Project: Water Treatment Plant at Tilda, Chhattisgarh
Owner: Municipal Corporation of Tilda
Contractor: M/s. Chandra Nirman Private Limited
Site: Intake Well of Tilda WTP
Title: Cable sizing design calculation
Basic Design Parameters
Motor Name Vertical Pump
Motor Rating 75 KW
Rated Voltage 415 V
Power Factor 0.8
Frequency 50 Hz
Length of Cable 400 M
Cable Type XLPE
Laying In Tray
Ambient Temperature 50 Deg.C
No. of Rack 1
No. of Cable/Rack 9 Max.
Load Current Calculation
Load Current 130.43 A
De-rating Calculations:
Temperature Derating 0.9
Rack Derating Factor 0.73
Total Derating 0.66
Load Current after Derating 198.52
As per cable manufacturer data following cable is selected Provisionally.
Voltage Drop Calculations
Option -1
Cable Size 185 Sq.mm
Cable Ampacity 337 A
Derated Capacity 221.41 A
Short Circuit Rating 17.50 kA
Resistance of Cable 0.21 Ohm/Km
Reactance of Cable 0.0718 mho/Km
No. of Run 1
Voltage Drop 4.596023 %
Option -2
Cable Size 240 Sq.mm
Cable Ampacity 399 A
Derated Capacity 262.14 A
Short Circuit Rating 22.60 kA
Resistance of Cable 0.16 Ohm/Km
Reactance of Cable 0.071 mho/Km
No. of Run 1
Voltage Drop 3.714618 %
Conclusion:
1. Both the cable size viz., 185Sq.mm & 240 Sq.mm satisfies all the conditions as mentioned:
a. Cable derating ampere
b. Voltage drop
c. Short circuit at that point
Hence in view of present site condition / hassle free operation cable size of 240 Sq.mm is proposed.

More Related Content

What's hot

03 partial discharge theory cutler-hammer
03 partial discharge theory cutler-hammer03 partial discharge theory cutler-hammer
03 partial discharge theory cutler-hammer
prasadkappala
 
Assuring Reliability of Critical Power Cable Systems
Assuring Reliability of Critical Power Cable SystemsAssuring Reliability of Critical Power Cable Systems
Assuring Reliability of Critical Power Cable Systems
michaeljmack
 
Transformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching TransientsTransformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching Transients
michaeljmack
 
Max demand
Max demandMax demand
Max demand
popet
 

What's hot (20)

Transformer less fpga controlled 2 stage isolated
Transformer less fpga controlled 2 stage isolatedTransformer less fpga controlled 2 stage isolated
Transformer less fpga controlled 2 stage isolated
 
Online condition moniroing of power system, branched cables
Online condition moniroing of power system, branched cablesOnline condition moniroing of power system, branched cables
Online condition moniroing of power system, branched cables
 
Power transformer losses
Power transformer lossesPower transformer losses
Power transformer losses
 
Power transformers rating
Power transformers ratingPower transformers rating
Power transformers rating
 
GaN Transistors Are Here - Faster, Smaller, and More Efficient
GaN Transistors Are Here - Faster, Smaller, and More EfficientGaN Transistors Are Here - Faster, Smaller, and More Efficient
GaN Transistors Are Here - Faster, Smaller, and More Efficient
 
Partial Discharge Detection Products by EA Technology
Partial Discharge Detection Products by EA TechnologyPartial Discharge Detection Products by EA Technology
Partial Discharge Detection Products by EA Technology
 
Power Transformers regulations - MEPS
Power Transformers regulations - MEPSPower Transformers regulations - MEPS
Power Transformers regulations - MEPS
 
Procedure cable testing
Procedure cable testingProcedure cable testing
Procedure cable testing
 
HIGH VOLTAGE PANEL SWITCHGEAR PRESENTATION
HIGH VOLTAGE PANEL SWITCHGEAR PRESENTATIONHIGH VOLTAGE PANEL SWITCHGEAR PRESENTATION
HIGH VOLTAGE PANEL SWITCHGEAR PRESENTATION
 
Deis talk-nov-2014-revised
Deis talk-nov-2014-revisedDeis talk-nov-2014-revised
Deis talk-nov-2014-revised
 
Descarga Parcial de Cables - Conferencia Virtual
Descarga Parcial de Cables - Conferencia VirtualDescarga Parcial de Cables - Conferencia Virtual
Descarga Parcial de Cables - Conferencia Virtual
 
European Regulation N 548/14 on power transformers
European Regulation N 548/14 on power transformersEuropean Regulation N 548/14 on power transformers
European Regulation N 548/14 on power transformers
 
electrical transients in power system
electrical transients in power systemelectrical transients in power system
electrical transients in power system
 
The benefits of pd monitoring Ben Jones
The benefits of pd monitoring Ben JonesThe benefits of pd monitoring Ben Jones
The benefits of pd monitoring Ben Jones
 
03 partial discharge theory cutler-hammer
03 partial discharge theory cutler-hammer03 partial discharge theory cutler-hammer
03 partial discharge theory cutler-hammer
 
Assuring Reliability of Critical Power Cable Systems
Assuring Reliability of Critical Power Cable SystemsAssuring Reliability of Critical Power Cable Systems
Assuring Reliability of Critical Power Cable Systems
 
Transformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching TransientsTransformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching Transients
 
High Voltage, Inc. Products Presentation Short Version
High Voltage, Inc. Products Presentation Short VersionHigh Voltage, Inc. Products Presentation Short Version
High Voltage, Inc. Products Presentation Short Version
 
Transmission network
Transmission  networkTransmission  network
Transmission network
 
Max demand
Max demandMax demand
Max demand
 

Similar to Cable sizing for inake well

2. station transformer 100 mva 230kv-datasheet revb
2. station transformer 100 mva 230kv-datasheet revb2. station transformer 100 mva 230kv-datasheet revb
2. station transformer 100 mva 230kv-datasheet revb
Van Phuong Pham
 
Optimum performances of ramallah
Optimum performances of ramallahOptimum performances of ramallah
Optimum performances of ramallah
slmnsvn
 
uwaft_electrical_ecocar2_y3
uwaft_electrical_ecocar2_y3uwaft_electrical_ecocar2_y3
uwaft_electrical_ecocar2_y3
Jordan Morris
 
cable ampacity calculations- IEC
cable ampacity calculations- IECcable ampacity calculations- IEC
cable ampacity calculations- IEC
Joe Khan
 
engineering and utilities report
engineering and utilities reportengineering and utilities report
engineering and utilities report
Hassan Bilal
 
UPS operation, Rev 2.pptx
UPS operation, Rev 2.pptxUPS operation, Rev 2.pptx
UPS operation, Rev 2.pptx
Jaimohan15
 

Similar to Cable sizing for inake well (20)

UNIT - 04 POWER INSTALLATIONS
UNIT - 04 POWER INSTALLATIONSUNIT - 04 POWER INSTALLATIONS
UNIT - 04 POWER INSTALLATIONS
 
UNIT IV design of Electrical Apparatus
UNIT IV design of Electrical ApparatusUNIT IV design of Electrical Apparatus
UNIT IV design of Electrical Apparatus
 
High Frequency Transformer for Multi-Output SMPS Applications
High Frequency Transformer for Multi-Output SMPS ApplicationsHigh Frequency Transformer for Multi-Output SMPS Applications
High Frequency Transformer for Multi-Output SMPS Applications
 
Switching Over Voltages (SOV)_Temporary Over Voltage (TOV).pdf
Switching Over Voltages (SOV)_Temporary Over Voltage (TOV).pdfSwitching Over Voltages (SOV)_Temporary Over Voltage (TOV).pdf
Switching Over Voltages (SOV)_Temporary Over Voltage (TOV).pdf
 
2. station transformer 100 mva 230kv-datasheet revb
2. station transformer 100 mva 230kv-datasheet revb2. station transformer 100 mva 230kv-datasheet revb
2. station transformer 100 mva 230kv-datasheet revb
 
CHAPTER 2 Design of Building Electrical Systems (2).pptx.pptx
CHAPTER 2 Design of Building Electrical Systems (2).pptx.pptxCHAPTER 2 Design of Building Electrical Systems (2).pptx.pptx
CHAPTER 2 Design of Building Electrical Systems (2).pptx.pptx
 
High_Voltage_Engineering.ppt
High_Voltage_Engineering.pptHigh_Voltage_Engineering.ppt
High_Voltage_Engineering.ppt
 
High voltage engineering
High voltage engineeringHigh voltage engineering
High voltage engineering
 
Optimum performances of ramallah
Optimum performances of ramallahOptimum performances of ramallah
Optimum performances of ramallah
 
Transformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching TransientsTransformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching Transients
 
Tibre table of contents
Tibre table of contentsTibre table of contents
Tibre table of contents
 
uwaft_electrical_ecocar2_y3
uwaft_electrical_ecocar2_y3uwaft_electrical_ecocar2_y3
uwaft_electrical_ecocar2_y3
 
Cable ampacity calculations iec
Cable ampacity calculations  iecCable ampacity calculations  iec
Cable ampacity calculations iec
 
cable ampacity calculations- IEC
cable ampacity calculations- IECcable ampacity calculations- IEC
cable ampacity calculations- IEC
 
Line upgrade
Line upgradeLine upgrade
Line upgrade
 
Autochennai
AutochennaiAutochennai
Autochennai
 
engineering and utilities report
engineering and utilities reportengineering and utilities report
engineering and utilities report
 
Electrical component at airport for airfield lighting circuit
Electrical component at airport for airfield lighting circuitElectrical component at airport for airfield lighting circuit
Electrical component at airport for airfield lighting circuit
 
UPS operation, Rev 2.pptx
UPS operation, Rev 2.pptxUPS operation, Rev 2.pptx
UPS operation, Rev 2.pptx
 
Setp by step design of transformer
Setp by step design of transformerSetp by step design of transformer
Setp by step design of transformer
 

Recently uploaded

Teachers record management system project report..pdf
Teachers record management system project report..pdfTeachers record management system project report..pdf
Teachers record management system project report..pdf
Kamal Acharya
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
Kamal Acharya
 

Recently uploaded (20)

Teachers record management system project report..pdf
Teachers record management system project report..pdfTeachers record management system project report..pdf
Teachers record management system project report..pdf
 
1. Henrich Triangle Safety and Fire Presentation
1. Henrich Triangle Safety and Fire Presentation1. Henrich Triangle Safety and Fire Presentation
1. Henrich Triangle Safety and Fire Presentation
 
retail automation billing system ppt.pptx
retail automation billing system ppt.pptxretail automation billing system ppt.pptx
retail automation billing system ppt.pptx
 
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationKIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
 
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfRESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdf
 
Natalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in KrakówNatalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in Kraków
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
 
Pharmacy management system project report..pdf
Pharmacy management system project report..pdfPharmacy management system project report..pdf
Pharmacy management system project report..pdf
 
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
 
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdfONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptx
 
Dairy management system project report..pdf
Dairy management system project report..pdfDairy management system project report..pdf
Dairy management system project report..pdf
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Electrical shop management system project report.pdf
Electrical shop management system project report.pdfElectrical shop management system project report.pdf
Electrical shop management system project report.pdf
 
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
 
Furniture showroom management system project.pdf
Furniture showroom management system project.pdfFurniture showroom management system project.pdf
Furniture showroom management system project.pdf
 
An improvement in the safety of big data using blockchain technology
An improvement in the safety of big data using blockchain technologyAn improvement in the safety of big data using blockchain technology
An improvement in the safety of big data using blockchain technology
 
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfA CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
 
Software Engineering - Modelling Concepts + Class Modelling + Building the An...
Software Engineering - Modelling Concepts + Class Modelling + Building the An...Software Engineering - Modelling Concepts + Class Modelling + Building the An...
Software Engineering - Modelling Concepts + Class Modelling + Building the An...
 

Cable sizing for inake well

  • 1. Project: Water Treatment Plant at Tilda, Chhattisgarh Owner: Municipal Corporation of Tilda Contractor: M/s. Chandra Nirman Private Limited Site: Intake Well of Tilda WTP Title: Cable sizing design calculation Basic Design Parameters Motor Name Vertical Pump Motor Rating 75 KW Rated Voltage 415 V Power Factor 0.8 Frequency 50 Hz Length of Cable 400 M Cable Type XLPE Laying In Tray Ambient Temperature 50 Deg.C No. of Rack 1 No. of Cable/Rack 9 Max. Load Current Calculation Load Current 130.43 A De-rating Calculations: Temperature Derating 0.9 Rack Derating Factor 0.73 Total Derating 0.66 Load Current after Derating 198.52 As per cable manufacturer data following cable is selected Provisionally. Voltage Drop Calculations Option -1 Cable Size 185 Sq.mm Cable Ampacity 337 A Derated Capacity 221.41 A Short Circuit Rating 17.50 kA Resistance of Cable 0.21 Ohm/Km Reactance of Cable 0.0718 mho/Km No. of Run 1 Voltage Drop 4.596023 % Option -2 Cable Size 240 Sq.mm Cable Ampacity 399 A Derated Capacity 262.14 A Short Circuit Rating 22.60 kA Resistance of Cable 0.16 Ohm/Km Reactance of Cable 0.071 mho/Km No. of Run 1 Voltage Drop 3.714618 % Conclusion: 1. Both the cable size viz., 185Sq.mm & 240 Sq.mm satisfies all the conditions as mentioned: a. Cable derating ampere b. Voltage drop c. Short circuit at that point Hence in view of present site condition / hassle free operation cable size of 240 Sq.mm is proposed.