SlideShare a Scribd company logo
1 of 28
Industrial Summer Training at
NTPC Badarpur

Anuj Kumar
Electronics & Communication
Introduction

10/31/11
Overview of NTPC
 NTPC was set up in the central sector in the
1975.
 NTPC has installed capacity of 29,394 MW. It
plans to be a 75,000 MW company by 2017.
 NTPC Badarpur station has also bagged ISO
9001/ ISO 14001 certification.
 Today NTPC contributes more than 3 / 5th of
the total power generation in India
Overview of NTPC
Click to edit the outline
text format
Second Outline
Level
− Third Outline
Level
Fourth
Outline Level
− Fifth
Outline
Level
NTPC Badarpur
Overview of BTPS
 BTPS MEETS MORE THAN 24% OF DELHI’S ELECTRICITY
CONSUMPTION

 INSTALLED CAPACITY

720 MW

DERATED CAPACITY

705 MW
(3x95 + 2x210MW)
 OWNED BY GOVT. OF INDIA, MINISTRY OF POWER
 BEING MANAGED BY NTPC FOR THE LAST 26 YEARS
SINCE 1st APRIL 1978
NTPC Badarpur
 BTPS was conceived in 1965 to meet
the growing electricity demand of
Northern Region.
 The site construction activities started
in 1968.
 The plant became operational with the
commissioning of its first unit on 26th
July 1973, 2nd unit in ;74 , 3rd unit in
’75 , 4th unit in ’78 & 5th unit in ’81.
Basic Principle
There are basically three main units of a thermal power plant:
1. Steam Generator or Boiler
2. Steam Turbine
3. Electric Generator
Electricity from Coal
C&I LABS
Control and Instrumentation Department has
following labs:
1.
2.
3.
4.
5.
6.

Manometry Lab
Protection and Interlocks Lab
Automation Lab
Electronics Lab
Water Treatment Plant
Furnaces Safety Supervisory System Lab
OPERATION AND MAINTAINANCE
This control & instrumentation is the brain of the plant because from the
relays to transmitters followed by the electronic computation chipsets and
recorders and lastly the controlling circuitry, all fall under this.
A View of Control Room at BTPS
CONTROL & MONITORING
MECHANISMS
There are basically two types of Problems
faced in a Power Plant
1. Metallurgical
2. Mechanical
C&I Lab
In C&I Lab parameters to be monitored are:
1. Speed
2. Temperature
3. Current
4. Voltage
5. Pressure
6. Flow of Gases
7. Vibration
IT Role & Responsibility
– Maintenance Management
– Materials & Contracts Management
– Financial Accounting
– Coal Monitoring & Accounting.
– Operations & Generation Monitoring
– Hospital Management
– H R & TMS, T/S Management
– Office Automation & communication.
– E-Samadhan complaints Monitoring
• Why IT ?
Materials : 30,000 + items
 Transaction data.
 Master data Material and Service

 Plant : 15,000 equipments





•

Equipment master. Task list.

Employees : 1100 + Personal and payroll data.
Finance : Accounting data.
Operation : Plant parameters history data
Vendors: 5000 + vendors.
Satellite Communication Network

4/6 GHZ

RHQ:ERHQ, NRHQ,SRHQ,WRHQ
Engg.Office, NOIDA

Rihand,
8 MBPS M/W Link

PMI,NOIDA

2 GHZ/ 8 MBPS

4/6 GHZ
( 512 kbps aggreagate )

2 mbps
leased line

CC, SCOPE
New Delhi

DADRI PROJECT

NTPC Hub Station
At CSES, Noida

Tapovan Loharinagpala
( ORDERED )

Singrauli
OFC
LINK

Vindhyachal

THERMAL: Farakka,Unchahar,Kahalgaon,
Korba, Ramagundam, Sipat, Simhadri,
Talcher (S), Talcher (T), Tanda, Barh

GAS/HYDRO:Anta,Auriya,Faridabad,
Gandhar, Kawas, Kayamkulam, Koldam,
Awards
MOP’s Meritorious Productivity Award:
For calendar years 1987, 1988, 1990.
For financial years 92-93, 94-95 and 97-98
Received Bronze medal in 1998-99 and
Received Silver shield and certificate of
Meritorious performance for 2000-01.
Received Gold shield and Certificate for
outstanding performance three consecutive years
01-02 & 02-03 , 03-04. the awards were
presented by Hon’ble President of India and
Hon’ble power Minister on 24 August 2004.
Awards
Awards
Awards
o British safety award for 1988, 1994 and
1999.
o

One employee bagged the Vishwakarma
Rashtriya Puraskar in 1994 from Ministry
of Labour. Six employees have been given
the same award for 1998.

o

6 BTPS employees were awarded under
Delhi Shramik Sujhao Yojna Puraskar’97 .
BTPS awarded Silver shield in Thermal Power Sector
for Outstanding Achievement in Safety management
by Greentech foundation for 2003-04
– BTPS awarded Greentech Environment
excellence Gold Award in Thermal Power sector
for 2002-03
– BTPS awarded Greentech Environment
excellence Gold Award in Thermal Power sector
for 2003-04
– BTPS received golden peacock award for IT
Innovations for 2003-04
BTPS received golden peacock award for IT innovations for
2003-04
Conclusion
The BTPS IT has come a long way from lagging
to leading in IT enablement among NTPC
power stations. IT Vision realized, making BTPS
highly information enabled plant.

10/31/11
Reference
• TRAINING REPORTS OF PAST YEARS AT
NALANDA LIBRARY
• INTERNET
• DOCUMENTS OF IT DEPARTMENT
ntpc

More Related Content

What's hot

Badarpur Thermal Power Station
Badarpur Thermal Power StationBadarpur Thermal Power Station
Badarpur Thermal Power Station
Ayush Khare
 
NTPC Auraiya Industrial Training
NTPC Auraiya Industrial TrainingNTPC Auraiya Industrial Training
NTPC Auraiya Industrial Training
Abhitendra Singh
 
DADRI GAS POWER PLANT report
DADRI GAS POWER PLANT reportDADRI GAS POWER PLANT report
DADRI GAS POWER PLANT report
94600banti
 
INTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCINTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPC
ADITYA ARYAN
 

What's hot (20)

Training NTPC
Training NTPCTraining NTPC
Training NTPC
 
Summer training report on
Summer training report onSummer training report on
Summer training report on
 
Udbhav's presentation on ntpc
Udbhav's presentation on ntpcUdbhav's presentation on ntpc
Udbhav's presentation on ntpc
 
Ntpc(btps) report
Ntpc(btps) reportNtpc(btps) report
Ntpc(btps) report
 
Vikas
VikasVikas
Vikas
 
NTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training ReportNTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training Report
 
Badarpur Thermal Power Station
Badarpur Thermal Power StationBadarpur Thermal Power Station
Badarpur Thermal Power Station
 
NTPC PROJECT..
NTPC PROJECT..NTPC PROJECT..
NTPC PROJECT..
 
NTPC Auraiya Industrial Training
NTPC Auraiya Industrial TrainingNTPC Auraiya Industrial Training
NTPC Auraiya Industrial Training
 
Industrial training at NTPC Shaktinagar
Industrial training at NTPC ShaktinagarIndustrial training at NTPC Shaktinagar
Industrial training at NTPC Shaktinagar
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar
 
Ntpc Report
Ntpc ReportNtpc Report
Ntpc Report
 
NTPC Report
NTPC ReportNTPC Report
NTPC Report
 
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHALVOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
 
Report ON NTPC DADRI .BY ....EMAM
Report ON NTPC DADRI  .BY ....EMAMReport ON NTPC DADRI  .BY ....EMAM
Report ON NTPC DADRI .BY ....EMAM
 
DADRI GAS POWER PLANT report
DADRI GAS POWER PLANT reportDADRI GAS POWER PLANT report
DADRI GAS POWER PLANT report
 
Project Report on Industrial Summer Training at NTPC Simhadri
 Project Report on Industrial Summer Training at NTPC Simhadri Project Report on Industrial Summer Training at NTPC Simhadri
Project Report on Industrial Summer Training at NTPC Simhadri
 
Summer training in NTPC ppt
Summer training in NTPC pptSummer training in NTPC ppt
Summer training in NTPC ppt
 
Industrial training report of NTPC
Industrial training report of NTPC Industrial training report of NTPC
Industrial training report of NTPC
 
INTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCINTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPC
 

Viewers also liked

DEVELOPMENT OF MICRO HYDRO-ELECTRIC PROJECT
DEVELOPMENT OF MICRO HYDRO-ELECTRIC PROJECTDEVELOPMENT OF MICRO HYDRO-ELECTRIC PROJECT
DEVELOPMENT OF MICRO HYDRO-ELECTRIC PROJECT
Vaisakh Shanmughan
 
NTPC LTD.
NTPC LTD.NTPC LTD.
Malabar cements internship report
Malabar cements internship reportMalabar cements internship report
Malabar cements internship report
Sarath Karan
 
Project on Corporate Social Responsibility
Project on Corporate Social ResponsibilityProject on Corporate Social Responsibility
Project on Corporate Social Responsibility
Padma Ch
 

Viewers also liked (17)

Best School Presentation - KV NTPC Kayamkulam Sulekha Rani.R 22-4-13
Best School Presentation - KV NTPC Kayamkulam Sulekha Rani.R  22-4-13 Best School Presentation - KV NTPC Kayamkulam Sulekha Rani.R  22-4-13
Best School Presentation - KV NTPC Kayamkulam Sulekha Rani.R 22-4-13
 
Mercy to Living Beings - Jiva Karunya Panchakam
Mercy to Living Beings - Jiva Karunya PanchakamMercy to Living Beings - Jiva Karunya Panchakam
Mercy to Living Beings - Jiva Karunya Panchakam
 
DEVELOPMENT OF MICRO HYDRO-ELECTRIC PROJECT
DEVELOPMENT OF MICRO HYDRO-ELECTRIC PROJECTDEVELOPMENT OF MICRO HYDRO-ELECTRIC PROJECT
DEVELOPMENT OF MICRO HYDRO-ELECTRIC PROJECT
 
Shoaib Report
Shoaib ReportShoaib Report
Shoaib Report
 
NTPC KAHALGAON BIHAR
NTPC KAHALGAON BIHARNTPC KAHALGAON BIHAR
NTPC KAHALGAON BIHAR
 
NTPC DADRI.
NTPC DADRI.NTPC DADRI.
NTPC DADRI.
 
ntpc soft
ntpc softntpc soft
ntpc soft
 
NTPC LTD.
NTPC LTD.NTPC LTD.
NTPC LTD.
 
Presentation Prerana bhavan
Presentation Prerana bhavanPresentation Prerana bhavan
Presentation Prerana bhavan
 
Internship report RAJIV GANDHI COMBINED CYCLE POWER PLANT-NTPC LTD. Kayamkulam
Internship report  RAJIV GANDHI COMBINED CYCLE POWER PLANT-NTPC LTD. KayamkulamInternship report  RAJIV GANDHI COMBINED CYCLE POWER PLANT-NTPC LTD. Kayamkulam
Internship report RAJIV GANDHI COMBINED CYCLE POWER PLANT-NTPC LTD. Kayamkulam
 
Malabar cements internship report
Malabar cements internship reportMalabar cements internship report
Malabar cements internship report
 
Final Report
Final ReportFinal Report
Final Report
 
Project on Corporate Social Responsibility
Project on Corporate Social ResponsibilityProject on Corporate Social Responsibility
Project on Corporate Social Responsibility
 
ambuja cement report
ambuja cement reportambuja cement report
ambuja cement report
 
Thermal Power Plant - Manual
Thermal Power Plant - ManualThermal Power Plant - Manual
Thermal Power Plant - Manual
 
Ambuja cement project report
Ambuja cement project reportAmbuja cement project report
Ambuja cement project report
 
5 s training at ntpc limited, rihand vkb
5 s training at ntpc limited, rihand vkb5 s training at ntpc limited, rihand vkb
5 s training at ntpc limited, rihand vkb
 

Similar to ntpc

PROFILE- ENCON EMSPL
PROFILE- ENCON EMSPLPROFILE- ENCON EMSPL
PROFILE- ENCON EMSPL
Cdr S Kumar
 
ASHWANI ANAND Resume
ASHWANI ANAND ResumeASHWANI ANAND Resume
ASHWANI ANAND Resume
ashwani anand
 

Similar to ntpc (20)

Vishnu_CV final rev2
Vishnu_CV final rev2Vishnu_CV final rev2
Vishnu_CV final rev2
 
T.chandramouli O & M_ele
T.chandramouli O & M_eleT.chandramouli O & M_ele
T.chandramouli O & M_ele
 
T.chandramouli O & M_Electrical
T.chandramouli O & M_ElectricalT.chandramouli O & M_Electrical
T.chandramouli O & M_Electrical
 
viklesh essar
viklesh essarviklesh essar
viklesh essar
 
Vipul updated elec resume..
Vipul updated elec resume..Vipul updated elec resume..
Vipul updated elec resume..
 
PROFILE- ENCON EMSPL
PROFILE- ENCON EMSPLPROFILE- ENCON EMSPL
PROFILE- ENCON EMSPL
 
Final Project-Simran Singh.pdf
Final Project-Simran Singh.pdfFinal Project-Simran Singh.pdf
Final Project-Simran Singh.pdf
 
Presentation on energy management, energy audit and carrier opportunities
Presentation on energy management, energy audit and carrier opportunities Presentation on energy management, energy audit and carrier opportunities
Presentation on energy management, energy audit and carrier opportunities
 
Resume
ResumeResume
Resume
 
training report , NTPC , FOR MANIT STUDENTS
training report , NTPC , FOR MANIT STUDENTStraining report , NTPC , FOR MANIT STUDENTS
training report , NTPC , FOR MANIT STUDENTS
 
Ajay ntpc
Ajay ntpcAjay ntpc
Ajay ntpc
 
Old resume forman
Old resume formanOld resume forman
Old resume forman
 
Final reprt at ntpc vindhyanagar , singrauli
Final  reprt at ntpc vindhyanagar , singrauliFinal  reprt at ntpc vindhyanagar , singrauli
Final reprt at ntpc vindhyanagar , singrauli
 
Energy audit and career opportunities -EnSave
Energy audit  and career opportunities -EnSaveEnergy audit  and career opportunities -EnSave
Energy audit and career opportunities -EnSave
 
Ajay Uikey
Ajay UikeyAjay Uikey
Ajay Uikey
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANTBanti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT
 
ASHWANI ANAND Resume
ASHWANI ANAND ResumeASHWANI ANAND Resume
ASHWANI ANAND Resume
 
Measures and equipment
Measures and equipmentMeasures and equipment
Measures and equipment
 
Maintenance Head
Maintenance  HeadMaintenance  Head
Maintenance Head
 

Recently uploaded

John Deere Tractors 5415 Diagnostic Repair Service Manual.pdf
John Deere Tractors 5415 Diagnostic Repair Service Manual.pdfJohn Deere Tractors 5415 Diagnostic Repair Service Manual.pdf
John Deere Tractors 5415 Diagnostic Repair Service Manual.pdf
Excavator
 
Top profile Call Girls In Mangalore [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Mangalore [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In Mangalore [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Mangalore [ 7014168258 ] Call Me For Genuine Models...
gajnagarg
 
如何办理(Waterloo毕业证书)滑铁卢大学毕业证毕业证成绩单原版一比一
如何办理(Waterloo毕业证书)滑铁卢大学毕业证毕业证成绩单原版一比一如何办理(Waterloo毕业证书)滑铁卢大学毕业证毕业证成绩单原版一比一
如何办理(Waterloo毕业证书)滑铁卢大学毕业证毕业证成绩单原版一比一
avy6anjnd
 
一比一原版(Deakin毕业证书)迪肯大学毕业证成绩单留信学历认证
一比一原版(Deakin毕业证书)迪肯大学毕业证成绩单留信学历认证一比一原版(Deakin毕业证书)迪肯大学毕业证成绩单留信学历认证
一比一原版(Deakin毕业证书)迪肯大学毕业证成绩单留信学历认证
62qaf0hi
 
一比一原版(Greenwich毕业证书)格林威治大学毕业证如何办理
一比一原版(Greenwich毕业证书)格林威治大学毕业证如何办理一比一原版(Greenwich毕业证书)格林威治大学毕业证如何办理
一比一原版(Greenwich毕业证书)格林威治大学毕业证如何办理
bd2c5966a56d
 
Top profile Call Girls In Anand [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Anand [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Anand [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Anand [ 7014168258 ] Call Me For Genuine Models We ...
gajnagarg
 
Top profile Call Girls In dharamshala [ 7014168258 ] Call Me For Genuine Mode...
Top profile Call Girls In dharamshala [ 7014168258 ] Call Me For Genuine Mode...Top profile Call Girls In dharamshala [ 7014168258 ] Call Me For Genuine Mode...
Top profile Call Girls In dharamshala [ 7014168258 ] Call Me For Genuine Mode...
gajnagarg
 
如何办理伦敦商学院毕业证(LBS毕业证)毕业证成绩单原版一比一
如何办理伦敦商学院毕业证(LBS毕业证)毕业证成绩单原版一比一如何办理伦敦商学院毕业证(LBS毕业证)毕业证成绩单原版一比一
如何办理伦敦商学院毕业证(LBS毕业证)毕业证成绩单原版一比一
avy6anjnd
 
CELLULAR RESPIRATION. Helpful slides for
CELLULAR RESPIRATION. Helpful slides forCELLULAR RESPIRATION. Helpful slides for
CELLULAR RESPIRATION. Helpful slides for
euphemism22
 

Recently uploaded (20)

Marathi Call Girls Santacruz WhatsApp +91-9930687706, Best Service
Marathi Call Girls Santacruz WhatsApp +91-9930687706, Best ServiceMarathi Call Girls Santacruz WhatsApp +91-9930687706, Best Service
Marathi Call Girls Santacruz WhatsApp +91-9930687706, Best Service
 
Nangloi Jat Escorts Service Girl ^ 9332606886, WhatsApp Anytime Nangloi Jat
Nangloi Jat Escorts Service Girl ^ 9332606886, WhatsApp Anytime Nangloi JatNangloi Jat Escorts Service Girl ^ 9332606886, WhatsApp Anytime Nangloi Jat
Nangloi Jat Escorts Service Girl ^ 9332606886, WhatsApp Anytime Nangloi Jat
 
Effortless Driving Experience Premier Mercedes Sprinter Suspension Service
Effortless Driving Experience Premier Mercedes Sprinter Suspension ServiceEffortless Driving Experience Premier Mercedes Sprinter Suspension Service
Effortless Driving Experience Premier Mercedes Sprinter Suspension Service
 
John Deere Tractors 5415 Diagnostic Repair Service Manual.pdf
John Deere Tractors 5415 Diagnostic Repair Service Manual.pdfJohn Deere Tractors 5415 Diagnostic Repair Service Manual.pdf
John Deere Tractors 5415 Diagnostic Repair Service Manual.pdf
 
SEM 922 MOTOR GRADER PARTS LIST, ALL WHEEL DRIVE
SEM 922 MOTOR GRADER PARTS LIST, ALL WHEEL DRIVESEM 922 MOTOR GRADER PARTS LIST, ALL WHEEL DRIVE
SEM 922 MOTOR GRADER PARTS LIST, ALL WHEEL DRIVE
 
Top profile Call Girls In Mangalore [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Mangalore [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In Mangalore [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Mangalore [ 7014168258 ] Call Me For Genuine Models...
 
如何办理(Waterloo毕业证书)滑铁卢大学毕业证毕业证成绩单原版一比一
如何办理(Waterloo毕业证书)滑铁卢大学毕业证毕业证成绩单原版一比一如何办理(Waterloo毕业证书)滑铁卢大学毕业证毕业证成绩单原版一比一
如何办理(Waterloo毕业证书)滑铁卢大学毕业证毕业证成绩单原版一比一
 
01552_14_01306_8.0_EPS_CMP_SW_VC2_Notebook.doc
01552_14_01306_8.0_EPS_CMP_SW_VC2_Notebook.doc01552_14_01306_8.0_EPS_CMP_SW_VC2_Notebook.doc
01552_14_01306_8.0_EPS_CMP_SW_VC2_Notebook.doc
 
一比一原版(Deakin毕业证书)迪肯大学毕业证成绩单留信学历认证
一比一原版(Deakin毕业证书)迪肯大学毕业证成绩单留信学历认证一比一原版(Deakin毕业证书)迪肯大学毕业证成绩单留信学历认证
一比一原版(Deakin毕业证书)迪肯大学毕业证成绩单留信学历认证
 
Is Your Mercedes Benz Trunk Refusing To Close Here's What Might Be Wrong
Is Your Mercedes Benz Trunk Refusing To Close Here's What Might Be WrongIs Your Mercedes Benz Trunk Refusing To Close Here's What Might Be Wrong
Is Your Mercedes Benz Trunk Refusing To Close Here's What Might Be Wrong
 
John deere 7200r 7230R 7260R Problems Repair Manual
John deere 7200r 7230R 7260R Problems Repair ManualJohn deere 7200r 7230R 7260R Problems Repair Manual
John deere 7200r 7230R 7260R Problems Repair Manual
 
Changodar Call Girls Book Now 7737669865 Top Class Escort Service Available
Changodar Call Girls Book Now 7737669865 Top Class Escort Service AvailableChangodar Call Girls Book Now 7737669865 Top Class Escort Service Available
Changodar Call Girls Book Now 7737669865 Top Class Escort Service Available
 
一比一原版(Greenwich毕业证书)格林威治大学毕业证如何办理
一比一原版(Greenwich毕业证书)格林威治大学毕业证如何办理一比一原版(Greenwich毕业证书)格林威治大学毕业证如何办理
一比一原版(Greenwich毕业证书)格林威治大学毕业证如何办理
 
Top profile Call Girls In Anand [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Anand [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Anand [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Anand [ 7014168258 ] Call Me For Genuine Models We ...
 
Top profile Call Girls In dharamshala [ 7014168258 ] Call Me For Genuine Mode...
Top profile Call Girls In dharamshala [ 7014168258 ] Call Me For Genuine Mode...Top profile Call Girls In dharamshala [ 7014168258 ] Call Me For Genuine Mode...
Top profile Call Girls In dharamshala [ 7014168258 ] Call Me For Genuine Mode...
 
如何办理伦敦商学院毕业证(LBS毕业证)毕业证成绩单原版一比一
如何办理伦敦商学院毕业证(LBS毕业证)毕业证成绩单原版一比一如何办理伦敦商学院毕业证(LBS毕业证)毕业证成绩单原版一比一
如何办理伦敦商学院毕业证(LBS毕业证)毕业证成绩单原版一比一
 
CELLULAR RESPIRATION. Helpful slides for
CELLULAR RESPIRATION. Helpful slides forCELLULAR RESPIRATION. Helpful slides for
CELLULAR RESPIRATION. Helpful slides for
 
Is Your Volvo XC90 Displaying Anti-Skid Service Required Alert Here's Why
Is Your Volvo XC90 Displaying Anti-Skid Service Required Alert Here's WhyIs Your Volvo XC90 Displaying Anti-Skid Service Required Alert Here's Why
Is Your Volvo XC90 Displaying Anti-Skid Service Required Alert Here's Why
 
Premium Call Girls Nagpur Call Girls (Adult Only) 💯Call Us 🔝 6378878445 🔝 💃 E...
Premium Call Girls Nagpur Call Girls (Adult Only) 💯Call Us 🔝 6378878445 🔝 💃 E...Premium Call Girls Nagpur Call Girls (Adult Only) 💯Call Us 🔝 6378878445 🔝 💃 E...
Premium Call Girls Nagpur Call Girls (Adult Only) 💯Call Us 🔝 6378878445 🔝 💃 E...
 
JOHN DEERE 7200R 7215R 7230R 7260R 7280R TECHNICAL SERVICE PDF MANUAL 2680PGS...
JOHN DEERE 7200R 7215R 7230R 7260R 7280R TECHNICAL SERVICE PDF MANUAL 2680PGS...JOHN DEERE 7200R 7215R 7230R 7260R 7280R TECHNICAL SERVICE PDF MANUAL 2680PGS...
JOHN DEERE 7200R 7215R 7230R 7260R 7280R TECHNICAL SERVICE PDF MANUAL 2680PGS...
 

ntpc

  • 1. Industrial Summer Training at NTPC Badarpur Anuj Kumar Electronics & Communication
  • 3. Overview of NTPC  NTPC was set up in the central sector in the 1975.  NTPC has installed capacity of 29,394 MW. It plans to be a 75,000 MW company by 2017.  NTPC Badarpur station has also bagged ISO 9001/ ISO 14001 certification.  Today NTPC contributes more than 3 / 5th of the total power generation in India
  • 4. Overview of NTPC Click to edit the outline text format Second Outline Level − Third Outline Level Fourth Outline Level − Fifth Outline Level
  • 6. Overview of BTPS  BTPS MEETS MORE THAN 24% OF DELHI’S ELECTRICITY CONSUMPTION  INSTALLED CAPACITY 720 MW DERATED CAPACITY 705 MW (3x95 + 2x210MW)  OWNED BY GOVT. OF INDIA, MINISTRY OF POWER  BEING MANAGED BY NTPC FOR THE LAST 26 YEARS SINCE 1st APRIL 1978
  • 7. NTPC Badarpur  BTPS was conceived in 1965 to meet the growing electricity demand of Northern Region.  The site construction activities started in 1968.  The plant became operational with the commissioning of its first unit on 26th July 1973, 2nd unit in ;74 , 3rd unit in ’75 , 4th unit in ’78 & 5th unit in ’81.
  • 8. Basic Principle There are basically three main units of a thermal power plant: 1. Steam Generator or Boiler 2. Steam Turbine 3. Electric Generator
  • 10. C&I LABS Control and Instrumentation Department has following labs: 1. 2. 3. 4. 5. 6. Manometry Lab Protection and Interlocks Lab Automation Lab Electronics Lab Water Treatment Plant Furnaces Safety Supervisory System Lab
  • 11. OPERATION AND MAINTAINANCE This control & instrumentation is the brain of the plant because from the relays to transmitters followed by the electronic computation chipsets and recorders and lastly the controlling circuitry, all fall under this. A View of Control Room at BTPS
  • 12. CONTROL & MONITORING MECHANISMS There are basically two types of Problems faced in a Power Plant 1. Metallurgical 2. Mechanical
  • 13. C&I Lab In C&I Lab parameters to be monitored are: 1. Speed 2. Temperature 3. Current 4. Voltage 5. Pressure 6. Flow of Gases 7. Vibration
  • 14. IT Role & Responsibility – Maintenance Management – Materials & Contracts Management – Financial Accounting – Coal Monitoring & Accounting. – Operations & Generation Monitoring – Hospital Management – H R & TMS, T/S Management – Office Automation & communication. – E-Samadhan complaints Monitoring
  • 15. • Why IT ? Materials : 30,000 + items  Transaction data.  Master data Material and Service  Plant : 15,000 equipments     • Equipment master. Task list. Employees : 1100 + Personal and payroll data. Finance : Accounting data. Operation : Plant parameters history data Vendors: 5000 + vendors.
  • 16.
  • 17.
  • 18.
  • 19. Satellite Communication Network 4/6 GHZ RHQ:ERHQ, NRHQ,SRHQ,WRHQ Engg.Office, NOIDA Rihand, 8 MBPS M/W Link PMI,NOIDA 2 GHZ/ 8 MBPS 4/6 GHZ ( 512 kbps aggreagate ) 2 mbps leased line CC, SCOPE New Delhi DADRI PROJECT NTPC Hub Station At CSES, Noida Tapovan Loharinagpala ( ORDERED ) Singrauli OFC LINK Vindhyachal THERMAL: Farakka,Unchahar,Kahalgaon, Korba, Ramagundam, Sipat, Simhadri, Talcher (S), Talcher (T), Tanda, Barh GAS/HYDRO:Anta,Auriya,Faridabad, Gandhar, Kawas, Kayamkulam, Koldam,
  • 20. Awards MOP’s Meritorious Productivity Award: For calendar years 1987, 1988, 1990. For financial years 92-93, 94-95 and 97-98 Received Bronze medal in 1998-99 and Received Silver shield and certificate of Meritorious performance for 2000-01. Received Gold shield and Certificate for outstanding performance three consecutive years 01-02 & 02-03 , 03-04. the awards were presented by Hon’ble President of India and Hon’ble power Minister on 24 August 2004.
  • 23. Awards o British safety award for 1988, 1994 and 1999. o One employee bagged the Vishwakarma Rashtriya Puraskar in 1994 from Ministry of Labour. Six employees have been given the same award for 1998. o 6 BTPS employees were awarded under Delhi Shramik Sujhao Yojna Puraskar’97 .
  • 24. BTPS awarded Silver shield in Thermal Power Sector for Outstanding Achievement in Safety management by Greentech foundation for 2003-04 – BTPS awarded Greentech Environment excellence Gold Award in Thermal Power sector for 2002-03 – BTPS awarded Greentech Environment excellence Gold Award in Thermal Power sector for 2003-04 – BTPS received golden peacock award for IT Innovations for 2003-04
  • 25. BTPS received golden peacock award for IT innovations for 2003-04
  • 26. Conclusion The BTPS IT has come a long way from lagging to leading in IT enablement among NTPC power stations. IT Vision realized, making BTPS highly information enabled plant. 10/31/11
  • 27. Reference • TRAINING REPORTS OF PAST YEARS AT NALANDA LIBRARY • INTERNET • DOCUMENTS OF IT DEPARTMENT