The company Salini undertook to build the Rogun Dam (Lot No. 2), but not to build the Rogun HPP
with the installation of its equipment. For construction of HPP and hydraulic structures on the left
and right banks, it is still necessary to find a general contractor before October 2016, otherwise
Salini does not undertake to fulfill its obligations to build the dam.
For safety of the Rogun dam the closure of the Vakhsh river by the end of October 2016 according
to the recommendations of the World Bank is to be carried out only if the following guarantees will
be fulfilled: 1 - construction of the upstream coffer dam before May 2017; 2 - accident-free flood
passage in May 2017; 3 - construction of diversion tunnel No. 3 (2 km long), which now is ready
only for 25% and can be completely constructed no earlier than in two years; 4 - construction of
open sections of tunnels passing through the Vakhsh river channel.
The highest dam in the world is under construction in the zone of tectonic fault with high seismicity
on huge salt layer. In this regard the Rogun project, based on engineering solutions and standards
of the 60s years of the last century, causes justified questions and objective concerns. In fact, the
Rogun HHP is an old and unfeasible project.
Assurances of Tajikistan that Rogun project is beneficial for the countries lying downstream of the
Amu Darya and the Syr Darya revers cause proper doubts and unrealistic. The creation of large
Rogun reservoir will cause huge damage to these countries, undermine the ecological balance in
this region, which is already disturbed due to the shallowing of the Aral Sea.
The new president of Uzbekistan continues to sharply object to the construction of the Rogun HPP.
Tajikistan's willing to build the Rogun HPP on transboundary rivers causes a legitimate concern in
Uzbekistan. Construction of Rogun dam without complex assessment of the project's impact on the
regime of the Amu Darya river and all environmental factors appears to be a dangerous solution.
Another important argument against construction of Rogun HPP is the increased melting of glaciers
in the Tien Shan mountains caused by the climate warming, which leads to an increase in the runoff
of the rivers they feed, and the area of the glaciers themselves, which in the future will lead to a
reduction in runoff. By 2040 the area of glaciers in Central Asia will be reduced by 80% and
accordingly the river run-off will decrease by 25-30%. Salt from the bottom of the Aral Sea by wind
currents shifts towards mountain ridges, settles on glaciers and accelerates their melting. This most
important factor was ignored during development of Rogun HPP. The installed capacity of the HPP
was established in the 1960s under different climatic conditions and has not been revised to date,
taking into account radically new hydrological data.

More Related Content

What's hot

Ataturk dam report
Ataturk dam report Ataturk dam report
Ataturk dam report
Narasimha Rao
 
Pakistan Flood Control System
Pakistan Flood Control SystemPakistan Flood Control System
Pakistan Flood Control System
grandestrategy
 
Sorrels 945 am tuesday ccw
Sorrels 945 am tuesday ccwSorrels 945 am tuesday ccw
Sorrels 945 am tuesday ccw
Clean Water
 
Inter Linking of Rivers_Shripad, Manthan Adhyayan Kendra_July 16,2014
Inter Linking of Rivers_Shripad, Manthan Adhyayan Kendra_July 16,2014Inter Linking of Rivers_Shripad, Manthan Adhyayan Kendra_July 16,2014
Inter Linking of Rivers_Shripad, Manthan Adhyayan Kendra_July 16,2014
India Water Portal
 
LINKING OF RIVERS IN INDIA
LINKING OF RIVERS IN INDIALINKING OF RIVERS IN INDIA
LINKING OF RIVERS IN INDIA
Narendrareddy123
 
Moses bridge
Moses bridgeMoses bridge
Moses bridge
Self-Employed
 
Water valuation, benefits and trade off after resettlement
Water valuation, benefits and trade off after resettlementWater valuation, benefits and trade off after resettlement
Water valuation, benefits and trade off after resettlement
CPWF Mekong
 
Circular waterway project
Circular waterway projectCircular waterway project
Circular waterway project
WRE Forum
 
Mtkvari
MtkvariMtkvari
Mtkvari
REVERS
 
Interlinking of rivers
Interlinking of riversInterlinking of rivers
Interlinking of rivers
Ashwath Sriram
 
Inter linking of river in india...
Inter linking of river in india...Inter linking of river in india...
Inter linking of river in india...
Puspendu Samanta
 
Mithi river pollution pptx.
Mithi river pollution pptx.Mithi river pollution pptx.
Mithi river pollution pptx.
mali yogesh kumar
 
OPERATION FOCUS-PERM
OPERATION FOCUS-PERMOPERATION FOCUS-PERM
OPERATION FOCUS-PERM
Robert Pell
 
MAUI - IAO STREAM (WAILUKU WATER CO) - County of Maui and US Army Corps of En...
MAUI - IAO STREAM (WAILUKU WATER CO) - County of Maui and US Army Corps of En...MAUI - IAO STREAM (WAILUKU WATER CO) - County of Maui and US Army Corps of En...
MAUI - IAO STREAM (WAILUKU WATER CO) - County of Maui and US Army Corps of En...
Clifton M. Hasegawa & Associates, LLC
 
Interlinking of rivers (NRLP)
Interlinking of rivers (NRLP)Interlinking of rivers (NRLP)
Interlinking of rivers (NRLP)
chitikeshi omprakash
 
Comments on NWDA's (National Water Development Authority) methodology of ILR ...
Comments on NWDA's (National Water Development Authority) methodology of ILR ...Comments on NWDA's (National Water Development Authority) methodology of ILR ...
Comments on NWDA's (National Water Development Authority) methodology of ILR ...
Shivu P
 
irrigation systems
irrigation systems irrigation systems
irrigation systems
shahroze123
 
INTERLINKING OF RIVERS
INTERLINKING OF             RIVERSINTERLINKING OF             RIVERS
INTERLINKING OF RIVERS
chitikeshi omprakash
 
Water resources of pakistan
Water resources of pakistanWater resources of pakistan
Water resources of pakistan
Alvina Raza
 
INTER-BASIN WATER TRANSFER – Is THIS a solution for water scarcity?
INTER-BASIN WATER TRANSFER – Is THIS a solution for water scarcity?INTER-BASIN WATER TRANSFER – Is THIS a solution for water scarcity?
INTER-BASIN WATER TRANSFER – Is THIS a solution for water scarcity?
International Water Management Institute (IWMI)
 

What's hot (20)

Ataturk dam report
Ataturk dam report Ataturk dam report
Ataturk dam report
 
Pakistan Flood Control System
Pakistan Flood Control SystemPakistan Flood Control System
Pakistan Flood Control System
 
Sorrels 945 am tuesday ccw
Sorrels 945 am tuesday ccwSorrels 945 am tuesday ccw
Sorrels 945 am tuesday ccw
 
Inter Linking of Rivers_Shripad, Manthan Adhyayan Kendra_July 16,2014
Inter Linking of Rivers_Shripad, Manthan Adhyayan Kendra_July 16,2014Inter Linking of Rivers_Shripad, Manthan Adhyayan Kendra_July 16,2014
Inter Linking of Rivers_Shripad, Manthan Adhyayan Kendra_July 16,2014
 
LINKING OF RIVERS IN INDIA
LINKING OF RIVERS IN INDIALINKING OF RIVERS IN INDIA
LINKING OF RIVERS IN INDIA
 
Moses bridge
Moses bridgeMoses bridge
Moses bridge
 
Water valuation, benefits and trade off after resettlement
Water valuation, benefits and trade off after resettlementWater valuation, benefits and trade off after resettlement
Water valuation, benefits and trade off after resettlement
 
Circular waterway project
Circular waterway projectCircular waterway project
Circular waterway project
 
Mtkvari
MtkvariMtkvari
Mtkvari
 
Interlinking of rivers
Interlinking of riversInterlinking of rivers
Interlinking of rivers
 
Inter linking of river in india...
Inter linking of river in india...Inter linking of river in india...
Inter linking of river in india...
 
Mithi river pollution pptx.
Mithi river pollution pptx.Mithi river pollution pptx.
Mithi river pollution pptx.
 
OPERATION FOCUS-PERM
OPERATION FOCUS-PERMOPERATION FOCUS-PERM
OPERATION FOCUS-PERM
 
MAUI - IAO STREAM (WAILUKU WATER CO) - County of Maui and US Army Corps of En...
MAUI - IAO STREAM (WAILUKU WATER CO) - County of Maui and US Army Corps of En...MAUI - IAO STREAM (WAILUKU WATER CO) - County of Maui and US Army Corps of En...
MAUI - IAO STREAM (WAILUKU WATER CO) - County of Maui and US Army Corps of En...
 
Interlinking of rivers (NRLP)
Interlinking of rivers (NRLP)Interlinking of rivers (NRLP)
Interlinking of rivers (NRLP)
 
Comments on NWDA's (National Water Development Authority) methodology of ILR ...
Comments on NWDA's (National Water Development Authority) methodology of ILR ...Comments on NWDA's (National Water Development Authority) methodology of ILR ...
Comments on NWDA's (National Water Development Authority) methodology of ILR ...
 
irrigation systems
irrigation systems irrigation systems
irrigation systems
 
INTERLINKING OF RIVERS
INTERLINKING OF             RIVERSINTERLINKING OF             RIVERS
INTERLINKING OF RIVERS
 
Water resources of pakistan
Water resources of pakistanWater resources of pakistan
Water resources of pakistan
 
INTER-BASIN WATER TRANSFER – Is THIS a solution for water scarcity?
INTER-BASIN WATER TRANSFER – Is THIS a solution for water scarcity?INTER-BASIN WATER TRANSFER – Is THIS a solution for water scarcity?
INTER-BASIN WATER TRANSFER – Is THIS a solution for water scarcity?
 

More from Yury Lyapichev

Lyapichev Yury - Innovation structures of very lean RCC dams (Journal of Stru...
Lyapichev Yury - Innovation structures of very lean RCC dams (Journal of Stru...Lyapichev Yury - Innovation structures of very lean RCC dams (Journal of Stru...
Lyapichev Yury - Innovation structures of very lean RCC dams (Journal of Stru...
Yury Lyapichev
 
My abstracts
My abstractsMy abstracts
My abstracts
Yury Lyapichev
 
Lyapichev: Analysis, design & behavior of CFRDs
Lyapichev: Analysis, design & behavior of CFRDsLyapichev: Analysis, design & behavior of CFRDs
Lyapichev: Analysis, design & behavior of CFRDs
Yury Lyapichev
 
Soluciones nuevas en presas en paises con alta sismisidad
Soluciones nuevas en presas en paises con alta sismisidadSoluciones nuevas en presas en paises con alta sismisidad
Soluciones nuevas en presas en paises con alta sismisidad
Yury Lyapichev
 
Curso postgrado internacional
Curso postgrado internacionalCurso postgrado internacional
Curso postgrado internacional
Yury Lyapichev
 
Boletin inicial del curso internacional (Lyapichev)
Boletin inicial del curso internacional (Lyapichev)Boletin inicial del curso internacional (Lyapichev)
Boletin inicial del curso internacional (Lyapichev)
Yury Lyapichev
 
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...Ляпичев. Проектирование, строительство и поведение современных высоких плотин...
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...
Yury Lyapichev
 
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...Ляпичев. Проектирование, строительство и поведение современных высоких плотин...
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...
Yury Lyapichev
 
Ляпичев. Проблема безопасности Богучанской КНП (HydroVision Russia, 2010)
Ляпичев. Проблема безопасности Богучанской КНП (HydroVision Russia, 2010)Ляпичев. Проблема безопасности Богучанской КНП (HydroVision Russia, 2010)
Ляпичев. Проблема безопасности Богучанской КНП (HydroVision Russia, 2010)
Yury Lyapichev
 
ремонт центрального водосброса Саяно-Шушенской ГЭС
ремонт центрального водосброса Саяно-Шушенской ГЭС ремонт центрального водосброса Саяно-Шушенской ГЭС
ремонт центрального водосброса Саяно-Шушенской ГЭС
Yury Lyapichev
 
Lyapichev. Laboratorio de segiridad de obras hidraulicas
Lyapichev. Laboratorio de segiridad de obras hidraulicasLyapichev. Laboratorio de segiridad de obras hidraulicas
Lyapichev. Laboratorio de segiridad de obras hidraulicas
Yury Lyapichev
 
Lyapichev. Research & teaching laboratory Safety of hydraulic structures (29 ...
Lyapichev. Research & teaching laboratory Safety of hydraulic structures (29 ...Lyapichev. Research & teaching laboratory Safety of hydraulic structures (29 ...
Lyapichev. Research & teaching laboratory Safety of hydraulic structures (29 ...
Yury Lyapichev
 
Ляпичев. Программа школы Оценка рисков в гидротехнике (РУДН)
Ляпичев. Программа школы Оценка рисков в гидротехнике (РУДН)Ляпичев. Программа школы Оценка рисков в гидротехнике (РУДН)
Ляпичев. Программа школы Оценка рисков в гидротехнике (РУДН)
Yury Lyapichev
 
Guidelines of Intern. Society for design of high CFRDs
Guidelines of Intern. Society for design of high CFRDsGuidelines of Intern. Society for design of high CFRDs
Guidelines of Intern. Society for design of high CFRDs
Yury Lyapichev
 
Seguridad de presas (Banco Mundial)
Seguridad de presas (Banco Mundial)Seguridad de presas (Banco Mundial)
Seguridad de presas (Banco Mundial)
Yury Lyapichev
 
Lyapichev. Curso seguridad sismica de presas según de ICOLD
Lyapichev. Curso seguridad sismica de presas según de ICOLDLyapichev. Curso seguridad sismica de presas según de ICOLD
Lyapichev. Curso seguridad sismica de presas según de ICOLD
Yury Lyapichev
 
Lyapichev. Seguridad sismica de presas (ICOLD Congreso, 2003)
Lyapichev. Seguridad sismica de presas (ICOLD Congreso, 2003)Lyapichev. Seguridad sismica de presas (ICOLD Congreso, 2003)
Lyapichev. Seguridad sismica de presas (ICOLD Congreso, 2003)
Yury Lyapichev
 
Lyapichev. Direcciones para gestión de seguridad de grandes presas y obras hi...
Lyapichev. Direcciones para gestión de seguridad de grandes presas y obras hi...Lyapichev. Direcciones para gestión de seguridad de grandes presas y obras hi...
Lyapichev. Direcciones para gestión de seguridad de grandes presas y obras hi...
Yury Lyapichev
 
Lyapichev. Soluciones nuevas para grandes presas en Rusia y países con alta s...
Lyapichev. Soluciones nuevas para grandes presas en Rusia y países con alta s...Lyapichev. Soluciones nuevas para grandes presas en Rusia y países con alta s...
Lyapichev. Soluciones nuevas para grandes presas en Rusia y países con alta s...
Yury Lyapichev
 
Ляпичев. Достоверность численных расчетов плотин
Ляпичев. Достоверность численных расчетов плотин Ляпичев. Достоверность численных расчетов плотин
Ляпичев. Достоверность численных расчетов плотин
Yury Lyapichev
 

More from Yury Lyapichev (20)

Lyapichev Yury - Innovation structures of very lean RCC dams (Journal of Stru...
Lyapichev Yury - Innovation structures of very lean RCC dams (Journal of Stru...Lyapichev Yury - Innovation structures of very lean RCC dams (Journal of Stru...
Lyapichev Yury - Innovation structures of very lean RCC dams (Journal of Stru...
 
My abstracts
My abstractsMy abstracts
My abstracts
 
Lyapichev: Analysis, design & behavior of CFRDs
Lyapichev: Analysis, design & behavior of CFRDsLyapichev: Analysis, design & behavior of CFRDs
Lyapichev: Analysis, design & behavior of CFRDs
 
Soluciones nuevas en presas en paises con alta sismisidad
Soluciones nuevas en presas en paises con alta sismisidadSoluciones nuevas en presas en paises con alta sismisidad
Soluciones nuevas en presas en paises con alta sismisidad
 
Curso postgrado internacional
Curso postgrado internacionalCurso postgrado internacional
Curso postgrado internacional
 
Boletin inicial del curso internacional (Lyapichev)
Boletin inicial del curso internacional (Lyapichev)Boletin inicial del curso internacional (Lyapichev)
Boletin inicial del curso internacional (Lyapichev)
 
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...Ляпичев. Проектирование, строительство и поведение современных высоких плотин...
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...
 
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...Ляпичев. Проектирование, строительство и поведение современных высоких плотин...
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...
 
Ляпичев. Проблема безопасности Богучанской КНП (HydroVision Russia, 2010)
Ляпичев. Проблема безопасности Богучанской КНП (HydroVision Russia, 2010)Ляпичев. Проблема безопасности Богучанской КНП (HydroVision Russia, 2010)
Ляпичев. Проблема безопасности Богучанской КНП (HydroVision Russia, 2010)
 
ремонт центрального водосброса Саяно-Шушенской ГЭС
ремонт центрального водосброса Саяно-Шушенской ГЭС ремонт центрального водосброса Саяно-Шушенской ГЭС
ремонт центрального водосброса Саяно-Шушенской ГЭС
 
Lyapichev. Laboratorio de segiridad de obras hidraulicas
Lyapichev. Laboratorio de segiridad de obras hidraulicasLyapichev. Laboratorio de segiridad de obras hidraulicas
Lyapichev. Laboratorio de segiridad de obras hidraulicas
 
Lyapichev. Research & teaching laboratory Safety of hydraulic structures (29 ...
Lyapichev. Research & teaching laboratory Safety of hydraulic structures (29 ...Lyapichev. Research & teaching laboratory Safety of hydraulic structures (29 ...
Lyapichev. Research & teaching laboratory Safety of hydraulic structures (29 ...
 
Ляпичев. Программа школы Оценка рисков в гидротехнике (РУДН)
Ляпичев. Программа школы Оценка рисков в гидротехнике (РУДН)Ляпичев. Программа школы Оценка рисков в гидротехнике (РУДН)
Ляпичев. Программа школы Оценка рисков в гидротехнике (РУДН)
 
Guidelines of Intern. Society for design of high CFRDs
Guidelines of Intern. Society for design of high CFRDsGuidelines of Intern. Society for design of high CFRDs
Guidelines of Intern. Society for design of high CFRDs
 
Seguridad de presas (Banco Mundial)
Seguridad de presas (Banco Mundial)Seguridad de presas (Banco Mundial)
Seguridad de presas (Banco Mundial)
 
Lyapichev. Curso seguridad sismica de presas según de ICOLD
Lyapichev. Curso seguridad sismica de presas según de ICOLDLyapichev. Curso seguridad sismica de presas según de ICOLD
Lyapichev. Curso seguridad sismica de presas según de ICOLD
 
Lyapichev. Seguridad sismica de presas (ICOLD Congreso, 2003)
Lyapichev. Seguridad sismica de presas (ICOLD Congreso, 2003)Lyapichev. Seguridad sismica de presas (ICOLD Congreso, 2003)
Lyapichev. Seguridad sismica de presas (ICOLD Congreso, 2003)
 
Lyapichev. Direcciones para gestión de seguridad de grandes presas y obras hi...
Lyapichev. Direcciones para gestión de seguridad de grandes presas y obras hi...Lyapichev. Direcciones para gestión de seguridad de grandes presas y obras hi...
Lyapichev. Direcciones para gestión de seguridad de grandes presas y obras hi...
 
Lyapichev. Soluciones nuevas para grandes presas en Rusia y países con alta s...
Lyapichev. Soluciones nuevas para grandes presas en Rusia y países con alta s...Lyapichev. Soluciones nuevas para grandes presas en Rusia y países con alta s...
Lyapichev. Soluciones nuevas para grandes presas en Rusia y países con alta s...
 
Ляпичев. Достоверность численных расчетов плотин
Ляпичев. Достоверность численных расчетов плотин Ляпичев. Достоверность численных расчетов плотин
Ляпичев. Достоверность численных расчетов плотин
 

Recently uploaded

basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
Mukeshwaran Balu
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
ssuser36d3051
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
heavyhaig
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
Divyam548318
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
Series of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.pptSeries of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.ppt
PauloRodrigues104553
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 

Recently uploaded (20)

basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
Series of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.pptSeries of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.ppt
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 

Lyapichev. Problems of initial construction of Rogun dam & HPP

  • 1. The company Salini undertook to build the Rogun Dam (Lot No. 2), but not to build the Rogun HPP with the installation of its equipment. For construction of HPP and hydraulic structures on the left and right banks, it is still necessary to find a general contractor before October 2016, otherwise Salini does not undertake to fulfill its obligations to build the dam. For safety of the Rogun dam the closure of the Vakhsh river by the end of October 2016 according to the recommendations of the World Bank is to be carried out only if the following guarantees will be fulfilled: 1 - construction of the upstream coffer dam before May 2017; 2 - accident-free flood passage in May 2017; 3 - construction of diversion tunnel No. 3 (2 km long), which now is ready only for 25% and can be completely constructed no earlier than in two years; 4 - construction of open sections of tunnels passing through the Vakhsh river channel. The highest dam in the world is under construction in the zone of tectonic fault with high seismicity on huge salt layer. In this regard the Rogun project, based on engineering solutions and standards of the 60s years of the last century, causes justified questions and objective concerns. In fact, the Rogun HHP is an old and unfeasible project. Assurances of Tajikistan that Rogun project is beneficial for the countries lying downstream of the Amu Darya and the Syr Darya revers cause proper doubts and unrealistic. The creation of large Rogun reservoir will cause huge damage to these countries, undermine the ecological balance in this region, which is already disturbed due to the shallowing of the Aral Sea. The new president of Uzbekistan continues to sharply object to the construction of the Rogun HPP. Tajikistan's willing to build the Rogun HPP on transboundary rivers causes a legitimate concern in Uzbekistan. Construction of Rogun dam without complex assessment of the project's impact on the regime of the Amu Darya river and all environmental factors appears to be a dangerous solution. Another important argument against construction of Rogun HPP is the increased melting of glaciers in the Tien Shan mountains caused by the climate warming, which leads to an increase in the runoff of the rivers they feed, and the area of the glaciers themselves, which in the future will lead to a reduction in runoff. By 2040 the area of glaciers in Central Asia will be reduced by 80% and accordingly the river run-off will decrease by 25-30%. Salt from the bottom of the Aral Sea by wind currents shifts towards mountain ridges, settles on glaciers and accelerates their melting. This most important factor was ignored during development of Rogun HPP. The installed capacity of the HPP was established in the 1960s under different climatic conditions and has not been revised to date, taking into account radically new hydrological data.