INDUSTRIAL TRAINING WEEKLY REPORT
L & T Construction
ITBA PROJECT CAHNDIGARH AIRPORT
SUBMITTED IN PARTIAL FULFILMENT OF THE REQUIREMENTS FOR THE
AWARD OF THE
DEGREE OF
BACHELOR OF ENGINEERING
IN
MECHANICAL ENGINEERING
MECHANICAL ENGINEERING DEPARTMENT
CCET
CHANDIGARH
SUBMITTED BY: SUBMITTED TO:
ABHISHEK VIJ – CO10103 MR RAJESH SHARMA
MECHANICAL, 4th
YEAR TRAINING COORDINATOR
CONSTRUCTION SITE SAFETY PLAN -I
1. PRE- WORK PLANNING
▪ A health & safety plan
▪ An OH&S policy displayed
▪ An accident report book
▪ Induction training records
▪ Workplace inspection records
▪ Documented safe working procedures or method statements
▪ Protective clothing & equipment records
▪ Material safety data sheets (MSDS) available
▪ Health & safety system manual
▪ Contract-specific risk assessment conducted
▪ Emergency procedures and necessary training records
▪ Identify ways that a risk can be controlled without
using personal protective equipment (PPE)
▪ Ensure that workers are using the right and fit PPE
for the job
▪ Fence the site against unauthorized entry
▪ Take measures to prevent objects from falling from height and to take measures to protect
members of the public (such as persons passing by the site)
▪ Provide and keep safe egress and access to the place of work, such as access to
scaffolding
▪ Put up appropriate signs including traffic routes, authorized personnel only etc.
▪ Keep the site tidy, well lit and well laid
▪ Provide sufficient welfare and first aid facilities
▪ Provide adequate fire precautions such as fire
▪ Ensure that existing power lines (buried or
systems of work in place
▪ Take necessary precautions to ensure that electrical
condition
▪ Ensure that vehicles and people are kept apart,
routes maintained in a safe condition
▪ Ensure that vehicle and plant operators are suitably
Keep the site tidy, well lit and well laid out
Provide sufficient welfare and first aid facilities
Provide adequate fire precautions such as fire extinguishers, escape routes
Ensure that existing power lines (buried or overhead) are identified and associated safe
ke necessary precautions to ensure that electrical systems are well maintained in a safe
Ensure that vehicles and people are kept apart, especially slewing vehicles, with traffic
maintained in a safe condition
Ensure that vehicle and plant operators are suitably trained or licensed if required
extinguishers, escape routes
overhead) are identified and associated safe
systems are well maintained in a safe
especially slewing vehicles, with traffic
trained or licensed if required
▪ Ensure that hoists and lifting appliances are properly installed and checked by competent
persons
▪ Ensure that scaffolds are erected, altered and dismantled by competent people only
▪ Take measures to stop workers from falling and ensure fall protection
▪ Minimize and eliminate risk of manual handling by the use of mechanical equipment, or
arrange material to be supplied in manageable sizes and weights to reduce the risk of back
injury
▪ Take all measures to reduce exposure to noise and vibration.
2. SITE LAYOUT
Plan emergency routes and exits, traffic routes, danger areas, loading bays, ramps, etc.
▪ Ensure provision of safe plant and equipment, with due care to suitability, selection,
safety features, safe use, training and information, inspection and maintenance.
▪ Provide safe working slope for excavators, fork-lift trucks and dump trucks
▪ Provide suitable safety signs and warning notices
2.1Well-planned site layout and process flow control at the Planning Stage.
2.2Maintenance of visitor’s log system to check unauthorized entry
2.3 Effective wheel washing facilities provided at site entrance
2.4 Steel sections stacked on the site for forming the mega-columns.
2.5 Proper selection of lifting appliances and gears to ensure safe lifting from the temporary
loading area to the upper floors.
3. HOUSE KEEPING
Keep work areas free from rubbish and obstructions
▪ Maintain all floor surfaces safe, suitable and free from slip or trip hazards.
▪ Ensure floor openings covered or otherwise fenced off.
▪ Materials are properly stacked and stored safely
Keep all passageways in good conditions:
▪ Unobstructed and clearly defined
▪ Provide adequate lighting
▪ Ensure clear sightline at breaks and corners
Are lightings maintained in good working order?
▪ Adequate and free from glare
▪ Lighting clean and efficient
▪ No flickering
▪ Maintain steady lights
▪ Provide and maintain all emergency lighting systems
Is workers’ access to worksites well-maintained?
▪ Keep all walkways and stairways clear of debris and other materials such as used boxes,
wooden scrap, loose gravel, oil leakage, tools and supplies to prevent tripping and slipping
▪ Put them in a bin or debris area to prevent fire and tripping hazards
▪ Provide adequate lighting to prevent accidents
Weekly safety report abhishek vij

More Related Content

What's hot

Slips Trips And Falls
Slips Trips And FallsSlips Trips And Falls
Slips Trips And FallsHvacmach
 
Health and safety induction
Health and safety inductionHealth and safety induction
Health and safety inductionGanesan Raju
 
Basic safety
Basic safetyBasic safety
Basic safetyLalit M
 
Behaviour-based safety (BBS) is the “application of science of behaviour chan...
Behaviour-based safety (BBS) is the “application of science of behaviour chan...Behaviour-based safety (BBS) is the “application of science of behaviour chan...
Behaviour-based safety (BBS) is the “application of science of behaviour chan...Indohaan Technology
 
bar bending safety precautions.pdf
bar bending safety precautions.pdfbar bending safety precautions.pdf
bar bending safety precautions.pdfconstruction
 
Working at-height
Working at-height Working at-height
Working at-height Reliance
 
Session no. 6 safety culture
Session no. 6 safety cultureSession no. 6 safety culture
Session no. 6 safety culturesameh shalash
 
Rebar cutting hazards
Rebar cutting hazardsRebar cutting hazards
Rebar cutting hazardsconstruction
 
Construction Site Hazards and Controls
Construction Site Hazards and ControlsConstruction Site Hazards and Controls
Construction Site Hazards and ControlsKrishna Gopal
 
Construction site safety
Construction site safetyConstruction site safety
Construction site safetyFroyd Dias
 
Permit to work training
Permit to work trainingPermit to work training
Permit to work trainingKarnav Rana
 
Operator Training
Operator TrainingOperator Training
Operator TrainingDariusDelon
 
General Safety Presentationupdated 04842993 1
General Safety Presentationupdated 04842993 1General Safety Presentationupdated 04842993 1
General Safety Presentationupdated 04842993 1debandleigh
 
Construction safety lecture-3
Construction safety  lecture-3Construction safety  lecture-3
Construction safety lecture-3Saleem Malik
 
Occupational health and safety implementation
Occupational health and safety implementationOccupational health and safety implementation
Occupational health and safety implementationDr Madhu Aman Sharma
 

What's hot (20)

Slips Trips And Falls
Slips Trips And FallsSlips Trips And Falls
Slips Trips And Falls
 
Health and safety induction
Health and safety inductionHealth and safety induction
Health and safety induction
 
Basic safety
Basic safetyBasic safety
Basic safety
 
Behaviour-based safety (BBS) is the “application of science of behaviour chan...
Behaviour-based safety (BBS) is the “application of science of behaviour chan...Behaviour-based safety (BBS) is the “application of science of behaviour chan...
Behaviour-based safety (BBS) is the “application of science of behaviour chan...
 
Scaffolds ppt construction
Scaffolds ppt constructionScaffolds ppt construction
Scaffolds ppt construction
 
Industrial safety.ppt
Industrial safety.pptIndustrial safety.ppt
Industrial safety.ppt
 
bar bending safety precautions.pdf
bar bending safety precautions.pdfbar bending safety precautions.pdf
bar bending safety precautions.pdf
 
Working at-height
Working at-height Working at-height
Working at-height
 
Session no. 6 safety culture
Session no. 6 safety cultureSession no. 6 safety culture
Session no. 6 safety culture
 
Industrial Safety
Industrial SafetyIndustrial Safety
Industrial Safety
 
Rebar cutting hazards
Rebar cutting hazardsRebar cutting hazards
Rebar cutting hazards
 
Construction Site Hazards and Controls
Construction Site Hazards and ControlsConstruction Site Hazards and Controls
Construction Site Hazards and Controls
 
Construction site safety
Construction site safetyConstruction site safety
Construction site safety
 
Permit to work training
Permit to work trainingPermit to work training
Permit to work training
 
Work safe with grinder
Work safe with grinderWork safe with grinder
Work safe with grinder
 
Work At Height
Work At HeightWork At Height
Work At Height
 
Operator Training
Operator TrainingOperator Training
Operator Training
 
General Safety Presentationupdated 04842993 1
General Safety Presentationupdated 04842993 1General Safety Presentationupdated 04842993 1
General Safety Presentationupdated 04842993 1
 
Construction safety lecture-3
Construction safety  lecture-3Construction safety  lecture-3
Construction safety lecture-3
 
Occupational health and safety implementation
Occupational health and safety implementationOccupational health and safety implementation
Occupational health and safety implementation
 

Viewers also liked

Job safety observation
Job safety observationJob safety observation
Job safety observationStean Vorster
 
OMC Safety Report Jan 16
OMC Safety Report Jan 16OMC Safety Report Jan 16
OMC Safety Report Jan 16Mark Resevsky
 
Resume Weekly safety meeting area 3 30 april 2015
Resume Weekly safety meeting area 3  30 april 2015Resume Weekly safety meeting area 3  30 april 2015
Resume Weekly safety meeting area 3 30 april 2015M. Yusuf Fikri
 
2016 accident prevention plan (app)
2016 accident prevention plan (app)2016 accident prevention plan (app)
2016 accident prevention plan (app)Elegant Painting
 
Daily Safety Check
Daily Safety CheckDaily Safety Check
Daily Safety CheckJoe Wilson
 
Construction Observation Tips
Construction Observation TipsConstruction Observation Tips
Construction Observation Tipsncengineer
 
75 mscaffolding070109
75 mscaffolding07010975 mscaffolding070109
75 mscaffolding070109Kaley Keane
 
Gasf monthly safety report 2014
Gasf monthly  safety report  2014Gasf monthly  safety report  2014
Gasf monthly safety report 2014Prasath B
 
Electrical safety and Arc Flash Training
Electrical safety and Arc Flash TrainingElectrical safety and Arc Flash Training
Electrical safety and Arc Flash TrainingLarry Riley
 
Scaffolding Software: A Decision Making Tool for Inspections & Material Manag...
Scaffolding Software: A Decision Making Tool for Inspections & Material Manag...Scaffolding Software: A Decision Making Tool for Inspections & Material Manag...
Scaffolding Software: A Decision Making Tool for Inspections & Material Manag...ASK EHS Engineering & Consultants
 
Global Hazards
Global HazardsGlobal Hazards
Global Hazardstotal
 
Monthly safety report 2012 11
Monthly safety report 2012 11Monthly safety report 2012 11
Monthly safety report 2012 11ChinaHarbour
 
Construction hazards and_safety_by_isti
Construction hazards and_safety_by_istiConstruction hazards and_safety_by_isti
Construction hazards and_safety_by_istiSYED HAIDER ABBAS
 
Monthly Safety Report- (Mr. Shekhar viset) Project M (03-2011)
Monthly Safety Report- (Mr. Shekhar viset) Project M (03-2011)Monthly Safety Report- (Mr. Shekhar viset) Project M (03-2011)
Monthly Safety Report- (Mr. Shekhar viset) Project M (03-2011)Alaa shahin
 
Scaffold Safety Part 1
Scaffold Safety Part 1Scaffold Safety Part 1
Scaffold Safety Part 1Larry Riley
 

Viewers also liked (20)

Job safety observation
Job safety observationJob safety observation
Job safety observation
 
OMC Safety Report Jan 16
OMC Safety Report Jan 16OMC Safety Report Jan 16
OMC Safety Report Jan 16
 
Resume Weekly safety meeting area 3 30 april 2015
Resume Weekly safety meeting area 3  30 april 2015Resume Weekly safety meeting area 3  30 april 2015
Resume Weekly safety meeting area 3 30 april 2015
 
2016 accident prevention plan (app)
2016 accident prevention plan (app)2016 accident prevention plan (app)
2016 accident prevention plan (app)
 
Daily Safety Check
Daily Safety CheckDaily Safety Check
Daily Safety Check
 
Construction Observation Tips
Construction Observation TipsConstruction Observation Tips
Construction Observation Tips
 
75 mscaffolding070109
75 mscaffolding07010975 mscaffolding070109
75 mscaffolding070109
 
Fire & safety_signs
Fire & safety_signsFire & safety_signs
Fire & safety_signs
 
Gasf monthly safety report 2014
Gasf monthly  safety report  2014Gasf monthly  safety report  2014
Gasf monthly safety report 2014
 
Electrical safety and Arc Flash Training
Electrical safety and Arc Flash TrainingElectrical safety and Arc Flash Training
Electrical safety and Arc Flash Training
 
Scaffolding Software: A Decision Making Tool for Inspections & Material Manag...
Scaffolding Software: A Decision Making Tool for Inspections & Material Manag...Scaffolding Software: A Decision Making Tool for Inspections & Material Manag...
Scaffolding Software: A Decision Making Tool for Inspections & Material Manag...
 
Observation check list by safety officer
Observation check list by safety officerObservation check list by safety officer
Observation check list by safety officer
 
Aha sample-scaffolding
Aha sample-scaffoldingAha sample-scaffolding
Aha sample-scaffolding
 
KNOW YOUR CONSTRUCTION SAFETY SIGNS.
KNOW YOUR CONSTRUCTION SAFETY SIGNS.KNOW YOUR CONSTRUCTION SAFETY SIGNS.
KNOW YOUR CONSTRUCTION SAFETY SIGNS.
 
Global Hazards
Global HazardsGlobal Hazards
Global Hazards
 
Monthly safety report 2012 11
Monthly safety report 2012 11Monthly safety report 2012 11
Monthly safety report 2012 11
 
Construction safety part 1
Construction safety  part 1Construction safety  part 1
Construction safety part 1
 
Construction hazards and_safety_by_isti
Construction hazards and_safety_by_istiConstruction hazards and_safety_by_isti
Construction hazards and_safety_by_isti
 
Monthly Safety Report- (Mr. Shekhar viset) Project M (03-2011)
Monthly Safety Report- (Mr. Shekhar viset) Project M (03-2011)Monthly Safety Report- (Mr. Shekhar viset) Project M (03-2011)
Monthly Safety Report- (Mr. Shekhar viset) Project M (03-2011)
 
Scaffold Safety Part 1
Scaffold Safety Part 1Scaffold Safety Part 1
Scaffold Safety Part 1
 

Similar to Weekly safety report abhishek vij

UNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdfUNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdfPinakRay1
 
Factories and Machinery Act (BOWEC)
Factories and Machinery Act (BOWEC)Factories and Machinery Act (BOWEC)
Factories and Machinery Act (BOWEC)Abirami V Veeramani
 
Lifting equipment at work
Lifting equipment at workLifting equipment at work
Lifting equipment at workPaul Smith
 
Induction process
Induction process Induction process
Induction process MansC1
 
SAFETY IN USE OF CONSTRUCTION MACHINARY AND EQUIPMENT.pptx
SAFETY IN USE OF CONSTRUCTION MACHINARY AND EQUIPMENT.pptxSAFETY IN USE OF CONSTRUCTION MACHINARY AND EQUIPMENT.pptx
SAFETY IN USE OF CONSTRUCTION MACHINARY AND EQUIPMENT.pptxShyam Sundar Roy
 
DPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptxDPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptxAamirAbbas75
 
13 Initial Project Site Office Set-up Risk Assessment Templates.docx
13 Initial Project Site Office Set-up Risk Assessment Templates.docx13 Initial Project Site Office Set-up Risk Assessment Templates.docx
13 Initial Project Site Office Set-up Risk Assessment Templates.docxDwarika Bhushan Sharma
 
Hse new microsoft power point presentation
Hse new microsoft power point presentationHse new microsoft power point presentation
Hse new microsoft power point presentationSamip Nathani nathani
 
Confined Spaces: An Industrial Work Guide
Confined Spaces: An Industrial Work GuideConfined Spaces: An Industrial Work Guide
Confined Spaces: An Industrial Work GuideManaswiMumbarkar
 
HSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputHSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputGaurav Singh Rajput
 

Similar to Weekly safety report abhishek vij (20)

Safety plan
Safety planSafety plan
Safety plan
 
ANNEX0~1.DOC
ANNEX0~1.DOCANNEX0~1.DOC
ANNEX0~1.DOC
 
UNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdfUNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdf
 
Site Induction
Site InductionSite Induction
Site Induction
 
Factories and Machinery Act (BOWEC)
Factories and Machinery Act (BOWEC)Factories and Machinery Act (BOWEC)
Factories and Machinery Act (BOWEC)
 
Lifting equipment at work
Lifting equipment at workLifting equipment at work
Lifting equipment at work
 
Induction process
Induction process Induction process
Induction process
 
Safety topics
Safety topicsSafety topics
Safety topics
 
Safety_induction
Safety_inductionSafety_induction
Safety_induction
 
SAFETY IN USE OF CONSTRUCTION MACHINARY AND EQUIPMENT.pptx
SAFETY IN USE OF CONSTRUCTION MACHINARY AND EQUIPMENT.pptxSAFETY IN USE OF CONSTRUCTION MACHINARY AND EQUIPMENT.pptx
SAFETY IN USE OF CONSTRUCTION MACHINARY AND EQUIPMENT.pptx
 
DPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptxDPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptx
 
13 Initial Project Site Office Set-up Risk Assessment Templates.docx
13 Initial Project Site Office Set-up Risk Assessment Templates.docx13 Initial Project Site Office Set-up Risk Assessment Templates.docx
13 Initial Project Site Office Set-up Risk Assessment Templates.docx
 
Warehouse ppts
Warehouse pptsWarehouse ppts
Warehouse ppts
 
Hse new microsoft power point presentation
Hse new microsoft power point presentationHse new microsoft power point presentation
Hse new microsoft power point presentation
 
Advance management for civil engineering
Advance management for civil engineeringAdvance management for civil engineering
Advance management for civil engineering
 
Student Practical Assessment_DEMOLITION
Student Practical Assessment_DEMOLITIONStudent Practical Assessment_DEMOLITION
Student Practical Assessment_DEMOLITION
 
Construction safety
Construction safetyConstruction safety
Construction safety
 
3220 warehouse
3220 warehouse3220 warehouse
3220 warehouse
 
Confined Spaces: An Industrial Work Guide
Confined Spaces: An Industrial Work GuideConfined Spaces: An Industrial Work Guide
Confined Spaces: An Industrial Work Guide
 
HSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputHSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh Rajput
 

Recently uploaded

VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 

Recently uploaded (20)

VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 

Weekly safety report abhishek vij

  • 1. INDUSTRIAL TRAINING WEEKLY REPORT L & T Construction ITBA PROJECT CAHNDIGARH AIRPORT SUBMITTED IN PARTIAL FULFILMENT OF THE REQUIREMENTS FOR THE AWARD OF THE DEGREE OF BACHELOR OF ENGINEERING IN MECHANICAL ENGINEERING MECHANICAL ENGINEERING DEPARTMENT CCET CHANDIGARH SUBMITTED BY: SUBMITTED TO: ABHISHEK VIJ – CO10103 MR RAJESH SHARMA MECHANICAL, 4th YEAR TRAINING COORDINATOR
  • 2. CONSTRUCTION SITE SAFETY PLAN -I 1. PRE- WORK PLANNING ▪ A health & safety plan ▪ An OH&S policy displayed ▪ An accident report book ▪ Induction training records ▪ Workplace inspection records ▪ Documented safe working procedures or method statements ▪ Protective clothing & equipment records ▪ Material safety data sheets (MSDS) available ▪ Health & safety system manual ▪ Contract-specific risk assessment conducted ▪ Emergency procedures and necessary training records ▪ Identify ways that a risk can be controlled without using personal protective equipment (PPE) ▪ Ensure that workers are using the right and fit PPE for the job ▪ Fence the site against unauthorized entry ▪ Take measures to prevent objects from falling from height and to take measures to protect members of the public (such as persons passing by the site) ▪ Provide and keep safe egress and access to the place of work, such as access to scaffolding ▪ Put up appropriate signs including traffic routes, authorized personnel only etc.
  • 3. ▪ Keep the site tidy, well lit and well laid ▪ Provide sufficient welfare and first aid facilities ▪ Provide adequate fire precautions such as fire ▪ Ensure that existing power lines (buried or systems of work in place ▪ Take necessary precautions to ensure that electrical condition ▪ Ensure that vehicles and people are kept apart, routes maintained in a safe condition ▪ Ensure that vehicle and plant operators are suitably Keep the site tidy, well lit and well laid out Provide sufficient welfare and first aid facilities Provide adequate fire precautions such as fire extinguishers, escape routes Ensure that existing power lines (buried or overhead) are identified and associated safe ke necessary precautions to ensure that electrical systems are well maintained in a safe Ensure that vehicles and people are kept apart, especially slewing vehicles, with traffic maintained in a safe condition Ensure that vehicle and plant operators are suitably trained or licensed if required extinguishers, escape routes overhead) are identified and associated safe systems are well maintained in a safe especially slewing vehicles, with traffic trained or licensed if required
  • 4. ▪ Ensure that hoists and lifting appliances are properly installed and checked by competent persons ▪ Ensure that scaffolds are erected, altered and dismantled by competent people only ▪ Take measures to stop workers from falling and ensure fall protection ▪ Minimize and eliminate risk of manual handling by the use of mechanical equipment, or arrange material to be supplied in manageable sizes and weights to reduce the risk of back injury ▪ Take all measures to reduce exposure to noise and vibration. 2. SITE LAYOUT Plan emergency routes and exits, traffic routes, danger areas, loading bays, ramps, etc. ▪ Ensure provision of safe plant and equipment, with due care to suitability, selection, safety features, safe use, training and information, inspection and maintenance. ▪ Provide safe working slope for excavators, fork-lift trucks and dump trucks ▪ Provide suitable safety signs and warning notices 2.1Well-planned site layout and process flow control at the Planning Stage.
  • 5. 2.2Maintenance of visitor’s log system to check unauthorized entry 2.3 Effective wheel washing facilities provided at site entrance 2.4 Steel sections stacked on the site for forming the mega-columns.
  • 6. 2.5 Proper selection of lifting appliances and gears to ensure safe lifting from the temporary loading area to the upper floors. 3. HOUSE KEEPING Keep work areas free from rubbish and obstructions ▪ Maintain all floor surfaces safe, suitable and free from slip or trip hazards. ▪ Ensure floor openings covered or otherwise fenced off. ▪ Materials are properly stacked and stored safely Keep all passageways in good conditions: ▪ Unobstructed and clearly defined ▪ Provide adequate lighting ▪ Ensure clear sightline at breaks and corners Are lightings maintained in good working order?
  • 7. ▪ Adequate and free from glare ▪ Lighting clean and efficient ▪ No flickering ▪ Maintain steady lights ▪ Provide and maintain all emergency lighting systems Is workers’ access to worksites well-maintained? ▪ Keep all walkways and stairways clear of debris and other materials such as used boxes, wooden scrap, loose gravel, oil leakage, tools and supplies to prevent tripping and slipping ▪ Put them in a bin or debris area to prevent fire and tripping hazards ▪ Provide adequate lighting to prevent accidents