SlideShare a Scribd company logo
1 of 7
PERSONAL PROFILE
HAFIZ MUHAMMAD BINYAMIN
QC ENGINEER
PERSONAL INFORMATION
NAME : HAFIZ MUHAMMAD BINYAMIN
FATHER’S NAME : BASHIR AHMED
DATE OF BIRTH : 12-12-1988
N. I. C. No. : 35301-8287158-5
PASSPORT # :AC 6201583
RELIGION : ISLAM
NATIONALITY : PAKISTANI
MARITAL STATUS : UNMARRIED
LANGUAGES : ENGLISH, URDU & PUNJABI
PERMANENT ADDRESS : MUZA MAROOF CHAK BAKHTAN WALA
TEHSIL DEPALPUR DIST OKARA
EMAIL ADDRESS : hafiz_binyamin@yahoo.com
MOBILE NO. : 0344-6781589
EDUCATION
Degree/certificate Institution Passing
Year
Marks
obtained
%
age
Matric High School Basirpur 2004 553 65
D.A.E (mech) GCT Sahiwal 2007 2479 74
B.Tech (Pass) Bahudin Zikria University Multan 2010 1073 74
B.Tech (Hons) Global University Lahore Result
awaited
COMPUTER LITERACY
Well versed with following software’s
• M. S Windows, M. S. WinWord, M. S. Excel, & M. S. Power Point
• Internet (Searching and email sending & receiving)
• AutoCAD Application
EXPERIENCE SUMMARY
From-To Month Designation ASME Certified Company/
Multinational Inspection Agency
Jul 2007 to Dec
2010
2 years
6 months
QC Inspector IMRAN Engineering (Pvt.)
Ltd.Lahore
Jan 2011 to
April 2012
1 year 4
months
QC Inspector RAVI GREEN Engineering (Pvt.)
Ltd.Lahore
April 2012 to till
date
2 year 7
months
QC Engineer DESCON Engineering (Pvt.)
Ltd.Lahore
- 1 -
PERSONAL PROFILE
HAFIZ MUHAMMAD BINYAMIN
QC ENGINEER
Technical Certification
• Level II certification in PT (SNT-TC-1A)
• Level II certification in MPI (SNT-TC-1A)
• Preparation Exam API 510
• CODES AND STANDARDS KNOWLEDGE
4.1- ASME Boiler and Pressure Vessel Code
• ASME Sec I; Rules for Construction of Power Boilers
• ASME Section II Part A; Ferrous Material Specifications
• ASME Section II Part B; Non-Ferrous Material Specifications
• ASME Section II Part C; Specifications for Welding Rods, Electrodes and Filler
Metals
• ASME Section VIII Division 1; Rules for Construction of Pressure Vessels
• ASME Section IX; Qualification Standard for Welding and Brazing Procedures,
Welders, Brazers and Welding and Brazing Operators
4.2- ASME Code for Pressure Piping, B31
• ASME B31.1; Power Piping
• ASME B31.3; Process Piping
• ASME B16.5
• ASME B16.9
• ASME B16.11
4.3- Other ASME Code/Standards
• ASME STS-1; Steel Stacks
JOB DESCRIPTION AND RESPONSIBILITY
INPROCESS QC INSPECTOR FOR ASME DEMO VESSEL
• Worked as In-process QC Inspector for ASME DEMO VESSEL
INCOMING MATERIAL
• Incoming material identification and inspection as per PR (Purchase Requisition), PO
(Purchase Order) and DC (Delivery Challan)
• Reviewing MTRs/Lab test reports
- 2 -
PERSONAL PROFILE
HAFIZ MUHAMMAD BINYAMIN
QC ENGINEER
WELDING
• Review WPSs (Welding Procedure Specifications) & PQRs (Procedure Qualification
Records)
• Review WPQs (Welder Performance Qualifications)
• Preparing Weld Matrices and NDE Map
• Carrying out Visual Welding inspections
• Taking Welders Tests for performance qualifications (WPQ)
• Ensuring Qualified welders are performing welding on job, in qualified welding
position
• Ensuring welding is being done as per approved WPS and PQR
• Checking welder stamps near the finished welding joints.
WLDING CONSUMABLE (ELECTRODE) STORAGE
• Keeping record of baking of low hydrogen electrodes- E 7018
• Keeping record of drying of low hydrogen electrodes- E 7018
• Check the temperature of electrodes E 7018 in desicators
VESSEL INITIAL DOCUMENTATION
• Preparing ITP (Inspection and Test Plan) or QIP (Quality Inspection Plan / Traveler
• Preparing Dossier/IDM (Inspection Data Manual)/MDM (Manufacturing Data
Manual)
FABRICATION INSPECTION
• Checking marking for cutting of materials
• Ensuring “material hard punching transferring” on cut parts
• Checking Layout of materials
• Fit ups checking
• Giving “Go Ahead” for NDT (RT, UT, MT and PT) after visual inspection of welding
• Checking Ovalty of individual shells and completed Vessel
• Performing Dimensional Check
• Checking material identification of each part of vessel etc
• Checking Hydrostatic Test
• Checking Pneumatic test of pads
• Checking Water fill Test of storage tanks
• Raising NCR (Non conformance report) if there is out of tolerance or non compliance
of materials
NDT (Non Destructive Testing)
• Arranging NDT (RT, UT and MT) Teams.
• Preparing NDT reports (RT, MT & PT)
• Performing PT (Penetrating Testing)
PWHT (Post Weld Heat Treatment)
- 3 -
PERSONAL PROFILE
HAFIZ MUHAMMAD BINYAMIN
QC ENGINEER
• Preparing PWHT Specifications for vessels
• Checking PWHT Reports
• Reviewing PWHT Charts
SAND BLASTING AND PAINTING
• Checking of sand blasting to surface SA-3 & SA 2.5
• Checking Painting Inspection to meet required microns of different coats
• Carrying out Peel off Test
NDT and DT (Non Destructive Testing and Destructive Testing)
• Checking Hardness in HB and Vickers etc
• Reviewing report of Tensile Testing (Tensile strength, yield strength, %age
Elongation and reduction of area)
FINAL DOCUMENTATION
• Reviewing IDM
• Handing over copy of IDM to Client
(1) IMRAN ENGINEERING (PVT.)Ltd.-AN ASME “S”, “U” and “R” Stamps
certified Company) Jul 2007 to Dec 2010
Position: QC Inspector
KEY WORKING PROJECTS
• Fabrication & Estimate the material of all types of Dish Ends (Elliptical 2:1,Decimal
End,Flat End,Hemispherical Head,)
• Fabrication of high pressure pippelinees , fabrication of steel structures and
equipment. Installation of pipeline, equipments and steel stirage tanks..
• Cress Resources LPG 50 m³ Storage Tank
• JJVL LPG Storage Tank
• Pyro Recycling Plant
• Fabrication & Errection of Kissan Ghee Plant
• LPG Storage Tank for Madni Gas
• Fabrication of diesel tanks according to UL 142
(2) RAVI GREEN ENGINEERING (pvt.) Ltd.-AN ASME “S”, “U” and “R”
Stamps certified Company) Jan 2011 to April 2012
POSITION:Welding INSPECTOR
RAVI GREEN Engineering is Pakistan Based company having ASME ‘S’,‘U’ and
‘R’Stamps.RAVI GREEN Engineering has special facility for fabrication of SS Silos,Pressure
Vessels and Tanks.
Major Responsibilities at: RAVI GREEN Engineering
 Raw Material Inspection as per job Specification,Stage inspection,Layout inspection
 Cutting inspection,Fit up,Welding,Galvanizing inspection,After welding cleaning
- 4 -
PERSONAL PROFILE
HAFIZ MUHAMMAD BINYAMIN
QC ENGINEER
 Final inspection etc,Welders qualification test,Welding Procedure Specification.
 Weld Map & Weld Matrix,Witness of Hydrostatic & Pneumatic Test
 To arrange the RT, UT, MPI and DPT as per code requirement.
Sand blasting, Galvanizing and Paint coating.
Preparing of all types of documents.
Calibration of measuring equipment and welding machine.
KEY WORKING PROJECTS
 Knock Out Drum
 Heat Exchanger
 Cress Gas, 50 m³ Diesel Storage Tank
 Project of Vertical Reactor Vessel of RODOLF.
 Middle East storage tanks structure.
 Oil Storage tanks Urdu Constration Location of Installation Afghanistan.
 Pig Launcher and Receiver Mobile Skid for OMV
 Package wastewater treatment plant afghan national army darulaman Afghanistan.
 Fabrication & inspection of hooper.
 Water tube boiler sodaash (ICI)
(3)DESCON ENGINEERING WORKS (LMW) (ASME “S”, “U” and “R” Stamps
certified Company) April 2012 to Till Date
POSITION:Welding inspector
 Having above 2 year 7 months of experience in the field of fabrication as a Quality
Control Inspection Engineer with Descon Engineering Ltd. Pakistan.
 Responsible For following Activities At Different Projects
 Preparation of Quality Inspection Plans.
 To observe and monitor the implementation of inspection and test plan with Regards
to welding related activities in Fabrication Shops.
 Inspection of the installation and welding of carbon steel, Alloy steel and stainless
steel, as per governing code, applicable project specs and proper line class and
drawings.
 To witness the WQT/Operator qualification as per WPS, and ensure material/ weld
consumable control as per project requirements and maintain welder qualification
record.
 In this field I have Knowledge about Surface Protection (Galvanizing , Beed
Blasting, Sandblasting, Shot Blasting and also Some knowledge about Paint
 Awareness of Construction codes (ASME, ).
 Awareness of In service inspection codes (API).
 Awareness of Non Destructive Testing according to ASME Sec V. (RT, UT, PT,
MT, VT).
 Fabrication Inspection of Pressure Vessel, Heat Exchangers, Process & Power Piping
and HRSG Boilers components as per Drawings specifications.
 Maintain the work progress
- 5 -
PERSONAL PROFILE
HAFIZ MUHAMMAD BINYAMIN
QC ENGINEER
Projects Details With Descon Lahore Manufactu ri n g
 PAKISTAN OIL FILED LTD.
• 50 TON LPG BULLETS (QUANTITY-2) (ASME SEC VIII DIV I)
 NESTLE.
• PIPING (ASME B 31.1)
 PAKISTAN PETROLEUM LIMITED.
• PRE-HEATER (ASME SEC VIII DIV I) (U stamped).
SPARATOR (ASME SEC VIII DIV I)(API 661) (U stamped).
 JORD
• EXPANDER COMPRESSOR DISCHARGE COOLER
(ASME SEC VIII DIV I)(API 661) (U stamped).
• DEBUTANIZER REFLUX CONDENSER
(ASME SEC VIII DIV I)(API 661) (U stamped).
• NGL COOLER (ASME SEC VIII DIV I)(API 661) (U stamped).
 MOL PAKISTAN OIL & GAS CO .B.V.
• FUEL GAS KNOCK OUT DRUM (ASME SEC VIII DIV I)
(U stamped).
• WARM FLARE KNOCK OUT DRUM (ASME SEC VIII DIV I)
(U stamped).
• CONDONSATE DECANTING VESSEL (ASME SEC VIII DIV I)
(U stamped).
• SLOP OIL VESSEL (ASME SEC VIII DIV I) (U stamped).
• STABILIZED OIL DECANTING VESSEL (ASME SEC VIII DIV I)
(U stamped).
• WATER DEGASSING BOOT (ASME SEC VIII DIV I) (U stamped).
• DRY AIR RECEIVER (ASME SEC VIII DIV I) (U stamped).
- 6 -
PERSONAL PROFILE
HAFIZ MUHAMMAD BINYAMIN
QC ENGINEER
• HOTOIL STORAGE VESSEL (ASME SEC VIII DIV I) (U stamped).
• SLUG CATCHER (ASME B 31.8) (QUANTITY-02)
 OMV PAKISTAN
• PIPING SKIDS (ASME B 31.3) (QUANTITY-05)
DIAMOND FOAM
• 9 TON LPG BULLETS (ASME SEC VIII DIV I) (QUANTITY-2)
 ARL
• ARL COLUMN (ASME SEC VIII DIV I) (U stamped) (QUANTITY-10).
 KAPCO
HEAT EXCHANGER (FUEL OIL HEATER (ASME SEC VIII DIV I)
(U stamped) (QUANTITY-13).
 FFCL
NH3 REFRIGRATION CONDENSER (U stamped) (QUANTITY-2).
 OGDCL
MERCURY REMOVAL VESSEL(U stamped) (QUANTITY-2).
REFERENCE
Mr. Muhammad Shabbir
Authorized Inspector Supervisor (AIS),
Authorized Nuclear Inspector (ANI),
Certification Manager,
Hartford Steam Boiler Inspection and Insurance Company of Connecticut.
Email: Muhammad.Shabbir@HSBCT.Com
Mobile No: 0092-300-9493855
- 7 -

More Related Content

What's hot

What's hot (20)

ARAVINTH(CV Aramco Approved)
ARAVINTH(CV Aramco Approved)ARAVINTH(CV Aramco Approved)
ARAVINTH(CV Aramco Approved)
 
RAJU CV
RAJU  CVRAJU  CV
RAJU CV
 
Saad_CV Senior QA&QC Engineer
Saad_CV Senior QA&QC EngineerSaad_CV Senior QA&QC Engineer
Saad_CV Senior QA&QC Engineer
 
Cv ardiansyah t.a cswip 3.1
Cv ardiansyah t.a cswip 3.1Cv ardiansyah t.a cswip 3.1
Cv ardiansyah t.a cswip 3.1
 
Updated cv
Updated cvUpdated cv
Updated cv
 
Tasha ramisetti new resume 2015
Tasha ramisetti new resume 2015Tasha ramisetti new resume 2015
Tasha ramisetti new resume 2015
 
QA- QC INSPECTOR AJITH CV - Copy
QA- QC INSPECTOR AJITH CV - CopyQA- QC INSPECTOR AJITH CV - Copy
QA- QC INSPECTOR AJITH CV - Copy
 
BNMurthy-Updated CV- QC Inspector
BNMurthy-Updated CV- QC InspectorBNMurthy-Updated CV- QC Inspector
BNMurthy-Updated CV- QC Inspector
 
Ganesan Selvakumar CV 151116_M+W
Ganesan Selvakumar CV 151116_M+WGanesan Selvakumar CV 151116_M+W
Ganesan Selvakumar CV 151116_M+W
 
CV : Inspection Engineer ( With SABIC Experience )
CV : Inspection Engineer ( With SABIC Experience )CV : Inspection Engineer ( With SABIC Experience )
CV : Inspection Engineer ( With SABIC Experience )
 
mohamed daowod cv
mohamed daowod cvmohamed daowod cv
mohamed daowod cv
 
Ganesan Plant Inspector_CV
Ganesan Plant Inspector_CVGanesan Plant Inspector_CV
Ganesan Plant Inspector_CV
 
Shafiq CV
Shafiq CVShafiq CV
Shafiq CV
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
 
Mohammed Asif Hassan-cv
Mohammed Asif Hassan-cvMohammed Asif Hassan-cv
Mohammed Asif Hassan-cv
 
haitham abdelaal CV
haitham abdelaal CVhaitham abdelaal CV
haitham abdelaal CV
 
MANAGER.QAQC(MECHANICAL)-1
MANAGER.QAQC(MECHANICAL)-1MANAGER.QAQC(MECHANICAL)-1
MANAGER.QAQC(MECHANICAL)-1
 
(QA_QC Welding,piping engineer
(QA_QC  Welding,piping engineer(QA_QC  Welding,piping engineer
(QA_QC Welding,piping engineer
 
Rajasekaran CV-updated
Rajasekaran CV-updatedRajasekaran CV-updated
Rajasekaran CV-updated
 
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-Welding
 

Viewers also liked

Mohamed Ashry Resume updated - Feb 2016
Mohamed Ashry Resume updated - Feb 2016Mohamed Ashry Resume updated - Feb 2016
Mohamed Ashry Resume updated - Feb 2016Mohamed Hamdallah
 
Sexual harassment of women at workplace
Sexual harassment of women at workplaceSexual harassment of women at workplace
Sexual harassment of women at workplaceSinu Joseph
 
Trabajos (2° parcial)
Trabajos (2° parcial)Trabajos (2° parcial)
Trabajos (2° parcial)JADSM11
 
19.04.2013 Investment in stocks and equities in Mongolia risks, challenges an...
19.04.2013 Investment in stocks and equities in Mongolia risks, challenges an...19.04.2013 Investment in stocks and equities in Mongolia risks, challenges an...
19.04.2013 Investment in stocks and equities in Mongolia risks, challenges an...The Business Council of Mongolia
 
Chadd Boulter - Focuses on Olympic Team
Chadd Boulter - Focuses on Olympic TeamChadd Boulter - Focuses on Olympic Team
Chadd Boulter - Focuses on Olympic TeamChadd Boulter
 
Prelims- Science Quiz at NSF 2012
Prelims- Science Quiz at NSF 2012Prelims- Science Quiz at NSF 2012
Prelims- Science Quiz at NSF 2012Dhruv Sharma
 
C:\Documents And Settings\Pci\Escritorio\Tecnicas De Ventas
C:\Documents And Settings\Pci\Escritorio\Tecnicas De VentasC:\Documents And Settings\Pci\Escritorio\Tecnicas De Ventas
C:\Documents And Settings\Pci\Escritorio\Tecnicas De VentasTecnológico Sudamericano
 
Para Ti, Abril
Para Ti, AbrilPara Ti, Abril
Para Ti, AbrilFreddy
 
PasióN Escenica1teatro
PasióN Escenica1teatroPasióN Escenica1teatro
PasióN Escenica1teatroguestde27fc9
 

Viewers also liked (14)

Creativity
CreativityCreativity
Creativity
 
Moocsの利用
Moocsの利用Moocsの利用
Moocsの利用
 
Mohamed Ashry Resume updated - Feb 2016
Mohamed Ashry Resume updated - Feb 2016Mohamed Ashry Resume updated - Feb 2016
Mohamed Ashry Resume updated - Feb 2016
 
Sexual harassment of women at workplace
Sexual harassment of women at workplaceSexual harassment of women at workplace
Sexual harassment of women at workplace
 
Trabajos (2° parcial)
Trabajos (2° parcial)Trabajos (2° parcial)
Trabajos (2° parcial)
 
Resume
ResumeResume
Resume
 
Il futuro che vorrei2
Il futuro che vorrei2Il futuro che vorrei2
Il futuro che vorrei2
 
19.04.2013 Investment in stocks and equities in Mongolia risks, challenges an...
19.04.2013 Investment in stocks and equities in Mongolia risks, challenges an...19.04.2013 Investment in stocks and equities in Mongolia risks, challenges an...
19.04.2013 Investment in stocks and equities in Mongolia risks, challenges an...
 
Chadd Boulter - Focuses on Olympic Team
Chadd Boulter - Focuses on Olympic TeamChadd Boulter - Focuses on Olympic Team
Chadd Boulter - Focuses on Olympic Team
 
Prelims- Science Quiz at NSF 2012
Prelims- Science Quiz at NSF 2012Prelims- Science Quiz at NSF 2012
Prelims- Science Quiz at NSF 2012
 
canales de distribucion
canales de distribucioncanales de distribucion
canales de distribucion
 
C:\Documents And Settings\Pci\Escritorio\Tecnicas De Ventas
C:\Documents And Settings\Pci\Escritorio\Tecnicas De VentasC:\Documents And Settings\Pci\Escritorio\Tecnicas De Ventas
C:\Documents And Settings\Pci\Escritorio\Tecnicas De Ventas
 
Para Ti, Abril
Para Ti, AbrilPara Ti, Abril
Para Ti, Abril
 
PasióN Escenica1teatro
PasióN Escenica1teatroPasióN Escenica1teatro
PasióN Escenica1teatro
 

Similar to QC Engineer Profile in 40 Characters

QA/QC Mechanical and Welding Inspector
QA/QC Mechanical and Welding InspectorQA/QC Mechanical and Welding Inspector
QA/QC Mechanical and Welding InspectorAsad Ahsan
 
BALAJI RESUME. UPDATED
BALAJI RESUME. UPDATEDBALAJI RESUME. UPDATED
BALAJI RESUME. UPDATEDP. Balaji
 
Ananda_Mariyan_DsouzaCV
Ananda_Mariyan_DsouzaCVAnanda_Mariyan_DsouzaCV
Ananda_Mariyan_DsouzaCVmariyan dsouza
 
SivakumarDhanapalan Resume@Inspector
SivakumarDhanapalan Resume@Inspector SivakumarDhanapalan Resume@Inspector
SivakumarDhanapalan Resume@Inspector Shivakumar Dhanabalan
 
Balkar Latest CV 2016
Balkar Latest CV 2016Balkar Latest CV 2016
Balkar Latest CV 2016Balkar Singh
 
IMRAN YAMEEN CV
IMRAN YAMEEN CV IMRAN YAMEEN CV
IMRAN YAMEEN CV Imran Malik
 
QA QC Engineer Mechanical
QA QC Engineer MechanicalQA QC Engineer Mechanical
QA QC Engineer MechanicalFaizan Raza
 
Venugopal revised Cv
Venugopal revised CvVenugopal revised Cv
Venugopal revised CvVenu Gopal
 
Aramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeAramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeRobin Parayil
 
PRAKASH VIJAYAN NEW CV 2015
PRAKASH VIJAYAN NEW CV 2015PRAKASH VIJAYAN NEW CV 2015
PRAKASH VIJAYAN NEW CV 2015prakash vijayan
 

Similar to QC Engineer Profile in 40 Characters (20)

QA/QC Mechanical and Welding Inspector
QA/QC Mechanical and Welding InspectorQA/QC Mechanical and Welding Inspector
QA/QC Mechanical and Welding Inspector
 
MANAGER.QAQC(MECHANICAL)
MANAGER.QAQC(MECHANICAL)MANAGER.QAQC(MECHANICAL)
MANAGER.QAQC(MECHANICAL)
 
Resume Khurshid
Resume KhurshidResume Khurshid
Resume Khurshid
 
VENKAT
VENKATVENKAT
VENKAT
 
BALAJI RESUME. UPDATED
BALAJI RESUME. UPDATEDBALAJI RESUME. UPDATED
BALAJI RESUME. UPDATED
 
CV_Balaji 2016
CV_Balaji 2016CV_Balaji 2016
CV_Balaji 2016
 
qaiser shahzad cv
qaiser shahzad cvqaiser shahzad cv
qaiser shahzad cv
 
CV-QC Engg Mech- piping & welding
CV-QC Engg Mech- piping & weldingCV-QC Engg Mech- piping & welding
CV-QC Engg Mech- piping & welding
 
Qaiser Cv 2016
Qaiser Cv 2016Qaiser Cv 2016
Qaiser Cv 2016
 
ASAD 01
ASAD 01ASAD 01
ASAD 01
 
Ananda_Mariyan_DsouzaCV
Ananda_Mariyan_DsouzaCVAnanda_Mariyan_DsouzaCV
Ananda_Mariyan_DsouzaCV
 
SivakumarDhanapalan Resume@Inspector
SivakumarDhanapalan Resume@Inspector SivakumarDhanapalan Resume@Inspector
SivakumarDhanapalan Resume@Inspector
 
Muhammed Riswan-QC rev1
Muhammed Riswan-QC rev1Muhammed Riswan-QC rev1
Muhammed Riswan-QC rev1
 
Balkar Latest CV 2016
Balkar Latest CV 2016Balkar Latest CV 2016
Balkar Latest CV 2016
 
IMRAN YAMEEN CV
IMRAN YAMEEN CV IMRAN YAMEEN CV
IMRAN YAMEEN CV
 
QA QC Engineer Mechanical
QA QC Engineer MechanicalQA QC Engineer Mechanical
QA QC Engineer Mechanical
 
Resume
ResumeResume
Resume
 
Venugopal revised Cv
Venugopal revised CvVenugopal revised Cv
Venugopal revised Cv
 
Aramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeAramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector Resume
 
PRAKASH VIJAYAN NEW CV 2015
PRAKASH VIJAYAN NEW CV 2015PRAKASH VIJAYAN NEW CV 2015
PRAKASH VIJAYAN NEW CV 2015
 

QC Engineer Profile in 40 Characters

  • 1. PERSONAL PROFILE HAFIZ MUHAMMAD BINYAMIN QC ENGINEER PERSONAL INFORMATION NAME : HAFIZ MUHAMMAD BINYAMIN FATHER’S NAME : BASHIR AHMED DATE OF BIRTH : 12-12-1988 N. I. C. No. : 35301-8287158-5 PASSPORT # :AC 6201583 RELIGION : ISLAM NATIONALITY : PAKISTANI MARITAL STATUS : UNMARRIED LANGUAGES : ENGLISH, URDU & PUNJABI PERMANENT ADDRESS : MUZA MAROOF CHAK BAKHTAN WALA TEHSIL DEPALPUR DIST OKARA EMAIL ADDRESS : hafiz_binyamin@yahoo.com MOBILE NO. : 0344-6781589 EDUCATION Degree/certificate Institution Passing Year Marks obtained % age Matric High School Basirpur 2004 553 65 D.A.E (mech) GCT Sahiwal 2007 2479 74 B.Tech (Pass) Bahudin Zikria University Multan 2010 1073 74 B.Tech (Hons) Global University Lahore Result awaited COMPUTER LITERACY Well versed with following software’s • M. S Windows, M. S. WinWord, M. S. Excel, & M. S. Power Point • Internet (Searching and email sending & receiving) • AutoCAD Application EXPERIENCE SUMMARY From-To Month Designation ASME Certified Company/ Multinational Inspection Agency Jul 2007 to Dec 2010 2 years 6 months QC Inspector IMRAN Engineering (Pvt.) Ltd.Lahore Jan 2011 to April 2012 1 year 4 months QC Inspector RAVI GREEN Engineering (Pvt.) Ltd.Lahore April 2012 to till date 2 year 7 months QC Engineer DESCON Engineering (Pvt.) Ltd.Lahore - 1 -
  • 2. PERSONAL PROFILE HAFIZ MUHAMMAD BINYAMIN QC ENGINEER Technical Certification • Level II certification in PT (SNT-TC-1A) • Level II certification in MPI (SNT-TC-1A) • Preparation Exam API 510 • CODES AND STANDARDS KNOWLEDGE 4.1- ASME Boiler and Pressure Vessel Code • ASME Sec I; Rules for Construction of Power Boilers • ASME Section II Part A; Ferrous Material Specifications • ASME Section II Part B; Non-Ferrous Material Specifications • ASME Section II Part C; Specifications for Welding Rods, Electrodes and Filler Metals • ASME Section VIII Division 1; Rules for Construction of Pressure Vessels • ASME Section IX; Qualification Standard for Welding and Brazing Procedures, Welders, Brazers and Welding and Brazing Operators 4.2- ASME Code for Pressure Piping, B31 • ASME B31.1; Power Piping • ASME B31.3; Process Piping • ASME B16.5 • ASME B16.9 • ASME B16.11 4.3- Other ASME Code/Standards • ASME STS-1; Steel Stacks JOB DESCRIPTION AND RESPONSIBILITY INPROCESS QC INSPECTOR FOR ASME DEMO VESSEL • Worked as In-process QC Inspector for ASME DEMO VESSEL INCOMING MATERIAL • Incoming material identification and inspection as per PR (Purchase Requisition), PO (Purchase Order) and DC (Delivery Challan) • Reviewing MTRs/Lab test reports - 2 -
  • 3. PERSONAL PROFILE HAFIZ MUHAMMAD BINYAMIN QC ENGINEER WELDING • Review WPSs (Welding Procedure Specifications) & PQRs (Procedure Qualification Records) • Review WPQs (Welder Performance Qualifications) • Preparing Weld Matrices and NDE Map • Carrying out Visual Welding inspections • Taking Welders Tests for performance qualifications (WPQ) • Ensuring Qualified welders are performing welding on job, in qualified welding position • Ensuring welding is being done as per approved WPS and PQR • Checking welder stamps near the finished welding joints. WLDING CONSUMABLE (ELECTRODE) STORAGE • Keeping record of baking of low hydrogen electrodes- E 7018 • Keeping record of drying of low hydrogen electrodes- E 7018 • Check the temperature of electrodes E 7018 in desicators VESSEL INITIAL DOCUMENTATION • Preparing ITP (Inspection and Test Plan) or QIP (Quality Inspection Plan / Traveler • Preparing Dossier/IDM (Inspection Data Manual)/MDM (Manufacturing Data Manual) FABRICATION INSPECTION • Checking marking for cutting of materials • Ensuring “material hard punching transferring” on cut parts • Checking Layout of materials • Fit ups checking • Giving “Go Ahead” for NDT (RT, UT, MT and PT) after visual inspection of welding • Checking Ovalty of individual shells and completed Vessel • Performing Dimensional Check • Checking material identification of each part of vessel etc • Checking Hydrostatic Test • Checking Pneumatic test of pads • Checking Water fill Test of storage tanks • Raising NCR (Non conformance report) if there is out of tolerance or non compliance of materials NDT (Non Destructive Testing) • Arranging NDT (RT, UT and MT) Teams. • Preparing NDT reports (RT, MT & PT) • Performing PT (Penetrating Testing) PWHT (Post Weld Heat Treatment) - 3 -
  • 4. PERSONAL PROFILE HAFIZ MUHAMMAD BINYAMIN QC ENGINEER • Preparing PWHT Specifications for vessels • Checking PWHT Reports • Reviewing PWHT Charts SAND BLASTING AND PAINTING • Checking of sand blasting to surface SA-3 & SA 2.5 • Checking Painting Inspection to meet required microns of different coats • Carrying out Peel off Test NDT and DT (Non Destructive Testing and Destructive Testing) • Checking Hardness in HB and Vickers etc • Reviewing report of Tensile Testing (Tensile strength, yield strength, %age Elongation and reduction of area) FINAL DOCUMENTATION • Reviewing IDM • Handing over copy of IDM to Client (1) IMRAN ENGINEERING (PVT.)Ltd.-AN ASME “S”, “U” and “R” Stamps certified Company) Jul 2007 to Dec 2010 Position: QC Inspector KEY WORKING PROJECTS • Fabrication & Estimate the material of all types of Dish Ends (Elliptical 2:1,Decimal End,Flat End,Hemispherical Head,) • Fabrication of high pressure pippelinees , fabrication of steel structures and equipment. Installation of pipeline, equipments and steel stirage tanks.. • Cress Resources LPG 50 m³ Storage Tank • JJVL LPG Storage Tank • Pyro Recycling Plant • Fabrication & Errection of Kissan Ghee Plant • LPG Storage Tank for Madni Gas • Fabrication of diesel tanks according to UL 142 (2) RAVI GREEN ENGINEERING (pvt.) Ltd.-AN ASME “S”, “U” and “R” Stamps certified Company) Jan 2011 to April 2012 POSITION:Welding INSPECTOR RAVI GREEN Engineering is Pakistan Based company having ASME ‘S’,‘U’ and ‘R’Stamps.RAVI GREEN Engineering has special facility for fabrication of SS Silos,Pressure Vessels and Tanks. Major Responsibilities at: RAVI GREEN Engineering  Raw Material Inspection as per job Specification,Stage inspection,Layout inspection  Cutting inspection,Fit up,Welding,Galvanizing inspection,After welding cleaning - 4 -
  • 5. PERSONAL PROFILE HAFIZ MUHAMMAD BINYAMIN QC ENGINEER  Final inspection etc,Welders qualification test,Welding Procedure Specification.  Weld Map & Weld Matrix,Witness of Hydrostatic & Pneumatic Test  To arrange the RT, UT, MPI and DPT as per code requirement. Sand blasting, Galvanizing and Paint coating. Preparing of all types of documents. Calibration of measuring equipment and welding machine. KEY WORKING PROJECTS  Knock Out Drum  Heat Exchanger  Cress Gas, 50 m³ Diesel Storage Tank  Project of Vertical Reactor Vessel of RODOLF.  Middle East storage tanks structure.  Oil Storage tanks Urdu Constration Location of Installation Afghanistan.  Pig Launcher and Receiver Mobile Skid for OMV  Package wastewater treatment plant afghan national army darulaman Afghanistan.  Fabrication & inspection of hooper.  Water tube boiler sodaash (ICI) (3)DESCON ENGINEERING WORKS (LMW) (ASME “S”, “U” and “R” Stamps certified Company) April 2012 to Till Date POSITION:Welding inspector  Having above 2 year 7 months of experience in the field of fabrication as a Quality Control Inspection Engineer with Descon Engineering Ltd. Pakistan.  Responsible For following Activities At Different Projects  Preparation of Quality Inspection Plans.  To observe and monitor the implementation of inspection and test plan with Regards to welding related activities in Fabrication Shops.  Inspection of the installation and welding of carbon steel, Alloy steel and stainless steel, as per governing code, applicable project specs and proper line class and drawings.  To witness the WQT/Operator qualification as per WPS, and ensure material/ weld consumable control as per project requirements and maintain welder qualification record.  In this field I have Knowledge about Surface Protection (Galvanizing , Beed Blasting, Sandblasting, Shot Blasting and also Some knowledge about Paint  Awareness of Construction codes (ASME, ).  Awareness of In service inspection codes (API).  Awareness of Non Destructive Testing according to ASME Sec V. (RT, UT, PT, MT, VT).  Fabrication Inspection of Pressure Vessel, Heat Exchangers, Process & Power Piping and HRSG Boilers components as per Drawings specifications.  Maintain the work progress - 5 -
  • 6. PERSONAL PROFILE HAFIZ MUHAMMAD BINYAMIN QC ENGINEER Projects Details With Descon Lahore Manufactu ri n g  PAKISTAN OIL FILED LTD. • 50 TON LPG BULLETS (QUANTITY-2) (ASME SEC VIII DIV I)  NESTLE. • PIPING (ASME B 31.1)  PAKISTAN PETROLEUM LIMITED. • PRE-HEATER (ASME SEC VIII DIV I) (U stamped). SPARATOR (ASME SEC VIII DIV I)(API 661) (U stamped).  JORD • EXPANDER COMPRESSOR DISCHARGE COOLER (ASME SEC VIII DIV I)(API 661) (U stamped). • DEBUTANIZER REFLUX CONDENSER (ASME SEC VIII DIV I)(API 661) (U stamped). • NGL COOLER (ASME SEC VIII DIV I)(API 661) (U stamped).  MOL PAKISTAN OIL & GAS CO .B.V. • FUEL GAS KNOCK OUT DRUM (ASME SEC VIII DIV I) (U stamped). • WARM FLARE KNOCK OUT DRUM (ASME SEC VIII DIV I) (U stamped). • CONDONSATE DECANTING VESSEL (ASME SEC VIII DIV I) (U stamped). • SLOP OIL VESSEL (ASME SEC VIII DIV I) (U stamped). • STABILIZED OIL DECANTING VESSEL (ASME SEC VIII DIV I) (U stamped). • WATER DEGASSING BOOT (ASME SEC VIII DIV I) (U stamped). • DRY AIR RECEIVER (ASME SEC VIII DIV I) (U stamped). - 6 -
  • 7. PERSONAL PROFILE HAFIZ MUHAMMAD BINYAMIN QC ENGINEER • HOTOIL STORAGE VESSEL (ASME SEC VIII DIV I) (U stamped). • SLUG CATCHER (ASME B 31.8) (QUANTITY-02)  OMV PAKISTAN • PIPING SKIDS (ASME B 31.3) (QUANTITY-05) DIAMOND FOAM • 9 TON LPG BULLETS (ASME SEC VIII DIV I) (QUANTITY-2)  ARL • ARL COLUMN (ASME SEC VIII DIV I) (U stamped) (QUANTITY-10).  KAPCO HEAT EXCHANGER (FUEL OIL HEATER (ASME SEC VIII DIV I) (U stamped) (QUANTITY-13).  FFCL NH3 REFRIGRATION CONDENSER (U stamped) (QUANTITY-2).  OGDCL MERCURY REMOVAL VESSEL(U stamped) (QUANTITY-2). REFERENCE Mr. Muhammad Shabbir Authorized Inspector Supervisor (AIS), Authorized Nuclear Inspector (ANI), Certification Manager, Hartford Steam Boiler Inspection and Insurance Company of Connecticut. Email: Muhammad.Shabbir@HSBCT.Com Mobile No: 0092-300-9493855 - 7 -