SlideShare a Scribd company logo
1 of 3
Download to read offline
S-1
DP Flow Transmitters
DP Flow Specification Sheet
00815-0100-4485, Rev AA
2013
DP Flowmeters SHEET__________ OF__________
SPEC. NO. REV.
NO BY DATE REVISION
CONTRACT DATE
REQ. - P.O.
BY CHK’D APPR.
Tag Number
Service
Line No./ Meter Location
Fluid
Line Size and Pipe Schedule OR
Pipe ID and Wall
Thickness
Pipe Material
Pipe Orientation
Fluid
Fluid State
Max Flow
Normal Flow
Normal Pressure
Normal Temp.
Base Pressure
Base Temp.
Specific Gravity at Base
Operating Specific Gravity
Mol. Weight Cp/Cv
Operating Viscosity
Quality % or Superheat
Base Press Base Temp.
Select Primary
Element
Check one and fill in corresponding information below:
Orifice Plate
Averaging Pitot Tube
Other:___________________________
Integral Temperature Yes No
DP Flow Specification Sheet
00815-0100-4485, Rev AA
2013DP Flow Transmitters
S-2
Orifice Primary
Element
Check one:
Standard (one hole plate)
Conditioning (multi-hole plate)
Beta = d/D
Orifice Bore Diameter
Line ID
Plate Material
Vent or Drain Hole
Plate Thickness
Connection Type
Plate Type
Tap Type
Flange Type
Flange Rating
Flange Material
Standard (AGA, etc)
Averaging
Pitot Tube
Primary Element
Line ID
Sensor Material
Mounting Style ___________________________________
Check all that apply:
Wafer Style
Compression Sealing Mechanism
Opposite Side Support Required
Flanged - Flange Rating________________________
Threaded
Hot-Tap
Other Primary
Element
Body Material
Wetted Material
Pressure Rating
Tap Type
Beta Ratio
Bore Size
Throat Size
Flow Coefficient
Standard/Approvals
Other Information:
Transmitter
Mounting
Check one:
Direct Mount
Remote Mount
Secondary
Instrument
Secondary Instr. Tag
Transmitter Type – Check one and fill out the corresponding calibration
information below:
Mass or Energy Flow(1)
- Compensation Level__________________________________
Differential Pressure
S-3
DP Flow Transmitters
DP Flow Specification Sheet
00815-0100-4485, Rev AA
2013
Flowmeter
Calibration
Differential Pressure LTV=_______________ UTV=_______________ Units=___________
Pressure LTV=_______________ UTV=_______________ Units=___________
Temperature LTV=_______________ UTV=_______________ Units=___________
Notes
(1)Transmitter that provides real-time fully compensated mass, energy, and totalized flow by measuring differential pres-
sure, static pressure, and process temperature

More Related Content

What's hot

Cqi 11 plating system assessment process table b - surface conditioning of me...
Cqi 11 plating system assessment process table b - surface conditioning of me...Cqi 11 plating system assessment process table b - surface conditioning of me...
Cqi 11 plating system assessment process table b - surface conditioning of me...
Paco Miró
 
cqi 11 plating system assessment - Portada
cqi 11 plating system assessment - Portadacqi 11 plating system assessment - Portada
cqi 11 plating system assessment - Portada
Paco Miró
 
GTAW Qualification - Michael Gartee
GTAW Qualification - Michael GarteeGTAW Qualification - Michael Gartee
GTAW Qualification - Michael Gartee
Michael Gartee
 
Axial Thrust Failure investigation
Axial Thrust Failure investigationAxial Thrust Failure investigation
Axial Thrust Failure investigation
Rory McKay
 
Some projects VIRO Arnhem
Some projects VIRO ArnhemSome projects VIRO Arnhem
Some projects VIRO Arnhem
Roel Tang
 

What's hot (18)

Pqr0
Pqr0Pqr0
Pqr0
 
Process Plant design fundementals
Process Plant design fundementalsProcess Plant design fundementals
Process Plant design fundementals
 
BVAA presentation 2015: The Use of CFD to assess valve performance and operat...
BVAA presentation 2015: The Use of CFD to assess valve performance and operat...BVAA presentation 2015: The Use of CFD to assess valve performance and operat...
BVAA presentation 2015: The Use of CFD to assess valve performance and operat...
 
Cqi 11 plating system assessment process table b - surface conditioning of me...
Cqi 11 plating system assessment process table b - surface conditioning of me...Cqi 11 plating system assessment process table b - surface conditioning of me...
Cqi 11 plating system assessment process table b - surface conditioning of me...
 
cqi 11 plating system assessment - Portada
cqi 11 plating system assessment - Portadacqi 11 plating system assessment - Portada
cqi 11 plating system assessment - Portada
 
Pipininspect
PipininspectPipininspect
Pipininspect
 
Piping fundamental
Piping fundamentalPiping fundamental
Piping fundamental
 
GTAW Qualification - Michael Gartee
GTAW Qualification - Michael GarteeGTAW Qualification - Michael Gartee
GTAW Qualification - Michael Gartee
 
Field transmitters
Field transmittersField transmitters
Field transmitters
 
Asme sec. ix bkr - 051010
Asme sec. ix   bkr - 051010Asme sec. ix   bkr - 051010
Asme sec. ix bkr - 051010
 
Process diagrams lecture
Process diagrams lectureProcess diagrams lecture
Process diagrams lecture
 
Well Test Design
Well Test DesignWell Test Design
Well Test Design
 
Axial Thrust Failure investigation
Axial Thrust Failure investigationAxial Thrust Failure investigation
Axial Thrust Failure investigation
 
Bfd pfd-pid
Bfd pfd-pidBfd pfd-pid
Bfd pfd-pid
 
Key Process Considerations for Pipeline Design Basis
Key Process Considerations for Pipeline Design BasisKey Process Considerations for Pipeline Design Basis
Key Process Considerations for Pipeline Design Basis
 
Const insp chklist
Const insp chklistConst insp chklist
Const insp chklist
 
Flow applicator 10_14
Flow applicator  10_14Flow applicator  10_14
Flow applicator 10_14
 
Some projects VIRO Arnhem
Some projects VIRO ArnhemSome projects VIRO Arnhem
Some projects VIRO Arnhem
 

Similar to Product data-sheet-dp-flow-specification-sheet-rosemount-en-77672

Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.
Emeka Ngwobia
 
Les vanne a boisson spécial koso parcol.pdf
Les vanne a boisson spécial koso parcol.pdfLes vanne a boisson spécial koso parcol.pdf
Les vanne a boisson spécial koso parcol.pdf
KamelSalhi3
 

Similar to Product data-sheet-dp-flow-specification-sheet-rosemount-en-77672 (20)

Bhel vis powerplant
Bhel vis powerplantBhel vis powerplant
Bhel vis powerplant
 
Asme wps-demo
Asme wps-demoAsme wps-demo
Asme wps-demo
 
Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.
 
NONG YAO PROJECT SUBSEA VALVE Rev 0
NONG YAO PROJECT SUBSEA VALVE Rev 0NONG YAO PROJECT SUBSEA VALVE Rev 0
NONG YAO PROJECT SUBSEA VALVE Rev 0
 
Hpv pinton pump test
Hpv pinton pump testHpv pinton pump test
Hpv pinton pump test
 
PSV Sizing - API Based
PSV Sizing - API BasedPSV Sizing - API Based
PSV Sizing - API Based
 
Cge666 chapter 1-wk 1-2
Cge666 chapter 1-wk 1-2Cge666 chapter 1-wk 1-2
Cge666 chapter 1-wk 1-2
 
ipec.info | Pfd p&id
ipec.info | Pfd p&idipec.info | Pfd p&id
ipec.info | Pfd p&id
 
pidslide.ppt
pidslide.pptpidslide.ppt
pidslide.ppt
 
Asme sec ix overview
Asme sec ix overviewAsme sec ix overview
Asme sec ix overview
 
Variable Springs Webinar
Variable Springs WebinarVariable Springs Webinar
Variable Springs Webinar
 
Les vanne a boisson spécial koso parcol.pdf
Les vanne a boisson spécial koso parcol.pdfLes vanne a boisson spécial koso parcol.pdf
Les vanne a boisson spécial koso parcol.pdf
 
Hazardous Area Pressure Switch
Hazardous Area Pressure SwitchHazardous Area Pressure Switch
Hazardous Area Pressure Switch
 
CPC-GenII_C.ppt
CPC-GenII_C.pptCPC-GenII_C.ppt
CPC-GenII_C.ppt
 
Cadillac CN Series
Cadillac CN SeriesCadillac CN Series
Cadillac CN Series
 
Constant Spring Supports Webinar
Constant Spring Supports WebinarConstant Spring Supports Webinar
Constant Spring Supports Webinar
 
Butt fusion welding procedure eng
Butt fusion welding procedure engButt fusion welding procedure eng
Butt fusion welding procedure eng
 
04 ret670 test report
04 ret670 test report04 ret670 test report
04 ret670 test report
 
P&ID Presentation.pdf
P&ID Presentation.pdfP&ID Presentation.pdf
P&ID Presentation.pdf
 
API 6A Wellhead Selection.ppt
API 6A Wellhead Selection.pptAPI 6A Wellhead Selection.ppt
API 6A Wellhead Selection.ppt
 

Recently uploaded

electrical installation and maintenance.
electrical installation and maintenance.electrical installation and maintenance.
electrical installation and maintenance.
benjamincojr
 

Recently uploaded (20)

15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon
 
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTUUNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
 
Software Engineering Practical File Front Pages.pdf
Software Engineering Practical File Front Pages.pdfSoftware Engineering Practical File Front Pages.pdf
Software Engineering Practical File Front Pages.pdf
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Students
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
 
electrical installation and maintenance.
electrical installation and maintenance.electrical installation and maintenance.
electrical installation and maintenance.
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptx
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1
 
Autodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptxAutodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptx
 
Circuit Breakers for Engineering Students
Circuit Breakers for Engineering StudentsCircuit Breakers for Engineering Students
Circuit Breakers for Engineering Students
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailing
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
Interfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdfInterfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdf
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility Applications
 
What is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsWhat is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, Functions
 
Dynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxDynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptx
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
 

Product data-sheet-dp-flow-specification-sheet-rosemount-en-77672

  • 1. S-1 DP Flow Transmitters DP Flow Specification Sheet 00815-0100-4485, Rev AA 2013 DP Flowmeters SHEET__________ OF__________ SPEC. NO. REV. NO BY DATE REVISION CONTRACT DATE REQ. - P.O. BY CHK’D APPR. Tag Number Service Line No./ Meter Location Fluid Line Size and Pipe Schedule OR Pipe ID and Wall Thickness Pipe Material Pipe Orientation Fluid Fluid State Max Flow Normal Flow Normal Pressure Normal Temp. Base Pressure Base Temp. Specific Gravity at Base Operating Specific Gravity Mol. Weight Cp/Cv Operating Viscosity Quality % or Superheat Base Press Base Temp. Select Primary Element Check one and fill in corresponding information below: Orifice Plate Averaging Pitot Tube Other:___________________________ Integral Temperature Yes No
  • 2. DP Flow Specification Sheet 00815-0100-4485, Rev AA 2013DP Flow Transmitters S-2 Orifice Primary Element Check one: Standard (one hole plate) Conditioning (multi-hole plate) Beta = d/D Orifice Bore Diameter Line ID Plate Material Vent or Drain Hole Plate Thickness Connection Type Plate Type Tap Type Flange Type Flange Rating Flange Material Standard (AGA, etc) Averaging Pitot Tube Primary Element Line ID Sensor Material Mounting Style ___________________________________ Check all that apply: Wafer Style Compression Sealing Mechanism Opposite Side Support Required Flanged - Flange Rating________________________ Threaded Hot-Tap Other Primary Element Body Material Wetted Material Pressure Rating Tap Type Beta Ratio Bore Size Throat Size Flow Coefficient Standard/Approvals Other Information: Transmitter Mounting Check one: Direct Mount Remote Mount Secondary Instrument Secondary Instr. Tag Transmitter Type – Check one and fill out the corresponding calibration information below: Mass or Energy Flow(1) - Compensation Level__________________________________ Differential Pressure
  • 3. S-3 DP Flow Transmitters DP Flow Specification Sheet 00815-0100-4485, Rev AA 2013 Flowmeter Calibration Differential Pressure LTV=_______________ UTV=_______________ Units=___________ Pressure LTV=_______________ UTV=_______________ Units=___________ Temperature LTV=_______________ UTV=_______________ Units=___________ Notes (1)Transmitter that provides real-time fully compensated mass, energy, and totalized flow by measuring differential pres- sure, static pressure, and process temperature