SUBMITTED TO-
Prof. Harpinder Singh
SUBMITTED BY-
Aman Kumar
GU-2015-0352-L
B.Tech CE 7th sem.
PRESENTATION ON:- ESTIMATE AND VALUATION
Contents…
•Introduction about Estimate
•Necessity of Estimate
•Data Required for Estimate
•Measurements of Materials and Works
•Introduction about Valuation
•Purpose of Valuation
•Basic definations of Valuation
Estimate…..?
An estimate is the probable cost of work and is usually
prepared before the construction is taken up.
OR
Estimation is the technique of calculating or computing the
various quantities and the expected expenditure to be
incurred on a particular work or project.
Necessity of Estimate
•Estimate give an idea of the cost of the work and hence
its feasibility can be determined i.e, whether the project
could be taken up with in the funds available or not.
•Estimate gives an idea about of the time required for the
completion of the project.
•Estimate is required to invite the Tenders.
•Estimate also required to control the expenditure during
the execution of the work.
•Estimate decides whether the proposed plan matches the
funds avail or not.
Data required for Estimate
Drawings:
Plan, sectional elevations
and detailed drawings to
scale, fully dimensions are
required.(scale 1cm=10cm
to 1cm=29cm)
If the drawings are not
clear and without complete
dimensions the preparation
of estimate very difficult.
So, it is very essential
before preparing an
estimate.
Specifications:
a) General Specifications- These gives the nature, quality and
class of work and materials. General specifications help to form
a general idea of the whole building or structure and are useful
in preparing the detailed estimate.
b) Detailed Specifications- These gives the detailed description of
various items of work laying down the quantities and qualities of
materials, their proportions, the method of preparation and
execution of work.
Rates:
The rates of per items of
work, the rates of
various materials to be
used in the construction
and the wages of
different categories of
labour, mason etc.
These rates may be
obtained from P.W.D
Schedule rate book.
Measurements of Materials and Works
S.No. Particular of
Item
Units of
Measurement
Units of
Payment
1 Earthwork cum Per % cum
2 D.P.C Sq.m Per sq.m
3 Brickwork cum Per cum
4 Steel work quintel Per quintal
5 Concrete cum Per cum
6 Plastering &
finishing
Sq.m Per sq.m
7 Flooring Sq.m Per sq.m
Valuation…??
Valuation is the technique of estimating or determining the fair price
or value of property such as building, a factory, other engineering
structures of various types, land etc.
By valuation the present value of a property is determined.
The present value of a property may be decided by its selling price,
or income or rent it may fetch.
The value of property depends on its structure,life,maintenance,
location,legal control,etc .
Purpose of Valuation..
 Buying or Selling Property
 Taxation
 Rent Fixation
 Security of Loans
 Compulsory Acquisition
Basic definations of Valuation
•Gross Income: It is the total income and includes all the
receipts from various sources of outgoings.
•Net Income: This is the saving or the amounts left after
deducting all outgoings from the gross income.
Net Income = Gross Income – outgoings
•Outgoings: In the forms of Taxes, Repairs, Management and
collection charges, Sinking fund, Miscellaneous.
•Scrap Value: Value of dismantled materials.
•Capital Cost: Total cost of construction including land.
Contact on facebook - https://www.facebook.com/amn.kmr352

More Related Content

What's hot

Ibe quantity surveyor 2013
Ibe quantity surveyor 2013Ibe quantity surveyor 2013
Ibe quantity surveyor 2013
nurun2010
 
Estimation (power point)
Estimation (power point)Estimation (power point)
Estimation (power point)
Waqas Aslam
 
Quantity Surveying
Quantity SurveyingQuantity Surveying
Quantity Surveying
geddolan
 
ITD Presentation
ITD PresentationITD Presentation
ITD Presentation
masonsth
 
ICI ITD QS PROJECT 1 (1).pptx
ICI ITD QS PROJECT 1 (1).pptxICI ITD QS PROJECT 1 (1).pptx
ICI ITD QS PROJECT 1 (1).pptx
mkyong1996
 
Itd project one (a) 4 m
Itd project one (a) 4 mItd project one (a) 4 m
Itd project one (a) 4 m
euxuanong
 

What's hot (20)

QUANTITY SURVEYOR magazine
QUANTITY SURVEYOR magazineQUANTITY SURVEYOR magazine
QUANTITY SURVEYOR magazine
 
Qs(ici&itd)
Qs(ici&itd)Qs(ici&itd)
Qs(ici&itd)
 
Estimating and Costing
Estimating and CostingEstimating and Costing
Estimating and Costing
 
Purpose and importance of estimate
Purpose and importance of estimatePurpose and importance of estimate
Purpose and importance of estimate
 
E.c.v Introduction
E.c.v IntroductionE.c.v Introduction
E.c.v Introduction
 
Ibe quantity surveyor 2013
Ibe quantity surveyor 2013Ibe quantity surveyor 2013
Ibe quantity surveyor 2013
 
Quantity surveying drawing FNBE 2014
Quantity surveying drawing FNBE 2014Quantity surveying drawing FNBE 2014
Quantity surveying drawing FNBE 2014
 
Estimation
EstimationEstimation
Estimation
 
Estimation (power point)
Estimation (power point)Estimation (power point)
Estimation (power point)
 
rate analysis
rate analysisrate analysis
rate analysis
 
Civil Quantity Survey and Estimation
Civil Quantity Survey and EstimationCivil Quantity Survey and Estimation
Civil Quantity Survey and Estimation
 
2# types of estimate
2# types of estimate2# types of estimate
2# types of estimate
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
 
Quantity Surveying
Quantity SurveyingQuantity Surveying
Quantity Surveying
 
ITD Presentation
ITD PresentationITD Presentation
ITD Presentation
 
Quantity surveying course
Quantity surveying courseQuantity surveying course
Quantity surveying course
 
Estimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provisionEstimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provision
 
estimation,its types and methods
estimation,its types and methodsestimation,its types and methods
estimation,its types and methods
 
ICI ITD QS PROJECT 1 (1).pptx
ICI ITD QS PROJECT 1 (1).pptxICI ITD QS PROJECT 1 (1).pptx
ICI ITD QS PROJECT 1 (1).pptx
 
Itd project one (a) 4 m
Itd project one (a) 4 mItd project one (a) 4 m
Itd project one (a) 4 m
 

Similar to Estimate and Valuation by Aman Kumar

Estimating various types of estimating
Estimating various types of estimatingEstimating various types of estimating
Estimating various types of estimating
Kailyn Lee
 

Similar to Estimate and Valuation by Aman Kumar (20)

Ici itd qs project 1
Ici itd qs project 1Ici itd qs project 1
Ici itd qs project 1
 
Quantity Survey and Estimation basic terms
Quantity Survey and Estimation basic termsQuantity Survey and Estimation basic terms
Quantity Survey and Estimation basic terms
 
Quantity Surveying & valuation.ppt
Quantity Surveying & valuation.pptQuantity Surveying & valuation.ppt
Quantity Surveying & valuation.ppt
 
ESTIMATION_AND_COSTING assignmentt-1.pdf
ESTIMATION_AND_COSTING assignmentt-1.pdfESTIMATION_AND_COSTING assignmentt-1.pdf
ESTIMATION_AND_COSTING assignmentt-1.pdf
 
Estimation and costing of a commercial building
Estimation and costing of a commercial buildingEstimation and costing of a commercial building
Estimation and costing of a commercial building
 
Estimating various types of estimating
Estimating various types of estimatingEstimating various types of estimating
Estimating various types of estimating
 
CPM 1 .pdf
CPM 1 .pdfCPM 1 .pdf
CPM 1 .pdf
 
Estimation (power Point).ppt
Estimation (power Point).pptEstimation (power Point).ppt
Estimation (power Point).ppt
 
EstimatesPresentation.pptx
EstimatesPresentation.pptxEstimatesPresentation.pptx
EstimatesPresentation.pptx
 
EEEC pdf.pdf
EEEC pdf.pdfEEEC pdf.pdf
EEEC pdf.pdf
 
Estimation and Costing
Estimation and Costing Estimation and Costing
Estimation and Costing
 
lecture ppt for contract administration and governing
lecture ppt for contract administration and governinglecture ppt for contract administration and governing
lecture ppt for contract administration and governing
 
Thesis presentation (wu 2016)
Thesis presentation  (wu 2016)Thesis presentation  (wu 2016)
Thesis presentation (wu 2016)
 
06 -Estimates, QS_CE, Mar 2021.pdf
06 -Estimates, QS_CE, Mar 2021.pdf06 -Estimates, QS_CE, Mar 2021.pdf
06 -Estimates, QS_CE, Mar 2021.pdf
 
Fundamentals of estimating_and_costing
Fundamentals of estimating_and_costingFundamentals of estimating_and_costing
Fundamentals of estimating_and_costing
 
SPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONSPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATION
 
3 estimate considerations
3 estimate considerations3 estimate considerations
3 estimate considerations
 
EstimationandCosting.ppt
EstimationandCosting.pptEstimationandCosting.ppt
EstimationandCosting.ppt
 
M&R of Project
M&R of ProjectM&R of Project
M&R of Project
 
IV -I - EQS - .pptx
IV -I - EQS - .pptxIV -I - EQS - .pptx
IV -I - EQS - .pptx
 

Recently uploaded

VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
dharasingh5698
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Recently uploaded (20)

VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 

Estimate and Valuation by Aman Kumar

  • 1. SUBMITTED TO- Prof. Harpinder Singh SUBMITTED BY- Aman Kumar GU-2015-0352-L B.Tech CE 7th sem. PRESENTATION ON:- ESTIMATE AND VALUATION
  • 2. Contents… •Introduction about Estimate •Necessity of Estimate •Data Required for Estimate •Measurements of Materials and Works •Introduction about Valuation •Purpose of Valuation •Basic definations of Valuation
  • 3. Estimate…..? An estimate is the probable cost of work and is usually prepared before the construction is taken up. OR Estimation is the technique of calculating or computing the various quantities and the expected expenditure to be incurred on a particular work or project.
  • 4. Necessity of Estimate •Estimate give an idea of the cost of the work and hence its feasibility can be determined i.e, whether the project could be taken up with in the funds available or not. •Estimate gives an idea about of the time required for the completion of the project. •Estimate is required to invite the Tenders. •Estimate also required to control the expenditure during the execution of the work. •Estimate decides whether the proposed plan matches the funds avail or not.
  • 5. Data required for Estimate Drawings: Plan, sectional elevations and detailed drawings to scale, fully dimensions are required.(scale 1cm=10cm to 1cm=29cm) If the drawings are not clear and without complete dimensions the preparation of estimate very difficult. So, it is very essential before preparing an estimate.
  • 6. Specifications: a) General Specifications- These gives the nature, quality and class of work and materials. General specifications help to form a general idea of the whole building or structure and are useful in preparing the detailed estimate. b) Detailed Specifications- These gives the detailed description of various items of work laying down the quantities and qualities of materials, their proportions, the method of preparation and execution of work.
  • 7. Rates: The rates of per items of work, the rates of various materials to be used in the construction and the wages of different categories of labour, mason etc. These rates may be obtained from P.W.D Schedule rate book.
  • 8. Measurements of Materials and Works S.No. Particular of Item Units of Measurement Units of Payment 1 Earthwork cum Per % cum 2 D.P.C Sq.m Per sq.m 3 Brickwork cum Per cum 4 Steel work quintel Per quintal 5 Concrete cum Per cum 6 Plastering & finishing Sq.m Per sq.m 7 Flooring Sq.m Per sq.m
  • 9. Valuation…?? Valuation is the technique of estimating or determining the fair price or value of property such as building, a factory, other engineering structures of various types, land etc. By valuation the present value of a property is determined. The present value of a property may be decided by its selling price, or income or rent it may fetch. The value of property depends on its structure,life,maintenance, location,legal control,etc .
  • 10. Purpose of Valuation..  Buying or Selling Property  Taxation  Rent Fixation  Security of Loans  Compulsory Acquisition
  • 11. Basic definations of Valuation •Gross Income: It is the total income and includes all the receipts from various sources of outgoings. •Net Income: This is the saving or the amounts left after deducting all outgoings from the gross income. Net Income = Gross Income – outgoings •Outgoings: In the forms of Taxes, Repairs, Management and collection charges, Sinking fund, Miscellaneous. •Scrap Value: Value of dismantled materials. •Capital Cost: Total cost of construction including land.
  • 12. Contact on facebook - https://www.facebook.com/amn.kmr352