This document provides a personal profile for Hafiz Muhammad Binyamin, a QC Engineer. It includes his personal details, education history, technical certifications, computer skills, work experience, and responsibilities in various QC roles. He has over 10 years of experience in inspection roles for companies that are ASME-certified. His responsibilities have included inspection of materials, welding, NDT testing, pressure testing, and documentation according to ASME and API codes. He is knowledgeable in welding, surface preparation, inspection techniques, and has experience with various industrial projects.
1. PERSONAL PROFILE
HAFIZ MUHAMMAD BINYAMIN
QC ENGINEER
PERSONAL INFORMATION
NAME : HAFIZ MUHAMMAD BINYAMIN
FATHER’S NAME : BASHIR AHMED
DATE OF BIRTH : 12-12-1988
N. I. C. No. : 35301-8287158-5
PASSPORT # :AC 6201583
RELIGION : ISLAM
NATIONALITY : PAKISTANI
MARITAL STATUS : UNMARRIED
LANGUAGES : ENGLISH, URDU & PUNJABI
PERMANENT ADDRESS : MUZA MAROOF CHAK BAKHTAN WALA
TEHSIL DEPALPUR DIST OKARA
EMAIL ADDRESS : hafiz_binyamin@yahoo.com
MOBILE NO. : 0344-6781589
EDUCATION
Degree/certificate Institution Passing
Year
Marks
obtained
%
age
Matric High School Basirpur 2004 553 65
D.A.E (mech) GCT Sahiwal 2007 2479 74
B.Tech (Pass) Bahudin Zikria University Multan 2010 1073 74
B.Tech (Hons) Global University Lahore Result
awaited
COMPUTER LITERACY
Well versed with following software’s
• M. S Windows, M. S. WinWord, M. S. Excel, & M. S. Power Point
• Internet (Searching and email sending & receiving)
• AutoCAD Application
EXPERIENCE SUMMARY
From-To Month Designation ASME Certified Company/
Multinational Inspection Agency
Jul 2007 to Dec
2010
2 years
6 months
QC Inspector IMRAN Engineering (Pvt.)
Ltd.Lahore
Jan 2011 to
April 2012
1 year 4
months
QC Inspector RAVI GREEN Engineering (Pvt.)
Ltd.Lahore
April 2012 to till
date
2 year 7
months
QC Engineer DESCON Engineering (Pvt.)
Ltd.Lahore
- 1 -
2. PERSONAL PROFILE
HAFIZ MUHAMMAD BINYAMIN
QC ENGINEER
Technical Certification
• Level II certification in PT (SNT-TC-1A)
• Level II certification in MPI (SNT-TC-1A)
• Preparation Exam API 510
• CODES AND STANDARDS KNOWLEDGE
4.1- ASME Boiler and Pressure Vessel Code
• ASME Sec I; Rules for Construction of Power Boilers
• ASME Section II Part A; Ferrous Material Specifications
• ASME Section II Part B; Non-Ferrous Material Specifications
• ASME Section II Part C; Specifications for Welding Rods, Electrodes and Filler
Metals
• ASME Section VIII Division 1; Rules for Construction of Pressure Vessels
• ASME Section IX; Qualification Standard for Welding and Brazing Procedures,
Welders, Brazers and Welding and Brazing Operators
4.2- ASME Code for Pressure Piping, B31
• ASME B31.1; Power Piping
• ASME B31.3; Process Piping
• ASME B16.5
• ASME B16.9
• ASME B16.11
4.3- Other ASME Code/Standards
• ASME STS-1; Steel Stacks
JOB DESCRIPTION AND RESPONSIBILITY
INPROCESS QC INSPECTOR FOR ASME DEMO VESSEL
• Worked as In-process QC Inspector for ASME DEMO VESSEL
INCOMING MATERIAL
• Incoming material identification and inspection as per PR (Purchase Requisition), PO
(Purchase Order) and DC (Delivery Challan)
• Reviewing MTRs/Lab test reports
- 2 -
3. PERSONAL PROFILE
HAFIZ MUHAMMAD BINYAMIN
QC ENGINEER
WELDING
• Review WPSs (Welding Procedure Specifications) & PQRs (Procedure Qualification
Records)
• Review WPQs (Welder Performance Qualifications)
• Preparing Weld Matrices and NDE Map
• Carrying out Visual Welding inspections
• Taking Welders Tests for performance qualifications (WPQ)
• Ensuring Qualified welders are performing welding on job, in qualified welding
position
• Ensuring welding is being done as per approved WPS and PQR
• Checking welder stamps near the finished welding joints.
WLDING CONSUMABLE (ELECTRODE) STORAGE
• Keeping record of baking of low hydrogen electrodes- E 7018
• Keeping record of drying of low hydrogen electrodes- E 7018
• Check the temperature of electrodes E 7018 in desicators
VESSEL INITIAL DOCUMENTATION
• Preparing ITP (Inspection and Test Plan) or QIP (Quality Inspection Plan / Traveler
• Preparing Dossier/IDM (Inspection Data Manual)/MDM (Manufacturing Data
Manual)
FABRICATION INSPECTION
• Checking marking for cutting of materials
• Ensuring “material hard punching transferring” on cut parts
• Checking Layout of materials
• Fit ups checking
• Giving “Go Ahead” for NDT (RT, UT, MT and PT) after visual inspection of welding
• Checking Ovalty of individual shells and completed Vessel
• Performing Dimensional Check
• Checking material identification of each part of vessel etc
• Checking Hydrostatic Test
• Checking Pneumatic test of pads
• Checking Water fill Test of storage tanks
• Raising NCR (Non conformance report) if there is out of tolerance or non compliance
of materials
NDT (Non Destructive Testing)
• Arranging NDT (RT, UT and MT) Teams.
• Preparing NDT reports (RT, MT & PT)
• Performing PT (Penetrating Testing)
PWHT (Post Weld Heat Treatment)
- 3 -
4. PERSONAL PROFILE
HAFIZ MUHAMMAD BINYAMIN
QC ENGINEER
• Preparing PWHT Specifications for vessels
• Checking PWHT Reports
• Reviewing PWHT Charts
SAND BLASTING AND PAINTING
• Checking of sand blasting to surface SA-3 & SA 2.5
• Checking Painting Inspection to meet required microns of different coats
• Carrying out Peel off Test
NDT and DT (Non Destructive Testing and Destructive Testing)
• Checking Hardness in HB and Vickers etc
• Reviewing report of Tensile Testing (Tensile strength, yield strength, %age
Elongation and reduction of area)
FINAL DOCUMENTATION
• Reviewing IDM
• Handing over copy of IDM to Client
(1) IMRAN ENGINEERING (PVT.)Ltd.-AN ASME “S”, “U” and “R” Stamps
certified Company) Jul 2007 to Dec 2010
Position: QC Inspector
KEY WORKING PROJECTS
• Fabrication & Estimate the material of all types of Dish Ends (Elliptical 2:1,Decimal
End,Flat End,Hemispherical Head,)
• Fabrication of high pressure pippelinees , fabrication of steel structures and
equipment. Installation of pipeline, equipments and steel stirage tanks..
• Cress Resources LPG 50 m³ Storage Tank
• JJVL LPG Storage Tank
• Pyro Recycling Plant
• Fabrication & Errection of Kissan Ghee Plant
• LPG Storage Tank for Madni Gas
• Fabrication of diesel tanks according to UL 142
(2) RAVI GREEN ENGINEERING (pvt.) Ltd.-AN ASME “S”, “U” and “R”
Stamps certified Company) Jan 2011 to April 2012
POSITION:Welding INSPECTOR
RAVI GREEN Engineering is Pakistan Based company having ASME ‘S’,‘U’ and
‘R’Stamps.RAVI GREEN Engineering has special facility for fabrication of SS Silos,Pressure
Vessels and Tanks.
Major Responsibilities at: RAVI GREEN Engineering
Raw Material Inspection as per job Specification,Stage inspection,Layout inspection
Cutting inspection,Fit up,Welding,Galvanizing inspection,After welding cleaning
- 4 -
5. PERSONAL PROFILE
HAFIZ MUHAMMAD BINYAMIN
QC ENGINEER
Final inspection etc,Welders qualification test,Welding Procedure Specification.
Weld Map & Weld Matrix,Witness of Hydrostatic & Pneumatic Test
To arrange the RT, UT, MPI and DPT as per code requirement.
Sand blasting, Galvanizing and Paint coating.
Preparing of all types of documents.
Calibration of measuring equipment and welding machine.
KEY WORKING PROJECTS
Knock Out Drum
Heat Exchanger
Cress Gas, 50 m³ Diesel Storage Tank
Project of Vertical Reactor Vessel of RODOLF.
Middle East storage tanks structure.
Oil Storage tanks Urdu Constration Location of Installation Afghanistan.
Pig Launcher and Receiver Mobile Skid for OMV
Package wastewater treatment plant afghan national army darulaman Afghanistan.
Fabrication & inspection of hooper.
Water tube boiler sodaash (ICI)
(3)DESCON ENGINEERING WORKS (LMW) (ASME “S”, “U” and “R” Stamps
certified Company) April 2012 to Till Date
POSITION:Welding inspector
Having above 2 year 7 months of experience in the field of fabrication as a Quality
Control Inspection Engineer with Descon Engineering Ltd. Pakistan.
Responsible For following Activities At Different Projects
Preparation of Quality Inspection Plans.
To observe and monitor the implementation of inspection and test plan with Regards
to welding related activities in Fabrication Shops.
Inspection of the installation and welding of carbon steel, Alloy steel and stainless
steel, as per governing code, applicable project specs and proper line class and
drawings.
To witness the WQT/Operator qualification as per WPS, and ensure material/ weld
consumable control as per project requirements and maintain welder qualification
record.
In this field I have Knowledge about Surface Protection (Galvanizing , Beed
Blasting, Sandblasting, Shot Blasting and also Some knowledge about Paint
Awareness of Construction codes (ASME, ).
Awareness of In service inspection codes (API).
Awareness of Non Destructive Testing according to ASME Sec V. (RT, UT, PT,
MT, VT).
Fabrication Inspection of Pressure Vessel, Heat Exchangers, Process & Power Piping
and HRSG Boilers components as per Drawings specifications.
Maintain the work progress
- 5 -
6. PERSONAL PROFILE
HAFIZ MUHAMMAD BINYAMIN
QC ENGINEER
Projects Details With Descon Lahore Manufactu ri n g
PAKISTAN OIL FILED LTD.
• 50 TON LPG BULLETS (QUANTITY-2) (ASME SEC VIII DIV I)
NESTLE.
• PIPING (ASME B 31.1)
PAKISTAN PETROLEUM LIMITED.
• PRE-HEATER (ASME SEC VIII DIV I) (U stamped).
SPARATOR (ASME SEC VIII DIV I)(API 661) (U stamped).
JORD
• EXPANDER COMPRESSOR DISCHARGE COOLER
(ASME SEC VIII DIV I)(API 661) (U stamped).
• DEBUTANIZER REFLUX CONDENSER
(ASME SEC VIII DIV I)(API 661) (U stamped).
• NGL COOLER (ASME SEC VIII DIV I)(API 661) (U stamped).
MOL PAKISTAN OIL & GAS CO .B.V.
• FUEL GAS KNOCK OUT DRUM (ASME SEC VIII DIV I)
(U stamped).
• WARM FLARE KNOCK OUT DRUM (ASME SEC VIII DIV I)
(U stamped).
• CONDONSATE DECANTING VESSEL (ASME SEC VIII DIV I)
(U stamped).
• SLOP OIL VESSEL (ASME SEC VIII DIV I) (U stamped).
• STABILIZED OIL DECANTING VESSEL (ASME SEC VIII DIV I)
(U stamped).
• WATER DEGASSING BOOT (ASME SEC VIII DIV I) (U stamped).
• DRY AIR RECEIVER (ASME SEC VIII DIV I) (U stamped).
- 6 -
7. PERSONAL PROFILE
HAFIZ MUHAMMAD BINYAMIN
QC ENGINEER
• HOTOIL STORAGE VESSEL (ASME SEC VIII DIV I) (U stamped).
• SLUG CATCHER (ASME B 31.8) (QUANTITY-02)
OMV PAKISTAN
• PIPING SKIDS (ASME B 31.3) (QUANTITY-05)
DIAMOND FOAM
• 9 TON LPG BULLETS (ASME SEC VIII DIV I) (QUANTITY-2)
ARL
• ARL COLUMN (ASME SEC VIII DIV I) (U stamped) (QUANTITY-10).
KAPCO
HEAT EXCHANGER (FUEL OIL HEATER (ASME SEC VIII DIV I)
(U stamped) (QUANTITY-13).
FFCL
NH3 REFRIGRATION CONDENSER (U stamped) (QUANTITY-2).
OGDCL
MERCURY REMOVAL VESSEL(U stamped) (QUANTITY-2).
REFERENCE
Mr. Muhammad Shabbir
Authorized Inspector Supervisor (AIS),
Authorized Nuclear Inspector (ANI),
Certification Manager,
Hartford Steam Boiler Inspection and Insurance Company of Connecticut.
Email: Muhammad.Shabbir@HSBCT.Com
Mobile No: 0092-300-9493855
- 7 -