This document provides a status update on the AKPO de-bottlenecking project. It summarizes that separator B has been evaluated and can handle the increased flows from de-rating the pressure to 22.5 barg. However, several pieces of equipment on separator B will need to be changed including increasing the port size on two control valves and replacing three pressure safety valves and their associated piping. The conclusions confirm separator B's capacity and list the specific equipment that requires changes.