CONSTRUCTION OF A WASTEWATER
POST TREATMENT PLANT AND ITS
ASSOCIATED CARRIER PIPELINE IN
NORTH MAWASI RAFAH
AHMED AJJOUR
GENERAL PLAN FOR TREATMENT PLANTS
TREATMENT PLANT COMPONENTS:
1. RAW WATER SUPPLY POND
2. SAND FILTERS
3. COLLECTION PONDS
4. PUMP STATION (WET WELL)
5. ELECTRICITY ROOM
6. ACCESSIBILITY ROADS
7. WATER NETWORKS
1. RAW WATER SUPPLY POND
TOTAL CAPACITY : 2600 M3
SUPPLY SOURCE: RAW-PRIMARY TREATED
WATER FROM RAFAH WASTE WATER
TREATMENT PLANT.
NUMBER: 1
SIDES SLOPE 1:2
BED AND SIDES : GEO-MEMBRANE SHEET
INLET: ENERGY BREAKER OUTLET: 3 MANHOLES
1. RAW WATER SUPPLY POND
2. SAND FILTERS
NUMBER: 6
SUPPLY SOURCE: RAW WATER SUPPLY POND
AVERAGE SIZE: 12X20X2.5
SIDES SLOPE: 1:2
SIDES AND BED: CONCRETE
LAYERS: GRAVEL LAYER, SAND LAYER &
FREEBOARD WATER LAYER
2. SAND FILTERS
3. COLLECTION POND
NUMBER: 1
SUPPLY SOURCE: SAND FILTERS
CAPACITY : 3600 M3
SIDES SLOPE: 1:2
SIDES AND BED: GEO-MEMBRANE
OUTLET: PUMP WET PIT
3. COLLECTION POND
4. PUMP WET PIT
NUMBER: 2
ROOM NO.1 : TREATED WATER
ROOM NO.2 : OVERFLOW WATER
4. PUMP WET PIT
5. ELECTRICITY ROOM
ELECTRICAL ROOM CONTAINS ALL CONTROL PANELS
AND SIGNAL BOARDS FOR THE INSTALLED PUMPS &
VALVES.
6. ACCESSIBILITY ROADS
NUMBER: 2X5M WIDE & 1X8M WIDE
PAVEMENT TYPE 1 : INTERLOCK TILES
PAVEMENT TYPE 2 : BASECOARSE
6. ACCESSIBILTY ROADS
7. WATER NETWORKS
1. RAW WATER NETWORK (HDPE)
2. TREATED WATER NETWORK (HDPE)
3. OVERFLOW WATER NETWORK (UPVC)
4. WATER TRANSFER LINE FROM WET PIT TO
MAWASI AREA
7. WATER NETWORKS
7. WATER NETWORKS
7. WATER NETWORKS
7. WATER NETWORKS - MANHOLES
7. WATER NETWORKS - MANHOLES
THANK
YOU

More Related Content

What's hot

Rivers: lifelines of human civilization
Rivers: lifelines of human civilizationRivers: lifelines of human civilization
Rivers: lifelines of human civilization
nisargsmart
 
Real time decision support system krishna and upper bhima river basin system ...
Real time decision support system krishna and upper bhima river basin system ...Real time decision support system krishna and upper bhima river basin system ...
Real time decision support system krishna and upper bhima river basin system ...
HydrologyWebsite
 

What's hot (14)

Lyapichev. Problems of initial construction of Rogun dam & HPP
Lyapichev. Problems of initial construction of Rogun dam & HPPLyapichev. Problems of initial construction of Rogun dam & HPP
Lyapichev. Problems of initial construction of Rogun dam & HPP
 
Osmotic power generation
Osmotic power generationOsmotic power generation
Osmotic power generation
 
Rivers: lifelines of human civilization
Rivers: lifelines of human civilizationRivers: lifelines of human civilization
Rivers: lifelines of human civilization
 
Human management of water
Human management of waterHuman management of water
Human management of water
 
Irrigation system of pakistan
Irrigation system of pakistan Irrigation system of pakistan
Irrigation system of pakistan
 
Dam It
Dam ItDam It
Dam It
 
Real time decision support system krishna and upper bhima river basin system ...
Real time decision support system krishna and upper bhima river basin system ...Real time decision support system krishna and upper bhima river basin system ...
Real time decision support system krishna and upper bhima river basin system ...
 
dam
damdam
dam
 
Sugar Creek PS
Sugar Creek PSSugar Creek PS
Sugar Creek PS
 
Irrigation system of Pakistan
Irrigation system of PakistanIrrigation system of Pakistan
Irrigation system of Pakistan
 
A comparative study on river hydrokinetic turbines blade profiles
A comparative study on river hydrokinetic turbines blade profilesA comparative study on river hydrokinetic turbines blade profiles
A comparative study on river hydrokinetic turbines blade profiles
 
Asaduzzaman
AsaduzzamanAsaduzzaman
Asaduzzaman
 
Omotic
OmoticOmotic
Omotic
 
Irrigation System Of Pakistan
Irrigation System Of PakistanIrrigation System Of Pakistan
Irrigation System Of Pakistan
 

Similar to The construction of a wastewater post treatment plant

Use it or loose it. The value of urban stormwater in cooling our cities
Use it or loose it. The value of urban stormwater in cooling our citiesUse it or loose it. The value of urban stormwater in cooling our cities
Use it or loose it. The value of urban stormwater in cooling our cities
Martin O'Dea
 
Final 5th Year Project Defense 2015
Final 5th Year Project Defense 2015Final 5th Year Project Defense 2015
Final 5th Year Project Defense 2015
lydia wayua
 
Goa evaluation of downstream consequences of ground water development at vern...
Goa evaluation of downstream consequences of ground water development at vern...Goa evaluation of downstream consequences of ground water development at vern...
Goa evaluation of downstream consequences of ground water development at vern...
hydrologywebsite1
 
Report of Sardar Sarovar Hydro Power Plant
Report of Sardar Sarovar Hydro Power Plant Report of Sardar Sarovar Hydro Power Plant
Report of Sardar Sarovar Hydro Power Plant
Sheel Shah
 
Civil v-hydrology and irrigation engineering [10 cv55]-notes
Civil v-hydrology and irrigation engineering [10 cv55]-notesCivil v-hydrology and irrigation engineering [10 cv55]-notes
Civil v-hydrology and irrigation engineering [10 cv55]-notes
Suryenn Edwie Mon
 
Dam Removal and Stream Restoration
Dam Removal and Stream RestorationDam Removal and Stream Restoration
Dam Removal and Stream Restoration
kylejanco
 

Similar to The construction of a wastewater post treatment plant (20)

DSD-SEA 2018 RIBASIM Applied For Subak Irrigation Schemes In Yeh Ho River Bas...
DSD-SEA 2018 RIBASIM Applied For Subak Irrigation Schemes In Yeh Ho River Bas...DSD-SEA 2018 RIBASIM Applied For Subak Irrigation Schemes In Yeh Ho River Bas...
DSD-SEA 2018 RIBASIM Applied For Subak Irrigation Schemes In Yeh Ho River Bas...
 
Use it or loose it. The value of urban stormwater in cooling our cities
Use it or loose it. The value of urban stormwater in cooling our citiesUse it or loose it. The value of urban stormwater in cooling our cities
Use it or loose it. The value of urban stormwater in cooling our cities
 
Final 5th Year Project Defense 2015
Final 5th Year Project Defense 2015Final 5th Year Project Defense 2015
Final 5th Year Project Defense 2015
 
Goa evaluation of downstream consequences of ground water development at vern...
Goa evaluation of downstream consequences of ground water development at vern...Goa evaluation of downstream consequences of ground water development at vern...
Goa evaluation of downstream consequences of ground water development at vern...
 
Scope of reuse of sewage for baroda city
Scope of reuse of sewage for baroda cityScope of reuse of sewage for baroda city
Scope of reuse of sewage for baroda city
 
Lake Haramaya Groundwater Recharge Report
Lake Haramaya Groundwater Recharge ReportLake Haramaya Groundwater Recharge Report
Lake Haramaya Groundwater Recharge Report
 
Report of Sardar Sarovar Hydro Power Plant
Report of Sardar Sarovar Hydro Power Plant Report of Sardar Sarovar Hydro Power Plant
Report of Sardar Sarovar Hydro Power Plant
 
Irrigation(Water Resource Engineering).pdf
Irrigation(Water Resource Engineering).pdfIrrigation(Water Resource Engineering).pdf
Irrigation(Water Resource Engineering).pdf
 
final animation
final animationfinal animation
final animation
 
H0372040043
H0372040043H0372040043
H0372040043
 
Planning of irrigation system
Planning of irrigation systemPlanning of irrigation system
Planning of irrigation system
 
Layout of drip irrigation system
Layout of drip irrigation systemLayout of drip irrigation system
Layout of drip irrigation system
 
Civil v-hydrology and irrigation engineering [10 cv55]-notes
Civil v-hydrology and irrigation engineering [10 cv55]-notesCivil v-hydrology and irrigation engineering [10 cv55]-notes
Civil v-hydrology and irrigation engineering [10 cv55]-notes
 
Wsse
WsseWsse
Wsse
 
Aranya wua
Aranya wuaAranya wua
Aranya wua
 
Types of Drip Irrigation and Design Data Requirement
Types of Drip Irrigation and Design Data RequirementTypes of Drip Irrigation and Design Data Requirement
Types of Drip Irrigation and Design Data Requirement
 
Dam Removal and Stream Restoration
Dam Removal and Stream RestorationDam Removal and Stream Restoration
Dam Removal and Stream Restoration
 
Study of parameters requiried for quanitification of
Study of parameters requiried for quanitification ofStudy of parameters requiried for quanitification of
Study of parameters requiried for quanitification of
 
INDTECH Final Research Paper
INDTECH Final Research PaperINDTECH Final Research Paper
INDTECH Final Research Paper
 
Margaret River Water Recycling Water Balance and Cost Benefit Analysis
Margaret River Water Recycling Water Balance and Cost Benefit AnalysisMargaret River Water Recycling Water Balance and Cost Benefit Analysis
Margaret River Water Recycling Water Balance and Cost Benefit Analysis
 

Recently uploaded

21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
rahulmanepalli02
 
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
c3384a92eb32
 

Recently uploaded (20)

5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
 
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
 
Adsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptAdsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) ppt
 
Working Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfWorking Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdf
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...
 
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailing
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Students
 
Databricks Generative AI Fundamentals .pdf
Databricks Generative AI Fundamentals  .pdfDatabricks Generative AI Fundamentals  .pdf
Databricks Generative AI Fundamentals .pdf
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata Model
 
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and ToolsMaximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility Applications
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
 
Presentation on Slab, Beam, Column, and Foundation/Footing
Presentation on Slab,  Beam, Column, and Foundation/FootingPresentation on Slab,  Beam, Column, and Foundation/Footing
Presentation on Slab, Beam, Column, and Foundation/Footing
 
Introduction-to- Metrology and Quality.pptx
Introduction-to- Metrology and Quality.pptxIntroduction-to- Metrology and Quality.pptx
Introduction-to- Metrology and Quality.pptx
 
Artificial Intelligence in due diligence
Artificial Intelligence in due diligenceArtificial Intelligence in due diligence
Artificial Intelligence in due diligence
 

The construction of a wastewater post treatment plant