2. Content
• Introduction to Energy
• What is power Factor
• Nature of Load (RLC)
• Power Factor Correction
• Block Diagram
• Working
• Project module
• Merits of improved Pf and Demerits of low Pf
13. System Before PFC
13
PF = 0.68 Lagging
ACTIVE POWER (P) = kW
APPARENT POW
ER
(S) = kVA
REACTIVEPOWER(Q)=kVAr
Θ1 = 47.17°
14. New System Power Triangle
PF = 0.92 Lagging
14
P = kW
S2 = kVA
Q2=kVAr
S1 = kVA
Q1=kVAr
Θ2 = 23.07°
Qold=kVAr
15. Merits of Improved Pf
• Improved plant efficiency
• Additional loads can be added to the system
• Reduced overloading of cables,transformers,
switchgear etc.
• Improved network voltage
• Improved starting torque of motors
15
16. Demerits of Low Pf
• Increases electricity costs
• Causes overloading of Generators,transformers and
distribution System
• Greater voltage drops and Power losses
• Low efficiency and unnecessary wear and tear to
Industrial electrical equipment
• Reduces load handling of the plant’s Electrical system
16