Johanes Herwin Hutapea is a naval architect and shipbuilding engineer from Indonesia with over 20 years of experience managing shipbuilding and offshore construction projects. He has worked on projects in Indonesia, Singapore, and Australia for companies like Siemens Energy, YAMAL LNG, and Saipem. His background includes experience in roles like construction superintendent, project manager, and welding supervisor on modular buildings, ships, offshore structures, and marine conversions.
1. CURRICULUM VITAE
PERSONAL DATA
Name
Johanes Herwin Hutapea, ST
Date and Place of Birth
June 8th
1971, Kutacane
South East Aceh – Indonesia
Religion
Christian
Marital Status
Married
Sex
Male
Nationality
Indonesian
Mobile Phone
0813 7221 8277
Passport No
U 208376
Height/Weight
163 cm/67 kg
Home Address
Kavling Sagulung Baru
Blok V No. 103-104 Sagulung
Batam - Indonesia
Email
John_hutapea@yahoo.com
This Curriculum Vitae is Right
and can be justified
Best Regards
( J. Herwin Hutapea, ST )
2. EDUCATION BACKGROUND
1. Elementary School
SD Negeri 8 Padang Sidempuan – North Sumatera 1978-1981
SD YPPK 5 Jayapura – Irian Jaya (Papua) 1981- 1983
SD Inpres Sorong - Irian Jaya (Papua) 1983 – 1984 (Graduate in 1984)
2. Junior High School
SMP Negeri 1 Sorong, Irian Jaya (Papua) – Indonesia Graduate in 1987
3. Senior High School
SMA Negeri 1 Sorong Irian Jaya(Papua) – Indonesia Graduate in 1990
4. University
Pattimura University, Faculty Engineering, Department Naval Architecture
Ambon – Maluku, 1992 - 1999
For 1999 – 2002 on leave Due the Chaos happened on Ambon
Finishing phases, Graduate in Dec 2002
5. Course
- Dua Utama Jaya Batam 2D & 3D Autocad course ( Certified)
- Oil Institut Batam Project Management Primavera P6 (Certified)
- Dua Utama Jaya-TWI Welding Inspector Course CSWIP 3.1 (Certified)
ACADEMIC AND PROFESIONAL QUALIFICATION
1. Naval Architect and Shipbuilding Engineer
2. Grade Point of Average
( Two point Seventh Five) in Scale 4.0
3. Computer Skill ( Ms. Office, Ms. Project, Internet, Autocad )
TRAINEE EXPERIENCE
1. On The Job Training at PT. PAL Indonesia
PROFFESIONAL EXPERIENCE
1.Construction Superintendent,Siemens Energy Oil/Gas Batam, 1 Sept 2014–31 Aug 2015
Responsibility :
Responsibility/Manage synchronize/Smoothness of Running project between all department
involve in project ; Safety,Structural, Blasting/Painting,Architectural, E/I, HVAC, Piping,
Scaffolding, Facility/Maintenance,
Preparation of Project since the beginning ( Provide Fabric area and supporting material, Check
Drawing To Doc Control, provide all yard rensponsibility to contractor as per Agreement/Matrix),
Planning (together with all department and all contractor) about daily target as per Task/Milestone
3. Trouleshooter on site
Coordinated and discuss with client about plan, progress and all issue project and client coment
Provide and lead daily Coordination meeting and Safety Meeting
Control directly of Structural fabrication process and progress ( Make sure all fabrication process
follow the role and Client Specification from ; Marking–Cutting – Fit-up –Welding – Cleaning
and Inspection
Project :
Main responsibility for Fabrication –Assembly/Erection- Installing – Finishing E/I
Modularized Building Packages MWP6 & MWP7a PAB 001 , 88mtrL x 34 mtrW.
Also involve on other project : Modularized Building Packages MWP6 & MWP7a ESS- 100,
ESS-800, ESS – 105/115, ESS - 106
Client : YAMGAZ – YAMAL LNG
Reason of Leaving : Finish Contract -
2. Senior Ship Repair Manager, PT. Bandar Abadi Shipyard
Ship Building,Repair & Steel Structure Fabrication Shipyard
Responsibility :
General planning,scheduling and Coordinator of ship repair project
General Control of Ship repair project ; Safety, Dock-Undock Plan, Repair progress
Choose and Issued PO for Subcontractor to carried out ship repair job
Reason of leaving : Finish Contract
3. Project Manager, PT. Dolly Putri Marsada, January 2014 – May 2014
Ship Building,Repair & Steel Structure Contractor
Responsibility :
General planning,scheduling and Coordinator of project
Control of preparation, drawing and material
Budgeting/Costing Planing/Calculation & Contro
Troubleshooter on Site
Work Done Report/Progres report
Invoice
4. Project Supervisor/Superintendent,Welding Depart, PT. World Wide Equipment
South East Asia
(Tat Hong Group), October 2012- January 2014, Shipyard & Onshore/Offshore Fabricator
Responsibility
General planning,scheduling and Coordinator of project
Control of preparation, drawing and material
Budgeting/Costing Planing/Calculation & Control
Volume Estimate & Calculation
Troubleshooter on Site
Work Done Report/Progres report
Project : 4009 – E/I Module – 37.5 m X 11.5 m T1 Utility Substation Building
4012- E/I Module – 38.0 m X 12.0 m T1 Propane Condenser Substation Building
4007 –E/I Module – 59.0 m X 18.0 m T1 Power Generation Substation Building
4056 – E/I Module – 37.5 m X 18.0 m T1 Compressor Substation Building
4010 – E/IModule – 32.5 m X 12.0 m T1 Loading Substation Building
Client : Australia Pacific LNG
4. Ship Conversion ; (June 2013 – Jan 2014)
THOM-823 ;Up Grade Barge from Flat Loading Barge to be Crane Barge (M.Hook SWL 300T)
Offshore Support Project ; (June 2013 - Nov 2013
S-45 Saipem , Zawtika Project ; Install 2 X 20m L Sway fender
Install & Dismantle 8”, 16”,24”,28” Rapid Ballast Pipe System
Secondary Rocker Arm
Reasen of Leaving ; Welding Department Closing/Shut Down
5. Project Manager, Structure Depart, PT. Sumber Sukses Ganda, July 1st
2012- Octo 2012
(New Building & Repair Sub Contractor at PT. BATAMEC SHIPYARD)
Responsibility :
General planning,scheduling and Coordinator of project
Control of preparation, drawing and material
Budgeting/Costing Planing/Calculation & Control
Volume Estimate & Calculation
Troubleshooter on Site
Work Done Report/Progres report
Invoice
Project : 90 meter Supply Offshore Vessel
190 mtr Drill Ship ( Block Fabrication from Jurong Shipyard)
6. Project Engineer, PT. Top Great Engineering & Marine june 1st
2012- June 30th
2012
Responsibility For:
General planning,scheduling and Coordinator of project
Control of preparation, drawing and material
Volume Estimate & Calculation
Troubleshooter on Site
Work Done Report/Progres report
Project : Mud Tank System 1000 HP and 1500 HP PERTAMINA
Outfitting panel (Panel Fabrication from Keppel Shipyard)
7. Project Manager, Structure Department, PT. Dolly Putri Marsada, Sept 2011- May 2012
Responsibility :
General planning,scheduling and Coordinator of project
Control of preparation, drawing and material
Budgeting/Costing Planing/Calculation & Control
Volume Estimate & Calculation
Troubleshooter on Site
Work Done Report/Progres report
Invoice
New Building Project :
1 unit 250 ft Work Barge ( PT. TWC Bintan Shipyard)
1 unit 54 Ton Spudcan of Liftboat Lisa ( Jack-up Barge)
1 unit 23 mtr Harbour Tug “ Multicat”
8. Project Engineer, Structure Depart PT.Bunatama Indah Prima,May 2011-August 2011
(Workshop Fabricator Sub Cont at PT. Top Great Engineering & Marine, Tj.Uncang)
Responsibility :
Job planning,scheduling and Coordinator
5. Preparation of drawing and material
Material Estimate
Budgeting/Costing Planing/Calculation & Control
Job Volume Estimate & Calculation
Troubleshooter on Site
Work Done Report/Invoice
Name of Project : Sea World Life Park – Sentosa World Ressort Singapore
Job : Aquarium Tank Frame
9. Project Engineer/Commercial, Structure & Piping Depart PT. Star Kembar Persada ,
January 2011 - May 2011
(New Building Sub Contractor at PT. Nexus Engineering Indonesia)
Responsibility :
Job planning,scheduling and Coordinator
Preparation of drawing and material
Costing Planing & Control
Job Volume Estimate & Calculation
Troubleshooter on Site
Work Done Report
Invoice
New Building Project : 2 Unit 29,4 m Tug Boat, 71,33m Patrol Boat Coast Guard
1 Unit 230 ft Deck Cargo Barge
10. Project In Charge/Commercial, Structure Depart CV. Arrahman Aut 2008 – Octo 2010
(New Building Sub Contractor at PT. Drydocks World Pertama)
Responsibility :
Job planning,scheduling and Coordinator
Preparation of drawing and material
Material Estimate
Budgeting/Costing Planing/Calculation & Control
Job Volume Estimate & Calculation
Troubleshooter on Site
Work Done Report
Invoice
New Building Project:
H – 184/185 : August 2008 – November 2009
72m Supply Offshore Vessel
Job : Structure & Outfittin
Owner : Bumi Armada Sdn Bhd
H – 186/187/188 : August 2008 – April 2010
65m Supply Offshore Vessel
Job : Structure & Outfittin
Owner : Bumi Armada Sdn Bhd
H – 191 : August 2008 – May 2010
180 m Super Heavy Weight Construction Vessel –DP-3
Job : Structure & Outfitting
Owner : Coastline
Repair Project ( July 2010 – Nov 2010)
Name of Project : Barge Britoil LB-1, CB. Sea Horizon, Castoro Otto(Saipem), KMA I,
MV.Gagah, Floating Dock V, Indobaruna V, MSC America
6. 11. Project Engineer/ In Charge, Structure /Depart PT. Satria Jaya Nov 2004 – July 2008
(Ship Repair&New Building SubCont at PT.Pan United Shipyard Indonesia/PT Dry Docks World
Pertama)
Responsibility :
Job planning,scheduling and Coordinator
Control of preparation of drawing and material
Material Estimate
Budgeting/Costing Planing/Calculation & Control
Troubleshooter on Site
Job Volume Estimate & Calculation
Progress Meeting Attendance
Work Done Report
Invoice
New Building Project:
Name of Project
H – 153 / 154 : Dec 2004 (Start work) – April 2005
65 m AHTS (Anchor Handling Tugboat Supply)
Job : Structure & Outfitting
Owner : Tide Water
H – 163 / 164 : March 2005 – April 2006
65 m AHTS (Anchor Handling Tugboat Supply)
Job : Structure & Outfitting
Owner : Pacific
H – 172 / 173 : Oct 2005 – Feb 2007
65 m AHTS (Anchor Handling Tugboat Supply)
Job : Structure & Outfitting
Owner : Lewek
H – 156 / 157 : June 2006 – August 2007
65 m AHTS (Anchor Handling Tugboat Supply)
Job : Structure & Outfitting
Owner : Tide water
H – 158 : June 2006 – July 2008
180m Super Heavy weight Construction Vessel- DP-3
Job : Structure & Outfitting
Owner : Coastline
H – 181 : March 2007 – July 2008
78 m Supply Offshore Vessel – DP-2
Job : Structure & Outfitting
Owner : Hallin
H – 186/187/188 : March 2008 – July 2008 (Sister Ship)
65m Supply Offshore Vessel- DP-2
Job : Structure & Outfitting
Owner : Bumi Armada Sdn Bhd
7. H – 191 : February 2008 – July 2008
180 m Super Heavy Weight Construction Vessel –DP. 3
Job : Structure & Outfitting
Owner : Coastline
Repair Project :
Reason of Leaving : Transfer by Company to CV. Arrahman
12. Engineer, Structure/Piping Depart PT. Jan Sanjaya Pusaka Batam Dec 2003 – Nov 2004
(Ship Repair Sub Contractor at PT. Pan United Shipyard Indonesia)
Job Description
Responsible For:
Preparation of drawing and material
Material Estimate
Costing Estimate/ Calculation
Job Volume Estimate
Work Done Report
Repair Project
Engineer, Painting – Blasting Depart PT. Jan Sanjaya Pusaka Batam Dec 2003 – Dec 2004
Reason of Leaving : Resign
13. Engineer, Piping Department PT. Lautan Mas Baruna Prima, Batam July – Dec 2003
(Sub Contractor at PT Pan United Shipyard Indonesia)
Responsibility :
Preparation of drawing and material
Coordination with supervisor
Man power planning
Made progress report and report to Project Manager
New Building Project
Name of project : H- 147
Owner : Lewek
Repair Project
Name of project : Desal 13
Reason of leaving : Resign
Best Regards
(J. Herwin Hutapea, ST)