Submit Search
Upload
IRJET- Delay Analysis due to Road Side Activities at Urban Arterial Road of Rajkot City
•
0 likes
•
20 views
IRJET Journal
Follow
https://www.irjet.net/archives/V6/i4/IRJET-V6I4375.pdf
Read less
Read more
Engineering
Report
Share
Report
Share
1 of 5
Download now
Download to read offline
Recommended
Modeling to Traffic Flow on Indian Expressway and Urban Mid-Block Section usi...
Modeling to Traffic Flow on Indian Expressway and Urban Mid-Block Section usi...
IRJET Journal
Traffic Volume Study
Traffic Volume Study
Abontee
Traffic analysis and Road Widening
Traffic analysis and Road Widening
Abhinav Pateriya
IRJET- Study on Vehicle Flow at Maraimalai Nagar Industrial Estate.
IRJET- Study on Vehicle Flow at Maraimalai Nagar Industrial Estate.
IRJET Journal
IRJET- Traffic Analysis and Alternative Solution
IRJET- Traffic Analysis and Alternative Solution
IRJET Journal
Renewing of Indonesia Highway Capacity Manual Urbanroad Segment with Traffic ...
Renewing of Indonesia Highway Capacity Manual Urbanroad Segment with Traffic ...
IJERA Editor
PERFORMANCE ANALYSIS OF NONSIGNALISED ROAD INTERSECTION USING THE KAJI APPLIC...
PERFORMANCE ANALYSIS OF NONSIGNALISED ROAD INTERSECTION USING THE KAJI APPLIC...
IAEME Publication
Traffic study project for final year CIVIL engineering
Traffic study project for final year CIVIL engineering
MohammadOsamaJafry
Recommended
Modeling to Traffic Flow on Indian Expressway and Urban Mid-Block Section usi...
Modeling to Traffic Flow on Indian Expressway and Urban Mid-Block Section usi...
IRJET Journal
Traffic Volume Study
Traffic Volume Study
Abontee
Traffic analysis and Road Widening
Traffic analysis and Road Widening
Abhinav Pateriya
IRJET- Study on Vehicle Flow at Maraimalai Nagar Industrial Estate.
IRJET- Study on Vehicle Flow at Maraimalai Nagar Industrial Estate.
IRJET Journal
IRJET- Traffic Analysis and Alternative Solution
IRJET- Traffic Analysis and Alternative Solution
IRJET Journal
Renewing of Indonesia Highway Capacity Manual Urbanroad Segment with Traffic ...
Renewing of Indonesia Highway Capacity Manual Urbanroad Segment with Traffic ...
IJERA Editor
PERFORMANCE ANALYSIS OF NONSIGNALISED ROAD INTERSECTION USING THE KAJI APPLIC...
PERFORMANCE ANALYSIS OF NONSIGNALISED ROAD INTERSECTION USING THE KAJI APPLIC...
IAEME Publication
Traffic study project for final year CIVIL engineering
Traffic study project for final year CIVIL engineering
MohammadOsamaJafry
IRJET- Study of Design Traffic Signal
IRJET- Study of Design Traffic Signal
IRJET Journal
IRJET- Assessment of Governing Factor for Traffic Congestion in Mix Landuse P...
IRJET- Assessment of Governing Factor for Traffic Congestion in Mix Landuse P...
IRJET Journal
Design of traffic signal on NH-12 near Barkatullah University, Bhopal Distric...
Design of traffic signal on NH-12 near Barkatullah University, Bhopal Distric...
IRJET Journal
Demand assessment of multi level car parking in garuda mall
Demand assessment of multi level car parking in garuda mall
eSAT Publishing House
IRJET- Feasibility Check and Analysis of a Flyover Over a Railway Cross
IRJET- Feasibility Check and Analysis of a Flyover Over a Railway Cross
IRJET Journal
Traffic studies of urban mid block section a case study of pragatinagar to ak...
Traffic studies of urban mid block section a case study of pragatinagar to ak...
eSAT Publishing House
Chapter 8
Chapter 8
EWIT
TRIP GENERATION Survey and ORIGIN / DESTINATION STUDY
TRIP GENERATION Survey and ORIGIN / DESTINATION STUDY
Grant Johnson, PE
O and d study
O and d study
meetmksvs
A Review on Intrusion Detection System Based Data Mining Techniques
A Review on Intrusion Detection System Based Data Mining Techniques
IRJET Journal
IRJET- Passing Opportunity Model of Vehicles on Two Lane Undivided Highways u...
IRJET- Passing Opportunity Model of Vehicles on Two Lane Undivided Highways u...
IRJET Journal
IRJET- Automated Traffic Control System
IRJET- Automated Traffic Control System
IRJET Journal
Study of Estimation of Road Roughness Condition and Ghat Complexity Analysis ...
Study of Estimation of Road Roughness Condition and Ghat Complexity Analysis ...
IRJET Journal
ITS Implementation in Public Transport Companies - Delhi Cluster Bus Experience
ITS Implementation in Public Transport Companies - Delhi Cluster Bus Experience
WRI Ross Center for Sustainable Cities
He final ppt
He final ppt
ShahIshani1996
IRJET- Evaluation of Traffic Congestion using Comparative Land use Pattern-A ...
IRJET- Evaluation of Traffic Congestion using Comparative Land use Pattern-A ...
IRJET Journal
UTS- Transportation Surveys by Manjurali
UTS- Transportation Surveys by Manjurali
Manjurali Balya
flow characteristic study of traffic on national highway
flow characteristic study of traffic on national highway
Vinaykumar Koli
Paper id 71201923
Paper id 71201923
IJRAT
Traffic analysis with respect to pedestrian facilities
Traffic analysis with respect to pedestrian facilities
Abhinav Pateriya
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRA
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRA
IRJET Journal
IRJET- Design of Parking Area and Traffic Signal for Moodbidri Town based...
IRJET- Design of Parking Area and Traffic Signal for Moodbidri Town based...
IRJET Journal
More Related Content
What's hot
IRJET- Study of Design Traffic Signal
IRJET- Study of Design Traffic Signal
IRJET Journal
IRJET- Assessment of Governing Factor for Traffic Congestion in Mix Landuse P...
IRJET- Assessment of Governing Factor for Traffic Congestion in Mix Landuse P...
IRJET Journal
Design of traffic signal on NH-12 near Barkatullah University, Bhopal Distric...
Design of traffic signal on NH-12 near Barkatullah University, Bhopal Distric...
IRJET Journal
Demand assessment of multi level car parking in garuda mall
Demand assessment of multi level car parking in garuda mall
eSAT Publishing House
IRJET- Feasibility Check and Analysis of a Flyover Over a Railway Cross
IRJET- Feasibility Check and Analysis of a Flyover Over a Railway Cross
IRJET Journal
Traffic studies of urban mid block section a case study of pragatinagar to ak...
Traffic studies of urban mid block section a case study of pragatinagar to ak...
eSAT Publishing House
Chapter 8
Chapter 8
EWIT
TRIP GENERATION Survey and ORIGIN / DESTINATION STUDY
TRIP GENERATION Survey and ORIGIN / DESTINATION STUDY
Grant Johnson, PE
O and d study
O and d study
meetmksvs
A Review on Intrusion Detection System Based Data Mining Techniques
A Review on Intrusion Detection System Based Data Mining Techniques
IRJET Journal
IRJET- Passing Opportunity Model of Vehicles on Two Lane Undivided Highways u...
IRJET- Passing Opportunity Model of Vehicles on Two Lane Undivided Highways u...
IRJET Journal
IRJET- Automated Traffic Control System
IRJET- Automated Traffic Control System
IRJET Journal
Study of Estimation of Road Roughness Condition and Ghat Complexity Analysis ...
Study of Estimation of Road Roughness Condition and Ghat Complexity Analysis ...
IRJET Journal
ITS Implementation in Public Transport Companies - Delhi Cluster Bus Experience
ITS Implementation in Public Transport Companies - Delhi Cluster Bus Experience
WRI Ross Center for Sustainable Cities
He final ppt
He final ppt
ShahIshani1996
IRJET- Evaluation of Traffic Congestion using Comparative Land use Pattern-A ...
IRJET- Evaluation of Traffic Congestion using Comparative Land use Pattern-A ...
IRJET Journal
UTS- Transportation Surveys by Manjurali
UTS- Transportation Surveys by Manjurali
Manjurali Balya
flow characteristic study of traffic on national highway
flow characteristic study of traffic on national highway
Vinaykumar Koli
Paper id 71201923
Paper id 71201923
IJRAT
Traffic analysis with respect to pedestrian facilities
Traffic analysis with respect to pedestrian facilities
Abhinav Pateriya
What's hot
(20)
IRJET- Study of Design Traffic Signal
IRJET- Study of Design Traffic Signal
IRJET- Assessment of Governing Factor for Traffic Congestion in Mix Landuse P...
IRJET- Assessment of Governing Factor for Traffic Congestion in Mix Landuse P...
Design of traffic signal on NH-12 near Barkatullah University, Bhopal Distric...
Design of traffic signal on NH-12 near Barkatullah University, Bhopal Distric...
Demand assessment of multi level car parking in garuda mall
Demand assessment of multi level car parking in garuda mall
IRJET- Feasibility Check and Analysis of a Flyover Over a Railway Cross
IRJET- Feasibility Check and Analysis of a Flyover Over a Railway Cross
Traffic studies of urban mid block section a case study of pragatinagar to ak...
Traffic studies of urban mid block section a case study of pragatinagar to ak...
Chapter 8
Chapter 8
TRIP GENERATION Survey and ORIGIN / DESTINATION STUDY
TRIP GENERATION Survey and ORIGIN / DESTINATION STUDY
O and d study
O and d study
A Review on Intrusion Detection System Based Data Mining Techniques
A Review on Intrusion Detection System Based Data Mining Techniques
IRJET- Passing Opportunity Model of Vehicles on Two Lane Undivided Highways u...
IRJET- Passing Opportunity Model of Vehicles on Two Lane Undivided Highways u...
IRJET- Automated Traffic Control System
IRJET- Automated Traffic Control System
Study of Estimation of Road Roughness Condition and Ghat Complexity Analysis ...
Study of Estimation of Road Roughness Condition and Ghat Complexity Analysis ...
ITS Implementation in Public Transport Companies - Delhi Cluster Bus Experience
ITS Implementation in Public Transport Companies - Delhi Cluster Bus Experience
He final ppt
He final ppt
IRJET- Evaluation of Traffic Congestion using Comparative Land use Pattern-A ...
IRJET- Evaluation of Traffic Congestion using Comparative Land use Pattern-A ...
UTS- Transportation Surveys by Manjurali
UTS- Transportation Surveys by Manjurali
flow characteristic study of traffic on national highway
flow characteristic study of traffic on national highway
Paper id 71201923
Paper id 71201923
Traffic analysis with respect to pedestrian facilities
Traffic analysis with respect to pedestrian facilities
Similar to IRJET- Delay Analysis due to Road Side Activities at Urban Arterial Road of Rajkot City
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRA
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRA
IRJET Journal
IRJET- Design of Parking Area and Traffic Signal for Moodbidri Town based...
IRJET- Design of Parking Area and Traffic Signal for Moodbidri Town based...
IRJET Journal
IRJET- Simulation of On-Street Parking Under Heterogeneous Urban Traffic ...
IRJET- Simulation of On-Street Parking Under Heterogeneous Urban Traffic ...
IRJET Journal
AGC2022-Project-Submission-Template_ASEAN.docx
AGC2022-Project-Submission-Template_ASEAN.docx
EmmanuelBondad1
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
IRJET Journal
IRJET - To Study Impact of Road Roughness on Free Flow Speed of Vehicle
IRJET - To Study Impact of Road Roughness on Free Flow Speed of Vehicle
IRJET Journal
IRJET- Study of Traffic Volume and Traffic Forecasting on State Highway-41
IRJET- Study of Traffic Volume and Traffic Forecasting on State Highway-41
IRJET Journal
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET Journal
A Review on Estimation of the Capacity at Urban Arterial
A Review on Estimation of the Capacity at Urban Arterial
IRJET Journal
IRJET- Identification and Analysis of Black Spots along the Selected Road...
IRJET- Identification and Analysis of Black Spots along the Selected Road...
IRJET Journal
IRJET- Road Traffic Accident Analysis on NH-6 of Amravati City (Maharashtra)
IRJET- Road Traffic Accident Analysis on NH-6 of Amravati City (Maharashtra)
IRJET Journal
IRJET- Study of Parking Space in Surat Railway Station Road and Resolving the...
IRJET- Study of Parking Space in Surat Railway Station Road and Resolving the...
IRJET Journal
IRJET- Review Paper on Estimate Traffic Volume and Geometric Design on Select...
IRJET- Review Paper on Estimate Traffic Volume and Geometric Design on Select...
IRJET Journal
IRJET - Synchronization of Traffic Signal System :- A Case Study of Godh ...
IRJET - Synchronization of Traffic Signal System :- A Case Study of Godh ...
IRJET Journal
Smart Road System to Ensure Road Accidents & Traffic Flow: an Overview
Smart Road System to Ensure Road Accidents & Traffic Flow: an Overview
IRJET Journal
Traffic Volume Study And Congestion Solution Using VisSim Software
Traffic Volume Study And Congestion Solution Using VisSim Software
IRJET Journal
IRJET- To Check Feasibility of ERP (Electronic Road Pricing) System at C ...
IRJET- To Check Feasibility of ERP (Electronic Road Pricing) System at C ...
IRJET Journal
IRJET-To Study Current Traffic Scenario in Metrocity and Finding Technically ...
IRJET-To Study Current Traffic Scenario in Metrocity and Finding Technically ...
IRJET Journal
IRJET- Study of Geometric Features of Road and Accident Rate
IRJET- Study of Geometric Features of Road and Accident Rate
IRJET Journal
Paper id 71201985
Paper id 71201985
IJRAT
Similar to IRJET- Delay Analysis due to Road Side Activities at Urban Arterial Road of Rajkot City
(20)
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRA
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRA
IRJET- Design of Parking Area and Traffic Signal for Moodbidri Town based...
IRJET- Design of Parking Area and Traffic Signal for Moodbidri Town based...
IRJET- Simulation of On-Street Parking Under Heterogeneous Urban Traffic ...
IRJET- Simulation of On-Street Parking Under Heterogeneous Urban Traffic ...
AGC2022-Project-Submission-Template_ASEAN.docx
AGC2022-Project-Submission-Template_ASEAN.docx
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
IRJET - To Study Impact of Road Roughness on Free Flow Speed of Vehicle
IRJET - To Study Impact of Road Roughness on Free Flow Speed of Vehicle
IRJET- Study of Traffic Volume and Traffic Forecasting on State Highway-41
IRJET- Study of Traffic Volume and Traffic Forecasting on State Highway-41
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
A Review on Estimation of the Capacity at Urban Arterial
A Review on Estimation of the Capacity at Urban Arterial
IRJET- Identification and Analysis of Black Spots along the Selected Road...
IRJET- Identification and Analysis of Black Spots along the Selected Road...
IRJET- Road Traffic Accident Analysis on NH-6 of Amravati City (Maharashtra)
IRJET- Road Traffic Accident Analysis on NH-6 of Amravati City (Maharashtra)
IRJET- Study of Parking Space in Surat Railway Station Road and Resolving the...
IRJET- Study of Parking Space in Surat Railway Station Road and Resolving the...
IRJET- Review Paper on Estimate Traffic Volume and Geometric Design on Select...
IRJET- Review Paper on Estimate Traffic Volume and Geometric Design on Select...
IRJET - Synchronization of Traffic Signal System :- A Case Study of Godh ...
IRJET - Synchronization of Traffic Signal System :- A Case Study of Godh ...
Smart Road System to Ensure Road Accidents & Traffic Flow: an Overview
Smart Road System to Ensure Road Accidents & Traffic Flow: an Overview
Traffic Volume Study And Congestion Solution Using VisSim Software
Traffic Volume Study And Congestion Solution Using VisSim Software
IRJET- To Check Feasibility of ERP (Electronic Road Pricing) System at C ...
IRJET- To Check Feasibility of ERP (Electronic Road Pricing) System at C ...
IRJET-To Study Current Traffic Scenario in Metrocity and Finding Technically ...
IRJET-To Study Current Traffic Scenario in Metrocity and Finding Technically ...
IRJET- Study of Geometric Features of Road and Accident Rate
IRJET- Study of Geometric Features of Road and Accident Rate
Paper id 71201985
Paper id 71201985
More from IRJET Journal
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
IRJET Journal
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
IRJET Journal
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
IRJET Journal
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
IRJET Journal
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
IRJET Journal
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
IRJET Journal
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
IRJET Journal
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
IRJET Journal
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
IRJET Journal
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
IRJET Journal
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
IRJET Journal
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
IRJET Journal
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
IRJET Journal
React based fullstack edtech web application
React based fullstack edtech web application
IRJET Journal
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
IRJET Journal
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
IRJET Journal
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
IRJET Journal
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
IRJET Journal
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
IRJET Journal
More from IRJET Journal
(20)
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
React based fullstack edtech web application
React based fullstack edtech web application
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Recently uploaded
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
simmis5
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
result management system report for college project
result management system report for college project
Tonystark477637
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
ranjana rawat
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
ranjana rawat
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
sanyuktamishra911
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
roncy bisnoi
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
fenichawla
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
rknatarajan
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
ranjana rawat
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
rakeshbaidya232001
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
rknatarajan
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
Asst.prof M.Gokilavani
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
Call Girls in Nagpur High Profile Call Girls
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Call Girls in Nagpur High Profile
Online banking management system project.pdf
Online banking management system project.pdf
Kamal Acharya
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
M Maged Hegazy, LLM, MBA, CCP, P3O
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
ranjana rawat
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
upamatechverse
Recently uploaded
(20)
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
result management system report for college project
result management system report for college project
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Online banking management system project.pdf
Online banking management system project.pdf
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
IRJET- Delay Analysis due to Road Side Activities at Urban Arterial Road of Rajkot City
1.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1754 Delay analysis due to Road side activities at Urban Arterial Road of Rajkot city Rita Bhanushali1, Prashant Lakkad2, Mayank Kanani3 1Final year M.E Student, Civil Engineering Department, Atmiya Institute of Technology & Science, Gujarat, India 2Assi. Prof. Civil Engineering Department, Atmiya Institute of Technology & Science, Gujarat, India 3Assi. Prof. Civil Engineering Department, Marwadi Group of Institutions, Gujarat, India ---------------------------------------------------------------------***---------------------------------------------------------------------- Abstract - India is one of the developing country with heterogeneous characteristics of traffic flow. One of them is road side activities causing side friction. The interference to smooth flow of traffic is known as “side friction”. Road side activities itself has impact on the road performance. The present work aims at identify the impact of road side activities on traffic parameters of urban arterial road of Rajkot city. The field studies using videographytechniques are carried out for traffic data collection. Data are extracted for one minute duration for vehicle composition, traveltimedelay and spot speed studies. Based on result the need to include road side activities on traffic related studies for proper planning of urban roads. Key Words: Road side activities, Travel time delay, Speed reduction 1. INTRODUCTION Transportation plays major role in economic growth of county. Traffic performance is affected by many factors like surface of road, shoulder and roadway, driver skills, width, road side activities, terrain, road maintenance, etc. In developing countries like road side activities influences the traffic performance of roads to considerable extent. Road side activities include bus stop of all types, petrol pumps, entries and exits from major roads, on street parking, road side trading, Pedestrians crossingormovingalongroadside, Vehicles stopping for pick up & set down passengers etc. In this study road side activities are considered and anattempt has been made to find the effect of these road side activities on travel time and travel speed of urban arterials of Rajkot city. Road side activities itself has impact on road performance. An urban mid-block is selected for the data collection of travel time and speed data. With side friction data and without side friction data was collected and travel time delay and speed reduction due to road side activities was calculated. Based on the results itisneedtoincluderoad side activities on traffic related studies. 1.1 Objectives of study To identify road side activities influencing performance of traffic parameter. Analysis of delay due to road side activities. 2. LITERATURE REVIEW In urban cities are generally overcrowded which faces problems due to road sideactivities.Activitiesareoftengoing on or along the carriagewayoftheurbanroadwhichinteracts with ongoing traffic flow which affects traffic parameters. Therefore, a short discussion of the previous literature has been made. Mayank Kanani, R.G. Motwani (2017) In this study they have concentrated on analysis of all factorswhichcausesthe side friction and to evaluate their impacts on the speed and road capacity. They have consider factor like pedestrians, slow moving vehicles, on road parked vehicles. They have obtain FRIC FACTOR from friction data which very low near residential area, medium in industrial area, high in commercial areas, and very high in commercial area with market areas. On road parked vehicles also affects the capacity of roads. They found that if 312 vehicles parked on road per km than there will be loss of 800 pcu per hour in capacity at speed of 25kmph. Birva B Shah(2016) In this study she has selectedC.G.Road of Ahmedabad city of Gujarat state. She determined traffic volume and speed relationship of peak hour for the study area. The capacity is determined and compared with theIRC guidelines. She has concluded that the observesd capacity is 16% higher than the specified in IRC guideline. Traffic composition and side friction also affects the capacity of road. She also used VISSIM software for capacity which is also more than suggested by IRC. Iin Irawati(2015) In this paper he has selected Mrageen city of Indonesia as his study area In this studyhehasmainly concentrated road side activity and road side friction which causes delay. Delay is one of the most useful parameter for study. He has collected data of amount of vehicle, composition of vehicle, road geometry, and friction data. After data collection he has used VISSIM software for micro simulation of data. Main object of the research is to compare the delay with side friction anddelaywithoutsidefriction.At conclusion he found that delay with side friction is 128.88 unit time per vehicle and delay without side friction is 96.310 unit times per hour. Chetan R Patel (2014) In this paper, they have carried out on six lane divided urban road in Pune and Patna city of
2.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1755 India. Videography is selected as primary source of data collection and data is extracted for one minute interval. Speed flow density relationships were developed for both the roads and parameter for mixed flow condition are derived and compared with IRC. They have taken Dynamic car unit instead of Passenger car unit. Due to side parking, effective lane width decreases from 10.5m to 7.0m which results into decrement of 57% in capacity in Patna city. Also due to presence of NMV 14% reduction in speed is observed in Patna city compares to Pune city. Manraj Singh Bains,Balaji Ponnu (2012)Inthisstudythey have concluded that the micro simulation model VISSIM is suitable to simulating heterogeneous traffic in expressway. They have found that the estimated pcu values of the heterogeneous traffic are accurateat5%level ofsignificance and decreases with increases in volume capacity ratio. This is due to decreasing speed difference as volume increases from free flow to that at capacity. Due to the platooning effect of trucks the pcu value ofvehiclesdecreasewhenraffic stream. It is found that due to the complex nature of interaction between vehicles under heterogeneous traffic condition, the pcu estimates made through simulation for different types of vehicles of heterogeneous traffic significally changes with change in traffic volume level. 2.1 Methodology Fig -1: Flow chart of Methodology 3. DATA COLLECTION & EXTRACTION 3.1 Study Area For this work urban arterial road of Rajkot city has been selected for data collection road containing stretchesamong which is having side frictional influence. Selected stretch on which there are two RMTS bus stop, on street parking and other road side activities. Fig -2: Study Area (all dimensions are in meter) Fig -3: Road Inventory Drawing 3.2 Classified Volume Count (CVC) To obtain speed reduction and travel time delay data of classified volume count and travel timeofparticularvehicles are collected on a urban mid-block. 60m stretch of a urban arterial road is selected for data collection.Classifiedvolume count data is collected by using videography method and travel time of vehicles are collected by manual method from the top of 5 storey commercial building.Travel time data is collected at one minute interval for 8 hours in regular day from morning 9:00AM to 1:00PM and in evening 3:00PM to 7:00PM. As the road side activities present in the study area that particular minute will be noted as friction minute and further analysis is done. Chart -1: Vehicle Composition 3.3 Road Side Friction Data Road side activities data were extracted from the recorded videos at urban arterial road over 60m length. The pedestrian movement, bus stopped at curb side bus stop, on street parking, shuttle are identified and frequency of each event type is noted. The data measured over study area is shown in Table.
3.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1756 Table -1: Side Friction Data-Lane A SIDE FRICTION TYPES-LANE A Time Interval Buses Parked Vehicles Shuttle Pedestrian 9 AM TO 10 AM 18 104 120 190 10 AM TO 11 AM 19 142 125 210 11 AM TO 12 PM 20 93 97 196 12 PM TO 1 PM 19 101 134 240 3 PM TO 4 PM 19 82 92 186 4 PM TO 5 PM 20 121 115 228 5 PM TO 6 PM 22 114 104 254 6 PM TO 7 PM 21 96 128 235 `Table -2: Side Friction Data-Lane B SIDE FRICTION TYPES-LANE B Time Interval Buses Parked Vehicles Shuttle Pedestrian 9 AM TO 10 AM 20 122 115 198 10 AM TO 11 AM 17 110 98 168 11 AM TO 12 PM 19 99 121 221 12 PM TO 1 PM 18 74 101 175 3 PM TO 4 PM 19 86 82 205 4 PM TO 5 PM 25 110 118 213 5 PM TO 6 PM 24 95 97 215 6 PM TO 7 PM 22 92 108 227 3.3 Travel time delay due to Road side Activities Travel time survey is carried out manually at mid block of urban arterial road. To calculate travel time delay due to road side activities on urban arterial road it is required to calculate the travel time of vehicle without side friction and travel time of vehicle with road side friction. Difference betweenthosetravel time given the travel time delay due to road side activities. Chart -2: Average travel time delay(sec) lane A Chart -3: Average travel time delay(sec) lane B Further travel time delay for a day is obtained by using the with side friction data and without side friction data as under: Chart -4: Travel time delay comparison (sec) lane A Chart -5: Travel time delay comparison (sec) lane B Chart -6: Travel time delay(sec) lane A
4.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1757 Chart -7: Travel time delay(sec) lane B It is found that travel time delay for 2w, 3w and 4w is 6.0, 4.6, and 5.1 seconds for lane A and 5.4, 4.2, and 4.9 sec for lane B respectively. 3.4 Speed reduction due to Road side Activities To calculate speed reduction due to road side activities on urban arterial road it is required to calculate the speed of vehicle without side friction and speed of vehicle with road side friction. Differencebetweenthosespeedgiventhespeed reduction due to road side activities. Chart -8: Average speed reduction(kmph) lane A Chart -9: Average speed reduction(kmph) lane B Further speed reduction for a day is obtained by using the with side friction data and without side friction data as under: Chart -10: Speed reduction comparison (kmph) lane A Chart -11: Speed reduction comparison (kmph) lane B Chart -12: Speed reduction(kmph) lane A Chart -13: Speed reduction(kmph) lane B
5.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1758 It is found that speed reduction for 2w, 3w and 4w is 19.4, 13.4, and 15.7 kmph for lane A and 17.7, 12.0, and 16.1 kmph for lane B respectively. 4. CONCLUSIONS From above study, it can be concluded that travel time delay and speed reduction in urban arterial roadisdependonroad side activities like on-street parking, curb side bus stop, pedestrian, pick up and drop of shuttle pedestrian. It is found that travel time delay for 2w, 3w and 4w is 6.0, 4.6, and 5.1 seconds for lane A and 5.4, 4.2, and 4.9 sec for lane B respectively. It is found that speed reduction for 2w, 3w and 4w is 19.4, 13.4, and 15.7 kmph for lane A and 17.7,12.0,and16.1kmph for lane B respectively. 5. FUTURE SCOPE AND STUDY As it seen from the current research work that road side activities play a vital role for the delay and speed reduction. So, it necessary to include side friction for the calculation of capacity and Level of Service(LOS).Influence of road side activities on traffic parameter at intersection & highway can also be done for future work. ACKNOWLEDGEMENT I am thankful to Prof. P. H. Lakkad sir and Prof. Mayank Kanani sir for their guidance and providing required information and knowledge for this project. My thanks and appreciations also go to faculty members of department of civil engineering, AITS Rajkot and all my friends who helped me in this work. REFERENCES Bains Manraj Singh,Balaji Ponnu,Shriniwas S Arkatkar ,“ Modeling of Traffic Flow on Indian Express ways using Simulation technique”, Irawati Iin, “Delay evaluations as impact of side friction on heterogeneous traffic towards road performance with vissim microsimulation”, IJERT, Feb-2015, ISSN: 2278-0181 Kanani Mayank, R G Motwani, H K Dave,” Review of Influence of Road side friction in urban area”,Volume3, Issue2, IJARIITT Patel Chetan R and G.J. Joshi, “ Mixed traffic speed- flow behaviour under influence of road side friction and non-motorised vehicles: A comparative study of arterial roads in India”, ISSRI, 2014 Shah Birva B and Prof. N.G. Raval,“Estimation of capacity for arterial road of urban area” IJIRT, May 2016, ISSN:2349-6002 HCM (2010) Highway Capacity Manual - Vol 3: Transportation research board L.R.Kadiyali, “Traffic Engineering & Transport Planning.” IRC 106-1990-“Guide lines for Capacity of Urban Roads in Plain Areas”
Download now