The document discusses the Kalpsar Yojna project in Gujarat, India. The project aims to create the world's largest fresh water reservoir by constructing a 30 km long dam in the Gulf of Khambhat. This would help address Gujarat's water scarcity issues, as the state has only 2% of water resources to support 5% of India's population. The project would provide fresh water for irrigation, industry, and municipal use, help solve water problems in Saurashtra region, enable tidal power generation, and improve road connectivity. The estimated cost of the project is 140,000 crore rupees.
Sweet water catchment area near Cambay, in gujarat,this is in gulf of Cambay and project is to construct Dam to prevent sea water entering sweet water catchments.
Sweet water catchment area near Cambay, in gujarat,this is in gulf of Cambay and project is to construct Dam to prevent sea water entering sweet water catchments.
Strategic Analysis on Water Resources in Pakistan.
Water Resources of Pakistan. Pakistan water resources.
Strategic Analysis of Water Resources in Pakistan.
Strategic Analysis on Water Resources in Pakistan.
Water Resources of Pakistan. Pakistan water resources.
Strategic Analysis of Water Resources in Pakistan.
Integrated watershed management programme at gunjala village – a case studyeSAT Journals
Abstract Integrated watershed management programme was launched in Tamsi mandal of gunjala village by using ‘Four water Concept’. Case study included Questionnaire survey from farmers living in that village, and continuous study over a period of two years. Tamsi village is a tribal village and drought area with very less rainfall. Total project area is 4566 Hac, Project Cost Rs. 547.92 Lakhs. The sanctioned area of Gunjala micro watershed is 710 Hac with a outlay of Rs. 85.20 Lakhs. Out of which the total expenditure incurred was Rs.39.12 Lakhs and constructed structures were LBS, RFDs, PTs, CDs and Plantation. Over two year period, it was observed that, 2 years of period the ground water has been improved in this village and three Bore wells are drilled and they are successful, even during peak summer they could meet their day today activities. The farmer Jadhav Uttam has an additional income of Rs. 17600 per Acre in cotton and Rs. 6300 per Acre in Red Gram. The farmer Gnan Singh had an additional income of Rs. 17600 per Acre in cotton and Rs. 5,250 per Acre in Red Gram. The farmer Amber Singh had an additional income of Rs. 13200 per Acre in cotton and Rs. 3,500 per Acre in Red Gram. In the same way, others farmers were also able to generate the benefits from the construction of water storage structures. Total Additional income generated for Seven farmers was Rs. 6, 31000/- in 2011-2012 Cropping Season with construction of Check Dams of Rs.3,24000/- an additional average income per Acre to the farmer is of Rs. 22,500/- and a series of 8 Nos. check dams are constructed on single 3rd order stream which flows Across the 6 Grama Panchayats from ridge to valley. There are 90 farmers cultivating 168 Acre of land who are benefited by getting an additional income of Rs.37,80,000/-. Keywords: Four water Concept, micro watershed, LBS, RFDs, PTs, CDs and Plantation
Presented by IWMI's Tushaar Shah and Shilp Verma at a meeting on rethinking the Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) irrigation programme held in Ranchi, Jharkhand in India, on September 7, 2016.
SSP would generate electricity. On completion, annual additional agricultural production would be Rs. 1600 crores, power generation and water supply Rs. 175 crores, aggregating about Rs. 2175 crores every year equivalent to about Rs. 6.0 crores a day.
Gujarat-india-engineering-mega structure.
ZGB - The Role of Generative AI in Government transformation.pdfSaeed Al Dhaheri
This keynote was presented during the the 7th edition of the UAE Hackathon 2024. It highlights the role of AI and Generative AI in addressing government transformation to achieve zero government bureaucracy
Russian anarchist and anti-war movement in the third year of full-scale warAntti Rautiainen
Anarchist group ANA Regensburg hosted my online-presentation on 16th of May 2024, in which I discussed tactics of anti-war activism in Russia, and reasons why the anti-war movement has not been able to make an impact to change the course of events yet. Cases of anarchists repressed for anti-war activities are presented, as well as strategies of support for political prisoners, and modest successes in supporting their struggles.
Thumbnail picture is by MediaZona, you may read their report on anti-war arson attacks in Russia here: https://en.zona.media/article/2022/10/13/burn-map
Links:
Autonomous Action
http://Avtonom.org
Anarchist Black Cross Moscow
http://Avtonom.org/abc
Solidarity Zone
https://t.me/solidarity_zone
Memorial
https://memopzk.org/, https://t.me/pzk_memorial
OVD-Info
https://en.ovdinfo.org/antiwar-ovd-info-guide
RosUznik
https://rosuznik.org/
Uznik Online
http://uznikonline.tilda.ws/
Russian Reader
https://therussianreader.com/
ABC Irkutsk
https://abc38.noblogs.org/
Send mail to prisoners from abroad:
http://Prisonmail.online
YouTube: https://youtu.be/c5nSOdU48O8
Spotify: https://podcasters.spotify.com/pod/show/libertarianlifecoach/episodes/Russian-anarchist-and-anti-war-movement-in-the-third-year-of-full-scale-war-e2k8ai4
This session provides a comprehensive overview of the latest updates to the Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (commonly known as the Uniform Guidance) outlined in the 2 CFR 200.
With a focus on the 2024 revisions issued by the Office of Management and Budget (OMB), participants will gain insight into the key changes affecting federal grant recipients. The session will delve into critical regulatory updates, providing attendees with the knowledge and tools necessary to navigate and comply with the evolving landscape of federal grant management.
Learning Objectives:
- Understand the rationale behind the 2024 updates to the Uniform Guidance outlined in 2 CFR 200, and their implications for federal grant recipients.
- Identify the key changes and revisions introduced by the Office of Management and Budget (OMB) in the 2024 edition of 2 CFR 200.
- Gain proficiency in applying the updated regulations to ensure compliance with federal grant requirements and avoid potential audit findings.
- Develop strategies for effectively implementing the new guidelines within the grant management processes of their respective organizations, fostering efficiency and accountability in federal grant administration.
Presentation by Jared Jageler, David Adler, Noelia Duchovny, and Evan Herrnstadt, analysts in CBO’s Microeconomic Studies and Health Analysis Divisions, at the Association of Environmental and Resource Economists Summer Conference.
Understanding the Challenges of Street ChildrenSERUDS INDIA
By raising awareness, providing support, advocating for change, and offering assistance to children in need, individuals can play a crucial role in improving the lives of street children and helping them realize their full potential
Donate Us
https://serudsindia.org/how-individuals-can-support-street-children-in-india/
#donatefororphan, #donateforhomelesschildren, #childeducation, #ngochildeducation, #donateforeducation, #donationforchildeducation, #sponsorforpoorchild, #sponsororphanage #sponsororphanchild, #donation, #education, #charity, #educationforchild, #seruds, #kurnool, #joyhome
A process server is a authorized person for delivering legal documents, such as summons, complaints, subpoenas, and other court papers, to peoples involved in legal proceedings.
Jennifer Schaus and Associates hosts a complimentary webinar series on The FAR in 2024. Join the webinars on Wednesdays and Fridays at noon, eastern.
Recordings are on YouTube and the company website.
https://www.youtube.com/@jenniferschaus/videos
Many ways to support street children.pptxSERUDS INDIA
By raising awareness, providing support, advocating for change, and offering assistance to children in need, individuals can play a crucial role in improving the lives of street children and helping them realize their full potential
Donate Us
https://serudsindia.org/how-individuals-can-support-street-children-in-india/
#donatefororphan, #donateforhomelesschildren, #childeducation, #ngochildeducation, #donateforeducation, #donationforchildeducation, #sponsorforpoorchild, #sponsororphanage #sponsororphanchild, #donation, #education, #charity, #educationforchild, #seruds, #kurnool, #joyhome
Jennifer Schaus and Associates hosts a complimentary webinar series on The FAR in 2024. Join the webinars on Wednesdays and Fridays at noon, eastern.
Recordings are on YouTube and the company website.
https://www.youtube.com/@jenniferschaus/videos
4. VISION & MISSION
Mission:-
a sustainable water state “water for all, water forever,
more crop for drop…..”
Vision :-
To create world’s largest fresh water reservoir in sea, by constructing 30
km long dam in the Gulf of Khambhat.
7/4/2018 4
5. WHY PROJECT IS REQUIRED ?
• Gujarat is a water scarce state, with 6.39% of geographical area, 5% of
population & only 2% of water resources.
• The excessive pumping of groundwater resulted in intrusion of saline water
up to 10 km of entire coastal belt of Saurashtra.
7/4/2018 5
6. CON….
• In Saurashtra region,only 15 lakh agricultural land will cover under
irrigation (including Sardar Sarovar Project), against 42 lakh ha
agricultural land. Hence, 27 lakh agricultural land will remain rain fed.
• The western and south-western parts of Gujarat always remain
uncertain for water availability for general purpose and for irrigation in
the area.
7/4/2018 6
7. ESTIMATED COST OF THE PROJECT
• As per pre-feasibility report of the project, the cost of project was estimated
of Rs. 53,000 crore (base year 1998) in which the tidal power component
was Rs.33000 crore.
• Considering, average 8% inflation per annum present cost works out to
approximate Rs.1,40,000 crore, in which the tidal power component is
Rs.86,000 crore.
7/4/2018 7
8. OBJECTIVES OF KALPASAR PROJECT
Fresh water reservoir
Irrigation and water supply in industrial requirement
in saurastra.
Water problem solution in surashtra.
7/4/2018 8
9. BENEFIT OF KALPSAR YOJNA
• Water supply for industrial use
• Tidal power
• Rode communication between central gujarat & saurastra.
• Navigation port development
7/4/2018 9
11. BIBLIOGRAPHY
http://en.wikipedia.org/wiki/Kalpasar_Project(viewed at 6th February 2018)
(http://www.indianjournals.com/ijor.aspx?target=ijor:wea&volume=14&issue=4
&article=120 ( viewed at 7th February 2018)
http://kalpasar.gujarat.gov.in/mainpage.htm(viewed at 8th February 2018)
https://en.wikipedia.org/wiki/Kalpasar_Project(viewed at 9th February 2018)
https://timesofindia.indiatimes.com/city/ahmedabad/kalpasar-to-take-at-least-
20-years-if-found-feasible/articleshow/56633405.cms(viewed at 11th February
2018)
http://kalpsaryojna.blogspot.in(viewed at 13th February 2018)
7/4/2018