SlideShare a Scribd company logo
1 of 7
Download to read offline
Curriculum Vitae
Name/Surname : Muhamed Shafiq Anjum Shafi
Date of Birth : August 28, 1981
Nationality : Pakistani
Profession : Lead Inspection Engineer E&I / Commissioning Engineer
Educational Qualification : BSc Electrical Engineering - (Reg. # 2003-zm-14) BHZU University Multan, Pak
DAE Associate Engineering (Electrical) - PBTE/DAE/24611 Lahore, Pak
S.S.C (Matriculation) - PBISE/SSC/147670 Multan, Pak
Technical Certification /
Profile Glance
Achievement(s)
: Advance Concept in “Quality Engineering” Regst.# 11011 Franklin University, USA
CQE (ASQ, Certified Regst.# 65373091 / Cert.# A7481) American Society for Quality, USA
Certified Quality Engineer - ASQ Body of Knowledge Cert.# A7481 Chicago Institute of Technology,
Abu Dhabi UAE
Certified QA/QC Engineer (ACAC Certified Reg.# ACAC803132) Accreditation Council, USA
Certified QA/QC Engineer (Ministry of KHDA, Dubai Reg.# KHDA-1998-014-963) Development Institute
for Science & Computer, Dubai
ISO 9001:2008 QMS - Internal Auditor (Cert.# OMCT 550619102/2015) Orient MCT, Abu Dhabi
ISO 9001:2008 QMS - Lead Auditor (IRCA Regst.# AO17561) IRCA Certified, UK
ISO 14001:2004 EMS - Lead Auditor (EIMA Regst.# BO1321) EIMA Certified, UK
BS OHSAS 18001:2007 - Lead Auditor (IRCA Regst.#) IRCA Certified, UK
Certification in Science & Power, Circuits (Royal Charter Certified Cert.# RC/ESCP/282173) City &
Guilds of London Institute, Pak
AUTO CAD Professional (Reg. # PS/SD/P2A.C/1329) Peak Solutions Institute, Pak
Training Courses &
Seminars Attended
(QATAR, UAE, KSA)
:  OFF SHORE-SEA SURVIVAL & HUET (Helicopter under water Escape) Training 2014 from
(ETSDC) Emirates Tech Safety Development Centre, Abu Dhabi-UAE
 HSE Safety Induction Course (ADMA-Off Shore) ZIRKU, DAS Island Abu Dhabi-UAE
 H2S/BA Awareness - VGTC Centre, Qatar
 Hazard Effect Management Process (HEMP) KSA
 Safety Training Observation Program, Petrofac Abu Dhabi-UAE
Operational & Maintenance Training Courses for
 132KV, 33KV ‘’GIS’’ Type, HV Switchgears - Schneider Electric
 6.6KV ‘’Metal Clad’’, MV Switchgears – Schneider Electric
 LV Switch Board, MCC Motor Control Centre - ABB/Siemens/Schneider Electric
 DMS, DCS, HMI, PLC (SCADA) - ABB/Honeywell/Schneider Electric
 UPS 24Vdc, 110Vdc, 48Vdc & 240Vac) - AEG/Power Solution
 DCS “HMI” Modification 800XA System - ABB/Honeywell
Driving Licenses : Holding AE-2142409 Driving License Abu Dhabi - Validity up to Dec, 2023
Holding GTSC-62223 Desert Driving License - Validity up to August, 2016 (GTSC, Abu Dhabi)
Holding CVT-20267 Defensive Driving Course - Validity up to July, 2016 (CVT, Dubai-UAE)
Computer Skills : Ms Office, Adobe Photoshop, Internet
Window Xp, Window 98, Window 2000
Summary of Experiences :
-
-
Having around 10.8 years experiences in Middle East Countries (UAE, KSA, Qatar and Pakistan) in the
field of Engineering, Construction, Quality and testing expertise being a client representative as
Company/TPI/PMC/PMT with well reputed clients, Gasco, Takreer, Adma-Opco, Aegean, Zadco, Al
Hosn Gas, Leighton, Gupco-Enppi, KJO, Dolphin Energy, Qatar Petroleum, Qatar Gas, EDT QP
Dukhan, PAPCO, OGDC, Lesco/Wapda Pak and Bechtel Arabia KSA.
Experienced in various Mega projects in Oil & Gas Industry, Plant Processing Facilities, Oil & Gas
Pipeline, Refineries, Water Transmission Pipeline, Infrastructure, Submarine Composite Cables
Inspection, Power Transmission lines includes Sub Stations 11/0.433KV to 132KV Systems.
Experience and expertise in supervision of Erection, Installation, Pre-Commissioning, Commissioning,
Quality Control and Vendor Inspections of LV/MV Electrical & Instrumentation systems includes SCADA
Integration, Electronic Control System (ESD/DCS/PLC/ACS/RTU), Port Special Systems, Telecom,
LAN, WAN, TNMS, PAGA, CCTV, F&G, FOC and Cathodic Protection systems adept in Engineering
Standard, Specification (DGS, DEL, QGPS, TOTAL) & other IEE, IEC, SABIC, QPES, BS Standards.
DNVGL/CV/FORMAT/VER-2.0-07/2015/MSA 2
Testing Expertise :
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Proficient and well knowledge about Logic, methodology of operational, functional test for following
System/Sub Systems, (FAT, IFAT, ISAT, SAT) & PRE COMM., COMMISSIONING Activities)
Power Transformers (Up to 120MVA) IR test, Winding Resistance (HV-G, LV-G, HV-LV), Polarization
Index test, CT test, Voltage Ratio test, Vector Group test, Magnetizing Current test, BDV test for Oil,
Neutral, bushing CT, Mechanical Protection & RTCC Operation tests.
HV, MV, LV Switchboard (132kv, 33kv, 11kv, 6.6kv, 3.3kv, 0.433kv) Mechanical Operation test,
functional test of HV/LV in Service & test position, Bus Bar Hi Pot, IR, Continuity test, Contact
Resistance (µΩ) test, Primary Injection for Ammeter, Voltmeter, Incomer Logic test, Interlocking with
AQT, ATS, NCS and DCS system.
CT's & VT's test (Metering & Protection) CT test (IR/Winding Resistance/Ratio/Class/
Burden/Polarity/Excitation), VT test (Ratio/Burden/Polarity) by Current and Voltage Injection.
Protection Relays test Relay setting, configuration, testing of Electro-mechanical and Microprocessor
relays (RD148, MIM200/300, REF630/615, RET, REM, RED) with relay functions of 25, 27, 46, 49, 50,
51, 67, 81, 87 etc.
Numerical relays and protection relay system of Sepam Series (20, 40, 80), Differential protection
relays" & "MIB30" HID (High Impedance Differential Module), MRL1 Lockout relay, TCP Micro logic
relay Series 5.0A & 6.0A and "SR-745" GE TR Management relay, MR Tap Changer "TAPCON 240"
HV/LV Circuit Breakers test Breaker Analyzer test, IR test, Contact Resistance, Tripping and closing
time test of HV/LV circuit breakers.
Hi Pot test for Bus bar, Bus Duct & Cables: DC Hi Pot test of HV cables (3.3kv, 6.6kv, 11kv, 33kv)
and AC Hi Pot test, Insulation Resistance test, DC resistance measurement test, Metallic Screen DC
resistance test, Capacitance Measurement test & Contact Resistance test of MV/LV Bus bars/Bus duct.
Submarine Composite Cables 6.6/11kv Material Receiving & Witnessed test: Non Electric tests;
Overall dimension check, Conductor Screen, Inner Layer and Outer Sheath thickness and Serving
check, Water Blocking Tape check, Conductor Sheath and Anti-Corrosion Sheath check, Anti-Teredo
Protection Test (No of copper tape, copper tape thickness and overlapping check), Inner Sheath /
Bedding, Bitumen check, Armour Check and Binder Tape check, Filler, Insulated steel fillers, diameter
check over the insulation, steel rope and no of wire check.
Electrical test; Power Frequency voltage test withstand 23KV/5minuts, Insulation resistance test after
and before of HV test, Conductor DC resistance measurement test, measured the resistance corrected
to at temperature @ 20degC, Metallic Screen DC resistance test, Capacitance Measurement test
Fibber Optic Cable Test; Non Electric Test, Visual check, overall dimension check, outer Insulation
thickness check; Electrical Test; Attenuation @ 1310nm and 1550nm, OTDR (Optical time domain
reflector) test, end to end test and Splicing with fusion arc splicer.
Sub Stations Energization Stability test of Power transformers and Bus bar; Line differential,
Transformer differential protection, End to End test up stream to downstream, Energization of power
transformers, MV and LV switchboards.
Diesel Generator Sets (5.5kva up to 2500kva) On load/Off load vibration measurements, Alarm & trip
logic checks for protection, Transient response load test (0-25% to 100-0%), Noise level Measurement
(Alternator & Engine), Alarms & Shutdowns on Engine (Emergency Stop/Diagnostic, Over Speed, Low
oil pressure, High coolant temperature test), Painting DFT checks, winding Insulation resistance checks
and full load test.
UPS’s & "TPR" Invertors and Battery Charger Batteries Charging & Dis-charging test of 24VDC,
110VDC, 48VDC & 240VAC and Invertors protection test (Float charging, Low level, earth Fault,
Temperature Limit) etc.
Cathodic Protection Controller test, Pipe to Soil, potential measurement swing test, AC interference
test & line current measurement at EBB points for U/G, A/G Oil & Gas pipeline.
TELECOM/LAN/WAN/TNMS System; System PING test, system Redundancy test, system Interface
test, system Optical Signal level test (Optical TX Power & Receive Sensitivity check)
CCTV System test; Monitoring test from Operator monitor, Operator Live Viewing Test, Calling
Cameras test using digital sentry, Video Playback & Recording Test, Pan / Tilt test.
Telephone System; Answering calls test, making calls test, automatic Redialling test, Voice Clarity
check test.
PA/UHF Radio System; Transmit Power & Frequency Measurement Test, UHF Duplexer test, Radio
Voice functionality test, Interface to LAN, TNMS system, Interface to Voice Recording / Dispatcher
System, F&G system Interface test.
PDH Multiplexer, Ethernet Switches, Media Converter; DM2+ Bit Error Rate Measurement test,
Ethernet interface Unit End-To-End test, EPSA Alarm test, Configuration and Traffic verification test,
Through-Put test, LC Transceiver Transmit Power, Receiver Sensitivity test.
DNVGL/CV/FORMAT/VER-2.0-07/2015/MSA 3
WORKING EXPERIENCE / EMPLOYMENT SCAN
Period:
April 2013 to till
date
Company : DNV GL, ABU DHABI UAE
Position : Lead Inspection Engineer E&I (Industrial Services Division)
Projects : Major Projects, Oil & Gas Middle East
ADMA-OPCO:
a) +100 MBD Das Island Project (Off Shore)
b) Nasr Umm Lulu (Brown & Green Fields) Projects
c) Flares Modification Revamp Project, Das Island (Off Shore)
d) Crude Oil Loading Facilities Project
e) ZWIUP Project (Off Shore)
f) DE Mothballing Project
g) Zakum West Super Complex (GGII) Project
h) CTU Treatment Unit Modification Project
i) SARB Island Package-6 Project, EPC Work For Drills Camp and Associated Utilities
ZADCO:
a) Satah Full Field Development (STFFD) Project
b) Thammama ll-Wad Phase-1 Gas Injection Project
c) EPC of work for black Powder Filtration System Project
d) Upper Zakum 750k, Accommodation & Utilities Project
GASCO:
a) HABSHAN-5 Sulphur Granulation Plant
b) 4TH NGL Train & IGD Tank-Ages Project
DOLPHIN ENERGY:
a) Export Gas Compression Facilities Upgrade Project
b) 48’’ Taweelah to Fujairah Down Stream Gas Pipeline Project
c) Third Party Gas Interconnecting Faculties Upgrade, Qatar
d) Ras Laffan Treatment Plant Unit 131 Diesel Train, Qatar
AL HOSN GAS:
a) EPC Package SGD-11 Project
b) EPC Package SGD NP-10 Project
MALAYSIA/LEIGHTON OFF SHORE:
a) S432, South Oil Sea line Project
ENPPI/GUPCO KSA:
a) GUPCO Rehabilitation Project
KOC/KUWAIT OIL COMPANY:
a) EPC of Supply, Erection, Operation, Maintenance of Gas Turbine to Up Grade Power
Capacity At Sabia & Az Zour Power Plant Projects
b) EPC of Effluent Water Disposal System at GC-15 ,GC-25 and Injection pump at CIPF/N
QATAR PETROLEUM:
a) EPIC of 16” JET A1 Fuel Pipeline Project
b) Offshore National Security Shield, Qatar
c) QSTec Polysilicon Project Phase-1, Qatar
d) EPIC of New CIB 33/11kv PDS Halul Island Project (Off Shore)
e) EPIC of Anti surge & Turbine Controls Upgrade @ KN, KM, JDS & RG Project
f) EPIC of Integrated Chiller, Freezer, Laundry, Dining & Accommodation Facilities In Halul
g) EPIC of Online Condition Monitoring System for Rotating Equipment Dukhan fields, Qatar
h) EPIC for Gas Supply to Ras Abu Fontas (RAF) Power Station-W2, Qatar
i) EPIC for Forward Mounted Base (FMB, NSS) Qatar
j) Doha South Sewage Treatment Works 40 MID Expansion
DNVGL/CV/FORMAT/VER-2.0-07/2015/MSA 4
Job Responsibilities :  Review and develop QA/QC Procedures and Quality Inspection Plan for all E&I work activities
includes Vendor inspections, material visual Inspection, FAT, IFAT, Calibration checks, Packing,
Marking, Issuance of inspection report and shipping released etc.
 Do witnessing test of HV, LV, MV and Fiber Optic Cables, MV, LV Switchgears, DBs, JBs, Fire
Alarm Control Panels, Pressure Gauges and Transmitters Instruments including materials as per
approved ITP, FAT, IFAT procedure and QP Plans.
 Do witnessing the loop sale, Interlocks functional test and ensure that all requirements in specified
procedure and narratives are being established.
 Designing and developing new control systems and maintaining and modifying existing systems to
ensure that these systems and processes operate effectively and safely carry out site acceptance
testing and the commissioning.
 Review ITPs to verify that Execution Contractor is performing all required inspections and
witnessing hold points, review Company Inspectors deliverables, analysis, resolve issues and
problems emerging during the Quality control activity and ensure that all inspections and tests
witnessed by Company Inspectors are recorded and documented.
o FAT of “500KVA-120MVA” Power Transformers at Siemens/Brush/Emirates Transformer
o FAT of MV/LV Switchgears at ABB/Siemens/Schneider-Electric
o FAT of 415V LV Switchboards at ABB/Siemens/Eaton/Al-Dafir/Masseera
o FAT of HVAC Control panels at Prisma/Honeywell/York
o FAT of Variable Speed Drive System at Emerson/Siemens/Schneider Electric
o FAT of HG7-Passive Harmonic Filter System at L&T Automation FZE
o FAT of Drive-Applied Passive Harmonic Filter system at Proserv
o FAT of PFC (Power Factor Capacitor) and Active Harmonic Filter System at Eaton/Proserv
o FAT of MV, LV, Control & Instrument cables at MESC Rak/Ducab, Dubai/Musaffah
o IFAT of Control Systems (PLC/DCS/SCADA) at ABB/Yokogawa/Honeywell/Silvertech
o IFAT of DCS “HMI” Modification 800XA system at ABB/Silvertech/Honeywell
o IFAT of “PEMS” Predictive Emission Monitoring system at Yokogawa/Honeywell
o FAT of FACP, HSSD, VESDA F&G System and Detectors at TYCO/NAFCO/Zeener ZLC
o FAT of CCTV & Security Control System at TYCO/Honeywell/3W Network
o IFAT of LAN, WAN, PAGA, ACS, PA/UHF Radio and Telecom systems at ABB/3W Network
o FAT of Diesel Generator (Rated up to 2800kva) at Caterpillar-Al Bahar/FG Wilson/Perkins
o Cathodic Protection System Inspection at AEGIS/Bss-tech
o Inspection of Ex’e/Ex’d Explosion Proof JB & PJB at Weidmuller/Walsall/Cooper/Bartech
o FAT for Inergin System, Chemical Injection skid, Electro-Chlorination Skids, Condensate & NGL
Shipping Metering Skid Packages at Proserv/Tyco/MISWACO/FMC
o Safety Relief Valves, Hydrolytic/Pneumatic actuators visual, function test & Bench Calibration test
at Proserv/Emerson/Adyard/NPCC
o Accommodation module, Electrical Rooms (KAAOT & ABOT for S432-Sealine Project South Oil
Company, Leighton Offshore) and Electrical System Containers Installation as per Zone-II
Classification for Accommodation & Utilities, Zirku Island Pressurization, Electrical, F&G system,
HVAC systems installation and start up test at Specialist Services/WBG/AL JABER
o Performed and witnessed the Powering up test for Accommodation Module Start-up test, Purging
the Accommodation Module, CPFG Start-up test, Powering up the Cabin utilities and Main
Distribution Board system, Powering up of HVAC system, Fire & Gas Detection System.
o FAT of Wellhead Control Panel, Local Gauge Control Panel & Emergency Shutdown System with
combination of standard Pneumatic and Hydraulic/PLC based logic in a single integrated solution
such as Single/Multiple WHCP controls for both onshore and offshore applications at
Proserv/Versatech.
o FAT of Modular Multi-Wellhead control system, PLC Based Wellhead control system, as
Instrumented Protective System (IPS) for Wellhead valves Open/Close sequence, Control,
Operation and shutdown safety requirements & to meet high degree of Reliability, functionality
Integrity of the system at Proserv/Silvertech/Versatech.
o FAT for Contacting/Retractable, pH Sensor/Total Chlorine Sensor and Analyzer system, ABB
Analyzer Houses/Shelters, Solar System, CPIC at AIMS/Emerson/Versatech.
Period:
May 2011 to
Feb 13
Company : MOODY INTERTEK, ABU DHABI UAE
Position : Electrical TPI/GASCO “PMT”
Project :
a). 4th NGL Train & IGD Tankages Project
b). SWI-3, Seawater Intake-3 Project
DNVGL/CV/FORMAT/VER-2.0-07/2015/MSA 5
Job Responsibilities :  Site job execution, Interacting with vendors, Coordination with inspectors, attending walk downs for
RFC, RFSU, Issuance, clearing punch points, pre mechanical completion of systems and witness
the HV, MV, LV Power distribution systems pre-comm., commissioning and start up activities.
 Review construction drawings IFC, AFC, P&ID diagrams, hook-up, Interconnection diagram,
typical installation details, loop, logic diagram, Cause & effect and participate in the demonstration
handover and acceptance of the system with operations group.
 Responsible for installation inspections of equipment, Power Transformers (up to 20MVA) and MV,
LV Switchgears, SB & MCC control panels, HVAC (MCC) Unit, DCS System, RTU System, NCS
System cabinet, Junction Boxes, Marshalling boxes, Motors & Compressors, UPS’s & "TPR"
Battery chargers, Lighting & Small power system, Earthing, Heat Tracing & Lightning system.
 Installation inspection and functional test for Diesel Generator sets (7.5kva up to 10kva).
 Installation, Inspection and functionality test for Modular Multi-Wellhead control system / PLC
Based Wellhead control system, as Instrumented Protective System (IPS) for Wellhead valves
OPEN/CLOSE sequence, Control, Operation and shutdown safety requirements.
 Installation, Inspection and Surveillance for all metallic equipment’s & Structures in seawater “stop
logs, Raking bar screens, travelling band screens, Pump body” and ensure that are protected by
impressed current Cathodic Protection system.
 Installation, Inspection and testing for electrode and ensure that each part of the zone shall be
monitored by reference electrode and shall be positioned such that all the surfaces are covered
within each structure and Test for MMO (Mixed Metal Oxide, Platinum) probe type anodes, ensure
the continuity with connector bars.
Period:
Aug 2010 to
May 2011
Company : VELOSI LLC, ABU DHABI UAE
Position : Sr. QC Inspector E&I - TPI/Dolphin Energy
Project : a). 48’’x243km, Taweelah to Fujairah down Stream Gas Pipeline
Job Responsibilities :  Ensured that all activities assigned compliance with DEL project Spec's and during inspections
follows the IFC, AFC, P&ID, hook-up, typical installation details, logic diagram, Cause & effect
diagrams and QC procedures, Inspection plans and carried out as per planned schedule to
achieve on target dates.
 Responsible to review contractor submittals ITP, QCP, QCF, MST, related QC documents and
make ensure that all Inspections being carried out as per approved documents.
 Responsible for installation inspections, testing of LV Switchgear, 415V motor control center, RMU
units, power transformers, distribution boards, Solar system, power, control, Instrumentation cables
laying, glanding, termination, HVAC & Earthing system, Lightning protection system.
 Involved in swing potential test and Natural potential survey for underground gas pipeline.
 Supervised, witnessed CIP & DCVG (DC voltage gradient) Survey for 48’' U/G gas pipeline.
 Installation of MMO Piggy back anode, Mg Anode, Big Fink, CMTP, CTP, PCR, AJB, NJB, STP,
CPTR, EBB, Zinc ribbon anode, Surge Diverters, Pin Brazing welding.
 Material Receiving & Witnessed test for Submarine Composite Cables 6.6/11kv, Overall dimension
check, Conductor Screen, Inner Layer and Outer Sheath thickness and Serving check, Water
Blocking Tape check, Conductor Sheath and Anti-Corrosion Sheath check, Anti-Teredo Protection
Test (No of copper tape, copper tape thickness and overlapping check), Inner Sheath / Bedding,
Bitumen check, Armour Check and Binder Tape check, Filler, Insulated steel fillers, diameter check
over the insulation, steel rope and no of wire check.
 Performed and witnessed Power Frequency voltage test withstand 23KV/5minuts, Insulation
resistance test after and before of HV test, Conductor DC resistance measurement test, measured
the resistance corrected to at temperature @ 20degC, Metallic Screen DC resistance test,
Capacitance Measurement test
 Fibber Optic Cable Test; Non Electric Test, Visual check, overall dimension check, outer Insulation
thickness check.
 Witnessed attenuation test 1310nm and 1550nm, OTDR (Optical time domain reflector) test, end
to end test and Splicing with fusion arc splicer.
Period:
July 2008 to
Company : TEKFEN CONSTRUCTION Co. QATAR
Position : QA/QC Engineer E&I
DNVGL/CV/FORMAT/VER-2.0-07/2015/MSA 6
Aug 2010 Projects : a). GTC06/190/ED
20’’x81km, A/G Crude Oil pipeline Umm-bab to Um-Messaieed tank farm
b). GTC05/124/ED
24’’/20”x120km, U/G Ras Laffan to Messaieed Gas transmission line
c). GTC05/124/ED VTC#2
6’’x32km, U/G LPG Messaieed Refinery to Doha bottling Plant
Job Responsibilities :  Responsible to conduct Installation inspections, surveillance, testing, mechanical completion on
following systems, power transformers (Up to 12.5/10 MVA), 33/11kv GIS (GM6), 6.6kv (Metal
Clad) Switchgears, SB, MCC control panels, JB, marshalling boxes, RCU, UCP, Motors, Diesel
Generator (Rated 10KVA), Nitrogen Generators (5.5kva), RTU system, Heat tracing system,
Ethane Gas compressors including lube Oil & Fin Fan coolers system, FOC & telecom system,
UPS’s & "TPR" Battery chargers, lighting, Earthing & Lightning.
 Control Valve, GLV, BFV, BD, MOV, ESD Valves and Magnetic Flow, Ultrasonic & Orifice Flow
meters, FT, PT, Transmitters, Gauge Control panel as well as other measuring Instruments.
 Responsible for Inspections field work according with ITP, generating punch lists, making final
inspection reports for various E & I works, loop folder preparation.
 Executes the specific, critical inspections on materials, equipment, construction, installation
activities on site, Inspection of Incoming materials, vendor package receiving
 Review of vender documents, test procedure, IRC certificates, operating manuals, design book,
engineering data book in accordance with the project design basis and specification.
Period:
Oct 2007 to
July 2008
Company : SAUDI BIN LADIN - PIC DIVISION, KSA
Position : QC Inspector Electrical
Project : a). PPLC; Product Pipe Line Corridor Phase-I
Job Responsibilities :  Contract job order review, preparation of Job quality plan and preparation of project specific
procedures, work instructions, QC procedures and method of statement, check lists, calibration
sheets and QC plans as required.
 Participated in creation, Implementation of project quality plans, procedures, work Instructions,
quality records, punch lists and compilation of test packs.
 Verified compliance of performance output, identification of non-conformances for corrective action
and issue of NCRs whenever required.
 Responsible for Inspections field work according with ITP, generating punch lists, making final
inspection reports for various E&I works, loop folder preparation.
 Equipment testing for LV & HV switchboards like CT, PT, MV drop, bus ducts and electro
mechanical relays, breakers, feeder differential and simulation tests.
 Installation & testing of F&G system including detectors GDT's, FDI's, HD, SD, HSSD, FACP,
Inergen and MCL alarming system according to cause & effect matrix.
 Worked on Communication systems (CCTV, PAGA, Data, Voice), Analyzers, Compressor Skids,
Pump Motor Controls, Machine Control Monitoring System (MCMS), Monitoring System (CEMS),
Catalyst & Spent Caustic treatment skids.
 Possesses sound command on Pneumatic & Electronic Instruments, Differential Pressure, Level,
Temperature, Flow Transmitters, Control Valves, Pressure, Temperature, Flow & Level Switches,
Turbine, Magnetic & Vortex flow meter.
Period:
Feb 2001 to
July 2003
Company : LESCO/WAPDA - (GSC) Division, PAK
Position : Line Superintendent Const. Grade-I
Project : a) 132/33/11kv Sub Stations, HT/LT Transmission lines & Electricity
DNVGL/CV/FORMAT/VER-2.0-07/2015/MSA 7
Job Responsibilities :  Responsible for end to end line feeder planning and execution, Erection of HT/LT 132kv, 33kv and
11kv transmission lines and distribution system works.
 Handling the project estimation, monitoring, execution of overhead, underground transmission
HT/LT line as per Project requirement.
 Marking the substation layout and foundation marking of Substation equipment’s like GA, LA,
Isolator, CVT, CT, breakers, post insulators, power transformer, and tower gantries, light mask,
cable trench, ear thing, lighting system etc.
 Responsible and supervision for laying, termination of HV, MV, LV and control cables from SWGR,
Control Panels end to field equipment’s like Power Transformers, Current Transformers (CT’s),
Voltage Transformers (VT’s), Motor Operated Isolators, Capacitor Bank, Capacitor bank Reactors,
Capacitor voltage Transformer and MCCB Breakers.
 Supervised Erection & Start up, Control Auxiliaries for Heavy-duty Gas Turbine Generators (Rated
1.1 to 22.4MW), 13.8/11kv Vacuum, 33kv GIS, 6.6kv Metal Clad switchgear, 415V LV MCC’s,
PCC’s and power transformers.
 Responsible for replacing the old ASEA distance relays with new numerical line differential &
distance relays.

More Related Content

What's hot

CV Field Mechanical and Piping Engineer
CV Field  Mechanical  and Piping EngineerCV Field  Mechanical  and Piping Engineer
CV Field Mechanical and Piping EngineerPopovici Adrian
 
TESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEERTESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEERsaravanan muthu
 
CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) Tarun Kumar
 
Mechanical Maintenance Supervisor CV
Mechanical  Maintenance  Supervisor CVMechanical  Maintenance  Supervisor CV
Mechanical Maintenance Supervisor CVvaithiya nathan
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Chandra ABS IV
 
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) Mudassir Nazar Dabilkar
 
MOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_EngrMOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_EngrMohammed Akbar
 
Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leonardo David
 
CIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoorCIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoorabdul shukoor
 
Resume to Engineer doc PDF
Resume to Engineer doc PDFResume to Engineer doc PDF
Resume to Engineer doc PDFshaju hossain
 
Resume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorResume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorandi dipayadnya
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisorJames Ct
 
Romy George civil site engineer.
Romy George civil site engineer.Romy George civil site engineer.
Romy George civil site engineer.Romy george
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEsekar palani
 
MEP Supervisor
MEP SupervisorMEP Supervisor
MEP SupervisorArun Arun
 

What's hot (20)

CV Field Mechanical and Piping Engineer
CV Field  Mechanical  and Piping EngineerCV Field  Mechanical  and Piping Engineer
CV Field Mechanical and Piping Engineer
 
TESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEERTESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEER
 
CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer)
 
Mechanical Maintenance Supervisor CV
Mechanical  Maintenance  Supervisor CVMechanical  Maintenance  Supervisor CV
Mechanical Maintenance Supervisor CV
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
 
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
MOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_EngrMOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_Engr
 
Karthik Resume
Karthik Resume Karthik Resume
Karthik Resume
 
Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)
 
CIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoorCIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoor
 
Ravishankar-CV
Ravishankar-CVRavishankar-CV
Ravishankar-CV
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
Resume to Engineer doc PDF
Resume to Engineer doc PDFResume to Engineer doc PDF
Resume to Engineer doc PDF
 
Resume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorResume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisor
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisor
 
safety officer cv 2
safety officer cv 2safety officer cv 2
safety officer cv 2
 
Romy George civil site engineer.
Romy George civil site engineer.Romy George civil site engineer.
Romy George civil site engineer.
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 
MEP Supervisor
MEP SupervisorMEP Supervisor
MEP Supervisor
 

Viewers also liked

Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Sangilimuthu Samiayyah
 
Inspection engineer ali zeineldein
Inspection engineer   ali zeineldeinInspection engineer   ali zeineldein
Inspection engineer ali zeineldeinAli Zeineldein
 
Resume Sandeep Patel 04092015
Resume  Sandeep Patel 04092015Resume  Sandeep Patel 04092015
Resume Sandeep Patel 04092015Sandeep Patel
 
NEW CV. SANKET APTE (1)
NEW CV. SANKET APTE (1)NEW CV. SANKET APTE (1)
NEW CV. SANKET APTE (1)Sanket Apte
 
PetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for ServicePetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for ServicePetroSync
 
Aramco Certificate Experience
Aramco Certificate ExperienceAramco Certificate Experience
Aramco Certificate ExperienceElias Omer Adam
 
ARAVINTH(CV Aramco Approved)
ARAVINTH(CV Aramco Approved)ARAVINTH(CV Aramco Approved)
ARAVINTH(CV Aramco Approved)Aravinth Jai
 
Complet cv of engineer habibi revet1 -
Complet  cv of engineer habibi revet1 -Complet  cv of engineer habibi revet1 -
Complet cv of engineer habibi revet1 -khanwali habibi
 
Saudi Aramco Heatmap
Saudi Aramco HeatmapSaudi Aramco Heatmap
Saudi Aramco HeatmapAaron Marion
 
Louis Johannes du Plessis CV Electrical Engineer
Louis Johannes du Plessis CV Electrical EngineerLouis Johannes du Plessis CV Electrical Engineer
Louis Johannes du Plessis CV Electrical EngineerLouis du Plessis
 
New base 815 special 24 march 2016
New base 815 special 24 march 2016New base 815 special 24 march 2016
New base 815 special 24 march 2016Khaled Al Awadi
 
Vigil Sitesafe Aramco Sch B system Compliance Document
Vigil Sitesafe Aramco Sch B system Compliance DocumentVigil Sitesafe Aramco Sch B system Compliance Document
Vigil Sitesafe Aramco Sch B system Compliance DocumentNabeel Khan
 
A. zouaghi drilling fluids & waste management engineer cv
A. zouaghi drilling fluids & waste management engineer cvA. zouaghi drilling fluids & waste management engineer cv
A. zouaghi drilling fluids & waste management engineer cvAbderrazak Zouaghi
 
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071Nithy Anantham
 

Viewers also liked (20)

Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
 
Resume Shinemon
Resume ShinemonResume Shinemon
Resume Shinemon
 
Updated cv
Updated cvUpdated cv
Updated cv
 
Inspection engineer ali zeineldein
Inspection engineer   ali zeineldeinInspection engineer   ali zeineldein
Inspection engineer ali zeineldein
 
Resume Sandeep Patel 04092015
Resume  Sandeep Patel 04092015Resume  Sandeep Patel 04092015
Resume Sandeep Patel 04092015
 
NEW CV. SANKET APTE (1)
NEW CV. SANKET APTE (1)NEW CV. SANKET APTE (1)
NEW CV. SANKET APTE (1)
 
B gas painting-multiple-choice-2
B gas painting-multiple-choice-2B gas painting-multiple-choice-2
B gas painting-multiple-choice-2
 
PetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for ServicePetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for Service
 
Aramco Certificate Experience
Aramco Certificate ExperienceAramco Certificate Experience
Aramco Certificate Experience
 
ARAVINTH(CV Aramco Approved)
ARAVINTH(CV Aramco Approved)ARAVINTH(CV Aramco Approved)
ARAVINTH(CV Aramco Approved)
 
saudi aramco (1)
saudi aramco (1)saudi aramco (1)
saudi aramco (1)
 
Complet cv of engineer habibi revet1 -
Complet  cv of engineer habibi revet1 -Complet  cv of engineer habibi revet1 -
Complet cv of engineer habibi revet1 -
 
Saudi Aramco Heatmap
Saudi Aramco HeatmapSaudi Aramco Heatmap
Saudi Aramco Heatmap
 
Louis Johannes du Plessis CV Electrical Engineer
Louis Johannes du Plessis CV Electrical EngineerLouis Johannes du Plessis CV Electrical Engineer
Louis Johannes du Plessis CV Electrical Engineer
 
New base 815 special 24 march 2016
New base 815 special 24 march 2016New base 815 special 24 march 2016
New base 815 special 24 march 2016
 
Vigil Sitesafe Aramco Sch B system Compliance Document
Vigil Sitesafe Aramco Sch B system Compliance DocumentVigil Sitesafe Aramco Sch B system Compliance Document
Vigil Sitesafe Aramco Sch B system Compliance Document
 
A. zouaghi drilling fluids & waste management engineer cv
A. zouaghi drilling fluids & waste management engineer cvA. zouaghi drilling fluids & waste management engineer cv
A. zouaghi drilling fluids & waste management engineer cv
 
Aramco Question
Aramco Question Aramco Question
Aramco Question
 
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
 
Aramco Exp.
Aramco Exp.Aramco Exp.
Aramco Exp.
 

Similar to Shafiq CV

JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)jeyaraj selvaraj
 
Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeIqbal Mohamed
 
sivachandran resume
sivachandran resumesivachandran resume
sivachandran resumesiva karnan
 
CURRICULUM VITAE UPDATED 07.01.17
CURRICULUM VITAE UPDATED 07.01.17 CURRICULUM VITAE UPDATED 07.01.17
CURRICULUM VITAE UPDATED 07.01.17 Ahmed Jaffar
 
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Sanil Balakrishnan
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)asish jana
 
Testing & Commissioning Engineer
Testing & Commissioning EngineerTesting & Commissioning Engineer
Testing & Commissioning EngineerKumaresanT7
 
Byjul rahman cv (updated)
Byjul rahman   cv (updated)Byjul rahman   cv (updated)
Byjul rahman cv (updated)BYJUL RAHMAN
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineerKRISHNAMOORTHY A
 

Similar to Shafiq CV (20)

Cv shafiq
Cv shafiqCv shafiq
Cv shafiq
 
New cv jithesh
New cv jitheshNew cv jithesh
New cv jithesh
 
ANBARASAN R CV
ANBARASAN R CV ANBARASAN R CV
ANBARASAN R CV
 
JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)
 
Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal Resume
 
sivachandran resume
sivachandran resumesivachandran resume
sivachandran resume
 
CURRICULUM VITAE UPDATED 07.01.17
CURRICULUM VITAE UPDATED 07.01.17 CURRICULUM VITAE UPDATED 07.01.17
CURRICULUM VITAE UPDATED 07.01.17
 
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
 
Kumar RESUME
Kumar RESUMEKumar RESUME
Kumar RESUME
 
QA/QC ENGINEER
QA/QC ENGINEERQA/QC ENGINEER
QA/QC ENGINEER
 
Testing & Commissioning Engineer
Testing & Commissioning EngineerTesting & Commissioning Engineer
Testing & Commissioning Engineer
 
Tamil E&I Compex inspector
Tamil E&I Compex  inspectorTamil E&I Compex  inspector
Tamil E&I Compex inspector
 
sathish kannan EEE
sathish kannan EEEsathish kannan EEE
sathish kannan EEE
 
Byjul rahman cv (updated)
Byjul rahman   cv (updated)Byjul rahman   cv (updated)
Byjul rahman cv (updated)
 
Resume
ResumeResume
Resume
 
NAVNATH UPDATED CV
NAVNATH UPDATED CVNAVNATH UPDATED CV
NAVNATH UPDATED CV
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineer
 
pradip updated c v
pradip updated c vpradip updated c v
pradip updated c v
 
QAQC E&I
QAQC E&IQAQC E&I
QAQC E&I
 

Recently uploaded

IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 

Recently uploaded (20)

IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 

Shafiq CV

  • 1. Curriculum Vitae Name/Surname : Muhamed Shafiq Anjum Shafi Date of Birth : August 28, 1981 Nationality : Pakistani Profession : Lead Inspection Engineer E&I / Commissioning Engineer Educational Qualification : BSc Electrical Engineering - (Reg. # 2003-zm-14) BHZU University Multan, Pak DAE Associate Engineering (Electrical) - PBTE/DAE/24611 Lahore, Pak S.S.C (Matriculation) - PBISE/SSC/147670 Multan, Pak Technical Certification / Profile Glance Achievement(s) : Advance Concept in “Quality Engineering” Regst.# 11011 Franklin University, USA CQE (ASQ, Certified Regst.# 65373091 / Cert.# A7481) American Society for Quality, USA Certified Quality Engineer - ASQ Body of Knowledge Cert.# A7481 Chicago Institute of Technology, Abu Dhabi UAE Certified QA/QC Engineer (ACAC Certified Reg.# ACAC803132) Accreditation Council, USA Certified QA/QC Engineer (Ministry of KHDA, Dubai Reg.# KHDA-1998-014-963) Development Institute for Science & Computer, Dubai ISO 9001:2008 QMS - Internal Auditor (Cert.# OMCT 550619102/2015) Orient MCT, Abu Dhabi ISO 9001:2008 QMS - Lead Auditor (IRCA Regst.# AO17561) IRCA Certified, UK ISO 14001:2004 EMS - Lead Auditor (EIMA Regst.# BO1321) EIMA Certified, UK BS OHSAS 18001:2007 - Lead Auditor (IRCA Regst.#) IRCA Certified, UK Certification in Science & Power, Circuits (Royal Charter Certified Cert.# RC/ESCP/282173) City & Guilds of London Institute, Pak AUTO CAD Professional (Reg. # PS/SD/P2A.C/1329) Peak Solutions Institute, Pak Training Courses & Seminars Attended (QATAR, UAE, KSA) :  OFF SHORE-SEA SURVIVAL & HUET (Helicopter under water Escape) Training 2014 from (ETSDC) Emirates Tech Safety Development Centre, Abu Dhabi-UAE  HSE Safety Induction Course (ADMA-Off Shore) ZIRKU, DAS Island Abu Dhabi-UAE  H2S/BA Awareness - VGTC Centre, Qatar  Hazard Effect Management Process (HEMP) KSA  Safety Training Observation Program, Petrofac Abu Dhabi-UAE Operational & Maintenance Training Courses for  132KV, 33KV ‘’GIS’’ Type, HV Switchgears - Schneider Electric  6.6KV ‘’Metal Clad’’, MV Switchgears – Schneider Electric  LV Switch Board, MCC Motor Control Centre - ABB/Siemens/Schneider Electric  DMS, DCS, HMI, PLC (SCADA) - ABB/Honeywell/Schneider Electric  UPS 24Vdc, 110Vdc, 48Vdc & 240Vac) - AEG/Power Solution  DCS “HMI” Modification 800XA System - ABB/Honeywell Driving Licenses : Holding AE-2142409 Driving License Abu Dhabi - Validity up to Dec, 2023 Holding GTSC-62223 Desert Driving License - Validity up to August, 2016 (GTSC, Abu Dhabi) Holding CVT-20267 Defensive Driving Course - Validity up to July, 2016 (CVT, Dubai-UAE) Computer Skills : Ms Office, Adobe Photoshop, Internet Window Xp, Window 98, Window 2000 Summary of Experiences : - - Having around 10.8 years experiences in Middle East Countries (UAE, KSA, Qatar and Pakistan) in the field of Engineering, Construction, Quality and testing expertise being a client representative as Company/TPI/PMC/PMT with well reputed clients, Gasco, Takreer, Adma-Opco, Aegean, Zadco, Al Hosn Gas, Leighton, Gupco-Enppi, KJO, Dolphin Energy, Qatar Petroleum, Qatar Gas, EDT QP Dukhan, PAPCO, OGDC, Lesco/Wapda Pak and Bechtel Arabia KSA. Experienced in various Mega projects in Oil & Gas Industry, Plant Processing Facilities, Oil & Gas Pipeline, Refineries, Water Transmission Pipeline, Infrastructure, Submarine Composite Cables Inspection, Power Transmission lines includes Sub Stations 11/0.433KV to 132KV Systems. Experience and expertise in supervision of Erection, Installation, Pre-Commissioning, Commissioning, Quality Control and Vendor Inspections of LV/MV Electrical & Instrumentation systems includes SCADA Integration, Electronic Control System (ESD/DCS/PLC/ACS/RTU), Port Special Systems, Telecom, LAN, WAN, TNMS, PAGA, CCTV, F&G, FOC and Cathodic Protection systems adept in Engineering Standard, Specification (DGS, DEL, QGPS, TOTAL) & other IEE, IEC, SABIC, QPES, BS Standards.
  • 2. DNVGL/CV/FORMAT/VER-2.0-07/2015/MSA 2 Testing Expertise : - - - - - - - - - - - - - - - - - - - Proficient and well knowledge about Logic, methodology of operational, functional test for following System/Sub Systems, (FAT, IFAT, ISAT, SAT) & PRE COMM., COMMISSIONING Activities) Power Transformers (Up to 120MVA) IR test, Winding Resistance (HV-G, LV-G, HV-LV), Polarization Index test, CT test, Voltage Ratio test, Vector Group test, Magnetizing Current test, BDV test for Oil, Neutral, bushing CT, Mechanical Protection & RTCC Operation tests. HV, MV, LV Switchboard (132kv, 33kv, 11kv, 6.6kv, 3.3kv, 0.433kv) Mechanical Operation test, functional test of HV/LV in Service & test position, Bus Bar Hi Pot, IR, Continuity test, Contact Resistance (µΩ) test, Primary Injection for Ammeter, Voltmeter, Incomer Logic test, Interlocking with AQT, ATS, NCS and DCS system. CT's & VT's test (Metering & Protection) CT test (IR/Winding Resistance/Ratio/Class/ Burden/Polarity/Excitation), VT test (Ratio/Burden/Polarity) by Current and Voltage Injection. Protection Relays test Relay setting, configuration, testing of Electro-mechanical and Microprocessor relays (RD148, MIM200/300, REF630/615, RET, REM, RED) with relay functions of 25, 27, 46, 49, 50, 51, 67, 81, 87 etc. Numerical relays and protection relay system of Sepam Series (20, 40, 80), Differential protection relays" & "MIB30" HID (High Impedance Differential Module), MRL1 Lockout relay, TCP Micro logic relay Series 5.0A & 6.0A and "SR-745" GE TR Management relay, MR Tap Changer "TAPCON 240" HV/LV Circuit Breakers test Breaker Analyzer test, IR test, Contact Resistance, Tripping and closing time test of HV/LV circuit breakers. Hi Pot test for Bus bar, Bus Duct & Cables: DC Hi Pot test of HV cables (3.3kv, 6.6kv, 11kv, 33kv) and AC Hi Pot test, Insulation Resistance test, DC resistance measurement test, Metallic Screen DC resistance test, Capacitance Measurement test & Contact Resistance test of MV/LV Bus bars/Bus duct. Submarine Composite Cables 6.6/11kv Material Receiving & Witnessed test: Non Electric tests; Overall dimension check, Conductor Screen, Inner Layer and Outer Sheath thickness and Serving check, Water Blocking Tape check, Conductor Sheath and Anti-Corrosion Sheath check, Anti-Teredo Protection Test (No of copper tape, copper tape thickness and overlapping check), Inner Sheath / Bedding, Bitumen check, Armour Check and Binder Tape check, Filler, Insulated steel fillers, diameter check over the insulation, steel rope and no of wire check. Electrical test; Power Frequency voltage test withstand 23KV/5minuts, Insulation resistance test after and before of HV test, Conductor DC resistance measurement test, measured the resistance corrected to at temperature @ 20degC, Metallic Screen DC resistance test, Capacitance Measurement test Fibber Optic Cable Test; Non Electric Test, Visual check, overall dimension check, outer Insulation thickness check; Electrical Test; Attenuation @ 1310nm and 1550nm, OTDR (Optical time domain reflector) test, end to end test and Splicing with fusion arc splicer. Sub Stations Energization Stability test of Power transformers and Bus bar; Line differential, Transformer differential protection, End to End test up stream to downstream, Energization of power transformers, MV and LV switchboards. Diesel Generator Sets (5.5kva up to 2500kva) On load/Off load vibration measurements, Alarm & trip logic checks for protection, Transient response load test (0-25% to 100-0%), Noise level Measurement (Alternator & Engine), Alarms & Shutdowns on Engine (Emergency Stop/Diagnostic, Over Speed, Low oil pressure, High coolant temperature test), Painting DFT checks, winding Insulation resistance checks and full load test. UPS’s & "TPR" Invertors and Battery Charger Batteries Charging & Dis-charging test of 24VDC, 110VDC, 48VDC & 240VAC and Invertors protection test (Float charging, Low level, earth Fault, Temperature Limit) etc. Cathodic Protection Controller test, Pipe to Soil, potential measurement swing test, AC interference test & line current measurement at EBB points for U/G, A/G Oil & Gas pipeline. TELECOM/LAN/WAN/TNMS System; System PING test, system Redundancy test, system Interface test, system Optical Signal level test (Optical TX Power & Receive Sensitivity check) CCTV System test; Monitoring test from Operator monitor, Operator Live Viewing Test, Calling Cameras test using digital sentry, Video Playback & Recording Test, Pan / Tilt test. Telephone System; Answering calls test, making calls test, automatic Redialling test, Voice Clarity check test. PA/UHF Radio System; Transmit Power & Frequency Measurement Test, UHF Duplexer test, Radio Voice functionality test, Interface to LAN, TNMS system, Interface to Voice Recording / Dispatcher System, F&G system Interface test. PDH Multiplexer, Ethernet Switches, Media Converter; DM2+ Bit Error Rate Measurement test, Ethernet interface Unit End-To-End test, EPSA Alarm test, Configuration and Traffic verification test, Through-Put test, LC Transceiver Transmit Power, Receiver Sensitivity test.
  • 3. DNVGL/CV/FORMAT/VER-2.0-07/2015/MSA 3 WORKING EXPERIENCE / EMPLOYMENT SCAN Period: April 2013 to till date Company : DNV GL, ABU DHABI UAE Position : Lead Inspection Engineer E&I (Industrial Services Division) Projects : Major Projects, Oil & Gas Middle East ADMA-OPCO: a) +100 MBD Das Island Project (Off Shore) b) Nasr Umm Lulu (Brown & Green Fields) Projects c) Flares Modification Revamp Project, Das Island (Off Shore) d) Crude Oil Loading Facilities Project e) ZWIUP Project (Off Shore) f) DE Mothballing Project g) Zakum West Super Complex (GGII) Project h) CTU Treatment Unit Modification Project i) SARB Island Package-6 Project, EPC Work For Drills Camp and Associated Utilities ZADCO: a) Satah Full Field Development (STFFD) Project b) Thammama ll-Wad Phase-1 Gas Injection Project c) EPC of work for black Powder Filtration System Project d) Upper Zakum 750k, Accommodation & Utilities Project GASCO: a) HABSHAN-5 Sulphur Granulation Plant b) 4TH NGL Train & IGD Tank-Ages Project DOLPHIN ENERGY: a) Export Gas Compression Facilities Upgrade Project b) 48’’ Taweelah to Fujairah Down Stream Gas Pipeline Project c) Third Party Gas Interconnecting Faculties Upgrade, Qatar d) Ras Laffan Treatment Plant Unit 131 Diesel Train, Qatar AL HOSN GAS: a) EPC Package SGD-11 Project b) EPC Package SGD NP-10 Project MALAYSIA/LEIGHTON OFF SHORE: a) S432, South Oil Sea line Project ENPPI/GUPCO KSA: a) GUPCO Rehabilitation Project KOC/KUWAIT OIL COMPANY: a) EPC of Supply, Erection, Operation, Maintenance of Gas Turbine to Up Grade Power Capacity At Sabia & Az Zour Power Plant Projects b) EPC of Effluent Water Disposal System at GC-15 ,GC-25 and Injection pump at CIPF/N QATAR PETROLEUM: a) EPIC of 16” JET A1 Fuel Pipeline Project b) Offshore National Security Shield, Qatar c) QSTec Polysilicon Project Phase-1, Qatar d) EPIC of New CIB 33/11kv PDS Halul Island Project (Off Shore) e) EPIC of Anti surge & Turbine Controls Upgrade @ KN, KM, JDS & RG Project f) EPIC of Integrated Chiller, Freezer, Laundry, Dining & Accommodation Facilities In Halul g) EPIC of Online Condition Monitoring System for Rotating Equipment Dukhan fields, Qatar h) EPIC for Gas Supply to Ras Abu Fontas (RAF) Power Station-W2, Qatar i) EPIC for Forward Mounted Base (FMB, NSS) Qatar j) Doha South Sewage Treatment Works 40 MID Expansion
  • 4. DNVGL/CV/FORMAT/VER-2.0-07/2015/MSA 4 Job Responsibilities :  Review and develop QA/QC Procedures and Quality Inspection Plan for all E&I work activities includes Vendor inspections, material visual Inspection, FAT, IFAT, Calibration checks, Packing, Marking, Issuance of inspection report and shipping released etc.  Do witnessing test of HV, LV, MV and Fiber Optic Cables, MV, LV Switchgears, DBs, JBs, Fire Alarm Control Panels, Pressure Gauges and Transmitters Instruments including materials as per approved ITP, FAT, IFAT procedure and QP Plans.  Do witnessing the loop sale, Interlocks functional test and ensure that all requirements in specified procedure and narratives are being established.  Designing and developing new control systems and maintaining and modifying existing systems to ensure that these systems and processes operate effectively and safely carry out site acceptance testing and the commissioning.  Review ITPs to verify that Execution Contractor is performing all required inspections and witnessing hold points, review Company Inspectors deliverables, analysis, resolve issues and problems emerging during the Quality control activity and ensure that all inspections and tests witnessed by Company Inspectors are recorded and documented. o FAT of “500KVA-120MVA” Power Transformers at Siemens/Brush/Emirates Transformer o FAT of MV/LV Switchgears at ABB/Siemens/Schneider-Electric o FAT of 415V LV Switchboards at ABB/Siemens/Eaton/Al-Dafir/Masseera o FAT of HVAC Control panels at Prisma/Honeywell/York o FAT of Variable Speed Drive System at Emerson/Siemens/Schneider Electric o FAT of HG7-Passive Harmonic Filter System at L&T Automation FZE o FAT of Drive-Applied Passive Harmonic Filter system at Proserv o FAT of PFC (Power Factor Capacitor) and Active Harmonic Filter System at Eaton/Proserv o FAT of MV, LV, Control & Instrument cables at MESC Rak/Ducab, Dubai/Musaffah o IFAT of Control Systems (PLC/DCS/SCADA) at ABB/Yokogawa/Honeywell/Silvertech o IFAT of DCS “HMI” Modification 800XA system at ABB/Silvertech/Honeywell o IFAT of “PEMS” Predictive Emission Monitoring system at Yokogawa/Honeywell o FAT of FACP, HSSD, VESDA F&G System and Detectors at TYCO/NAFCO/Zeener ZLC o FAT of CCTV & Security Control System at TYCO/Honeywell/3W Network o IFAT of LAN, WAN, PAGA, ACS, PA/UHF Radio and Telecom systems at ABB/3W Network o FAT of Diesel Generator (Rated up to 2800kva) at Caterpillar-Al Bahar/FG Wilson/Perkins o Cathodic Protection System Inspection at AEGIS/Bss-tech o Inspection of Ex’e/Ex’d Explosion Proof JB & PJB at Weidmuller/Walsall/Cooper/Bartech o FAT for Inergin System, Chemical Injection skid, Electro-Chlorination Skids, Condensate & NGL Shipping Metering Skid Packages at Proserv/Tyco/MISWACO/FMC o Safety Relief Valves, Hydrolytic/Pneumatic actuators visual, function test & Bench Calibration test at Proserv/Emerson/Adyard/NPCC o Accommodation module, Electrical Rooms (KAAOT & ABOT for S432-Sealine Project South Oil Company, Leighton Offshore) and Electrical System Containers Installation as per Zone-II Classification for Accommodation & Utilities, Zirku Island Pressurization, Electrical, F&G system, HVAC systems installation and start up test at Specialist Services/WBG/AL JABER o Performed and witnessed the Powering up test for Accommodation Module Start-up test, Purging the Accommodation Module, CPFG Start-up test, Powering up the Cabin utilities and Main Distribution Board system, Powering up of HVAC system, Fire & Gas Detection System. o FAT of Wellhead Control Panel, Local Gauge Control Panel & Emergency Shutdown System with combination of standard Pneumatic and Hydraulic/PLC based logic in a single integrated solution such as Single/Multiple WHCP controls for both onshore and offshore applications at Proserv/Versatech. o FAT of Modular Multi-Wellhead control system, PLC Based Wellhead control system, as Instrumented Protective System (IPS) for Wellhead valves Open/Close sequence, Control, Operation and shutdown safety requirements & to meet high degree of Reliability, functionality Integrity of the system at Proserv/Silvertech/Versatech. o FAT for Contacting/Retractable, pH Sensor/Total Chlorine Sensor and Analyzer system, ABB Analyzer Houses/Shelters, Solar System, CPIC at AIMS/Emerson/Versatech. Period: May 2011 to Feb 13 Company : MOODY INTERTEK, ABU DHABI UAE Position : Electrical TPI/GASCO “PMT” Project : a). 4th NGL Train & IGD Tankages Project b). SWI-3, Seawater Intake-3 Project
  • 5. DNVGL/CV/FORMAT/VER-2.0-07/2015/MSA 5 Job Responsibilities :  Site job execution, Interacting with vendors, Coordination with inspectors, attending walk downs for RFC, RFSU, Issuance, clearing punch points, pre mechanical completion of systems and witness the HV, MV, LV Power distribution systems pre-comm., commissioning and start up activities.  Review construction drawings IFC, AFC, P&ID diagrams, hook-up, Interconnection diagram, typical installation details, loop, logic diagram, Cause & effect and participate in the demonstration handover and acceptance of the system with operations group.  Responsible for installation inspections of equipment, Power Transformers (up to 20MVA) and MV, LV Switchgears, SB & MCC control panels, HVAC (MCC) Unit, DCS System, RTU System, NCS System cabinet, Junction Boxes, Marshalling boxes, Motors & Compressors, UPS’s & "TPR" Battery chargers, Lighting & Small power system, Earthing, Heat Tracing & Lightning system.  Installation inspection and functional test for Diesel Generator sets (7.5kva up to 10kva).  Installation, Inspection and functionality test for Modular Multi-Wellhead control system / PLC Based Wellhead control system, as Instrumented Protective System (IPS) for Wellhead valves OPEN/CLOSE sequence, Control, Operation and shutdown safety requirements.  Installation, Inspection and Surveillance for all metallic equipment’s & Structures in seawater “stop logs, Raking bar screens, travelling band screens, Pump body” and ensure that are protected by impressed current Cathodic Protection system.  Installation, Inspection and testing for electrode and ensure that each part of the zone shall be monitored by reference electrode and shall be positioned such that all the surfaces are covered within each structure and Test for MMO (Mixed Metal Oxide, Platinum) probe type anodes, ensure the continuity with connector bars. Period: Aug 2010 to May 2011 Company : VELOSI LLC, ABU DHABI UAE Position : Sr. QC Inspector E&I - TPI/Dolphin Energy Project : a). 48’’x243km, Taweelah to Fujairah down Stream Gas Pipeline Job Responsibilities :  Ensured that all activities assigned compliance with DEL project Spec's and during inspections follows the IFC, AFC, P&ID, hook-up, typical installation details, logic diagram, Cause & effect diagrams and QC procedures, Inspection plans and carried out as per planned schedule to achieve on target dates.  Responsible to review contractor submittals ITP, QCP, QCF, MST, related QC documents and make ensure that all Inspections being carried out as per approved documents.  Responsible for installation inspections, testing of LV Switchgear, 415V motor control center, RMU units, power transformers, distribution boards, Solar system, power, control, Instrumentation cables laying, glanding, termination, HVAC & Earthing system, Lightning protection system.  Involved in swing potential test and Natural potential survey for underground gas pipeline.  Supervised, witnessed CIP & DCVG (DC voltage gradient) Survey for 48’' U/G gas pipeline.  Installation of MMO Piggy back anode, Mg Anode, Big Fink, CMTP, CTP, PCR, AJB, NJB, STP, CPTR, EBB, Zinc ribbon anode, Surge Diverters, Pin Brazing welding.  Material Receiving & Witnessed test for Submarine Composite Cables 6.6/11kv, Overall dimension check, Conductor Screen, Inner Layer and Outer Sheath thickness and Serving check, Water Blocking Tape check, Conductor Sheath and Anti-Corrosion Sheath check, Anti-Teredo Protection Test (No of copper tape, copper tape thickness and overlapping check), Inner Sheath / Bedding, Bitumen check, Armour Check and Binder Tape check, Filler, Insulated steel fillers, diameter check over the insulation, steel rope and no of wire check.  Performed and witnessed Power Frequency voltage test withstand 23KV/5minuts, Insulation resistance test after and before of HV test, Conductor DC resistance measurement test, measured the resistance corrected to at temperature @ 20degC, Metallic Screen DC resistance test, Capacitance Measurement test  Fibber Optic Cable Test; Non Electric Test, Visual check, overall dimension check, outer Insulation thickness check.  Witnessed attenuation test 1310nm and 1550nm, OTDR (Optical time domain reflector) test, end to end test and Splicing with fusion arc splicer. Period: July 2008 to Company : TEKFEN CONSTRUCTION Co. QATAR Position : QA/QC Engineer E&I
  • 6. DNVGL/CV/FORMAT/VER-2.0-07/2015/MSA 6 Aug 2010 Projects : a). GTC06/190/ED 20’’x81km, A/G Crude Oil pipeline Umm-bab to Um-Messaieed tank farm b). GTC05/124/ED 24’’/20”x120km, U/G Ras Laffan to Messaieed Gas transmission line c). GTC05/124/ED VTC#2 6’’x32km, U/G LPG Messaieed Refinery to Doha bottling Plant Job Responsibilities :  Responsible to conduct Installation inspections, surveillance, testing, mechanical completion on following systems, power transformers (Up to 12.5/10 MVA), 33/11kv GIS (GM6), 6.6kv (Metal Clad) Switchgears, SB, MCC control panels, JB, marshalling boxes, RCU, UCP, Motors, Diesel Generator (Rated 10KVA), Nitrogen Generators (5.5kva), RTU system, Heat tracing system, Ethane Gas compressors including lube Oil & Fin Fan coolers system, FOC & telecom system, UPS’s & "TPR" Battery chargers, lighting, Earthing & Lightning.  Control Valve, GLV, BFV, BD, MOV, ESD Valves and Magnetic Flow, Ultrasonic & Orifice Flow meters, FT, PT, Transmitters, Gauge Control panel as well as other measuring Instruments.  Responsible for Inspections field work according with ITP, generating punch lists, making final inspection reports for various E & I works, loop folder preparation.  Executes the specific, critical inspections on materials, equipment, construction, installation activities on site, Inspection of Incoming materials, vendor package receiving  Review of vender documents, test procedure, IRC certificates, operating manuals, design book, engineering data book in accordance with the project design basis and specification. Period: Oct 2007 to July 2008 Company : SAUDI BIN LADIN - PIC DIVISION, KSA Position : QC Inspector Electrical Project : a). PPLC; Product Pipe Line Corridor Phase-I Job Responsibilities :  Contract job order review, preparation of Job quality plan and preparation of project specific procedures, work instructions, QC procedures and method of statement, check lists, calibration sheets and QC plans as required.  Participated in creation, Implementation of project quality plans, procedures, work Instructions, quality records, punch lists and compilation of test packs.  Verified compliance of performance output, identification of non-conformances for corrective action and issue of NCRs whenever required.  Responsible for Inspections field work according with ITP, generating punch lists, making final inspection reports for various E&I works, loop folder preparation.  Equipment testing for LV & HV switchboards like CT, PT, MV drop, bus ducts and electro mechanical relays, breakers, feeder differential and simulation tests.  Installation & testing of F&G system including detectors GDT's, FDI's, HD, SD, HSSD, FACP, Inergen and MCL alarming system according to cause & effect matrix.  Worked on Communication systems (CCTV, PAGA, Data, Voice), Analyzers, Compressor Skids, Pump Motor Controls, Machine Control Monitoring System (MCMS), Monitoring System (CEMS), Catalyst & Spent Caustic treatment skids.  Possesses sound command on Pneumatic & Electronic Instruments, Differential Pressure, Level, Temperature, Flow Transmitters, Control Valves, Pressure, Temperature, Flow & Level Switches, Turbine, Magnetic & Vortex flow meter. Period: Feb 2001 to July 2003 Company : LESCO/WAPDA - (GSC) Division, PAK Position : Line Superintendent Const. Grade-I Project : a) 132/33/11kv Sub Stations, HT/LT Transmission lines & Electricity
  • 7. DNVGL/CV/FORMAT/VER-2.0-07/2015/MSA 7 Job Responsibilities :  Responsible for end to end line feeder planning and execution, Erection of HT/LT 132kv, 33kv and 11kv transmission lines and distribution system works.  Handling the project estimation, monitoring, execution of overhead, underground transmission HT/LT line as per Project requirement.  Marking the substation layout and foundation marking of Substation equipment’s like GA, LA, Isolator, CVT, CT, breakers, post insulators, power transformer, and tower gantries, light mask, cable trench, ear thing, lighting system etc.  Responsible and supervision for laying, termination of HV, MV, LV and control cables from SWGR, Control Panels end to field equipment’s like Power Transformers, Current Transformers (CT’s), Voltage Transformers (VT’s), Motor Operated Isolators, Capacitor Bank, Capacitor bank Reactors, Capacitor voltage Transformer and MCCB Breakers.  Supervised Erection & Start up, Control Auxiliaries for Heavy-duty Gas Turbine Generators (Rated 1.1 to 22.4MW), 13.8/11kv Vacuum, 33kv GIS, 6.6kv Metal Clad switchgear, 415V LV MCC’s, PCC’s and power transformers.  Responsible for replacing the old ASEA distance relays with new numerical line differential & distance relays.