International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1557
A CONTRACT BIDDING PROCESS IN CONSTRUCTION INDUSTRY
JANANI S1, SASI KUMAR M2
1Student, Dept. of Civil Engineering, Erode Builders Educational Trust’s group of institutions, Tamil Nadu, India
2Professor, Dept. of Civil Engineering, Erode Builders Educational Trust’s group of institutions, Tamil Nadu, India
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract – Construction contractor selection methods are
fundamentally different from other service contract. In the
present scenario, there are numerous types of construction
contract but the choice of contract depends on money and
contract strategy. In most of the cases construction work is
awarded mainly on the basis if competitivebidding. Under this
system, project owner invites a interested contractors to
compete for a project by tendering bids. The award is made on
basis of the bidder with lowest quoted price.
Keywords: Contractor, Bidding, Award, Bidder, Money,
Lowest, etc...
1. BIDDING PROCESS
Bidding is the process of setting a price; bidder is interested
to pay for the project. The ultimate aim of the bidding
process is to maximize the value of money by creating
competition among bidders. The bidding process includes,
1. List of websites
2. Eligibility criteria for technical bid
3. Technical bid enclosures
4. Prequalification document
1.1 List of websites
The following are the some of the online websites to collect
details about the notifying tenders and tender process,
1. www.tntenders.gov.in
2. www.tnderwizard.com/CPWD
3. www.tenderwizard.com/NBCC
4. www.north.eproc.in (old)
5. www.north.eproc.in (new)
6. www.bpdeproc.in
7. www.eprocure.gov.in
8. www.tenderdetail.com
9. www.domexinfo.com
10. www.sr.indianrailways.gov.in
11. www.CPWD.com / www.cpwd.gov.in
12. www.eproc.karnataka.gov.in
13. www.tendertiger.com
14. www.ireps.gov.in
15. www.eprocurement.gov.in
1.2 Eligibility Criteria for technical bid
The following criteria is mandatory for technical bid
evaluation in any type of project
1. Financial bid capacity ( A*N*2) – B (equal
or more than the estimated cost)
A - Maximum annual turnover last 5 years
N - Duration of the project to be done
B - Balance work on hand
2. Similar works
3. Bank balance
1.3 Technical Bid Enclosures
A detailed analysis has been done in order to figure out the
bid preparation and enclosures during bid preparation. A
data and factors considered in bid preparation has
discussed. The following are the list of enclosures to be
attached while submitting technical bid for tender,
1. Fresh certificate of incorporation
consequent upon change of name
2. PWDregistrationforconstructionworks
3. PWD registration for Electrical
contractor Electrical Licensing Board
(License)
4. Tamil Nadu Value Added Tax Act, 2006
(1. Registration Certificate 2.Clearance
Certificate)
5. Certificate of Sales Tax Verification
6. PAN card (in the name of company)
7. Certificate of central excise department
(conditions prescribed in chapter V of the
FINANCE ACT,1994)
8. Power of Attorney
9. Stamp paper – BOARD MEETING MINUTES
(consider & authorize directors to do all
acts,deeds,etc., and on behalf of the
company in respect of any contract)
10. Employees provident fund organization
(forms to be maintained)
11. Turnover certificate ( last 5 years)
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1558
12. Contract profit & loss account(last5years)
13. Solvency certificate ( 6months once – good
financial standing)
14. Equipment & asset details
15. NIL certificate of enclosures on property
16. Balance sheets(last 5 years)
1.4 Prequalification Document
The prequalification documents includes following set of
documents. In most of the projects based on these
documents technical bids can be evaluated.
1. Certificate of incorporation (companies
act,1956)
2. Fresh certificate of incorporation
consequent upon change of name
3. Form 18 (notice of situation or change of
situation of registered office)
4. Form 32 (appointment of managing
directors, directors, managers and
secretary)
5. Authorizing executivestosignlegal &other
document
6. PAN card
7. Organization chart
8. PWD registration
9. Last 5years turnover(balance sheet)
10. Income tax acknowledgement(5years)
11. Solvency certificate
12. Central sales tax registration certificate
13. Registration of new branch
14. Registration of VAT
15. Registration of central board of excise and
customs
16. Form of certificate of sales tax clearance
17. Employees state insurance (registration
form)
18. Technical persons engaged (resume copy
with experience details)
19. List of major machines and construction
equipments (RC book)
20. Bidder information form
21. Litigation history, pending litigation
22. Annual construction turnover
23. Project completion certificate
24. Memorandum of association
25. Registered partnership deed in the case of
partnership firms
26. Details of similar projects
2. EVALUATION PROCESS FOR TECHNICAL BIDS
Technical Bid Evaluation mainlybasedontherequirementof
the project. From the list of enclosures, marks or grade split
up will be awarded. The bid which satisfies the qualifying
criteria will be accepted. The bid without proper enclosures
will be rejected. The following factors are considered for
technical evaluation,
1. Threshold Capacity
2. Experience Certificate
3. Solvency Certificate
4. Turnover and Income Tax Verification
3. EVALUATION PROCESS FOR FINANACIAL BID
Financial Bid Evaluation will takes place once the technical
bid evaluation gets over. In all cases, the bidder with lowest
quoted price will be awarded. The following factors to be
considered during evaluation,
1. In case of equally quoted bidders (percentage
basis),the project will be awarded based
on)bid capacity (higher)ii)Annual turnover
(more)
2. In case of any discrepancy in contract price
quoted ( words / figures) price quoted in
words shall prevail
3. CONCLUSION
Collected information’s and data regarding contract bidding
and prequalification process are studied. The above factors
and data are very helpful forthenew entrepreneurandfirms
to know about the bidding process and it also helpful for the
contractors to prepare most eligible bid.
ACKNOWLEDGEMENT
I should express my sincere thanks to my institution for
providing facilities for successful completion oftheproject.I
should thank my department staff and my guide for their
constant guidance and valuable suggestions towards the
completion of this project. I would express my thanks to the
firm and working staff for providing the necessary detail for
my project.
REFERENCES
[1]. Abdalla M.odeh (2002), Causes of Construction Delay:
Traditional Contracts, International Journal of Project
Management, 67-73.
[2]. Bagies, A and Fortune, C (2006), Bid/No Bid Decision
Modelling for Construction Projects, Association of
Researches in Construction Management, 511-521.
[3]. Dwarika Puri (2014), EvaluatingCriteria forContractors
Selection and Bid Evaluation, International Journal of
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1559
Engineering Science Invention,ISSN:2319-6726,Vol 3,Issue
7, pp.44-48.
[4]. Fu-Yuan Chiang (2016), Construction Contractor
Selection in Taiwan Using AHP, International Journal of
Engineering and Technology, Vol.9, No: 3.
[5]. Hatush, Z and Skitmore, M. (1998), Contractor selection
using multicriteria utilitytheory:anadditivemodel,Building
and Environment, 33(2-3), 105-15.
[6]. Mitkus, S., & Trinkuniene, E. (2008), Reasoned decisions
in construction contracts evaluation. Technological and
Economic Development of Economy, 14(3), 402–416.
[7]. Mohammad S. El-Mashaleh (2014), Understanding key
bidding factors considered by top Jordanian contractors,
Jordan Journal of Civil Engineering, Volume 8, No. 4, 2014
[8]. Rosmayati Mohemad(2010), DecisionSupportSystemin
Tendering Process,International Journal of Computer
Science Issues, Vol. 7, Issue 2, No 1.
[9]. Seydel, J. and Olson, D.L., (2001), Multicriteria support
for construction bidding, Mathematical and Computer
Modelling, 34, 677-702.
[10]. Shih Tong Lu (2002), A Decision Support System for
Construction Project Risk Assessment, The Second
International Conference On Electronic Business.
[11].Sik-Wah Fong P., Kit-Yung Choi S. (2000), Final
Contractor Selection Using the Analytical HierarchyProcess.
Construction Management and Economics, No 18, p. 547-
577.
[12]. Surabhi Mishra (2016), A Study on Risk Factors
Involved in the Construction Projects, International Journal
of Innovative Research in Science, Engineering and
Technology, ISSN: 2347-6710, vol.5, Issue 2.
[13].Tejas C Patil. (2014), Tendering and Bidding in
Construction Projects, International Journal of Engineering
Research and Applications, ISSN: 2248-9622, Vol.4, Issue
12(part 5), pp.18-22.
BIOGRAPHIES
JANANI S
Construction Engineering &
Management
Department of Civil Engineering
Erode Builders Educational Trust
Kangeyam-638108, India
Sasi Kumar M
Assistant Professor
Department of Civil Engineering
Erode Builders Educational Trust
Kangeyam-638108, India2nd
Author
Photo

More Related Content

Similar to A Contract Bidding Process in Construction Industry

IRJET- The Evaluation of Payback period for Formwork system
IRJET-  	  The Evaluation of Payback period for Formwork systemIRJET-  	  The Evaluation of Payback period for Formwork system
IRJET- The Evaluation of Payback period for Formwork systemIRJET Journal
 
Contract Procurement Management Report of Ntpc
Contract Procurement Management Report of  NtpcContract Procurement Management Report of  Ntpc
Contract Procurement Management Report of Ntpc1988chandan
 
IRJET- Portfolio Management of Builders
IRJET- Portfolio Management of BuildersIRJET- Portfolio Management of Builders
IRJET- Portfolio Management of BuildersIRJET Journal
 
IRJET- Analysis of Change Order in Road Construction Projects
IRJET-  	  Analysis of Change Order in Road Construction ProjectsIRJET-  	  Analysis of Change Order in Road Construction Projects
IRJET- Analysis of Change Order in Road Construction ProjectsIRJET Journal
 
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...IRJET Journal
 
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...IRJET Journal
 
Impact of delayness on construction projects
Impact of delayness on construction projectsImpact of delayness on construction projects
Impact of delayness on construction projectsIRJET Journal
 
Uae facility management market forecast & opportunities, 2025 - TechSci Research
Uae facility management market forecast & opportunities, 2025 - TechSci ResearchUae facility management market forecast & opportunities, 2025 - TechSci Research
Uae facility management market forecast & opportunities, 2025 - TechSci ResearchTechSci Research
 
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET Journal
 
Study on Procurement Method Selection Procedure in Construction Industry
Study on Procurement Method Selection Procedure in Construction IndustryStudy on Procurement Method Selection Procedure in Construction Industry
Study on Procurement Method Selection Procedure in Construction IndustryIRJET Journal
 
STUDY ON VALUATION OF PLANT AND MACHINERY – CASE STUDY OF GEAR SHAFT MANUFACT...
STUDY ON VALUATION OF PLANT AND MACHINERY – CASE STUDY OF GEAR SHAFT MANUFACT...STUDY ON VALUATION OF PLANT AND MACHINERY – CASE STUDY OF GEAR SHAFT MANUFACT...
STUDY ON VALUATION OF PLANT AND MACHINERY – CASE STUDY OF GEAR SHAFT MANUFACT...IRJET Journal
 
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...IRJET Journal
 
Management For Construction Project:-Various Aspects Of Delay
Management For Construction Project:-Various Aspects Of DelayManagement For Construction Project:-Various Aspects Of Delay
Management For Construction Project:-Various Aspects Of DelayIRJET Journal
 
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...IRJET Journal
 
Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...
Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...
Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...Project Controls Expo
 
China facility management market size, share &market forecast 2024 - TechSci ...
China facility management market size, share &market forecast 2024 - TechSci ...China facility management market size, share &market forecast 2024 - TechSci ...
China facility management market size, share &market forecast 2024 - TechSci ...TechSci Research
 
IRJET- Impact of Demonetisation and Gst on Construction Industry
IRJET- Impact of Demonetisation and Gst on Construction IndustryIRJET- Impact of Demonetisation and Gst on Construction Industry
IRJET- Impact of Demonetisation and Gst on Construction IndustryIRJET Journal
 
IRJET- A Study on Factors Affecting Estimation of Construction Project
IRJET- A Study on Factors Affecting Estimation of Construction ProjectIRJET- A Study on Factors Affecting Estimation of Construction Project
IRJET- A Study on Factors Affecting Estimation of Construction ProjectIRJET Journal
 

Similar to A Contract Bidding Process in Construction Industry (20)

IRJET- The Evaluation of Payback period for Formwork system
IRJET-  	  The Evaluation of Payback period for Formwork systemIRJET-  	  The Evaluation of Payback period for Formwork system
IRJET- The Evaluation of Payback period for Formwork system
 
Contract Procurement Management Report of Ntpc
Contract Procurement Management Report of  NtpcContract Procurement Management Report of  Ntpc
Contract Procurement Management Report of Ntpc
 
IRJET- Portfolio Management of Builders
IRJET- Portfolio Management of BuildersIRJET- Portfolio Management of Builders
IRJET- Portfolio Management of Builders
 
IRJET- Analysis of Change Order in Road Construction Projects
IRJET-  	  Analysis of Change Order in Road Construction ProjectsIRJET-  	  Analysis of Change Order in Road Construction Projects
IRJET- Analysis of Change Order in Road Construction Projects
 
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
 
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
 
Impact of delayness on construction projects
Impact of delayness on construction projectsImpact of delayness on construction projects
Impact of delayness on construction projects
 
Uae facility management market forecast & opportunities, 2025 - TechSci Research
Uae facility management market forecast & opportunities, 2025 - TechSci ResearchUae facility management market forecast & opportunities, 2025 - TechSci Research
Uae facility management market forecast & opportunities, 2025 - TechSci Research
 
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in Construction
 
Study on Procurement Method Selection Procedure in Construction Industry
Study on Procurement Method Selection Procedure in Construction IndustryStudy on Procurement Method Selection Procedure in Construction Industry
Study on Procurement Method Selection Procedure in Construction Industry
 
STUDY ON VALUATION OF PLANT AND MACHINERY – CASE STUDY OF GEAR SHAFT MANUFACT...
STUDY ON VALUATION OF PLANT AND MACHINERY – CASE STUDY OF GEAR SHAFT MANUFACT...STUDY ON VALUATION OF PLANT AND MACHINERY – CASE STUDY OF GEAR SHAFT MANUFACT...
STUDY ON VALUATION OF PLANT AND MACHINERY – CASE STUDY OF GEAR SHAFT MANUFACT...
 
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
 
Lk3619561964
Lk3619561964Lk3619561964
Lk3619561964
 
Management For Construction Project:-Various Aspects Of Delay
Management For Construction Project:-Various Aspects Of DelayManagement For Construction Project:-Various Aspects Of Delay
Management For Construction Project:-Various Aspects Of Delay
 
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
 
Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...
Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...
Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...
 
China facility management market size, share &market forecast 2024 - TechSci ...
China facility management market size, share &market forecast 2024 - TechSci ...China facility management market size, share &market forecast 2024 - TechSci ...
China facility management market size, share &market forecast 2024 - TechSci ...
 
IRJET- Impact of Demonetisation and Gst on Construction Industry
IRJET- Impact of Demonetisation and Gst on Construction IndustryIRJET- Impact of Demonetisation and Gst on Construction Industry
IRJET- Impact of Demonetisation and Gst on Construction Industry
 
IRJET- A Study on Factors Affecting Estimation of Construction Project
IRJET- A Study on Factors Affecting Estimation of Construction ProjectIRJET- A Study on Factors Affecting Estimation of Construction Project
IRJET- A Study on Factors Affecting Estimation of Construction Project
 
PCA2015EntryForm
PCA2015EntryFormPCA2015EntryForm
PCA2015EntryForm
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 

Recently uploaded (20)

HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 

A Contract Bidding Process in Construction Industry

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1557 A CONTRACT BIDDING PROCESS IN CONSTRUCTION INDUSTRY JANANI S1, SASI KUMAR M2 1Student, Dept. of Civil Engineering, Erode Builders Educational Trust’s group of institutions, Tamil Nadu, India 2Professor, Dept. of Civil Engineering, Erode Builders Educational Trust’s group of institutions, Tamil Nadu, India ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract – Construction contractor selection methods are fundamentally different from other service contract. In the present scenario, there are numerous types of construction contract but the choice of contract depends on money and contract strategy. In most of the cases construction work is awarded mainly on the basis if competitivebidding. Under this system, project owner invites a interested contractors to compete for a project by tendering bids. The award is made on basis of the bidder with lowest quoted price. Keywords: Contractor, Bidding, Award, Bidder, Money, Lowest, etc... 1. BIDDING PROCESS Bidding is the process of setting a price; bidder is interested to pay for the project. The ultimate aim of the bidding process is to maximize the value of money by creating competition among bidders. The bidding process includes, 1. List of websites 2. Eligibility criteria for technical bid 3. Technical bid enclosures 4. Prequalification document 1.1 List of websites The following are the some of the online websites to collect details about the notifying tenders and tender process, 1. www.tntenders.gov.in 2. www.tnderwizard.com/CPWD 3. www.tenderwizard.com/NBCC 4. www.north.eproc.in (old) 5. www.north.eproc.in (new) 6. www.bpdeproc.in 7. www.eprocure.gov.in 8. www.tenderdetail.com 9. www.domexinfo.com 10. www.sr.indianrailways.gov.in 11. www.CPWD.com / www.cpwd.gov.in 12. www.eproc.karnataka.gov.in 13. www.tendertiger.com 14. www.ireps.gov.in 15. www.eprocurement.gov.in 1.2 Eligibility Criteria for technical bid The following criteria is mandatory for technical bid evaluation in any type of project 1. Financial bid capacity ( A*N*2) – B (equal or more than the estimated cost) A - Maximum annual turnover last 5 years N - Duration of the project to be done B - Balance work on hand 2. Similar works 3. Bank balance 1.3 Technical Bid Enclosures A detailed analysis has been done in order to figure out the bid preparation and enclosures during bid preparation. A data and factors considered in bid preparation has discussed. The following are the list of enclosures to be attached while submitting technical bid for tender, 1. Fresh certificate of incorporation consequent upon change of name 2. PWDregistrationforconstructionworks 3. PWD registration for Electrical contractor Electrical Licensing Board (License) 4. Tamil Nadu Value Added Tax Act, 2006 (1. Registration Certificate 2.Clearance Certificate) 5. Certificate of Sales Tax Verification 6. PAN card (in the name of company) 7. Certificate of central excise department (conditions prescribed in chapter V of the FINANCE ACT,1994) 8. Power of Attorney 9. Stamp paper – BOARD MEETING MINUTES (consider & authorize directors to do all acts,deeds,etc., and on behalf of the company in respect of any contract) 10. Employees provident fund organization (forms to be maintained) 11. Turnover certificate ( last 5 years)
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1558 12. Contract profit & loss account(last5years) 13. Solvency certificate ( 6months once – good financial standing) 14. Equipment & asset details 15. NIL certificate of enclosures on property 16. Balance sheets(last 5 years) 1.4 Prequalification Document The prequalification documents includes following set of documents. In most of the projects based on these documents technical bids can be evaluated. 1. Certificate of incorporation (companies act,1956) 2. Fresh certificate of incorporation consequent upon change of name 3. Form 18 (notice of situation or change of situation of registered office) 4. Form 32 (appointment of managing directors, directors, managers and secretary) 5. Authorizing executivestosignlegal &other document 6. PAN card 7. Organization chart 8. PWD registration 9. Last 5years turnover(balance sheet) 10. Income tax acknowledgement(5years) 11. Solvency certificate 12. Central sales tax registration certificate 13. Registration of new branch 14. Registration of VAT 15. Registration of central board of excise and customs 16. Form of certificate of sales tax clearance 17. Employees state insurance (registration form) 18. Technical persons engaged (resume copy with experience details) 19. List of major machines and construction equipments (RC book) 20. Bidder information form 21. Litigation history, pending litigation 22. Annual construction turnover 23. Project completion certificate 24. Memorandum of association 25. Registered partnership deed in the case of partnership firms 26. Details of similar projects 2. EVALUATION PROCESS FOR TECHNICAL BIDS Technical Bid Evaluation mainlybasedontherequirementof the project. From the list of enclosures, marks or grade split up will be awarded. The bid which satisfies the qualifying criteria will be accepted. The bid without proper enclosures will be rejected. The following factors are considered for technical evaluation, 1. Threshold Capacity 2. Experience Certificate 3. Solvency Certificate 4. Turnover and Income Tax Verification 3. EVALUATION PROCESS FOR FINANACIAL BID Financial Bid Evaluation will takes place once the technical bid evaluation gets over. In all cases, the bidder with lowest quoted price will be awarded. The following factors to be considered during evaluation, 1. In case of equally quoted bidders (percentage basis),the project will be awarded based on)bid capacity (higher)ii)Annual turnover (more) 2. In case of any discrepancy in contract price quoted ( words / figures) price quoted in words shall prevail 3. CONCLUSION Collected information’s and data regarding contract bidding and prequalification process are studied. The above factors and data are very helpful forthenew entrepreneurandfirms to know about the bidding process and it also helpful for the contractors to prepare most eligible bid. ACKNOWLEDGEMENT I should express my sincere thanks to my institution for providing facilities for successful completion oftheproject.I should thank my department staff and my guide for their constant guidance and valuable suggestions towards the completion of this project. I would express my thanks to the firm and working staff for providing the necessary detail for my project. REFERENCES [1]. Abdalla M.odeh (2002), Causes of Construction Delay: Traditional Contracts, International Journal of Project Management, 67-73. [2]. Bagies, A and Fortune, C (2006), Bid/No Bid Decision Modelling for Construction Projects, Association of Researches in Construction Management, 511-521. [3]. Dwarika Puri (2014), EvaluatingCriteria forContractors Selection and Bid Evaluation, International Journal of
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1559 Engineering Science Invention,ISSN:2319-6726,Vol 3,Issue 7, pp.44-48. [4]. Fu-Yuan Chiang (2016), Construction Contractor Selection in Taiwan Using AHP, International Journal of Engineering and Technology, Vol.9, No: 3. [5]. Hatush, Z and Skitmore, M. (1998), Contractor selection using multicriteria utilitytheory:anadditivemodel,Building and Environment, 33(2-3), 105-15. [6]. Mitkus, S., & Trinkuniene, E. (2008), Reasoned decisions in construction contracts evaluation. Technological and Economic Development of Economy, 14(3), 402–416. [7]. Mohammad S. El-Mashaleh (2014), Understanding key bidding factors considered by top Jordanian contractors, Jordan Journal of Civil Engineering, Volume 8, No. 4, 2014 [8]. Rosmayati Mohemad(2010), DecisionSupportSystemin Tendering Process,International Journal of Computer Science Issues, Vol. 7, Issue 2, No 1. [9]. Seydel, J. and Olson, D.L., (2001), Multicriteria support for construction bidding, Mathematical and Computer Modelling, 34, 677-702. [10]. Shih Tong Lu (2002), A Decision Support System for Construction Project Risk Assessment, The Second International Conference On Electronic Business. [11].Sik-Wah Fong P., Kit-Yung Choi S. (2000), Final Contractor Selection Using the Analytical HierarchyProcess. Construction Management and Economics, No 18, p. 547- 577. [12]. Surabhi Mishra (2016), A Study on Risk Factors Involved in the Construction Projects, International Journal of Innovative Research in Science, Engineering and Technology, ISSN: 2347-6710, vol.5, Issue 2. [13].Tejas C Patil. (2014), Tendering and Bidding in Construction Projects, International Journal of Engineering Research and Applications, ISSN: 2248-9622, Vol.4, Issue 12(part 5), pp.18-22. BIOGRAPHIES JANANI S Construction Engineering & Management Department of Civil Engineering Erode Builders Educational Trust Kangeyam-638108, India Sasi Kumar M Assistant Professor Department of Civil Engineering Erode Builders Educational Trust Kangeyam-638108, India2nd Author Photo