1. M. SARAVANAN
E-Mail: saravanamani030@gmail.com Contact: +91 9772796600, +918 015503241
Post Applied For - WELLHEAD OPERATOR
PERSONAL VITAE
Date of Birth : 23th January, 1990
Fathers Name : Mr. C. Mani
Marital Status : Single
Languages Known : English, Hindi and Malayalam
Address : Mr.C.Mani
Vellar Street
16/83A3,
Vins Nagar,
Chunkankadai PO,
Kanyakumari-Dt,
Tamilnadu State –
PASSPORT DETAILS
Passport No : L 5460749
Issue Date : 16 /02 /2013
Expiry Date : 29 /10 /2023
Issue Place : Madurai
Status : ECNR.
ACADEMIC CREDENTIALS
B.E. – Mechanical Engineering from VINS Christian College of Engineering, Chunkankadai,
Anna University in Tirunelveli.
Good usage of Ms-office.
EXPERIENCE RECORD
5 Years Experience as a WELLHEAD OPERATOR in Oil & Gas, onshore – offshore
operations.
EMPLOYMENT RECORD
Employer : Brunel India Pvt Ltd
Client : CAIRN ENERGY (Onshore)
Designation : Wellhead Operator
Period : Jun 2013 to till date
Employer : Reliance Engineers Pvt Ltd
Client : ONGC (Mumbai High Offshore)
Designation : Production Operator
Period : May 2012 - Apr 2013.
Employer : S.S.Construction
Client : ONGC (Mumbai High Offshore))
Designation : Production Operator Trainee
Period : Apr 2011 - March 2012.
2. SAFETY COURSES
Permit to work system
Job hazard analysis
Basic gas testing
H2S awareness & escape training
Personnel survival techniques
Fire prevention and fire fighting.
Elementary first aid.
Personnel safety and social responsibilities.
Helicopter underwater escape training.
Well Head On-Shore Operations:
Well pad routine checks
Well parameters monitoring and logging
Contact with CCR on need basis for any process / Equipment performance update
Equipment operations observation and inform control / Field Engineer
For any abnormalities
Mud pit, Flare pit, Drain system observation for any abnormalities
Well (Jet pump, ESP Pump and Natural ) Opening / Shutting Down as per CCR advice
Well activation
Choke Bean Up / Bean Down as per CCR advice
Pad shutdown for any maintenance
Pad handover to Rig / From Rig
Pad handover to Well Service / From Well Service
Co – Ordination with Well services and process activities
PM activities Co – Ordination with mechanical crews
To do process Isolation and De-isolation
Cellar pit dewatering during rainy season
Well head sampling
Ensure PTW adherence and mitigative measures
Local parameter checks for comparison with CCR reading
Tool box meeting
Mobile MPFM installation and co-ordination with crews
LG, LIC ,LT, PIC, PT and FIT flushing to reconfirmed
Instrument air compressor start up and parameter monitoring.
Everyday Taking and Calculating Chemical Tanks Reading.
Reporting Daily Shift Activities to Supervisor .
3. Well Head Off-Shore Operations:
Operation of X-Mas Tree, start up and shut down operations of SSV & SSSV. Operations of Upper
Master valve, Lower Master Valve and Crown Valve. Flow line choke changing, taking reading
FTHP & STHP Test separator handling. Test of Expansion joint, SSSV and Gas Lift Mandrel,
Annulus Holdup Test for Sliding Side Door. Start up of dead well. Well equalizing and Annulus
pressure bleeding Oil Manifold operations Adjusting Chokes, Changing flow well to test
separators.
Pig Launching & Pig Receiving, Taking Flow – chart Reading, Handling Isolation permits, Crude Oil
sampling, Ph Monitoring
CRUDE OIL SEPARATION
Operation of Two Phase and Three Phase Separator (H.P, M.P, L.P )
Monitor the plant parameters and ensure that working properly.
Adjust the LIC, PIC, TIC and FIC setting points as per control room instructions.
Handover the equipments to inspection and maintenance.
Taking necessary actions when the abnormalities occurring in plant equipments.
Changeover the rotating equipments as per duty roaster.
Make sure the process safeguarding systems are healthy in local panels.
Daily checking of panel switches status and ensure that no one
Isolate and De-isolate the equipments for maintenance according to the authorized
isolation certificate.
Checking the critical valves as per LO/LC valve register and update it monthly.
Continuous equipments monitoring during calibration and corrective maintenance of
process safeguarding system and Fire and gas system.
Checking the chemical injection pumps and calibrate as per control room record.
Water Injection Unit
To inject high pressure treated water to the reservoir for maintains the well pressure
This unit designed to inject high pressure water into the well for maintaining level. Pump
type 54 stages
Lube oil level maintain and RPM settings
Centrifugal pump normal discharge pressure is 180Kg/cm2, Plant capacity -18000m3/day.
4. Pigging Operation;
Pig Launching in Oil Production line, Water Injection and power fluid line
Pig Receiving in Oil Production line, Water Injection and power fluid line
Using Bi-Di brush and Bi-Di batch pig
Biocide Injection during pigging
Chemicals Handling:
Corrosion inhibitor, Scale inhibitor, Demulsifier , Bio-side, Acroclear, H2s Scavenger
Fire & Safety:
Have completed H2S Entry/Escape course and hazardous chemical handling.
Knowledge of fire and Safety System, Deluge Valve, Sprinkler System, Monitors,
Hydrants.
Experience in the operation of Fire Extinguishers like Foam, DCP, CO2, Operation
usage of fire suit preparation and hot work and familiar with breathing apparatus
etc.
Declaration;
I hereby declare that the above information furnished is true to the best of my
knowledge & belief.
DATE : yours sincerely
PLACE : Chunkankadai saravanan.M