SlideShare a Scribd company logo
1 of 7
CURRICULUM VITAE
POST APPLIED FOR : PRODUCTION TECHNICIAN
NAME : M.Sahaya Suresh Minnal Mani
FATHER NAME : A. Maria Xavier
DATE OF BIRTH : 01-10-1975
NATIONALITY : Indian
MARITAL STATUS : Married
COMMUNICATION ADDRESS : Door No: 6/79,
Govt Hospital Road,
Azhagappapuram,
Kanyakumari District-629 401
Tamil Nadu, India
EMAIL ADDRESS : minnalstays@yahoo.com
CONTACT PHONE NUMBER : Ph : 0091-4652-268258
Cell: 0091- 9994702878
0091- 8144117883
Fax: 0091-4652-266694
PROFICIENCY IN LANGUAGES : English, Hindi, Tamil and Malayalam
EDUCATIONAL QUALIFICATIONS : S.S.L.C (10 Years)
Diploma in Mechanical Engineering
(1993-1996)
PASSPORT DETAILS : Passport No - G - 6829779
Issued At - Madurai
Valid Up to - 07- 01-2018
Passport Status - ECNR
DRIVING LICENSE : Heavy Motor Vehicle in INDIA
Light Motor Vehicle in SAUDI ARABIA
Light Motor Vehicle in UAE
Page 1/7
PROFESSIONAL SAFETY TRAINING
• Basic Fire Fighting - Indian Navy & Brazil
• Basic/Advanced First Aid Curse -Indian Navy & Brazil
• Personal Survival Techniques - Indian Navy & Brazil
• Personal Safety and Social Responsibilities - Indian Navy & Brazil
• Offshore Sea Survival & Helicopter Under water
Escape Training- Qatar & Brazil Also India
• H2S Awareness & Escape Course - Qatar
PROFESSIONAL EXPERIENCE
Around 15 Years Experience in Oil and Gas Field
 AUGUST 1996 TO OCTOBER 1997 AS A PRODUCTION TECHNICIAN IN
BARODA THROUGH BYAINDLEY ALCAN MARINE SERVICES PVT.LTD.INDIA
 NOVEMBER 1997 TO MARCH 2004 AS A PRODUCTION TECHNICIAN
OPERATOR IN SAUDI ARAMCO OFFSHORE SITES (MARJAN, SAFANIYA,
ABUSAFAH, ZULUF, ABUALI, ALKHAFJI, M/S STAR NAVIGATION CO LTD
JEDDAH. SAUDI ARABIA
 MAY 2004 TO AUGUST 2005 AS A PRODUCTION TECHNICIAN IN ONGC
SITE (BPA, BPP, SAGAR LEKSHMI) M/S THEKKENS NAKCO.INDIA
 AUGUST 2005 TO OCTOBER 2005 AS A PRODUCTION TECHNICIAN IN AD
GAS. ABU DHABI
 NOV 2005 TO AUGUST 2006 DATE AS A PRODUCTION TECHNICIAN OIL
AND NATURAL GAS CORPORATION M/S THEKKENS NAKCO. INDIA
 SEPT 2006 TO DECEMBER 2007 DATE AS PRODUCTION TECHNICIAN QPD
(QATAR PETROLEUM DEVELOPMENT CO LTD) THROUGH IPEDEX
L.L.C.QATAR
 MARCH 2008 TO TILL DATE AS PRODUCTION TECHNICIAN IN FPSO
BRASIL SBM (SINGLE BUOY MOORINGS INC) THROGH V.SHIPS. BRASIL
Page 2/7
JOB PROFILE
During the Past and Present career experienced in the following areas
Well Head Operation
Operations involved in Well Head X-Mas tree valve, operations with Baker Panel
facilities, Well Testing, Monitoring through Test Separators. Well versed in Operations of
Adjustable and Variable Choke and Choke Housing, Monitoring Gas and Oil flow,
monitoring all the parameters of the Test Separators and Platform, Start-up and Shut-
down procedures of the Well in the Emergency Circumstances, Operations involved in the
Artificial Lift such a Gas Lift and Water Injection Systems. Knowing all the safety
Procedures and Precautions carried out in the Offshore Platform on ESD, FSD and SDV
systems.
Well Testing
Flowing the Well through various sizes of Chocks through Three Stage Test Separator,
Separator Charging, Diverting the Well into Test/ Production Separator, and changing
different size Orifice Plates to measure the quantity of Gas. Positive Displacement Meter
or Turbine Meter with Totalizer measures oil and water rate.
Oil and Gas Gathering Stations
Operation and Control of wells through different headers for Optimum Production. Oil
Manifolds, Gas Lift Manifolds, Surge Tanks, Separators (Two/Three Phase), De-
hydration tanks, Water Disposal Pumps, Crude Transfer Pumps, Chemical Injection, Gas
and Oil line, Pigging Operations, Well Testing etc.,
Gas Compressors, Inter stage Scrubbers, Gas Treatment. Glycol Injectors, Glycol
Regeneration Unit, Gas Export, Routine Sampling of Oil, Gas, Glycol and Condensate.
Isolation and De-isolation of Equipments, Vessels, Tanks for Maintenance. Gas testing for
Hot Work, Mechanical and Electrical Isolation Procedures and Co-ordination with
Maintenance Crew, Trouble Shooting and reporting.
Central Production Facility and Tank Farm
Receiving Crude from different Gathering Stations, Gas Boot and Free water knock
out Tank, Dehydration Tank, Skimmer Tank, Storage Tank operations. Emulsion
Treatment, Demulsifier Injection Pumps, Injection Rate Calculations, Crude Transfer
Pumps, Water Injection Pumps, Shipping Pumps, Operation of Gas Turbines for
Generators, Compressors, Pumps, Fire water Pumps, PIG Launching and Receiving
Stations. Well Test Data Entry, Fuel Gas Systems, Hot oil systems, HP and LP Flare
systems, Trouble Shooting as per Cause and Effect Logics, Well versed Knowledge in
Plant Safety Procedures, Equipment’s and Emergency Procedures. In Tank Farm
Operation involved in Cone Roof Storage Tanks, Floating Roof Storage Tanks, High
Pressure Hydrocarbon Bullets, Operation Involved Nitrogen Blanketing.
Page 3/7
Gas Dehydration Unit
Natural Gas Dehydration, Glycol Purification, Regeneration, Coalescar Filter
Separator, Cartridge Filter, Charcoal Filter, Glycol Flash Drum. Hot Oil Treatment,
Glycol Scrubber Operations, Glycol Booster Pump Operation. All Filter Changing, Glycol
Pumping, Glycol Storage Tank Level, Temperature Maintaining, Ground Flare System
Operation, Dew-Point setting, Methanol Injection, taking of plant Shut-down and Start-up
Operation. Pre and super Heater’s for Fuel Gas Heating and Heat Exchangers.
Gas Sweetening Unit
Methyl Diethanol Amine (MDEA) absorbs the H2S from sour gas. Gas Sweetening
Unit (GSU) consists of two sections. Absorption section and amine Regeneration section.
Operation and Control of the Absorber, Knockout Drum, and Heat Exchangers – maintain
the MDEA Temp. Control the Level of Rich Amine Flash Drum, Rich/Lean Amine
Exchanger, Regenerator, and Control the Lean Amine Flash Drum, Operation of Vapour
compressors and Reflex Pumps, Oxidizer and Absorber, Adding Catalytic Reagents ARI
310, Liquid Sulphur is transferred to Sulphur Storage Tank by Transfer Pumps at Sulphur
Recovery Unit. Familiar with start up and shutdown of GSU.
Re- Boiler
Maintains the Reboiler Temperature, Glycol Level, Fuel Gas and Poilet Gas supply,
Still Column Temperature Setting, Three Way Valve Function. Log Sheet for Glycol
Regeneration Unit and Control Room Reading, PH Value checking Nacap Mixing.
Instrument Gas Receiver
All LCV, PCV, TCV, FCV, DCV Solenoid Valve, PI Control Valves and all
Instrumentation Valves are operating in this dry Gas. Maintain the Fuel gas, Poilet Gas,
Blanket Gas, Stripping Gas Pressure, Operation of Instrument Gas Receiver and Air
Dryers, Ground Flair system.
Gas Compressor Unit
Inject High Pressure Dehydrated Gas into Well Reservoir, Operation and Maintenance
of Multistage Compressors, Scrubbers, Inter Coolers, After Coolers, Separated Start-up
and Shutdown Operations of Compressors at Gas Injection Unit. The Plant Receiving
Medium and Low Pressure Gas from Respective Separators, Compress and Send To
GNFC, Operation and Control of the Compressor, Start-up Shut-down Operations,
Maintain High Pressure Scrubbers, Inter Coolers and After Coolers, Drainage Pump
Operation, Cooling Fan Operation.
Gas Plant Operations
Involved Operations in Glycol Injection Systems, Glycol Regeneration System,
Operations involved in Propane Compressor, Propane Chilling Units, Propane Chillers,
NGL Separators, Analysis of Gas Moisture Content and Hydrocarbon Dew Point
Checking, Gas Export and Control through the Main Line.
Page 4/7
Water Injection Unit
To inject High Pressure Treated Water to the Oil-Reservoir for Maintains the Well
Pressure Pump Operation, Centrifugal and Reciprocating Compressor Operation.
Chemical Injection System
Handled following Crude Oil Injection and Treatment Chemicals such as Pour Point
Depressant, Demulsifer, Gas Phase Corrosion Inhibitor, Liquid Phase Corrosion Inhibitor and
Water Injection Chemicals such as Biocide, Oxygen Scavenger, Corrosion Inhibitors, Poly
Electrolyte, Scale Inhibitor. Gas Treatment Chemical like Glycol.
Panel Board Operations
Conversant in handling of all types of Control Panels, Local Control panels, Pneumatic
Control Panels, Value Mounted Control Panels, DCS Control and SCADA System. Various
Types Of Valves PCV, LCV, FCV, TCV, Fisher Controllers, Joucovier Pilot Operated Norbro
Actuators, Gas Detectors, UV Detectors, Detronics, FoxPro, Microns and Honeywell Instrument
Panels
Pigging Operation
Successfully carried out PIG launching and Receiving Operation on Oil and Gas Flow
Lines. Well Head and Oil and Gas Export Lines. Water injection lines, well experience in
Chemical Injection for Pigging Operation, Operation of Polly pig, Scrubber Pig, Isolation Valve,
Kick of Valve, Scrubber Tee Valve.
Equipments Handling
Operation and Handling of Separators (HP, LP Test) two /three phase. H2S Stripper, Knock
Out Drum, Scrubbers, Filters, Surge Tanks, Heater-Treater, Gas Compressor and all type of
Pumps (Injection, Booster, Transfer) and Cooler (Inter, After) and all type of Valves (Gate, Ball,
Butterfly, Plug, Globe, Needle) Operation, Oil and Gas sample collection.
Operation and Testing of Pump out Plug (POP). Landing Nipple, Expansion Joint, Backer,
Mandrel (Gas Lift Valve, Circulation Valve) SSV, SSSV, Back Pressure Valve, Chemical
Supply, Hot Oil Supply, Magnetic Fluid Conditioner (Paraffin Wax Well), Sliding Sleeve, Tail
Pipe, Storm Choke, Diesel Dozing, Acid Dozing, Gas Sample Collection, Tubing Hanger X-Mas
Tree, Flange Testing, String Making, Burner Light Operation.
Safety Equipments
H2S Monitor, Gas Detector, Fire Detection System, DCP, Foam, CO2 Fire Extinguisher, Life
Jackets and Belts. Operation and Maintenance of various types of Fire Fighting equipments and
have knowledge’s of Fire and Safety Equipments.
Utilities
Waste Water Treatment Plant, Raw Water Treatment Plant Cooling Water Treatment Plant,
Fire Water Pump Operations. Normal operations on Centrifugal Pump, Positive Displacement
Pump, Reciprocating Compressor, Centrifugal Compressor, Multistage Compressor.
Commissioning Activities
Well experienced in commissioning and Pre commissioning activities. Checking
instruments, equipments and system as per P & I diagram. Vessel internal inspection,
water flushing of the pipelines, cardboard flushing, air flushing, drying, Purging and
Page 5/7
inertsation start up activities of the compressor pump, Gas Turbine, Heat exchanger, HP
& LP Leak testing, Permit to work issue etc.
Commissioning of hot oil system, fuel gas system, flare system, dryer regeneration,
pumps, cooler and heat exchangers, fractionation system.
JOB RESPONSIBILITIES
•1 Make regular routine checks of all Equipment and Units to ensure that they are functioning
correctly in accordance with Standard Operating Procedure.
•2 Report at Equipment and Instrument defects and leaks immediately to my executive
engineer and take possible corrective action.
•3 Check and Record in the Plant Log Sheet each and every hour a variety of readings such as
Oil and Gas Flow, Temperature and Pressure and Record unusual occurrences after
reporting them to my executive engineer.
•4 Start, Check and Stop Pumps locally according to instructions or in case of emergency.
•5 Open or Close the Injection Water Distribution Manifold and Gas Lift Manifold on the
Satellites, which receive Treated Water from the Process Platform and distribute it to the
relevant Well Head Platform under the guidance of the executive engineer.
•6 Assist in carrying out the Routine Weekly Run Tests of Equipments like Emergency Diesel
Generator diesel and Electrical Fire Pumps. Etc.,
•7 Participate under instructions, In Launching Pigs into Pipelines, Prepare Pig Receiver
Stations and remove the Pig and check it for damage under the guidance of the executive
engineer.
•8 Unload Chemicals into Tanks for Injections, Start and adjust the Flow Rate of Chemical
Injection Pumps as required.
•9 Check the Water / Oil interface level in Sump Tanks and operate their pumps locally when
they required.
•10 Collect Oil, Gas, and Water Samples and measure the Water Cut in Oil, Salt Concentration
in the Produced Water and pass the samples to the Laboratory for Analysis.
•11 Initiate and lead Fire Fighting or other emergency actions in my area until taken over by a
higher authority.
•12 Testing of Expansion Joint. SSSV under the supervision of senior engineer.
•13 To assist the production engineer in Well Completion, Production Testing
(Injection of Acid and Nitrogen)
•14 Checking the Leakage of Gas like Hydrogen sulphide, Carbon Dioxide.
I hereby declare that the information furnished above is correct and true to the best
of my knowledge.
Place: India Sincerely Yours,
Page 6/7
Date: 13.04.2015 (M.Minnal Mani)
Page 7/7

More Related Content

What's hot

Commissioning Supervisor New
Commissioning Supervisor NewCommissioning Supervisor New
Commissioning Supervisor NewJoseph Jaiwin Das
 
AJITHKUMAR -Lead Production Operator
AJITHKUMAR -Lead Production OperatorAJITHKUMAR -Lead Production Operator
AJITHKUMAR -Lead Production OperatorAjith Kumar
 
Hc petroleum equipment_Manufacturer of surface test equipment for oil and gas...
Hc petroleum equipment_Manufacturer of surface test equipment for oil and gas...Hc petroleum equipment_Manufacturer of surface test equipment for oil and gas...
Hc petroleum equipment_Manufacturer of surface test equipment for oil and gas...ssuserd552b4
 
Alfa laval-tratamiento-de-oil-modelo-p-y-s
Alfa laval-tratamiento-de-oil-modelo-p-y-sAlfa laval-tratamiento-de-oil-modelo-p-y-s
Alfa laval-tratamiento-de-oil-modelo-p-y-sMohamedLamfouad
 
Transformer Bladder Replacement work Report
Transformer Bladder Replacement work ReportTransformer Bladder Replacement work Report
Transformer Bladder Replacement work ReportDanish Aslam
 
Control room operator
Control room operatorControl room operator
Control room operatoralalawi123
 
OLEFIN HYDROGENATION - VULCAN Series VHT-S101/S103
OLEFIN HYDROGENATION - VULCAN Series VHT-S101/S103OLEFIN HYDROGENATION - VULCAN Series VHT-S101/S103
OLEFIN HYDROGENATION - VULCAN Series VHT-S101/S103Gerard B. Hawkins
 
Synchronising the 210MW unit to the 220KV grid
Synchronising the 210MW unit to the 220KV gridSynchronising the 210MW unit to the 220KV grid
Synchronising the 210MW unit to the 220KV gridManohar Tatwawadi
 
05 chapt 5 pd section 5.5 process eng final_oct 04
05 chapt 5 pd section 5.5 process eng final_oct 0405 chapt 5 pd section 5.5 process eng final_oct 04
05 chapt 5 pd section 5.5 process eng final_oct 04Ishwarya Srikanth
 
Crude oil Production System
Crude oil Production System Crude oil Production System
Crude oil Production System Tobiloba Omitola
 
adnan ppl internship report
adnan ppl internship reportadnan ppl internship report
adnan ppl internship reportAdnan Nek
 
4916 4920.output
4916 4920.output4916 4920.output
4916 4920.outputj1075017
 

What's hot (18)

Raiyani cv
Raiyani cvRaiyani cv
Raiyani cv
 
CV Dian Risdiana
CV Dian RisdianaCV Dian Risdiana
CV Dian Risdiana
 
Commissioning Supervisor New
Commissioning Supervisor NewCommissioning Supervisor New
Commissioning Supervisor New
 
SURESH CCR & FIELD OPERATOR
SURESH CCR & FIELD OPERATORSURESH CCR & FIELD OPERATOR
SURESH CCR & FIELD OPERATOR
 
AJITHKUMAR -Lead Production Operator
AJITHKUMAR -Lead Production OperatorAJITHKUMAR -Lead Production Operator
AJITHKUMAR -Lead Production Operator
 
Separatore pa 605
Separatore pa 605Separatore pa 605
Separatore pa 605
 
Power Plant Boiler feed pump
Power Plant Boiler feed pump Power Plant Boiler feed pump
Power Plant Boiler feed pump
 
Hc petroleum equipment_Manufacturer of surface test equipment for oil and gas...
Hc petroleum equipment_Manufacturer of surface test equipment for oil and gas...Hc petroleum equipment_Manufacturer of surface test equipment for oil and gas...
Hc petroleum equipment_Manufacturer of surface test equipment for oil and gas...
 
Alfa laval-tratamiento-de-oil-modelo-p-y-s
Alfa laval-tratamiento-de-oil-modelo-p-y-sAlfa laval-tratamiento-de-oil-modelo-p-y-s
Alfa laval-tratamiento-de-oil-modelo-p-y-s
 
Transformer Bladder Replacement work Report
Transformer Bladder Replacement work ReportTransformer Bladder Replacement work Report
Transformer Bladder Replacement work Report
 
Control room operator
Control room operatorControl room operator
Control room operator
 
OLEFIN HYDROGENATION - VULCAN Series VHT-S101/S103
OLEFIN HYDROGENATION - VULCAN Series VHT-S101/S103OLEFIN HYDROGENATION - VULCAN Series VHT-S101/S103
OLEFIN HYDROGENATION - VULCAN Series VHT-S101/S103
 
Synchronising the 210MW unit to the 220KV grid
Synchronising the 210MW unit to the 220KV gridSynchronising the 210MW unit to the 220KV grid
Synchronising the 210MW unit to the 220KV grid
 
05 chapt 5 pd section 5.5 process eng final_oct 04
05 chapt 5 pd section 5.5 process eng final_oct 0405 chapt 5 pd section 5.5 process eng final_oct 04
05 chapt 5 pd section 5.5 process eng final_oct 04
 
Crude oil Production System
Crude oil Production System Crude oil Production System
Crude oil Production System
 
adnan ppl internship report
adnan ppl internship reportadnan ppl internship report
adnan ppl internship report
 
Zeeshan Hyder
Zeeshan HyderZeeshan Hyder
Zeeshan Hyder
 
4916 4920.output
4916 4920.output4916 4920.output
4916 4920.output
 

Similar to MINNAL MANI PROD TECH CV 2012 (20)

Antro
AntroAntro
Antro
 
Kannan resume
Kannan resumeKannan resume
Kannan resume
 
CV LINKEDIN Kolli Ramesh Babu cv
CV LINKEDIN Kolli Ramesh Babu cvCV LINKEDIN Kolli Ramesh Babu cv
CV LINKEDIN Kolli Ramesh Babu cv
 
Tankfarm terminal operator
Tankfarm  terminal operatorTankfarm  terminal operator
Tankfarm terminal operator
 
Chidambaram_cv
Chidambaram_cvChidambaram_cv
Chidambaram_cv
 
Field Production Operator CV
Field Production Operator CVField Production Operator CV
Field Production Operator CV
 
Kolli Ramesh Babu cv
Kolli Ramesh Babu cvKolli Ramesh Babu cv
Kolli Ramesh Babu cv
 
saravanan WHOP
saravanan WHOPsaravanan WHOP
saravanan WHOP
 
Chidambaram_cv sr,mech
Chidambaram_cv sr,mechChidambaram_cv sr,mech
Chidambaram_cv sr,mech
 
remesh new
remesh newremesh new
remesh new
 
PRODUCTION&WELLHEAD
PRODUCTION&WELLHEADPRODUCTION&WELLHEAD
PRODUCTION&WELLHEAD
 
Mechanical resume (1)
Mechanical resume (1)Mechanical resume (1)
Mechanical resume (1)
 
NANIK COMMISSIONING
NANIK COMMISSIONINGNANIK COMMISSIONING
NANIK COMMISSIONING
 
shivpratapshukla 6906
shivpratapshukla 6906shivpratapshukla 6906
shivpratapshukla 6906
 
CV3
CV3CV3
CV3
 
bismilla operation & comissioning
bismilla operation & comissioningbismilla operation & comissioning
bismilla operation & comissioning
 
SENTHIL PANDIAN CV
SENTHIL PANDIAN CVSENTHIL PANDIAN CV
SENTHIL PANDIAN CV
 
VETRI CV
VETRI CVVETRI CV
VETRI CV
 
prs om&terminal
prs om&terminalprs om&terminal
prs om&terminal
 
Instrument Supervisor
Instrument SupervisorInstrument Supervisor
Instrument Supervisor
 

MINNAL MANI PROD TECH CV 2012

  • 1. CURRICULUM VITAE POST APPLIED FOR : PRODUCTION TECHNICIAN NAME : M.Sahaya Suresh Minnal Mani FATHER NAME : A. Maria Xavier DATE OF BIRTH : 01-10-1975 NATIONALITY : Indian MARITAL STATUS : Married COMMUNICATION ADDRESS : Door No: 6/79, Govt Hospital Road, Azhagappapuram, Kanyakumari District-629 401 Tamil Nadu, India EMAIL ADDRESS : minnalstays@yahoo.com CONTACT PHONE NUMBER : Ph : 0091-4652-268258 Cell: 0091- 9994702878 0091- 8144117883 Fax: 0091-4652-266694 PROFICIENCY IN LANGUAGES : English, Hindi, Tamil and Malayalam EDUCATIONAL QUALIFICATIONS : S.S.L.C (10 Years) Diploma in Mechanical Engineering (1993-1996) PASSPORT DETAILS : Passport No - G - 6829779 Issued At - Madurai Valid Up to - 07- 01-2018 Passport Status - ECNR DRIVING LICENSE : Heavy Motor Vehicle in INDIA Light Motor Vehicle in SAUDI ARABIA Light Motor Vehicle in UAE Page 1/7
  • 2. PROFESSIONAL SAFETY TRAINING • Basic Fire Fighting - Indian Navy & Brazil • Basic/Advanced First Aid Curse -Indian Navy & Brazil • Personal Survival Techniques - Indian Navy & Brazil • Personal Safety and Social Responsibilities - Indian Navy & Brazil • Offshore Sea Survival & Helicopter Under water Escape Training- Qatar & Brazil Also India • H2S Awareness & Escape Course - Qatar PROFESSIONAL EXPERIENCE Around 15 Years Experience in Oil and Gas Field  AUGUST 1996 TO OCTOBER 1997 AS A PRODUCTION TECHNICIAN IN BARODA THROUGH BYAINDLEY ALCAN MARINE SERVICES PVT.LTD.INDIA  NOVEMBER 1997 TO MARCH 2004 AS A PRODUCTION TECHNICIAN OPERATOR IN SAUDI ARAMCO OFFSHORE SITES (MARJAN, SAFANIYA, ABUSAFAH, ZULUF, ABUALI, ALKHAFJI, M/S STAR NAVIGATION CO LTD JEDDAH. SAUDI ARABIA  MAY 2004 TO AUGUST 2005 AS A PRODUCTION TECHNICIAN IN ONGC SITE (BPA, BPP, SAGAR LEKSHMI) M/S THEKKENS NAKCO.INDIA  AUGUST 2005 TO OCTOBER 2005 AS A PRODUCTION TECHNICIAN IN AD GAS. ABU DHABI  NOV 2005 TO AUGUST 2006 DATE AS A PRODUCTION TECHNICIAN OIL AND NATURAL GAS CORPORATION M/S THEKKENS NAKCO. INDIA  SEPT 2006 TO DECEMBER 2007 DATE AS PRODUCTION TECHNICIAN QPD (QATAR PETROLEUM DEVELOPMENT CO LTD) THROUGH IPEDEX L.L.C.QATAR  MARCH 2008 TO TILL DATE AS PRODUCTION TECHNICIAN IN FPSO BRASIL SBM (SINGLE BUOY MOORINGS INC) THROGH V.SHIPS. BRASIL Page 2/7
  • 3. JOB PROFILE During the Past and Present career experienced in the following areas Well Head Operation Operations involved in Well Head X-Mas tree valve, operations with Baker Panel facilities, Well Testing, Monitoring through Test Separators. Well versed in Operations of Adjustable and Variable Choke and Choke Housing, Monitoring Gas and Oil flow, monitoring all the parameters of the Test Separators and Platform, Start-up and Shut- down procedures of the Well in the Emergency Circumstances, Operations involved in the Artificial Lift such a Gas Lift and Water Injection Systems. Knowing all the safety Procedures and Precautions carried out in the Offshore Platform on ESD, FSD and SDV systems. Well Testing Flowing the Well through various sizes of Chocks through Three Stage Test Separator, Separator Charging, Diverting the Well into Test/ Production Separator, and changing different size Orifice Plates to measure the quantity of Gas. Positive Displacement Meter or Turbine Meter with Totalizer measures oil and water rate. Oil and Gas Gathering Stations Operation and Control of wells through different headers for Optimum Production. Oil Manifolds, Gas Lift Manifolds, Surge Tanks, Separators (Two/Three Phase), De- hydration tanks, Water Disposal Pumps, Crude Transfer Pumps, Chemical Injection, Gas and Oil line, Pigging Operations, Well Testing etc., Gas Compressors, Inter stage Scrubbers, Gas Treatment. Glycol Injectors, Glycol Regeneration Unit, Gas Export, Routine Sampling of Oil, Gas, Glycol and Condensate. Isolation and De-isolation of Equipments, Vessels, Tanks for Maintenance. Gas testing for Hot Work, Mechanical and Electrical Isolation Procedures and Co-ordination with Maintenance Crew, Trouble Shooting and reporting. Central Production Facility and Tank Farm Receiving Crude from different Gathering Stations, Gas Boot and Free water knock out Tank, Dehydration Tank, Skimmer Tank, Storage Tank operations. Emulsion Treatment, Demulsifier Injection Pumps, Injection Rate Calculations, Crude Transfer Pumps, Water Injection Pumps, Shipping Pumps, Operation of Gas Turbines for Generators, Compressors, Pumps, Fire water Pumps, PIG Launching and Receiving Stations. Well Test Data Entry, Fuel Gas Systems, Hot oil systems, HP and LP Flare systems, Trouble Shooting as per Cause and Effect Logics, Well versed Knowledge in Plant Safety Procedures, Equipment’s and Emergency Procedures. In Tank Farm Operation involved in Cone Roof Storage Tanks, Floating Roof Storage Tanks, High Pressure Hydrocarbon Bullets, Operation Involved Nitrogen Blanketing. Page 3/7
  • 4. Gas Dehydration Unit Natural Gas Dehydration, Glycol Purification, Regeneration, Coalescar Filter Separator, Cartridge Filter, Charcoal Filter, Glycol Flash Drum. Hot Oil Treatment, Glycol Scrubber Operations, Glycol Booster Pump Operation. All Filter Changing, Glycol Pumping, Glycol Storage Tank Level, Temperature Maintaining, Ground Flare System Operation, Dew-Point setting, Methanol Injection, taking of plant Shut-down and Start-up Operation. Pre and super Heater’s for Fuel Gas Heating and Heat Exchangers. Gas Sweetening Unit Methyl Diethanol Amine (MDEA) absorbs the H2S from sour gas. Gas Sweetening Unit (GSU) consists of two sections. Absorption section and amine Regeneration section. Operation and Control of the Absorber, Knockout Drum, and Heat Exchangers – maintain the MDEA Temp. Control the Level of Rich Amine Flash Drum, Rich/Lean Amine Exchanger, Regenerator, and Control the Lean Amine Flash Drum, Operation of Vapour compressors and Reflex Pumps, Oxidizer and Absorber, Adding Catalytic Reagents ARI 310, Liquid Sulphur is transferred to Sulphur Storage Tank by Transfer Pumps at Sulphur Recovery Unit. Familiar with start up and shutdown of GSU. Re- Boiler Maintains the Reboiler Temperature, Glycol Level, Fuel Gas and Poilet Gas supply, Still Column Temperature Setting, Three Way Valve Function. Log Sheet for Glycol Regeneration Unit and Control Room Reading, PH Value checking Nacap Mixing. Instrument Gas Receiver All LCV, PCV, TCV, FCV, DCV Solenoid Valve, PI Control Valves and all Instrumentation Valves are operating in this dry Gas. Maintain the Fuel gas, Poilet Gas, Blanket Gas, Stripping Gas Pressure, Operation of Instrument Gas Receiver and Air Dryers, Ground Flair system. Gas Compressor Unit Inject High Pressure Dehydrated Gas into Well Reservoir, Operation and Maintenance of Multistage Compressors, Scrubbers, Inter Coolers, After Coolers, Separated Start-up and Shutdown Operations of Compressors at Gas Injection Unit. The Plant Receiving Medium and Low Pressure Gas from Respective Separators, Compress and Send To GNFC, Operation and Control of the Compressor, Start-up Shut-down Operations, Maintain High Pressure Scrubbers, Inter Coolers and After Coolers, Drainage Pump Operation, Cooling Fan Operation. Gas Plant Operations Involved Operations in Glycol Injection Systems, Glycol Regeneration System, Operations involved in Propane Compressor, Propane Chilling Units, Propane Chillers, NGL Separators, Analysis of Gas Moisture Content and Hydrocarbon Dew Point Checking, Gas Export and Control through the Main Line. Page 4/7
  • 5. Water Injection Unit To inject High Pressure Treated Water to the Oil-Reservoir for Maintains the Well Pressure Pump Operation, Centrifugal and Reciprocating Compressor Operation. Chemical Injection System Handled following Crude Oil Injection and Treatment Chemicals such as Pour Point Depressant, Demulsifer, Gas Phase Corrosion Inhibitor, Liquid Phase Corrosion Inhibitor and Water Injection Chemicals such as Biocide, Oxygen Scavenger, Corrosion Inhibitors, Poly Electrolyte, Scale Inhibitor. Gas Treatment Chemical like Glycol. Panel Board Operations Conversant in handling of all types of Control Panels, Local Control panels, Pneumatic Control Panels, Value Mounted Control Panels, DCS Control and SCADA System. Various Types Of Valves PCV, LCV, FCV, TCV, Fisher Controllers, Joucovier Pilot Operated Norbro Actuators, Gas Detectors, UV Detectors, Detronics, FoxPro, Microns and Honeywell Instrument Panels Pigging Operation Successfully carried out PIG launching and Receiving Operation on Oil and Gas Flow Lines. Well Head and Oil and Gas Export Lines. Water injection lines, well experience in Chemical Injection for Pigging Operation, Operation of Polly pig, Scrubber Pig, Isolation Valve, Kick of Valve, Scrubber Tee Valve. Equipments Handling Operation and Handling of Separators (HP, LP Test) two /three phase. H2S Stripper, Knock Out Drum, Scrubbers, Filters, Surge Tanks, Heater-Treater, Gas Compressor and all type of Pumps (Injection, Booster, Transfer) and Cooler (Inter, After) and all type of Valves (Gate, Ball, Butterfly, Plug, Globe, Needle) Operation, Oil and Gas sample collection. Operation and Testing of Pump out Plug (POP). Landing Nipple, Expansion Joint, Backer, Mandrel (Gas Lift Valve, Circulation Valve) SSV, SSSV, Back Pressure Valve, Chemical Supply, Hot Oil Supply, Magnetic Fluid Conditioner (Paraffin Wax Well), Sliding Sleeve, Tail Pipe, Storm Choke, Diesel Dozing, Acid Dozing, Gas Sample Collection, Tubing Hanger X-Mas Tree, Flange Testing, String Making, Burner Light Operation. Safety Equipments H2S Monitor, Gas Detector, Fire Detection System, DCP, Foam, CO2 Fire Extinguisher, Life Jackets and Belts. Operation and Maintenance of various types of Fire Fighting equipments and have knowledge’s of Fire and Safety Equipments. Utilities Waste Water Treatment Plant, Raw Water Treatment Plant Cooling Water Treatment Plant, Fire Water Pump Operations. Normal operations on Centrifugal Pump, Positive Displacement Pump, Reciprocating Compressor, Centrifugal Compressor, Multistage Compressor. Commissioning Activities Well experienced in commissioning and Pre commissioning activities. Checking instruments, equipments and system as per P & I diagram. Vessel internal inspection, water flushing of the pipelines, cardboard flushing, air flushing, drying, Purging and Page 5/7
  • 6. inertsation start up activities of the compressor pump, Gas Turbine, Heat exchanger, HP & LP Leak testing, Permit to work issue etc. Commissioning of hot oil system, fuel gas system, flare system, dryer regeneration, pumps, cooler and heat exchangers, fractionation system. JOB RESPONSIBILITIES •1 Make regular routine checks of all Equipment and Units to ensure that they are functioning correctly in accordance with Standard Operating Procedure. •2 Report at Equipment and Instrument defects and leaks immediately to my executive engineer and take possible corrective action. •3 Check and Record in the Plant Log Sheet each and every hour a variety of readings such as Oil and Gas Flow, Temperature and Pressure and Record unusual occurrences after reporting them to my executive engineer. •4 Start, Check and Stop Pumps locally according to instructions or in case of emergency. •5 Open or Close the Injection Water Distribution Manifold and Gas Lift Manifold on the Satellites, which receive Treated Water from the Process Platform and distribute it to the relevant Well Head Platform under the guidance of the executive engineer. •6 Assist in carrying out the Routine Weekly Run Tests of Equipments like Emergency Diesel Generator diesel and Electrical Fire Pumps. Etc., •7 Participate under instructions, In Launching Pigs into Pipelines, Prepare Pig Receiver Stations and remove the Pig and check it for damage under the guidance of the executive engineer. •8 Unload Chemicals into Tanks for Injections, Start and adjust the Flow Rate of Chemical Injection Pumps as required. •9 Check the Water / Oil interface level in Sump Tanks and operate their pumps locally when they required. •10 Collect Oil, Gas, and Water Samples and measure the Water Cut in Oil, Salt Concentration in the Produced Water and pass the samples to the Laboratory for Analysis. •11 Initiate and lead Fire Fighting or other emergency actions in my area until taken over by a higher authority. •12 Testing of Expansion Joint. SSSV under the supervision of senior engineer. •13 To assist the production engineer in Well Completion, Production Testing (Injection of Acid and Nitrogen) •14 Checking the Leakage of Gas like Hydrogen sulphide, Carbon Dioxide. I hereby declare that the information furnished above is correct and true to the best of my knowledge. Place: India Sincerely Yours, Page 6/7
  • 7. Date: 13.04.2015 (M.Minnal Mani) Page 7/7