Will Masson Resume
Memberships/Qualifications
• Member of Association for Programme Management
• Member of Pipeline Industries Guild
• Member of Chartered Institute of IT
• Advanced Network Rail Primavera P3e Course
• OPRIS Safety Course
• SAP Spiridon Course
• Siemens QM@TS Course
• MAXIMO Series 5 Course
• Production Fundamentals Course
• DUSUP – HSE Induction (Dubai)
• Basic FirstAid
• BOSIET & Offshore Medical (Current)
• EUSR 135787 - Utility SHEA (Gas)
• EUSR 135787 – Basic Electrical Safety Competence: Substations
Relevant Experience: Will has Over 28 years Claims and planning experience gained in a variety of industries
including 15 years On/Offshore Oil & Gas, Platforms, FPSO, FDPSO Azurite, Jack ups (Rowan Gorilla 3, Onome,
Delta Queen, Oritsetymine) Pipelines, Carbon Capture and Storage, Solar power Plants, Carbon Capture, NHS
IT, Network Rail, London Underground, M&E Facilities Management, Nuclear construction, Finance/banking &
Logistics, Banking software implementation.
Competent and experienced in Forensic Claims and Project Control utilising the use of Primavera software,
including version p3 to P6 latest version, Microsoft Project, Tilos, PowerProject and Prince 2 methodologies.
Excellent interpersonal skills combined with a flexible, motivated approach to work and ability to lead and
manage scheduling teams to achieve deadlines .
In addition Computer literate - proficient in use of Primavera from version 3 up to 8.3, Tilos, PowerProject,
Microsoft Project, MAXIMO, Microsoft Office applications and the Internet
Contracts
 Choosing,drafting and/or amending;
 Tendering processes;
Extensions ofTime
 Claims preparation;
 Forensic planning and retrospective delayanalysis.
 Preparation of Documents for Expert Witness including:
o Time Slice (also known as Time Impacted) Analysis.
o Window Analysis
o Collapsed As-Built(also known as 'As-BuiltButFor' method)
o Impacted-As-Planned
o As-Planned vs As-Built
Loss & Expense
 Claims preparation including cause and effect
Experience in Full Field Shutdowns,Workovers,Subsea Manifolds,Construction Work packages
Experience in Fabrication of Skids / modules etc
Experience on Fixed and Flotation Rigs,Jack Ups and FPDSO/FPSO’s
Experience on Drilling Derrick Decommissioning on the Azurite FPDSO
Experience on Overseas Shipyard – Site Establishment
Experience on AssetPlanning and Full Lifecycle Maintenance
Experience with Sea Trials and Commissioning ofOffshore Facilities
Experience with HSE and DNV Liaison with regards to Safety and Certification
Experience with interfacing with Subcontractors and Installation Management
Experience in Forensic Analysis of change
Experience of undertaking Critical Path Analysis and Forensic Planning
Will Masson Resume
Experience in the implementation ofprojectcontrols within Airports
Experience of managing and implementing EVM Systems
Experience in the Production of Dashboard Reports
Experience in Integrated Project & CostManagement
Experience in Full Programme Portfolio Managementand Reporting
Experience in working as part of an alliance team to ensure effective delivery across numerous stakeholders.
Experience with Major Blue Chip Clients – Shell,Total, Chevron, Mobil, Elf, Hess,National Grid,Network Rail.
Professional History
Sept 2014 to Present: Senior Planner – National Grid
IFA2 – 1000MW Interconnection – France to UK
 Develop and Maintain Project Schedule
 Bid Team Member - Evaluation of Supplier Programmes (Cable & Converter stations)
 Carry out analysis using Acumen Fuse & Primavera Risk Analysis
White Rose Carbon Capture & Storage Project (CCS)
 DevelopmentofFeed & EPC Schedules
 Maintenance and reporting of the above Schedules
 Member of the Tender Review Panel
Sept 2013 to Sept 2014 – HS Ocean Group Ltd
Role: Project Controls Manager – Rowan Gorilla 3 Jack Up – Trinidad – HS Ocean Group
 Assisting Kerrigan Construction Lawyers Produce Global Claim (30m USD)
 DevelopmentofExecutive Managementreporting
 Establish projectcontrols managementofexpended man-hours /materials /Sub contractors
 Responsible ofLocal Trinidad Labour & Communityprojects
 Responsible for the Armed Security managementofCIT
Role: Project Manager - Azurite Decommissioning FPDSO - Congo - HS Ocean Group
 Dispute Resolution/Mediation with Sub Contractor based in UK
 Decommissioning ofthe Nabors Drilling Package on-board the Azurite FPDSO whilstat sea
 Development& Implementation ofMethod Statements /Lift Plans / Risk Assessments'
 Managing Heavy Lifts, Decommissioning ofDrilling Derrick with use ofGin Pole, cranes and 4 rope
access teams
 Daily Planning & Reporting
Role: PCM / Interim Asset Integrity Manager – HS Ocean Group - Nigeria
PCM / Interim AssetIntegrity Manager responsible for 3 Jack up Drilling Rigs in Nigeria:
• Implementation ofProcesses and Procedures into Seawolf
• Carry out Audits on Planned Maintenance and Implementimprovements
• Develop Planning Strategy for the Company
• Implementation ofSafety & Quality Step Change
• Implementation ofone reporting tool for ManagementReporting
 Daily Planning of all Rig Activities
 Look Ahead Planning for 5 Yearly Drilling Maintenance Routines and Rig Recertification
March 2013 to Sept 2013: PMO Lead – Travelex One Platform Project – Global IT Role Out
PMO Lead for the Corporate Services Team responsible for the following work streams:
• Finance – CODA 12 global implementation replacing SAP, DREAM, CODA 11 etc
Will Masson Resume
• HR – Workday, Cornerstone,PeopleFluent,Ulearn,LMS, Payroll
• Treasury – Global implementation ofSunGard Quantum software
• People & Change – Training and Communication
• MIBI – Implementation ofone reporting tool for ManagementReporting
Sept 2011 to March 2013: Project Controls Manager – Rhead Group – ISS Project
Reporting directly to the Project Director on the Critical National Infrastructure securityprojectfor National Grid.
Directly responsible for producing:
• Contractor Programme Dispute Avoidance, Disputes and Resolution
• NG Board Pack Reports on a monthly basis.
• Weekly Portfolio Project Status Reports
• Providing ManagementInformation
• Assisting on the RECON development(ProjectAudit Tool)
March 2011 to Sept 2011: Project Controls Consultant – Shams 1 CSP Project – Turner & Townsend
Role Purpose:
To assistSHAMS in the planning and progress measurementofthe Shams 1 100MW CSP project by developing
an overall project schedule utilising Primavera project management software, MS Office software and other
project management tools. Assist the project management team in the review of EPC contractor’s and other
parties’ submitted plans, schedules and quantitative assessments of work planned or progressed. To use
reasonable endeavours to ensure the qualityand efficiency of the project plan to meetthe objectives of optimised
costs and minimise delays
Key Activities:
o To develop the overall “Master Project Schedule” (MPS) in accordance with the needs of SHAMS and to
train SHAMS staff in the monthly updates process to ensure accurate and timely reporting.
o To develop the methodology and written instructions to guide SHAMS staff through the monthly update
process including the analysis and reporting of:
o Critical Path Method / Critical Item Report
o Description of changes in the MPS since the previous update, i.e., work breakdown structure
changes,work breakdown dictionarychanges activity ID changes,logic changes,duration changes,
constraint changes, etc.
o Description ofchanges in the EPC contractor’s schedule from month to month, including the above
type of analysis.
July 2008 – March 2011 Head of International Project Controls – Rhead Group
Responsible for all planning related functions within the company, providing Dispute Avoidance/Resolution,
Project Control Solutions covering six divisions within the Rhead Group. Leading a dedicated team of Project
Control Managers / Planners. Significantexperience leading the planning content of numerous Forensic claims
analysis on major disputes including Offshore/onshore, Pipelines (CCC [Dolphin Energy], Dutco,McConnell
Dowell [DUSUP]) , Rail, Power Generation and Water Sectors. Claims ranging from 150K to 80m. Principally
covering United Kingdom, United Arab Emirates, South Africa and Asia. Acted as planning lead on the EU
Carbon Capture Competition (Longannet) alongside Aker Solutions, Shell, Scottish Power, National Grid and
Mott MacDonalds. Actively involved in implementing full lifecycle Project Solutions into clients, including
Tendering and evaluations,Bid development,implementation of EVM, Linear Project Control, Risk management
(Pertmaster),
Mar 2008 to July 2008 Senior Planner, Amey IS, Project: Birmingham Highways PFI Bid
Senior planner responsible for all project plans for the Bid submission to local government (Birmingham City
Council), this involved working closely with each of the disciplines to develop programmes to cover the
Mobilisation,Core InvestmentPeriod and high level programmes for maintenance ofthe highways and structures
over a 20 year duration.Developing programmes from conception. Importing and exporting programmes using
Will Masson Resume
Primavera 6 / excel. Delivered programme requirements within tight timescales, working with GIS mapping
software.
Nov 2006 – Mar 2008 Planning Manager, Siemens Transportation Systems Ltd, Project: Various
Signalling & Electrification Projects.
Responsible for developing bid programmes and planning procedures for Siemens UK. Major tasks included:
Development of a Project Management Office, Development of Project Controls and procedures, Develop,
maintain and monitor bid and integrated project programmes, Preparation of project dashboards and
managementreports.Lead overall costplanning and manpower schedule development, analysis and reporting
including critical path, schedule impact, progress assessment, completion forecasts and mitigation. Highlight
Risks and Opportunities throughoutthe full project lifecycle. WCRM – Northampton Signalling Re-control Project
(GRIP4), Implemented Tilos to the Signalling Commissioning Phase, IEP Planning Lead for High Speed Train
Replacement Bid Programme.
Oct 2006 to Nov 06: Air & Marine Transportation Scheduling Superintendent - AGIP
Project: Kashagan Oilfield Project, Caspian Sea
Organise,manage and be responsible for the developmentof Logistics Air and Marine Vessel planning and
scheduling activities. Implementation ofprojectstandards and procedures for the planning effort through the EP
Marine department. Prepare and maintain the logistic Schedules. Collate and provide status reports. Develop
fully integrated plans and schedules for controlling companyowned/chartered and Contractors air fleet &
vessels.
Oct 2005 to Oct 2006 Senior Project Planner - Kellogg Brown & Root, Project: North West National
Programme for IT.
Responsible for all aspects of planning and project control for £ 1bn project to provide IT solutions for the North
West Cluster of the National Health Service (NHS). Systems used Primavera v5 Microsoft Project and Prince 2.
Major tasks included: Development of planning procedures and integrated project programme, assisting
contractor with schedule development, Analysis of contractor programmes, Preparation and submission of
reports for the Department of Health
Jan 2005 to Oct 2005 Senior Project Planner, Jacobs Babtie / Network Rail MPI Estates, Project: IMS
Programme Implementation @ Network Rail
Responsible for Primavera P3 migration of Network Rail “MP&I (Estates)” Programmes into P3e V: 4.5.1 in the
Citrix environment.This included developmentand integration ofsub-contractors programmes into Network Rail’s
network investmentlifecycle (GRIP) in P3e. Programmes were fully cost loaded for EVA reports and transfer into
Oracle Projects.Programmes were reconciled againstthe Business Plan before establishing baselines in P3e &
PMCS. Systems used Primavera Enterprise, Microsoft Project and Prince 2. Responsible for MPI Estates sub -
contractors construction programmes. Projects included York and Sheffield Station Redevelopment, station
platform extensions and bridge replacement.
Aug 2004 to Jan 2005 Senior Project Planner / PCM, Bombardier Transportation, Project: London
Underground Victoria Line Upgrade.
Responsible for managing Westinghouse Signalling Systems and rolling stock replacement of the Victoria Line
subcontractelementofthe Bombardier BCVcontract programme and integrating this with the overall logistics of
Bombardier programme in P3e/c. Extensive liaison with Westinghouse management to con vert the P3
programmes submitted to P3e/c format each period, developing the Earned Value reporting mechanism and
producing periodic reporting with forensic analysis. Proactively evaluate project performance and recommend
improvements and highlight and report critical issues and develop work-around plans where necessary.
Development of Time Chainage Diagram for Access to SER’s and Trackside. I was also involved in testing the
use of P3e/c through a Citrix link to a remote server.
Will Masson Resume
Previous Employment
Project Controls Manager, Optilan Communication Systems, Project: CTRL Section 2 – NEC
Responsible for programme developmentand visualisation centre. Produce progress reports based on periodic
schedule updates and EVA reporting of the of the following systems: CCTV, DTN, Telephony and FON. Maintain
Project Controls of significant change and budget transfers. Produce various programme outputs from P3 as
required.
Programme Manager, Bombardier Transportation.
Responsible for programme managementand logistics of Connex & GoVia (375, 376 & 377) replacement rolling
stock. Includes development of an integrated programme to encompass all aspects of the manufacturing
process from bid stage, concept design through to product testing, certification and fleet i ntroduction onto the
Network. Monitored project progress and logistics on a continuous basis in conjunction with the inputs of
functional schedulers and suppliers. Facilitated the resolution of any potential slippages to ensure schedule is
adhered to. Provided expert advice as necessary to ensure high quality solutions.
Lead Planning Engineer, Fluor Limited.
Lead Planning Engineer for the London Underground Construction Enabling Works for the Citylink Project.
Responsible for initial projectstart up and logistics programme in Primavera P3. Integration of PPP and Railtrack
enabling work scopes which included civil construction, cable/power management and building services.
Responsible for the supervision of two planning engineers.
Planning Engineer, Dounreay Nuclear Power Station.
Developing, controlling and managing decommissioning and upgrade programmes. To facilitate
decommissioning many of the facilities on the Dounreay site required major construction of new hospital wing,
nuclear waste retrieval (SHAFT), transportation logistics ofwaste material overseas,M&E Facility’s management,
treatmentplants and stores were needed to deal with the waste material. Competence gained in Primavera P3
and wide range of computer applications. Required understanding and compliance with existing legislation,
accurate report writing and interdisciplinary team working skills. Reporting weekly progress to the NII.
Demonstrated ability to prioritise effectively.
Offshore and Onshore Planner, Kvaerner Oil and Gas Ltd. (Claymore Alpha)
Involved in multidiscipline Platform operations,construction and shutdown logistics. Developing and maintaining
M&E plans utilising Primavera. Solely responsible for updating maintenance management records utilising
Maximo PMS system. Necessitated excellent organisational and communication skills.
Planner, North Sea Production Co. Ltd.
Temporary Position, within the Floating Production Department. Maintained and modified 90 Day Plans. M&E
Facility’s management. Devised crew change rotas.
Master Planner, Stewart Milne Timber Systems.
Senior Position held Co-ordinated planning function for five departments (Contracts,Design office, Procurement,
Production and Construction). Provided Board Management reports, Financial Projections and forecast
Manpower requirements. Effectively liaised with corporate and individual clients worldwide. Highlighted ability to
work under pressure and meetdeadlines.Successful delivery of commercial and residential projects in both the
public and private sectors having extensive expertise in a variety of business sectors such as healthcare,
airports, office accommodation, leisure facilities, commercial buildings and residential housing.
Engineering Technical Assistant, Quest Consulting Ltd.
Reviewed and enhanced existing companyP&ID database.Required in-depth knowledge and understanding of
petrochemical process plant and equipment. Compiled corrosion reports for client review.
Maintenance Planning Co-ordinator, Bluewater Operations (UK) Ltd. Project: UISGE GORM FPSO (Fife
Field).
Will Masson Resume
Responsible commissioning and maintenance planning of all platform operational systems/assets and also for
Maximo System Administration.Development of Commissioning Programme Levels 1, 2, and 4, Monitored and
controlled commissioning activities, Critical Path Evaluation, Manpower Histograms, Risk and Issue
Management. Implementation of maintenance routines for Marine and Installation equipment. Coordinated
maintenance and commissioning activities in association with on/offshore personnel. Wide experience gained in
utilisation of Maximo PMS system. Responsible for Document Control and Technical Library.
IMIS Quality Control & Planning Technician, APG/Salamis JV Ltd.
Project: Asset Planning & Lifecycle Maintenance on the North Cormorant. Responsible for the outage planning
for heavy rotating power plant equipment, Asset Planning & M&E Lifecycle Maintenance of all systems on within
the Royal Dutch Shell Northern Business Unit. Including interfacing with subcontractors and platform
management. Demonstrated ability for monitoring of erection and maintenance outage schedules and
management of risk mitigation programs.
Project Documentation and Planning Engineer, Vauldale Engineering Ltd.
Project: ESD Valve Installation and HVAC Refurbishment – Brent Field
Responsible for all work packages for the ESDV, HVAC and “Ex” electrical certification for equipmentin
hazardous areas. This also included recording ofall documentation & certification.

More Related Content

What's hot

Asselin Resume Dec 2015 Final
Asselin Resume Dec 2015 FinalAsselin Resume Dec 2015 Final
Asselin Resume Dec 2015 FinalRob Asselin, MPM
 
Project Superintendent Mandar
Project Superintendent MandarProject Superintendent Mandar
Project Superintendent MandarMandar Sawant
 
Detailed Resume For Bryan Hill Oct 09
Detailed Resume For Bryan Hill Oct 09Detailed Resume For Bryan Hill Oct 09
Detailed Resume For Bryan Hill Oct 09Bryan_Hill
 
Beakal Likassa - Resume
Beakal Likassa - ResumeBeakal Likassa - Resume
Beakal Likassa - ResumeBeakal Likassa
 
CV_MAR 2015
CV_MAR 2015CV_MAR 2015
CV_MAR 2015Rana M.
 
Chris Rainey Resume 2016
Chris Rainey Resume 2016Chris Rainey Resume 2016
Chris Rainey Resume 2016Chris Rainey
 
Resume f sanchez Project Manager Oct 2016.pdf
Resume f sanchez Project Manager Oct 2016.pdfResume f sanchez Project Manager Oct 2016.pdf
Resume f sanchez Project Manager Oct 2016.pdfFranklin Sanchez
 
Todd Dickey_ resume June 2016 gov
Todd Dickey_ resume June 2016 govTodd Dickey_ resume June 2016 gov
Todd Dickey_ resume June 2016 govTodd Dickey
 
Alexander Joy Cartwright Iv Cpa V3
Alexander  Joy Cartwright Iv Cpa V3Alexander  Joy Cartwright Iv Cpa V3
Alexander Joy Cartwright Iv Cpa V3mrbaseball
 
Jen Tong Resume
Jen Tong ResumeJen Tong Resume
Jen Tong ResumeJen Tong
 
CV Ab Koster updated Feb 2017
CV Ab Koster updated Feb 2017CV Ab Koster updated Feb 2017
CV Ab Koster updated Feb 2017Ab Koster
 
Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...
Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...
Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...Torben Haagh
 
Modularization the-key-to-success
Modularization the-key-to-successModularization the-key-to-success
Modularization the-key-to-successMerrylyn Yeo
 
S.D.Parson CV-Resume - 2016
S.D.Parson CV-Resume - 2016S.D.Parson CV-Resume - 2016
S.D.Parson CV-Resume - 2016Dean Parson
 
Gonzalez.matthew
Gonzalez.matthewGonzalez.matthew
Gonzalez.matthewNASAPMC
 

What's hot (20)

Asselin Resume Dec 2015 Final
Asselin Resume Dec 2015 FinalAsselin Resume Dec 2015 Final
Asselin Resume Dec 2015 Final
 
Project Superintendent Mandar
Project Superintendent MandarProject Superintendent Mandar
Project Superintendent Mandar
 
Detailed Resume For Bryan Hill Oct 09
Detailed Resume For Bryan Hill Oct 09Detailed Resume For Bryan Hill Oct 09
Detailed Resume For Bryan Hill Oct 09
 
Beakal Likassa - Resume
Beakal Likassa - ResumeBeakal Likassa - Resume
Beakal Likassa - Resume
 
CV_MAR 2015
CV_MAR 2015CV_MAR 2015
CV_MAR 2015
 
Chris Rainey Resume 2016
Chris Rainey Resume 2016Chris Rainey Resume 2016
Chris Rainey Resume 2016
 
Resume f sanchez Project Manager Oct 2016.pdf
Resume f sanchez Project Manager Oct 2016.pdfResume f sanchez Project Manager Oct 2016.pdf
Resume f sanchez Project Manager Oct 2016.pdf
 
WL CV 2016
WL CV 2016WL CV 2016
WL CV 2016
 
PMM_CV_Summary 20150521
PMM_CV_Summary 20150521PMM_CV_Summary 20150521
PMM_CV_Summary 20150521
 
Todd Dickey_ resume June 2016 gov
Todd Dickey_ resume June 2016 govTodd Dickey_ resume June 2016 gov
Todd Dickey_ resume June 2016 gov
 
Alexander Joy Cartwright Iv Cpa V3
Alexander  Joy Cartwright Iv Cpa V3Alexander  Joy Cartwright Iv Cpa V3
Alexander Joy Cartwright Iv Cpa V3
 
Ahmed CV
Ahmed CVAhmed CV
Ahmed CV
 
Jen Tong Resume
Jen Tong ResumeJen Tong Resume
Jen Tong Resume
 
CV Ab Koster updated Feb 2017
CV Ab Koster updated Feb 2017CV Ab Koster updated Feb 2017
CV Ab Koster updated Feb 2017
 
D Sloey Resume1
D  Sloey Resume1D  Sloey Resume1
D Sloey Resume1
 
Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...
Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...
Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...
 
Modularization the-key-to-success
Modularization the-key-to-successModularization the-key-to-success
Modularization the-key-to-success
 
S.D.Parson CV-Resume - 2016
S.D.Parson CV-Resume - 2016S.D.Parson CV-Resume - 2016
S.D.Parson CV-Resume - 2016
 
Mahmoud Al Khouli_CV2015
Mahmoud Al Khouli_CV2015Mahmoud Al Khouli_CV2015
Mahmoud Al Khouli_CV2015
 
Gonzalez.matthew
Gonzalez.matthewGonzalez.matthew
Gonzalez.matthew
 

Viewers also liked

Little Lady Burlesque Dance Class Program
Little Lady Burlesque Dance Class ProgramLittle Lady Burlesque Dance Class Program
Little Lady Burlesque Dance Class ProgramLittle Lady Burlesque
 
The Recovery Ethos and Some Personal Reflections
The Recovery Ethos and Some Personal ReflectionsThe Recovery Ethos and Some Personal Reflections
The Recovery Ethos and Some Personal ReflectionsRussell Pierce
 
47 Sylvan Ave, Pleasant Ridge, Forsale2
47 Sylvan Ave, Pleasant Ridge, Forsale247 Sylvan Ave, Pleasant Ridge, Forsale2
47 Sylvan Ave, Pleasant Ridge, Forsale2Julie Thayer
 
NMFS_1999_Fall_Plankton_survey
NMFS_1999_Fall_Plankton_surveyNMFS_1999_Fall_Plankton_survey
NMFS_1999_Fall_Plankton_surveyJim Tobias
 
NMFS_61_1998_Marine_Mammal_Survey
NMFS_61_1998_Marine_Mammal_SurveyNMFS_61_1998_Marine_Mammal_Survey
NMFS_61_1998_Marine_Mammal_SurveyJim Tobias
 
Magic book unit 3 - the ant and the cricket pres
Magic book unit 3 - the ant and the cricket presMagic book unit 3 - the ant and the cricket pres
Magic book unit 3 - the ant and the cricket presDora Kouri
 
Presentation M. Manouvrier #apidays 2013
Presentation M. Manouvrier #apidays 2013 Presentation M. Manouvrier #apidays 2013
Presentation M. Manouvrier #apidays 2013 Maude Manouvrier
 
Recursos abiertos en línea. tecnol.2016
Recursos abiertos en línea. tecnol.2016Recursos abiertos en línea. tecnol.2016
Recursos abiertos en línea. tecnol.2016nowa martinz
 
第2回ゆかむ勉強会
第2回ゆかむ勉強会第2回ゆかむ勉強会
第2回ゆかむ勉強会Yukamu Tomita
 
Application Migration - What, When, Why, How?
Application Migration - What, When, Why, How?Application Migration - What, When, Why, How?
Application Migration - What, When, Why, How?Ajit Kumar
 
кар фин - подбор ипотеки для сайтов недвижимости
кар фин - подбор ипотеки для сайтов недвижимостикар фин - подбор ипотеки для сайтов недвижимости
кар фин - подбор ипотеки для сайтов недвижимостиAnastasiia Moroz
 
Grammer book ivan correa
Grammer book ivan correaGrammer book ivan correa
Grammer book ivan correaetwh138
 
Proappsys Software Company flyer
Proappsys Software Company flyerProappsys Software Company flyer
Proappsys Software Company flyerPradeep Gudipati
 
26644 Eureka, Forsale2
26644 Eureka, Forsale226644 Eureka, Forsale2
26644 Eureka, Forsale2Julie Thayer
 
Portafolio final de tecnologia. 1
Portafolio final de tecnologia. 1Portafolio final de tecnologia. 1
Portafolio final de tecnologia. 1nowa martinz
 
6176 Atkins, Forsale2
6176 Atkins, Forsale26176 Atkins, Forsale2
6176 Atkins, Forsale2Julie Thayer
 

Viewers also liked (20)

Little Lady Burlesque Dance Class Program
Little Lady Burlesque Dance Class ProgramLittle Lady Burlesque Dance Class Program
Little Lady Burlesque Dance Class Program
 
Verbs junior
Verbs juniorVerbs junior
Verbs junior
 
The Recovery Ethos and Some Personal Reflections
The Recovery Ethos and Some Personal ReflectionsThe Recovery Ethos and Some Personal Reflections
The Recovery Ethos and Some Personal Reflections
 
FEO White Paper
FEO White PaperFEO White Paper
FEO White Paper
 
47 Sylvan Ave, Pleasant Ridge, Forsale2
47 Sylvan Ave, Pleasant Ridge, Forsale247 Sylvan Ave, Pleasant Ridge, Forsale2
47 Sylvan Ave, Pleasant Ridge, Forsale2
 
NMFS_1999_Fall_Plankton_survey
NMFS_1999_Fall_Plankton_surveyNMFS_1999_Fall_Plankton_survey
NMFS_1999_Fall_Plankton_survey
 
NMFS_61_1998_Marine_Mammal_Survey
NMFS_61_1998_Marine_Mammal_SurveyNMFS_61_1998_Marine_Mammal_Survey
NMFS_61_1998_Marine_Mammal_Survey
 
Magic book unit 3 - the ant and the cricket pres
Magic book unit 3 - the ant and the cricket presMagic book unit 3 - the ant and the cricket pres
Magic book unit 3 - the ant and the cricket pres
 
Presentation M. Manouvrier #apidays 2013
Presentation M. Manouvrier #apidays 2013 Presentation M. Manouvrier #apidays 2013
Presentation M. Manouvrier #apidays 2013
 
176 Ardmore
176 Ardmore176 Ardmore
176 Ardmore
 
Recursos abiertos en línea. tecnol.2016
Recursos abiertos en línea. tecnol.2016Recursos abiertos en línea. tecnol.2016
Recursos abiertos en línea. tecnol.2016
 
第2回ゆかむ勉強会
第2回ゆかむ勉強会第2回ゆかむ勉強会
第2回ゆかむ勉強会
 
Application Migration - What, When, Why, How?
Application Migration - What, When, Why, How?Application Migration - What, When, Why, How?
Application Migration - What, When, Why, How?
 
кар фин - подбор ипотеки для сайтов недвижимости
кар фин - подбор ипотеки для сайтов недвижимостикар фин - подбор ипотеки для сайтов недвижимости
кар фин - подбор ипотеки для сайтов недвижимости
 
Grammer book ivan correa
Grammer book ivan correaGrammer book ivan correa
Grammer book ivan correa
 
Zak Precast Concrete India Conference
Zak Precast Concrete India ConferenceZak Precast Concrete India Conference
Zak Precast Concrete India Conference
 
Proappsys Software Company flyer
Proappsys Software Company flyerProappsys Software Company flyer
Proappsys Software Company flyer
 
26644 Eureka, Forsale2
26644 Eureka, Forsale226644 Eureka, Forsale2
26644 Eureka, Forsale2
 
Portafolio final de tecnologia. 1
Portafolio final de tecnologia. 1Portafolio final de tecnologia. 1
Portafolio final de tecnologia. 1
 
6176 Atkins, Forsale2
6176 Atkins, Forsale26176 Atkins, Forsale2
6176 Atkins, Forsale2
 

Similar to William masson 2016-cv_a

Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013psmuga9
 
PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...
PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...
PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...petroEDGE
 
Offshore & Marine Projects and Risk Management with Contractual Perspectives
Offshore & Marine Projects and Risk Management with Contractual PerspectivesOffshore & Marine Projects and Risk Management with Contractual Perspectives
Offshore & Marine Projects and Risk Management with Contractual PerspectivespetroEDGE
 
Peter White CV - Latest
Peter White CV - LatestPeter White CV - Latest
Peter White CV - LatestPeter White
 
Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013psmuga9
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013psmuga9
 
CV_PhilMorris_2015
CV_PhilMorris_2015CV_PhilMorris_2015
CV_PhilMorris_2015Phil Morris
 
Project Development Routemap UK – Caribbean Knowledge Exchange Programme
Project Development Routemap UK – Caribbean  Knowledge Exchange  ProgrammeProject Development Routemap UK – Caribbean  Knowledge Exchange  Programme
Project Development Routemap UK – Caribbean Knowledge Exchange ProgrammeCaribbean Development Bank
 
Manuel Neto- Resume 2016
Manuel Neto-  Resume 2016Manuel Neto-  Resume 2016
Manuel Neto- Resume 2016Neto Manuel
 
Wendell Spencer Resume Mar 2015
Wendell Spencer Resume Mar 2015Wendell Spencer Resume Mar 2015
Wendell Spencer Resume Mar 2015wendell spencer
 

Similar to William masson 2016-cv_a (20)

Geraldine_Goh-CV
Geraldine_Goh-CVGeraldine_Goh-CV
Geraldine_Goh-CV
 
Psm Cv Presentation 3 2012
Psm Cv Presentation 3  2012Psm Cv Presentation 3  2012
Psm Cv Presentation 3 2012
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013
 
PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...
PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...
PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...
 
Peter White CV
Peter White CV Peter White CV
Peter White CV
 
Offshore & Marine Projects and Risk Management with Contractual Perspectives
Offshore & Marine Projects and Risk Management with Contractual PerspectivesOffshore & Marine Projects and Risk Management with Contractual Perspectives
Offshore & Marine Projects and Risk Management with Contractual Perspectives
 
Adonis Curriculum Vitae
Adonis Curriculum VitaeAdonis Curriculum Vitae
Adonis Curriculum Vitae
 
Peter White CV - Latest
Peter White CV - LatestPeter White CV - Latest
Peter White CV - Latest
 
Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013
 
CV_PhilMorris_2015
CV_PhilMorris_2015CV_PhilMorris_2015
CV_PhilMorris_2015
 
Project Development Routemap UK – Caribbean Knowledge Exchange Programme
Project Development Routemap UK – Caribbean  Knowledge Exchange  ProgrammeProject Development Routemap UK – Caribbean  Knowledge Exchange  Programme
Project Development Routemap UK – Caribbean Knowledge Exchange Programme
 
Topside
TopsideTopside
Topside
 
Psm Cv Presentation Aug 16, 2012
Psm Cv Presentation Aug 16, 2012Psm Cv Presentation Aug 16, 2012
Psm Cv Presentation Aug 16, 2012
 
Psm Cv Presentation Aug 16, 2012
Psm Cv Presentation Aug 16, 2012Psm Cv Presentation Aug 16, 2012
Psm Cv Presentation Aug 16, 2012
 
JJC-CV - April-2016
JJC-CV - April-2016JJC-CV - April-2016
JJC-CV - April-2016
 
Manuel Neto- Resume 2016
Manuel Neto-  Resume 2016Manuel Neto-  Resume 2016
Manuel Neto- Resume 2016
 
Flannagan_David 2016
Flannagan_David 2016Flannagan_David 2016
Flannagan_David 2016
 
Wendell Spencer Resume Mar 2015
Wendell Spencer Resume Mar 2015Wendell Spencer Resume Mar 2015
Wendell Spencer Resume Mar 2015
 
RESUME
RESUMERESUME
RESUME
 

Recently uploaded

Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedKaiNexus
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCRsoniya singh
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 

Recently uploaded (20)

Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 

William masson 2016-cv_a

  • 1. Will Masson Resume Memberships/Qualifications • Member of Association for Programme Management • Member of Pipeline Industries Guild • Member of Chartered Institute of IT • Advanced Network Rail Primavera P3e Course • OPRIS Safety Course • SAP Spiridon Course • Siemens QM@TS Course • MAXIMO Series 5 Course • Production Fundamentals Course • DUSUP – HSE Induction (Dubai) • Basic FirstAid • BOSIET & Offshore Medical (Current) • EUSR 135787 - Utility SHEA (Gas) • EUSR 135787 – Basic Electrical Safety Competence: Substations Relevant Experience: Will has Over 28 years Claims and planning experience gained in a variety of industries including 15 years On/Offshore Oil & Gas, Platforms, FPSO, FDPSO Azurite, Jack ups (Rowan Gorilla 3, Onome, Delta Queen, Oritsetymine) Pipelines, Carbon Capture and Storage, Solar power Plants, Carbon Capture, NHS IT, Network Rail, London Underground, M&E Facilities Management, Nuclear construction, Finance/banking & Logistics, Banking software implementation. Competent and experienced in Forensic Claims and Project Control utilising the use of Primavera software, including version p3 to P6 latest version, Microsoft Project, Tilos, PowerProject and Prince 2 methodologies. Excellent interpersonal skills combined with a flexible, motivated approach to work and ability to lead and manage scheduling teams to achieve deadlines . In addition Computer literate - proficient in use of Primavera from version 3 up to 8.3, Tilos, PowerProject, Microsoft Project, MAXIMO, Microsoft Office applications and the Internet Contracts  Choosing,drafting and/or amending;  Tendering processes; Extensions ofTime  Claims preparation;  Forensic planning and retrospective delayanalysis.  Preparation of Documents for Expert Witness including: o Time Slice (also known as Time Impacted) Analysis. o Window Analysis o Collapsed As-Built(also known as 'As-BuiltButFor' method) o Impacted-As-Planned o As-Planned vs As-Built Loss & Expense  Claims preparation including cause and effect Experience in Full Field Shutdowns,Workovers,Subsea Manifolds,Construction Work packages Experience in Fabrication of Skids / modules etc Experience on Fixed and Flotation Rigs,Jack Ups and FPDSO/FPSO’s Experience on Drilling Derrick Decommissioning on the Azurite FPDSO Experience on Overseas Shipyard – Site Establishment Experience on AssetPlanning and Full Lifecycle Maintenance Experience with Sea Trials and Commissioning ofOffshore Facilities Experience with HSE and DNV Liaison with regards to Safety and Certification Experience with interfacing with Subcontractors and Installation Management Experience in Forensic Analysis of change Experience of undertaking Critical Path Analysis and Forensic Planning
  • 2. Will Masson Resume Experience in the implementation ofprojectcontrols within Airports Experience of managing and implementing EVM Systems Experience in the Production of Dashboard Reports Experience in Integrated Project & CostManagement Experience in Full Programme Portfolio Managementand Reporting Experience in working as part of an alliance team to ensure effective delivery across numerous stakeholders. Experience with Major Blue Chip Clients – Shell,Total, Chevron, Mobil, Elf, Hess,National Grid,Network Rail. Professional History Sept 2014 to Present: Senior Planner – National Grid IFA2 – 1000MW Interconnection – France to UK  Develop and Maintain Project Schedule  Bid Team Member - Evaluation of Supplier Programmes (Cable & Converter stations)  Carry out analysis using Acumen Fuse & Primavera Risk Analysis White Rose Carbon Capture & Storage Project (CCS)  DevelopmentofFeed & EPC Schedules  Maintenance and reporting of the above Schedules  Member of the Tender Review Panel Sept 2013 to Sept 2014 – HS Ocean Group Ltd Role: Project Controls Manager – Rowan Gorilla 3 Jack Up – Trinidad – HS Ocean Group  Assisting Kerrigan Construction Lawyers Produce Global Claim (30m USD)  DevelopmentofExecutive Managementreporting  Establish projectcontrols managementofexpended man-hours /materials /Sub contractors  Responsible ofLocal Trinidad Labour & Communityprojects  Responsible for the Armed Security managementofCIT Role: Project Manager - Azurite Decommissioning FPDSO - Congo - HS Ocean Group  Dispute Resolution/Mediation with Sub Contractor based in UK  Decommissioning ofthe Nabors Drilling Package on-board the Azurite FPDSO whilstat sea  Development& Implementation ofMethod Statements /Lift Plans / Risk Assessments'  Managing Heavy Lifts, Decommissioning ofDrilling Derrick with use ofGin Pole, cranes and 4 rope access teams  Daily Planning & Reporting Role: PCM / Interim Asset Integrity Manager – HS Ocean Group - Nigeria PCM / Interim AssetIntegrity Manager responsible for 3 Jack up Drilling Rigs in Nigeria: • Implementation ofProcesses and Procedures into Seawolf • Carry out Audits on Planned Maintenance and Implementimprovements • Develop Planning Strategy for the Company • Implementation ofSafety & Quality Step Change • Implementation ofone reporting tool for ManagementReporting  Daily Planning of all Rig Activities  Look Ahead Planning for 5 Yearly Drilling Maintenance Routines and Rig Recertification March 2013 to Sept 2013: PMO Lead – Travelex One Platform Project – Global IT Role Out PMO Lead for the Corporate Services Team responsible for the following work streams: • Finance – CODA 12 global implementation replacing SAP, DREAM, CODA 11 etc
  • 3. Will Masson Resume • HR – Workday, Cornerstone,PeopleFluent,Ulearn,LMS, Payroll • Treasury – Global implementation ofSunGard Quantum software • People & Change – Training and Communication • MIBI – Implementation ofone reporting tool for ManagementReporting Sept 2011 to March 2013: Project Controls Manager – Rhead Group – ISS Project Reporting directly to the Project Director on the Critical National Infrastructure securityprojectfor National Grid. Directly responsible for producing: • Contractor Programme Dispute Avoidance, Disputes and Resolution • NG Board Pack Reports on a monthly basis. • Weekly Portfolio Project Status Reports • Providing ManagementInformation • Assisting on the RECON development(ProjectAudit Tool) March 2011 to Sept 2011: Project Controls Consultant – Shams 1 CSP Project – Turner & Townsend Role Purpose: To assistSHAMS in the planning and progress measurementofthe Shams 1 100MW CSP project by developing an overall project schedule utilising Primavera project management software, MS Office software and other project management tools. Assist the project management team in the review of EPC contractor’s and other parties’ submitted plans, schedules and quantitative assessments of work planned or progressed. To use reasonable endeavours to ensure the qualityand efficiency of the project plan to meetthe objectives of optimised costs and minimise delays Key Activities: o To develop the overall “Master Project Schedule” (MPS) in accordance with the needs of SHAMS and to train SHAMS staff in the monthly updates process to ensure accurate and timely reporting. o To develop the methodology and written instructions to guide SHAMS staff through the monthly update process including the analysis and reporting of: o Critical Path Method / Critical Item Report o Description of changes in the MPS since the previous update, i.e., work breakdown structure changes,work breakdown dictionarychanges activity ID changes,logic changes,duration changes, constraint changes, etc. o Description ofchanges in the EPC contractor’s schedule from month to month, including the above type of analysis. July 2008 – March 2011 Head of International Project Controls – Rhead Group Responsible for all planning related functions within the company, providing Dispute Avoidance/Resolution, Project Control Solutions covering six divisions within the Rhead Group. Leading a dedicated team of Project Control Managers / Planners. Significantexperience leading the planning content of numerous Forensic claims analysis on major disputes including Offshore/onshore, Pipelines (CCC [Dolphin Energy], Dutco,McConnell Dowell [DUSUP]) , Rail, Power Generation and Water Sectors. Claims ranging from 150K to 80m. Principally covering United Kingdom, United Arab Emirates, South Africa and Asia. Acted as planning lead on the EU Carbon Capture Competition (Longannet) alongside Aker Solutions, Shell, Scottish Power, National Grid and Mott MacDonalds. Actively involved in implementing full lifecycle Project Solutions into clients, including Tendering and evaluations,Bid development,implementation of EVM, Linear Project Control, Risk management (Pertmaster), Mar 2008 to July 2008 Senior Planner, Amey IS, Project: Birmingham Highways PFI Bid Senior planner responsible for all project plans for the Bid submission to local government (Birmingham City Council), this involved working closely with each of the disciplines to develop programmes to cover the Mobilisation,Core InvestmentPeriod and high level programmes for maintenance ofthe highways and structures over a 20 year duration.Developing programmes from conception. Importing and exporting programmes using
  • 4. Will Masson Resume Primavera 6 / excel. Delivered programme requirements within tight timescales, working with GIS mapping software. Nov 2006 – Mar 2008 Planning Manager, Siemens Transportation Systems Ltd, Project: Various Signalling & Electrification Projects. Responsible for developing bid programmes and planning procedures for Siemens UK. Major tasks included: Development of a Project Management Office, Development of Project Controls and procedures, Develop, maintain and monitor bid and integrated project programmes, Preparation of project dashboards and managementreports.Lead overall costplanning and manpower schedule development, analysis and reporting including critical path, schedule impact, progress assessment, completion forecasts and mitigation. Highlight Risks and Opportunities throughoutthe full project lifecycle. WCRM – Northampton Signalling Re-control Project (GRIP4), Implemented Tilos to the Signalling Commissioning Phase, IEP Planning Lead for High Speed Train Replacement Bid Programme. Oct 2006 to Nov 06: Air & Marine Transportation Scheduling Superintendent - AGIP Project: Kashagan Oilfield Project, Caspian Sea Organise,manage and be responsible for the developmentof Logistics Air and Marine Vessel planning and scheduling activities. Implementation ofprojectstandards and procedures for the planning effort through the EP Marine department. Prepare and maintain the logistic Schedules. Collate and provide status reports. Develop fully integrated plans and schedules for controlling companyowned/chartered and Contractors air fleet & vessels. Oct 2005 to Oct 2006 Senior Project Planner - Kellogg Brown & Root, Project: North West National Programme for IT. Responsible for all aspects of planning and project control for £ 1bn project to provide IT solutions for the North West Cluster of the National Health Service (NHS). Systems used Primavera v5 Microsoft Project and Prince 2. Major tasks included: Development of planning procedures and integrated project programme, assisting contractor with schedule development, Analysis of contractor programmes, Preparation and submission of reports for the Department of Health Jan 2005 to Oct 2005 Senior Project Planner, Jacobs Babtie / Network Rail MPI Estates, Project: IMS Programme Implementation @ Network Rail Responsible for Primavera P3 migration of Network Rail “MP&I (Estates)” Programmes into P3e V: 4.5.1 in the Citrix environment.This included developmentand integration ofsub-contractors programmes into Network Rail’s network investmentlifecycle (GRIP) in P3e. Programmes were fully cost loaded for EVA reports and transfer into Oracle Projects.Programmes were reconciled againstthe Business Plan before establishing baselines in P3e & PMCS. Systems used Primavera Enterprise, Microsoft Project and Prince 2. Responsible for MPI Estates sub - contractors construction programmes. Projects included York and Sheffield Station Redevelopment, station platform extensions and bridge replacement. Aug 2004 to Jan 2005 Senior Project Planner / PCM, Bombardier Transportation, Project: London Underground Victoria Line Upgrade. Responsible for managing Westinghouse Signalling Systems and rolling stock replacement of the Victoria Line subcontractelementofthe Bombardier BCVcontract programme and integrating this with the overall logistics of Bombardier programme in P3e/c. Extensive liaison with Westinghouse management to con vert the P3 programmes submitted to P3e/c format each period, developing the Earned Value reporting mechanism and producing periodic reporting with forensic analysis. Proactively evaluate project performance and recommend improvements and highlight and report critical issues and develop work-around plans where necessary. Development of Time Chainage Diagram for Access to SER’s and Trackside. I was also involved in testing the use of P3e/c through a Citrix link to a remote server.
  • 5. Will Masson Resume Previous Employment Project Controls Manager, Optilan Communication Systems, Project: CTRL Section 2 – NEC Responsible for programme developmentand visualisation centre. Produce progress reports based on periodic schedule updates and EVA reporting of the of the following systems: CCTV, DTN, Telephony and FON. Maintain Project Controls of significant change and budget transfers. Produce various programme outputs from P3 as required. Programme Manager, Bombardier Transportation. Responsible for programme managementand logistics of Connex & GoVia (375, 376 & 377) replacement rolling stock. Includes development of an integrated programme to encompass all aspects of the manufacturing process from bid stage, concept design through to product testing, certification and fleet i ntroduction onto the Network. Monitored project progress and logistics on a continuous basis in conjunction with the inputs of functional schedulers and suppliers. Facilitated the resolution of any potential slippages to ensure schedule is adhered to. Provided expert advice as necessary to ensure high quality solutions. Lead Planning Engineer, Fluor Limited. Lead Planning Engineer for the London Underground Construction Enabling Works for the Citylink Project. Responsible for initial projectstart up and logistics programme in Primavera P3. Integration of PPP and Railtrack enabling work scopes which included civil construction, cable/power management and building services. Responsible for the supervision of two planning engineers. Planning Engineer, Dounreay Nuclear Power Station. Developing, controlling and managing decommissioning and upgrade programmes. To facilitate decommissioning many of the facilities on the Dounreay site required major construction of new hospital wing, nuclear waste retrieval (SHAFT), transportation logistics ofwaste material overseas,M&E Facility’s management, treatmentplants and stores were needed to deal with the waste material. Competence gained in Primavera P3 and wide range of computer applications. Required understanding and compliance with existing legislation, accurate report writing and interdisciplinary team working skills. Reporting weekly progress to the NII. Demonstrated ability to prioritise effectively. Offshore and Onshore Planner, Kvaerner Oil and Gas Ltd. (Claymore Alpha) Involved in multidiscipline Platform operations,construction and shutdown logistics. Developing and maintaining M&E plans utilising Primavera. Solely responsible for updating maintenance management records utilising Maximo PMS system. Necessitated excellent organisational and communication skills. Planner, North Sea Production Co. Ltd. Temporary Position, within the Floating Production Department. Maintained and modified 90 Day Plans. M&E Facility’s management. Devised crew change rotas. Master Planner, Stewart Milne Timber Systems. Senior Position held Co-ordinated planning function for five departments (Contracts,Design office, Procurement, Production and Construction). Provided Board Management reports, Financial Projections and forecast Manpower requirements. Effectively liaised with corporate and individual clients worldwide. Highlighted ability to work under pressure and meetdeadlines.Successful delivery of commercial and residential projects in both the public and private sectors having extensive expertise in a variety of business sectors such as healthcare, airports, office accommodation, leisure facilities, commercial buildings and residential housing. Engineering Technical Assistant, Quest Consulting Ltd. Reviewed and enhanced existing companyP&ID database.Required in-depth knowledge and understanding of petrochemical process plant and equipment. Compiled corrosion reports for client review. Maintenance Planning Co-ordinator, Bluewater Operations (UK) Ltd. Project: UISGE GORM FPSO (Fife Field).
  • 6. Will Masson Resume Responsible commissioning and maintenance planning of all platform operational systems/assets and also for Maximo System Administration.Development of Commissioning Programme Levels 1, 2, and 4, Monitored and controlled commissioning activities, Critical Path Evaluation, Manpower Histograms, Risk and Issue Management. Implementation of maintenance routines for Marine and Installation equipment. Coordinated maintenance and commissioning activities in association with on/offshore personnel. Wide experience gained in utilisation of Maximo PMS system. Responsible for Document Control and Technical Library. IMIS Quality Control & Planning Technician, APG/Salamis JV Ltd. Project: Asset Planning & Lifecycle Maintenance on the North Cormorant. Responsible for the outage planning for heavy rotating power plant equipment, Asset Planning & M&E Lifecycle Maintenance of all systems on within the Royal Dutch Shell Northern Business Unit. Including interfacing with subcontractors and platform management. Demonstrated ability for monitoring of erection and maintenance outage schedules and management of risk mitigation programs. Project Documentation and Planning Engineer, Vauldale Engineering Ltd. Project: ESD Valve Installation and HVAC Refurbishment – Brent Field Responsible for all work packages for the ESDV, HVAC and “Ex” electrical certification for equipmentin hazardous areas. This also included recording ofall documentation & certification.