 INTRODUCTION
 DIFFERENT CONSTRAINTS IN ECONOMIC LOAD
DISPATCH
 OPERATING COST OF THERMAL PLANT
 ECONOMIC DISPATCH NEGLECTING
LOSSES
 ECONOMIC DISPATCH INCLUDING
LOSSES
 REFERENCES
INTRODUCTION
 In power generation our main aim is to generate the
required amount of power with minimum cost.
 Economic load dispatch means that the generator’s
real and reactive power are allowed to vary within
certain limits so as to meet a particular load demand
with minimum fuel cost
 This allocation of loads are based on some
constraints.
DIFFERENT CONSTRAINTS IN
ECONOMIC LOAD DISPATCH
 INEQUALITY CONSTRAINTS
 Voltage constraints
Vmin ≤ V ≤ Vmax ,
δmin ≤ δ ≤ δmax
 Generator constraints
KVA loading of generator should not exceed prescribed
value
Pmin ≤ P ≤ Pmax
Qmin ≤ Q ≤ Qmax
 Running spare capacity constraints
This constraints are needed to meet forced outage of
one or more alternators in the system and also
unexpected load on the system
 Transmission line constraints
flow of power through transmission line should less
than its thermal capacity
 Transformer tap set
for autotransformer tap t should between 0 & 1
For two winding transformer – between 0& k
 Equality constraints
 Real power
Pp= Vp Σ Ypq Vq cos(θpq-(δp+δq))
 Reactive power
Qp= Vp Σ Ypq Vq sin(θpq-(δp+δq))
OPERATING COST OF THERMAL
PLANT
 The factors influencing power generation at minimum
cost are operating efficiencies of generators, fuel
cost, and transmission losses.
 The most efficient generator in the system does not
guarantee minimum cost as it may be located in an
area where fuel cost is high.
 If the plant is located far from the load
center, transmission losses may be considerably higher
and hence the plant may be overly uneconomical.
 The input to the thermal plant is generally measured
in Btu/h, and the output is measured in MW
 In all practical cases, the fuel cost of generator can be
represented as a quadratic function of real power
generation
a) Heat rate curve b) Fuel cost curve
• By plotting the derivative of the fuel-cost curve versus
the real power we get the incremental fuel-cost curve
Incremental fuel-cost curve
The incremental fuel-cost curve is a measure of how
costly it will be to produce the next increment of
power.
ECONOMIC DISPATCH NEGLECTING
LOSSES
 It is the simplest economic dispatch problem
 Assume that the system is only one bus with all
generation and loads connected to it
 A cost function Ci is assumed to be known for each
plant
 The problem is to find the real power generation for
each plant such that the objective function (i.e., total
production cost) as defined by the equation
Is minimum ,subjected to the constraints
 when losses are neglected with no generator limits, for
most economic operation. all plants must operate at
equal incremental production cost
 Production from each plant can be found by
This equation is known as the coordination equation
For analytic solution we can find λ by
 In an iterative technique, starting with a value of λ and
the process is continued until ∆Pi is within a specified
accuracy
 Corresponding to this λ ,
is calculated, and the power mismatch is calculated by
Update value of λ by
EXAMPLE
 Above three eqn represent the eqn for straight line on
plotting this line we will get
ECONOMIC DISPATCH INCLUDING
LOSSES
 When power is transmitted over long distances
transmission losses are a major factor that affect the
optimum dispatch of generation
 One common practice for including the effect of
transmission losses is to express the total transmission loss
as a quadratic function of the generator power outputs. The
simplest quadratic form is
Using the langrange multiplier
Minimum of this function is fount at the points where the
partials of the function to it’s variables are zero
Itration method
Initially assume a λ value. Then find out the generation
from each plant using the equation
Calculate the power mismatch
calculate
Update value of λ
Repeat the procedure with new value of λ until the
power mismatch is within the limit
EXAMPLE
SOLUTION
REFERENCES
 Power System Analysis - Hadi Saadat
 power system analysis by nagrath and kothari
THANKS

More Related Content

What's hot

Economic dispatch
Economic dispatch  Economic dispatch
Economic dispatch Hussain Ali
 
Economic load dispatch(with and without losses)
Economic load dispatch(with and without losses)Economic load dispatch(with and without losses)
Economic load dispatch(with and without losses)Asha Anu Kurian
 
Unit 1 Power System Stability
Unit 1 Power System Stability Unit 1 Power System Stability
Unit 1 Power System Stability SANTOSH GADEKAR
 
Load Frequency Control of Two Area System
Load Frequency Control of Two Area SystemLoad Frequency Control of Two Area System
Load Frequency Control of Two Area SystemManash Deka
 
Hydrothermal scheduling
Hydrothermal schedulingHydrothermal scheduling
Hydrothermal schedulingASHIRBAD BARIK
 
Input output , heat rate characteristics and Incremental cost
Input output , heat rate characteristics and Incremental costInput output , heat rate characteristics and Incremental cost
Input output , heat rate characteristics and Incremental costEklavya Sharma
 
importance of reactive power in power system
importance of reactive power in power systemimportance of reactive power in power system
importance of reactive power in power systemsneh pratap singh
 
Chapter 2 automatic_load_frequency_contr
Chapter 2 automatic_load_frequency_contrChapter 2 automatic_load_frequency_contr
Chapter 2 automatic_load_frequency_contrSrinivas Dalli
 
Reactive Power : Problems and Solutions
Reactive Power : Problems and SolutionsReactive Power : Problems and Solutions
Reactive Power : Problems and SolutionsAbhinav Dubey
 
Classification of unified power quality compensators
Classification of unified power quality compensatorsClassification of unified power quality compensators
Classification of unified power quality compensatorsDuvvuruSravya
 
Power System Planning
Power System PlanningPower System Planning
Power System Planninglinsstalex
 
Economic load dispatch
Economic load dispatchEconomic load dispatch
Economic load dispatchVipin Pandey
 
Load forecasting
Load forecastingLoad forecasting
Load forecastingsushrut p
 
Deregulation in power industry
Deregulation in power industryDeregulation in power industry
Deregulation in power industryjerry patel
 
Hydro-Thermal Scheduling: Using Soft Computing Technique Approch
Hydro-Thermal Scheduling: Using Soft Computing Technique ApprochHydro-Thermal Scheduling: Using Soft Computing Technique Approch
Hydro-Thermal Scheduling: Using Soft Computing Technique ApprochIOSR Journals
 
OPTIMAL PLACEMENT AND SIZING OF CAPACITOR BANKS BASED ON VOLTAGE PROFILE AND ...
OPTIMAL PLACEMENT AND SIZING OF CAPACITOR BANKS BASED ON VOLTAGE PROFILE AND ...OPTIMAL PLACEMENT AND SIZING OF CAPACITOR BANKS BASED ON VOLTAGE PROFILE AND ...
OPTIMAL PLACEMENT AND SIZING OF CAPACITOR BANKS BASED ON VOLTAGE PROFILE AND ...Prashanta Sarkar
 

What's hot (20)

Economic dispatch
Economic dispatch  Economic dispatch
Economic dispatch
 
Economic load dispatch(with and without losses)
Economic load dispatch(with and without losses)Economic load dispatch(with and without losses)
Economic load dispatch(with and without losses)
 
Unit 1 Power System Stability
Unit 1 Power System Stability Unit 1 Power System Stability
Unit 1 Power System Stability
 
Load Frequency Control of Two Area System
Load Frequency Control of Two Area SystemLoad Frequency Control of Two Area System
Load Frequency Control of Two Area System
 
Hydrothermal scheduling
Hydrothermal schedulingHydrothermal scheduling
Hydrothermal scheduling
 
Input output , heat rate characteristics and Incremental cost
Input output , heat rate characteristics and Incremental costInput output , heat rate characteristics and Incremental cost
Input output , heat rate characteristics and Incremental cost
 
importance of reactive power in power system
importance of reactive power in power systemimportance of reactive power in power system
importance of reactive power in power system
 
Chapter 2 automatic_load_frequency_contr
Chapter 2 automatic_load_frequency_contrChapter 2 automatic_load_frequency_contr
Chapter 2 automatic_load_frequency_contr
 
Introduction
IntroductionIntroduction
Introduction
 
Power system planing and operation (pce5312) chapter five
Power system planing and operation (pce5312) chapter fivePower system planing and operation (pce5312) chapter five
Power system planing and operation (pce5312) chapter five
 
Economic load dispatch
Economic load  dispatchEconomic load  dispatch
Economic load dispatch
 
Reactive Power : Problems and Solutions
Reactive Power : Problems and SolutionsReactive Power : Problems and Solutions
Reactive Power : Problems and Solutions
 
Classification of unified power quality compensators
Classification of unified power quality compensatorsClassification of unified power quality compensators
Classification of unified power quality compensators
 
Power System Planning
Power System PlanningPower System Planning
Power System Planning
 
Economic load dispatch
Economic load dispatchEconomic load dispatch
Economic load dispatch
 
Load forecasting
Load forecastingLoad forecasting
Load forecasting
 
Microgrid
MicrogridMicrogrid
Microgrid
 
Deregulation in power industry
Deregulation in power industryDeregulation in power industry
Deregulation in power industry
 
Hydro-Thermal Scheduling: Using Soft Computing Technique Approch
Hydro-Thermal Scheduling: Using Soft Computing Technique ApprochHydro-Thermal Scheduling: Using Soft Computing Technique Approch
Hydro-Thermal Scheduling: Using Soft Computing Technique Approch
 
OPTIMAL PLACEMENT AND SIZING OF CAPACITOR BANKS BASED ON VOLTAGE PROFILE AND ...
OPTIMAL PLACEMENT AND SIZING OF CAPACITOR BANKS BASED ON VOLTAGE PROFILE AND ...OPTIMAL PLACEMENT AND SIZING OF CAPACITOR BANKS BASED ON VOLTAGE PROFILE AND ...
OPTIMAL PLACEMENT AND SIZING OF CAPACITOR BANKS BASED ON VOLTAGE PROFILE AND ...
 

Similar to Economicloaddispatch 111213025406-phpapp01

Economic operation of power system
Economic operation of power systemEconomic operation of power system
Economic operation of power systemBalaram Das
 
Economic Load Dispatch for Multi-Generator Systems with Units Having Nonlinea...
Economic Load Dispatch for Multi-Generator Systems with Units Having Nonlinea...Economic Load Dispatch for Multi-Generator Systems with Units Having Nonlinea...
Economic Load Dispatch for Multi-Generator Systems with Units Having Nonlinea...IJAPEJOURNAL
 
Optimal load scheduling
Optimal load schedulingOptimal load scheduling
Optimal load schedulingMayank Sharma
 
Computer Application in Power system: Chapter six - optimization and security
Computer Application in Power system: Chapter six - optimization and securityComputer Application in Power system: Chapter six - optimization and security
Computer Application in Power system: Chapter six - optimization and securityAdama Science and Technology University
 
frequency regulation of deregulated power system having grc integrated with r...
frequency regulation of deregulated power system having grc integrated with r...frequency regulation of deregulated power system having grc integrated with r...
frequency regulation of deregulated power system having grc integrated with r...Yedukondalachari B
 
A presentation on economic load dispatch
A presentation on economic load dispatchA presentation on economic load dispatch
A presentation on economic load dispatchsouravsahoo28
 
Economic Dispatch of Generated Power Using Modified Lambda-Iteration Method
Economic Dispatch of Generated Power Using Modified Lambda-Iteration MethodEconomic Dispatch of Generated Power Using Modified Lambda-Iteration Method
Economic Dispatch of Generated Power Using Modified Lambda-Iteration MethodIOSR Journals
 
211658558-Chapter-4-Economic-Dispatch.pdf
211658558-Chapter-4-Economic-Dispatch.pdf211658558-Chapter-4-Economic-Dispatch.pdf
211658558-Chapter-4-Economic-Dispatch.pdfyoziscijunior
 
economic load dispatch and unit commitment power_system_operation.pdf
economic load dispatch and unit commitment power_system_operation.pdfeconomic load dispatch and unit commitment power_system_operation.pdf
economic load dispatch and unit commitment power_system_operation.pdfArnabChakraborty499766
 
Optimal Unit Commitment Based on Economic Dispatch Using Improved Particle Sw...
Optimal Unit Commitment Based on Economic Dispatch Using Improved Particle Sw...Optimal Unit Commitment Based on Economic Dispatch Using Improved Particle Sw...
Optimal Unit Commitment Based on Economic Dispatch Using Improved Particle Sw...paperpublications3
 
Mr. Bakar Presentation for group discussion.docx
Mr. Bakar Presentation for group discussion.docxMr. Bakar Presentation for group discussion.docx
Mr. Bakar Presentation for group discussion.docxCyberMohdSalahShoty
 
Economic Dispatch Research paper solution slides
Economic Dispatch Research paper solution slidesEconomic Dispatch Research paper solution slides
Economic Dispatch Research paper solution slidesMuhammad Abdullah
 

Similar to Economicloaddispatch 111213025406-phpapp01 (20)

Economic load dispatch
Economic load dispatchEconomic load dispatch
Economic load dispatch
 
Unit 5.pptx
Unit 5.pptxUnit 5.pptx
Unit 5.pptx
 
Economic operation of power system
Economic operation of power systemEconomic operation of power system
Economic operation of power system
 
Economic Load Dispatch for Multi-Generator Systems with Units Having Nonlinea...
Economic Load Dispatch for Multi-Generator Systems with Units Having Nonlinea...Economic Load Dispatch for Multi-Generator Systems with Units Having Nonlinea...
Economic Load Dispatch for Multi-Generator Systems with Units Having Nonlinea...
 
Optimal load scheduling
Optimal load schedulingOptimal load scheduling
Optimal load scheduling
 
UNIT-4-PPT.ppt
UNIT-4-PPT.pptUNIT-4-PPT.ppt
UNIT-4-PPT.ppt
 
Computer Application in Power system: Chapter six - optimization and security
Computer Application in Power system: Chapter six - optimization and securityComputer Application in Power system: Chapter six - optimization and security
Computer Application in Power system: Chapter six - optimization and security
 
frequency regulation of deregulated power system having grc integrated with r...
frequency regulation of deregulated power system having grc integrated with r...frequency regulation of deregulated power system having grc integrated with r...
frequency regulation of deregulated power system having grc integrated with r...
 
Economic dipatch
Economic dipatch Economic dipatch
Economic dipatch
 
1.3
1.31.3
1.3
 
A presentation on economic load dispatch
A presentation on economic load dispatchA presentation on economic load dispatch
A presentation on economic load dispatch
 
Economic Dispatch of Generated Power Using Modified Lambda-Iteration Method
Economic Dispatch of Generated Power Using Modified Lambda-Iteration MethodEconomic Dispatch of Generated Power Using Modified Lambda-Iteration Method
Economic Dispatch of Generated Power Using Modified Lambda-Iteration Method
 
211658558-Chapter-4-Economic-Dispatch.pdf
211658558-Chapter-4-Economic-Dispatch.pdf211658558-Chapter-4-Economic-Dispatch.pdf
211658558-Chapter-4-Economic-Dispatch.pdf
 
A039101011
A039101011A039101011
A039101011
 
economic load dispatch and unit commitment power_system_operation.pdf
economic load dispatch and unit commitment power_system_operation.pdfeconomic load dispatch and unit commitment power_system_operation.pdf
economic load dispatch and unit commitment power_system_operation.pdf
 
Optimal Unit Commitment Based on Economic Dispatch Using Improved Particle Sw...
Optimal Unit Commitment Based on Economic Dispatch Using Improved Particle Sw...Optimal Unit Commitment Based on Economic Dispatch Using Improved Particle Sw...
Optimal Unit Commitment Based on Economic Dispatch Using Improved Particle Sw...
 
Mr. Bakar Presentation for group discussion.docx
Mr. Bakar Presentation for group discussion.docxMr. Bakar Presentation for group discussion.docx
Mr. Bakar Presentation for group discussion.docx
 
PSOC.pptx
PSOC.pptxPSOC.pptx
PSOC.pptx
 
Gs3511851192
Gs3511851192Gs3511851192
Gs3511851192
 
Economic Dispatch Research paper solution slides
Economic Dispatch Research paper solution slidesEconomic Dispatch Research paper solution slides
Economic Dispatch Research paper solution slides
 

More from vikram anand

Multidimensional optimal droop control for wind resources in dc m 2
Multidimensional optimal droop control for wind resources in dc m 2Multidimensional optimal droop control for wind resources in dc m 2
Multidimensional optimal droop control for wind resources in dc m 2vikram anand
 
Karimulla selected project
Karimulla selected projectKarimulla selected project
Karimulla selected projectvikram anand
 
Ece333 2018 lect18_rh power flow
Ece333 2018 lect18_rh power flowEce333 2018 lect18_rh power flow
Ece333 2018 lect18_rh power flowvikram anand
 
Economic load dispatch
Economic load dispatchEconomic load dispatch
Economic load dispatchvikram anand
 
160701 lamp-template-16x9
160701 lamp-template-16x9160701 lamp-template-16x9
160701 lamp-template-16x9vikram anand
 
L14 cosinecontrolscheme-151116184737-lva1-app6892
L14 cosinecontrolscheme-151116184737-lva1-app6892L14 cosinecontrolscheme-151116184737-lva1-app6892
L14 cosinecontrolscheme-151116184737-lva1-app6892vikram anand
 

More from vikram anand (20)

Dcgrid
DcgridDcgrid
Dcgrid
 
Dcgrid2
Dcgrid2Dcgrid2
Dcgrid2
 
Dcgris3
Dcgris3Dcgris3
Dcgris3
 
Multidimensional optimal droop control for wind resources in dc m 2
Multidimensional optimal droop control for wind resources in dc m 2Multidimensional optimal droop control for wind resources in dc m 2
Multidimensional optimal droop control for wind resources in dc m 2
 
Karimulla selected project
Karimulla selected projectKarimulla selected project
Karimulla selected project
 
Energies 13-02570
Energies 13-02570Energies 13-02570
Energies 13-02570
 
Energies 13-01607
Energies 13-01607Energies 13-01607
Energies 13-01607
 
Energies 12-01934
Energies 12-01934Energies 12-01934
Energies 12-01934
 
Energies 12-03415
Energies 12-03415Energies 12-03415
Energies 12-03415
 
Energies 11-01963
Energies 11-01963Energies 11-01963
Energies 11-01963
 
Ece333 2018 lect18_rh power flow
Ece333 2018 lect18_rh power flowEce333 2018 lect18_rh power flow
Ece333 2018 lect18_rh power flow
 
Energies 10-00523
Energies 10-00523Energies 10-00523
Energies 10-00523
 
Economic load dispatch
Economic load dispatchEconomic load dispatch
Economic load dispatch
 
Presentation2
Presentation2Presentation2
Presentation2
 
160701 lamp-template-16x9
160701 lamp-template-16x9160701 lamp-template-16x9
160701 lamp-template-16x9
 
Chapter02
Chapter02Chapter02
Chapter02
 
Khan2018
Khan2018Khan2018
Khan2018
 
Smartgrid
SmartgridSmartgrid
Smartgrid
 
L14 cosinecontrolscheme-151116184737-lva1-app6892
L14 cosinecontrolscheme-151116184737-lva1-app6892L14 cosinecontrolscheme-151116184737-lva1-app6892
L14 cosinecontrolscheme-151116184737-lva1-app6892
 
Anand2020
Anand2020Anand2020
Anand2020
 

Recently uploaded

GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 

Recently uploaded (20)

GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 

Economicloaddispatch 111213025406-phpapp01

  • 1. DEEPAK JOHN S1 M. Tech POWER SYSTEM PRESENTED BY
  • 2. CONTENTS  INTRODUCTION  DIFFERENT CONSTRAINTS IN ECONOMIC LOAD DISPATCH  OPERATING COST OF THERMAL PLANT  ECONOMIC DISPATCH NEGLECTING LOSSES  ECONOMIC DISPATCH INCLUDING LOSSES  REFERENCES
  • 3. INTRODUCTION  In power generation our main aim is to generate the required amount of power with minimum cost.  Economic load dispatch means that the generator’s real and reactive power are allowed to vary within certain limits so as to meet a particular load demand with minimum fuel cost  This allocation of loads are based on some constraints.
  • 4. DIFFERENT CONSTRAINTS IN ECONOMIC LOAD DISPATCH  INEQUALITY CONSTRAINTS  Voltage constraints Vmin ≤ V ≤ Vmax , δmin ≤ δ ≤ δmax  Generator constraints KVA loading of generator should not exceed prescribed value Pmin ≤ P ≤ Pmax Qmin ≤ Q ≤ Qmax
  • 5.  Running spare capacity constraints This constraints are needed to meet forced outage of one or more alternators in the system and also unexpected load on the system  Transmission line constraints flow of power through transmission line should less than its thermal capacity  Transformer tap set for autotransformer tap t should between 0 & 1 For two winding transformer – between 0& k
  • 6.  Equality constraints  Real power Pp= Vp Σ Ypq Vq cos(θpq-(δp+δq))  Reactive power Qp= Vp Σ Ypq Vq sin(θpq-(δp+δq))
  • 7. OPERATING COST OF THERMAL PLANT  The factors influencing power generation at minimum cost are operating efficiencies of generators, fuel cost, and transmission losses.  The most efficient generator in the system does not guarantee minimum cost as it may be located in an area where fuel cost is high.  If the plant is located far from the load center, transmission losses may be considerably higher and hence the plant may be overly uneconomical.
  • 8.  The input to the thermal plant is generally measured in Btu/h, and the output is measured in MW  In all practical cases, the fuel cost of generator can be represented as a quadratic function of real power generation a) Heat rate curve b) Fuel cost curve
  • 9. • By plotting the derivative of the fuel-cost curve versus the real power we get the incremental fuel-cost curve Incremental fuel-cost curve The incremental fuel-cost curve is a measure of how costly it will be to produce the next increment of power.
  • 10. ECONOMIC DISPATCH NEGLECTING LOSSES  It is the simplest economic dispatch problem  Assume that the system is only one bus with all generation and loads connected to it  A cost function Ci is assumed to be known for each plant
  • 11.  The problem is to find the real power generation for each plant such that the objective function (i.e., total production cost) as defined by the equation Is minimum ,subjected to the constraints
  • 12.
  • 13.
  • 14.  when losses are neglected with no generator limits, for most economic operation. all plants must operate at equal incremental production cost  Production from each plant can be found by This equation is known as the coordination equation For analytic solution we can find λ by
  • 15.  In an iterative technique, starting with a value of λ and the process is continued until ∆Pi is within a specified accuracy  Corresponding to this λ , is calculated, and the power mismatch is calculated by Update value of λ by
  • 17.
  • 18.  Above three eqn represent the eqn for straight line on plotting this line we will get
  • 19.
  • 20.
  • 21. ECONOMIC DISPATCH INCLUDING LOSSES  When power is transmitted over long distances transmission losses are a major factor that affect the optimum dispatch of generation  One common practice for including the effect of transmission losses is to express the total transmission loss as a quadratic function of the generator power outputs. The simplest quadratic form is
  • 22.
  • 23. Using the langrange multiplier Minimum of this function is fount at the points where the partials of the function to it’s variables are zero
  • 24.
  • 25. Itration method Initially assume a λ value. Then find out the generation from each plant using the equation Calculate the power mismatch calculate
  • 26. Update value of λ Repeat the procedure with new value of λ until the power mismatch is within the limit
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35. REFERENCES  Power System Analysis - Hadi Saadat  power system analysis by nagrath and kothari