The document summarizes plans for the removal of Bunker Pond Dam and restoration of the stream. It provides background on the dam's construction in 1865 and deterioration over time. Removal is proposed rather than rehabilitation due to flooding risks and lack of funding for repairs. Removal is estimated to cost $180,000 and would improve habitat and allow fish passage on the Lamprey River. Sediment testing was conducted and a deconstruction plan created involving draining, concrete removal, and bank stabilization. Stream restoration designs include rock structures and plantings to reduce erosion.