Dynamic simulation of Steam
and Power System
Dr M S R Murty
msrm1951@gmail.com
Stream
Generators
LP
Process
VHP HP MP
PRDS
Process Process
Process
HRSGs
UBs
G
Typical Steam and Power System
Headers
107/ 510 45/ 400 20/ 340 5.5/ 220
Kg/Cm2 o C
C
G
GAS TURBINE
G
Steam
Turbine
Captive Power Plant - General Overview
NAPHTHA
GAS OIL
GAS TURBINE
NAPHTHA
GAS OIL
8 X 125 TPH HRSG
AUX
BOILERS
4 x 125 TPH
Refinery Fuel Oil
STEAM
TURBINE
HP steam 42 Kg/cm2
MP steam 17 Kg/cm2
To
Refinery
Power Steam
INSTALLED CAPACITY 360 MW 1500 TPH
PRESENT GENERATION 269 MW 979 TPH
EXPORT TO GEB CAPABILITY 80 MW ------------
TO GEB 132/220 kV
TO REFINERY
4 X 30 MW
8 X 30 MW
11 KV
33 KV
33 KV
11 KV
Reliance Jamnagar
• All 4 STGs are tested to deliver 30 MW of power.
• Steam turbines are provided with HP and MP extractions
• Maximum steam flow through one steam turbine shall be as follows
262 TPH HHP steam (Max)
Pr: 109 Kg/CM^2 @ 505 DegC
180 TPH HP steam (Max)
149 TPH HP steam (Normal)
Pr: 44.8 Kg/CM^2 @ 383 DegC
80 TPH MP steam (Max)
53 TPH MP steam (Normal)
Pr: 18.8 Kg/Cm^2 @ 282 DegC
60 TPH to Condenser (Max.)
20 TPH to Condenser (Min.)
Steam Turbine
MP
133
TPH
LP
60
TPH
Normal steam flow
HP section =15.27 MW
MP section = 5.73 MW
LP section = 11.81 MW
Reliance Jamnagar
Typical Steam and Power System
• 8 GTGs, 4 STGs (extraction types)
• 8 HRSGs, 4 Aux Boilers
• Steam generators and Consumers within
Process
• Turbine driven equipment in Process
• Limits on Header pressure:+3 %,- 10 %
Temperature: + or – 10 %
Set point
Process
Steam
Pressure
STEAM
GENERATORs
V
H
P
H
E
A
D
E
R
GOVERNING
SYSTEM
G
UPSET : SUDDEN STEAM DEMAND CHANGE
MP
LP
tph
sec
Set point
Process Steam
Pressure
STEAM
GENERATORs
V
H
P
H
E
A
D
E
R
GOVERNING
SYSTEM
G
UPSET : STEAM TURBINE TRIP
MP
LP
C
ST
G
G
G
GAS TURBINE
Div Damper
HRSG
VHP STEAM
HEADER
Upset: GT TTRIP or HRSG Trip
Fuel
Inlet Air
Steam and Power system Dynamics
Steam
System
Power
System
Fuel
System
Upsets in one system can influence the other
Header Pr Variations For T-C Upset
Steam Flows for Upset condition
Summary
• Dynamic simulation helps in predicting
transient deviations in critical process
parameters
• Tuning of control system parameters can be
done based on simulation study
• Different control strategies can be evaluated

More Related Content

Similar to Dynamic simulation of Steam and Power System.ppt

Hrsg & turbine as run energy efficiency assessment
Hrsg  & turbine as run energy efficiency assessmentHrsg  & turbine as run energy efficiency assessment
Hrsg & turbine as run energy efficiency assessment
D.Pawan Kumar
 
Microsoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual FillingMicrosoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual Filling
PRAN-RFL Group
 
thermal power plant PTTP Parichha
thermal power plant PTTP Parichhathermal power plant PTTP Parichha
thermal power plant PTTP Parichha
Gagandeep Maan
 

Similar to Dynamic simulation of Steam and Power System.ppt (20)

Ntpc report
Ntpc  report Ntpc  report
Ntpc report
 
1 palmer international consulting_presentation_artc_singapore_2014 (10)
1 palmer international consulting_presentation_artc_singapore_2014 (10)1 palmer international consulting_presentation_artc_singapore_2014 (10)
1 palmer international consulting_presentation_artc_singapore_2014 (10)
 
Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...
Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...
Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...
 
Waste Heat Recovery in Power Station Boilers by Greens Power Equipment
Waste Heat Recovery in Power Station Boilers by Greens Power EquipmentWaste Heat Recovery in Power Station Boilers by Greens Power Equipment
Waste Heat Recovery in Power Station Boilers by Greens Power Equipment
 
Basic ccpp overview Power plant
Basic ccpp overview Power plantBasic ccpp overview Power plant
Basic ccpp overview Power plant
 
Thermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesThermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its Auxillaries
 
suratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadavsuratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadav
 
Combined Cycle power Plant IFFCO Aonla
Combined Cycle power Plant IFFCO AonlaCombined Cycle power Plant IFFCO Aonla
Combined Cycle power Plant IFFCO Aonla
 
Hrsg & turbine as run energy efficiency assessment
Hrsg  & turbine as run energy efficiency assessmentHrsg  & turbine as run energy efficiency assessment
Hrsg & turbine as run energy efficiency assessment
 
urea processes - Copy.pptx
urea processes - Copy.pptxurea processes - Copy.pptx
urea processes - Copy.pptx
 
660 mw turbo generator & its auxiliaries
660 mw turbo generator & its auxiliaries660 mw turbo generator & its auxiliaries
660 mw turbo generator & its auxiliaries
 
353685130-CCGT-Combined-Cycle-Gas-Turbine.ppt
353685130-CCGT-Combined-Cycle-Gas-Turbine.ppt353685130-CCGT-Combined-Cycle-Gas-Turbine.ppt
353685130-CCGT-Combined-Cycle-Gas-Turbine.ppt
 
gas power plant h.ppt
gas power plant                h.pptgas power plant                h.ppt
gas power plant h.ppt
 
Microsoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual FillingMicrosoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual Filling
 
thermal power plant PTTP Parichha
thermal power plant PTTP Parichhathermal power plant PTTP Parichha
thermal power plant PTTP Parichha
 
ppt
 ppt ppt
ppt
 
Jitendra ppt
Jitendra pptJitendra ppt
Jitendra ppt
 
Schneider process automation power industry solutions
Schneider process automation power industry solutionsSchneider process automation power industry solutions
Schneider process automation power industry solutions
 
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadri
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadriAbdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadri
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadri
 
Feb. 2016 webinar_condensate_return_piping
Feb. 2016 webinar_condensate_return_pipingFeb. 2016 webinar_condensate_return_piping
Feb. 2016 webinar_condensate_return_piping
 

Recently uploaded

Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manual
BalamuruganV28
 
electrical installation and maintenance.
electrical installation and maintenance.electrical installation and maintenance.
electrical installation and maintenance.
benjamincojr
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
IJECEIAES
 

Recently uploaded (20)

Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...
 
The Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptxThe Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptx
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.ppt
 
Independent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging StationIndependent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging Station
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1
 
Artificial Intelligence in due diligence
Artificial Intelligence in due diligenceArtificial Intelligence in due diligence
Artificial Intelligence in due diligence
 
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manual
 
Intro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney UniIntro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney Uni
 
History of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & ModernizationHistory of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & Modernization
 
Diploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfDiploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdf
 
electrical installation and maintenance.
electrical installation and maintenance.electrical installation and maintenance.
electrical installation and maintenance.
 
15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded Systems
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailing
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university
 

Dynamic simulation of Steam and Power System.ppt

  • 1. Dynamic simulation of Steam and Power System Dr M S R Murty msrm1951@gmail.com
  • 2. Stream Generators LP Process VHP HP MP PRDS Process Process Process HRSGs UBs G Typical Steam and Power System Headers 107/ 510 45/ 400 20/ 340 5.5/ 220 Kg/Cm2 o C C G GAS TURBINE G Steam Turbine
  • 3. Captive Power Plant - General Overview NAPHTHA GAS OIL GAS TURBINE NAPHTHA GAS OIL 8 X 125 TPH HRSG AUX BOILERS 4 x 125 TPH Refinery Fuel Oil STEAM TURBINE HP steam 42 Kg/cm2 MP steam 17 Kg/cm2 To Refinery Power Steam INSTALLED CAPACITY 360 MW 1500 TPH PRESENT GENERATION 269 MW 979 TPH EXPORT TO GEB CAPABILITY 80 MW ------------ TO GEB 132/220 kV TO REFINERY 4 X 30 MW 8 X 30 MW 11 KV 33 KV 33 KV 11 KV Reliance Jamnagar
  • 4. • All 4 STGs are tested to deliver 30 MW of power. • Steam turbines are provided with HP and MP extractions • Maximum steam flow through one steam turbine shall be as follows 262 TPH HHP steam (Max) Pr: 109 Kg/CM^2 @ 505 DegC 180 TPH HP steam (Max) 149 TPH HP steam (Normal) Pr: 44.8 Kg/CM^2 @ 383 DegC 80 TPH MP steam (Max) 53 TPH MP steam (Normal) Pr: 18.8 Kg/Cm^2 @ 282 DegC 60 TPH to Condenser (Max.) 20 TPH to Condenser (Min.) Steam Turbine MP 133 TPH LP 60 TPH Normal steam flow HP section =15.27 MW MP section = 5.73 MW LP section = 11.81 MW Reliance Jamnagar
  • 5. Typical Steam and Power System • 8 GTGs, 4 STGs (extraction types) • 8 HRSGs, 4 Aux Boilers • Steam generators and Consumers within Process • Turbine driven equipment in Process • Limits on Header pressure:+3 %,- 10 % Temperature: + or – 10 %
  • 8. C ST G G G GAS TURBINE Div Damper HRSG VHP STEAM HEADER Upset: GT TTRIP or HRSG Trip Fuel Inlet Air
  • 9. Steam and Power system Dynamics Steam System Power System Fuel System Upsets in one system can influence the other
  • 10. Header Pr Variations For T-C Upset