route).
Participate to offshore pre-installation survey (soil core
sampling and sub-bottom profiler survey) by “M/v PTSC
Researcher” and post-survey.
Participate to offshore post trenching using Jet Slet (natrural
back filling) by construction barge “OB1”.
Position Company Site Representative.
4. Project Te Giac Trang Field Development – Transportation and
Installation of H5-WHP Topside and Infield Pipelines (2015)
(Provision of Transportation and Offshore Installation Services
of H5-WHP Topside and Infield Pipeline for Hoang Long Joint
Operating Company – HLJOC)
Task Participate to offshore campaign of pipe-laying by “HLPV-SK
1200” (5.8 Km 6’’ Gaslift from H4-WHP to H5-WHP; 5.8 Km
8’’ Water injection from H4-WHP to H5-WHP; 12.5 Km
Production from H5-WHP to H1-WHP).
Assist Company Site Representative in preparation, orgnizing &
supervising for job execution at offshore work site.
Monitor project progress and issue 6 hourly offshore flash
report.
Monitor sevices provided Installation Subcontractor SK TLO
Sdn. Bhd. (SKTLO).
Position Field Engineer.
5. Project H4 Modification Phase 2 and 6’’Gaslift Riser Installation
Project (2015)
(Provision of H4 Modification phase 2 and 6’’ GL Riser
Installation for Hoang Long Joint Operating Company)
Task Onshore Preparation:
Prepare the bidding documents (Project Execution Plan, Project
Risk Management Plan).
Liaise with Project Management Team and technical disciplines
involved in engineering, fabrication and installation to issue
feasible schedule, manpower loading.
Participate to issue work deployment procedure.
4. CURRICULUM VITAE Nguyen Manh Chien
PTSC Offshore Services JSC Page 4 of 7
Control the material requisition order.
Monitor the progress of project, issue Daily/Weekly/Monthly
Progress Report.
Assist and organize regular meeting, either face-to-face
discussion among parties.
Coordinate/supervise the fabrication at site and load-out onto
AWB POS1.
Monitor services provided by sub-contractors (NDT, hot
bonded, FJC, diving,...).
Prepare the as-built document during job execuation and after
completion job.
Offshore Installation by “AWB POS1”:
Assist Offshore Construction Manager in organizing,
supervising preparation for job execution at offshore work site.
Issue offshore flash report, DPR.
Assist and organize daily meeting, either face-to-face discussion
among parties (HLJOC/MWS/VR/Diving sub-contractor-
PVMTC).
Position Project Coordinator & Planner.
6. Project Su Tu Vang Extension Plan – Su Tu Vang South West
(SVSW or SV6X) – Work Pack 2 (2014)
(Provision of (24)KV Submarine Cable Laying Service from
STV-CPP to SVSW-WHP for Cuu Long Joint Operating
Company CLJOC).
Task Onshore Preparation:
Liaise with Project Management Team and technical disciplines
involved in engineering and installation of submarine cable.
Organize and supervise the preparation on installation vessel
“Sea Comanche” for offshore installation including installation
of ROV spread, laying equipmennt and load-out of laying
equipment (15T tensioner, reel adapter, 200T spooler &
accessories).
Offshore Installation:
Assist Offshore Construction Manager in organizing and
supervising preparation for submarine cable laying.
Issue offshore flash report, DPR.
Position Project Engineer.
7. Project Su Tu Vang Extension Plan – Su Tu Vang South West
(SVSW or SV6X) – Work Pack 1 (2014)
(Provision of Saturation Diving Support Service for Tie-In
Spool Installation, Pre-Commissioning of Pipeline System and
Concrete mattress installation for Cuu Long Joint Operating
Company CLJOC).
5. CURRICULUM VITAE Nguyen Manh Chien
PTSC Offshore Services JSC Page 5 of 7
Task Participate to offshore campaign of tie-in spools installation,
pre-commissioning of pipeline system and concrete mattress
installation by “DSV Armada Hawk”.
Manage, monior to maintain the project performance, quality
and progress as planned to meet Client CLJOC’s requirement
within approved budget and schedule.
Position Company Site Representative.
8. Project Provision of Rectification Work – Campaign 2 - for ‘HST’
Full Field Development and ‘HSD’ Early Field Development
Project (2014).
(Provision of air and saturation diving for Hai Su Trang Jacket
member cleaning, jacket structure member removal, mud-mat
removal, seal clamp removal, anode removal & installation,
clamp installation, grouting works, insertion of inhibitor stick to
f the jacket structure members and weld crack sealing for Thang
Long Joint Operating Company TLJOC).
Task Participate to offshore campaign of tie-in spools installation,
pre-commissioning of pipeline system and concrete mattress
installation by “DSV-Armada Hawk”.
Manage, monior to maintain the project performance, quality
and progress as planned to meet Client TLJOC’s requirement
within approved budget and schedule.
Position Company Site Representative.
9. Project EPC HCG-EOR FFS Project (2013 – 2014)
(Provision of Engineering, Procurement, Installation Services
of P17 & P18 Subsea Flexible Pipeline connecting three
platforms NWCI, WHP-C1 and WHP-E1/E1A for Japan
Vietnam Petroleum Company - JVPC)
Task Participate to offshore campaign of riser & riser guard
installation for WHP-C1 & NCWI by “AWB POS1”.
Assist Offshore Construction Manager in organizing,
supervising preparation for job execution at offshore work site.
Issue offshore flash report, DPR.
Assist and organize daily meeting, either face-to-face discussion
among parties (JVPC/MWS/VR/Diving sub-contractor-Master
Tech).
Position Project Engineer.
10. Project RBDP-A Line - Engineering, Procurement, Construction,
Installation, Hook-up and Commissioning (EPCIC) Project
(June, 2013 – April, 2014; project value of 13 mil. USD)
(Verification and rectification of detailed engineering,
procurement for new material & equipment, fabrication piping
spools & extension deck, removal of old equipment on WHP-A
& WHP-B platform, installation of new equipment, structure,
process piping, E&I devices and commissioning for new
6. CURRICULUM VITAE Nguyen Manh Chien
PTSC Offshore Services JSC Page 6 of 7
installed equipment, installation of 4” marine grade Gaslift
flexible pipeline)
Task Onshore Preparation:
Liaise with Project Management Team and technical disciplines
involved in engineering and installation of flexible pipeline.
Organize and supervise the preparation on installation vessel for
offshore installation including installation of ROV spread,
trenching equipment and load-out of concrete mattress.
Offshore Installation by “DSV-Harkand Harmony”:
Assist Offshore Construction Manager in organizing and
supervising preparation for pipe laying & trenching, installation
of concrete mattress.
Position Field Engineer.
11. Project Diamond Field Development –Work Pack 2 (2014)
(Provision of marine transportation and offshore installation of
DMDP-A Topside (WP2) for Petronas Carigali Vietnam
Limited PVCL).
Task Coordinate with Installation Subcontractor and Client &
Fabricator for preparation of offshore transportation and
installation scopes of DMDP-A Topside at PVC-MS fabrication
yard
Position Field Engineer.
12. Project Diamond Field Development –Work Pack 1 (2013)
(Provision of marine transportation and offshore installation of
18km 10” Production Pipeline & DMDP-A Jacket, Conductors,
Closed Drained Deck (WP1) for Petronas Carigali Vietnam
Limited PVCL).
Task Coordinate with Installation Subcontractor and Client &
Fabricator for preparation of load-out and sea transportation of
DMDP-A Jacket, Piles, Conductors, Closed Drained Deck at
PVC-MS fabrication yard.
Participate to offshore installation 18km 10” Production
Pipeline & DMDP-A Jacket, Conductors, Closed Drained Deck
by “HLPV-SK2000”.
Monitor project progress and issue 6 hourly offshore flash
report.
Monitor sevices provided Installation Subcontractor SK TLO
Sdn. Bhd. (SKTLO).
Position Field Engineer.
13. Project Bien Dong 1 Field Development including Workpack 1 and
Workpack 2&3 (2012-2013)
(Provision of Transportation and Offshore Installation Services
of WHP-MT1 (WP1), Concrete Coated Pipelines, Flexible
Pipelines, Subsea Cable, Umbilical, SSIV Skid, Tie-in Skid &
7. CURRICULUM VITAE Nguyen Manh Chien
PTSC Offshore Services JSC Page 7 of 7
WHP-HT1, PQP-HT & BR-HT Link Bridge (WP2&3) for Bien
Dong Petroleum Operating Company)
Task Coordinate T&I Subcontractor and Client and other parties like
Fabricator, MWS, CA for preparation of offshore transportation
and installation scopes of WHP-HT1 at VSP fabrication yard &
PQP-HT at PTSC M&C fabrication yard.
Participate the offshore installation of 20inch Gas Export
Pipeline by “DLB-Catoro Otto”.
Coordinate the load-out for 12 inch CRA Clad pipeline at
Wasco coating yard, Kuantan, Malaysia and PVID coating yard,
Ba Ria – Vung Tau, Vietnam.
Participate the offshore installation of 12inch CRA Clad
Pipeline by “DLB-Semac 1”
Position Field Engineer.