Curriculum Vitae
E-mail: Sameh.H.Aly@Hotmail.com
G E N E R A L
Name : Sameh Hassan Aly
Date of Birth : September, 30th
, 1980.
Place of Birth : Alexandria – Egypt
Nationality : Egyptian
Gender : Male
Marital Status : Married.
Military Status : Exempted.
Telephone : 00201229915862
E D U C A T IO N
Graduation Degree : B.Sc. in Electrical Engineering
Communications & Electronics Section Alexandria University
Graduation year : 2002
Cumulative Grade : Very Good
- OSHA Training Course In construction Safety and Health with : ID
# 600426384
- Strategic Business Marketing
- Certified from Siemens (EGTI) institute in advanced
telecommunication training.
P r o f i l e S u m m a r y
- Working as Electrical and Instrumentation Engineer for 12years in
construction field.
- Member in Egyptian Engineering Syndicate since 2002 till now
membership No. 46/07102
- Certified From Qatar Engineers Committee with Grade B.
- Member in Institute of Electrical & Electronic Engineers (IEEE) for
two years from 2001 till 2002 Membership No. 41396236
- Member In United Engineers Network since 2010 till Now
Membership No. 600.
- Very Good English command.
- Excellent computer skills.
D E T A I L E D E X P E R IE N C E R E C O R D
PERIOD : From: July 2014 To: Till Now
CONTRACTOR : ACCURATE Electrical Contracting S.A.E.
POSITION : Technical Manager in main office.
PERIOD : From: Sep. 2013 To: July 2014
Main CONTRACTOR : Petrojet & (BAPETCO Bader El Din Petroleum Co.)
CONTRACTOR : ACCURATE Electrical Contracting S.A.E.
PROJECT : ASSIL & KARAM Gas Development Plant & 12 Gas well.
POSITION : Projects Manager.
Total Man-hours : 223,000 hr.
Curriculum Vitae
E-mail: Sameh.H.Aly@Hotmail.com
PERIOD : From: Jan. 2013 To: Aug 2013
Main CONTRACTOR : ASWAN Trading & Contracting (State of Qatar)
PROJECT : EPIC for Owiena Camel Race Trace Street Lighting (40Km)
POSITION : Project Manager
Total Man-hours : 180,000 hr.
PERIOD : From: Feb 2012 To: Dec-2012
Main CONTRACTOR : BUTEC  Johnson Controls (State of Qatar)
PROJECT : New Doha International Airport (NDIA) CP75&CP65
POSITION : Project Manager
Total Man-hours : 95,000 hr.
PERIOD : From: Jan. 2012 To: Dec-2012
Main CONTRACTOR : AL Jaber & Partners (State of Qatar)
PROJECT : AL Jaber Accommodation BLDG (450 personnel)
POSITION : Project Manager
Total Man-hours : 160,000 hr.
PERIOD : From: May. 2011 To: May-2012
Main CONTRACTOR : Al Jaber & Partners (State of Qatar)
CONTRACTOR : ACCURATE Electromechanical Projects W.L.L.
PROJECT : Truck Marshalling Project NSUT (Qatar Foundation)
POSITION : Project Coordinator
Total Man-hours : 95,000 hr.
Work Description: Responsible for coordination with consultant, main contractor, and MEP
subcontractor from material submittals, workshop DWGs, LPO status, supply
and installation progress, test reports ect…
PERIOD : From: Oct -2011 To: Aug 2012
Owner : UHDE-GMBH / QAPCO (Qatar Petrochemical Company.
Main CONTRACTOR : ACCURATE Electromechanical Projects W.L.L.
PROJECT : 03-3124 LDPE3 QAPCO
POSITION : Project Manager
Total Man-hours : 65,000 hr.
Work Description: Provisional of Electrical and
Instrumentation Commissioning Team QA/QC Inspectors and Construction
Work Supervisors
.
PERIOD : From: Feb -2011 To: Aug 2011
Owner : Q-Chem. Qatar Chemical Co. (State of Qatar)
Main CONTRACTOR : ACCURATE Electromechanical Projects W.L.L.
PROJECT : EPIC of Q-Chem. Warehouse AC Storage
Curriculum Vitae
E-mail: Sameh.H.Aly@Hotmail.com
POSITION : Project Manager
Total Man-hours : 40,000 hr.
Work Description: Responsible for follow up design, supply, installation and commissioning of
steel structure, walls, electrical, fire alarm and A/C units.
PERIOD : From: March. 2010 To: November. 2010
Owner : SCCT “Suez Canal Container Terminal”
Main CONTRACTOR : ACCURATE Electrical Contracting S.A.E.
PROJECT : EPIC contract for Co2, Foam Fire Fighting and Fire Alarm for No. 36 S/S
rooms
POSITION : Project Manager.
Total Man-hours : 60,000 hr.
Work Description: Responsible for follow up procurement, installation and commissioning
works of CO2 firefighting system in No. 36 S/S rooms.
Follow up procurement, installation and commissioning works of foam
firefighting system for fuel tanks.
Follow up procurement, installation and commissioning works of fire alarm
system for No. 36 S/S rooms.
PERIOD : From: May. 2009 To: March 2010
Main CONTRACTOR : Egyptian LNG
CONTRACTOR : ACCURATE Electrical Contracting S.A.E.
PROJECT : EPIC of Firefighting & Fire Alarm for Refrigerant Bullets
POSITION : Site Manager.
Total Man-hours : 85,000 hr.
Work Description: Responsible for installation and commissioning works of water spray nozzle
deluge firefighting system for 7 refrigerant bullets.
Follow up installation and commissioning works of fire alarm system for No. 7
refrigerant bullets.
PERIOD : From: Nov. 2008 To: May. 2009
Main CONTRACTOR : Petrojet Marine Branch
CONTRACTOR : ACCURATE Electrical Contracting S.A.E.
PROJECT : Flow Station Y1B Platform / Alkhafji (KJO) FDP Phase I Offshore Facilities
POSITION : Site Manager.
Total Man-hours : 71,000 hr.
Work Description: Responsible for Electrical system installation (Substation Equipments,
earthing, HV and LV Cable laying and termination, navigation aids, cable
ladders and trays, Lighting system, Telecommunication system (CCTV,
Telephony and Public Address and Fire alarm and Gas alarm systems).
Instrumentation work installation (Instruments Hook-Up, instruments
calibration and loop check)
Execution of commissioning and test for all electrical and instrumentation
works.
Curriculum Vitae
E-mail: Sameh.H.Aly@Hotmail.com
PERIOD : From: May. 2008 To: Nov.2008
MAIN CONTRACTOR : AFCO Alex Fibre / Aditya Birla Group.
CONTRACTOR : ACCURATE Electrical Contracting S.A.E.
PROJECT : Alexandria Fibre Company phase II
POSITION : Site Manager.
Total Man-hours : 150,825 hr.
Work Description: Responsible for Electrical system installation (Substation Equipment,
earthing, Lightening, HV and LV Cable laying and termination, cable ladders
and trays, Lighting system.
Instrumentation work installation (Instruments Hook-Up, instruments
calibration, Pneumatic process, loop check)
Overhauling, Maintenance and Refurbishment of instruments, Measuring
devices, Control Valves and DCS Panels.
Execution of commissioning and test for all electrical and instrumentation
works.
PERIOD : From: Apr. 2007 To: May.2008
MAIN CONTRACTOR : ESACO / FLSHMIDT.
CONTRACTOR : ACCURATE Electrical Contracting S.A.E.
PROJECT : Ramliya Arabian Cement Co.
POSITION : E&I Construction Manager.
Total Man-hours : 240,000 hr.
Work Description: Responsible for Electrical system installation (Substation Equipment,
earthing, Lightening, HV and LV Cable laying and termination, cable ladders
and trays, Lighting system, Telecommunication system (CCTV, Telephony
and Public Address and Fire alarm system).
Instrumentation work installation (Instruments Hook-Up, instruments and loop
check)
Execution of commissioning and test for all electrical and instrumentation
works.
PERIOD : From: Mar. 2006 To: Apr. 2007
MAIN CONTRACTOR : ABB / UHDE Tyssen Krrup GMBH
CONTRACTOR : ACCURATE Electrical Contracting S.A.E.
PROJECT : Helwan Fertilizer Company (HFC)
POSITION : E&I Construction Manager.
Total Man-hours : 140,000 hr.
Work Description: Responsible for Electrical system installation (Substation Equipments,
earthing, Lightening, LV Cable laying and termination, cable ladders and
trays, Lighting system,
Instrumentation work installation (Instruments Hook-Up, instruments
calibration, Pneumatic process, loop check)
Execution of commissioning and test for all electrical and instrumentation
works.
Curriculum Vitae
E-mail: Sameh.H.Aly@Hotmail.com
PERIOD : From: Dec.2005 To: Mar. 2006
MAIN CONTRACTOR : UHDE Tyssen Krrup GMBH
CONTRACTOR : ABB Automation
PROJECT : Egyptian Fertilizer Company (EFC II)
POSITION : E&I Construction Manager and (technical office Engineer).
Total Man-hours : 130,000 hr.
Work Description: Responsible for Electrical system installation (Substation Equipments,
earthing, Lightening, LV Cable laying and termination, cable ladders and
trays, Lighting system,
Instrumentation work installation (Instruments Hook-Up, instruments
calibration, Pneumatic process, loop check)
Execution of commissioning and test for all electrical and instrumentation
works.
PERIOD : From: Jun 2005 To: Dec. 2005
MAIN CONTRACTOR : AFCO Alex Fibre / Aditya Birla Group
CONTRACTOR : ABB Automation
PROJECT : Alex Fibre Company Phase I
POSITION : E&I Construction Manager.
Total Man-hours : 195,000 hr.
Work Description: Responsible for Electrical system installation (Substation Equipments,
earthing, Lightening, HV and LV Cable laying and termination, cable ladders
and trays, Lighting system.
Instrumentation work installation (Instruments Hook-Up, instruments
calibration, Pneumatic process, loop check)
Overhauling, Maintenance and Refurbishment of instruments, Measuring
devices, Control Valves and DCS Panels.
Execution of commissioning and test for all electrical and instrumentation
works.
PERIOD : From: Sep. 2004 To: Jun.2005
MAIN CONTRACTOR : BECHTEL
CONTRACTOR : SIEMENS Industrial and Services
PROJECT : Egyptian LNG IDKU Train1&Train2
POSITION : Electrical and Telecommunication Engineer.
Total Man-hours : 965,000 hr.
Work Description:Responsible for Electrical & Telecommunication for Systems (Street
Lighting, Main Power feeders for telecom cabinets, CCTV, Card Access
Control, Anti-Introgan, UHF, RF, LAN, and Telephony systems),
Instrumentation Optical Fibre Backbone, including general supervision for
all erection activities, systems commissioning and start up, consultant and
designer for this project was NACC North American Controls Corp.
Curriculum Vitae
E-mail: Sameh.H.Aly@Hotmail.com
PERIOD : From: Mar. 2003 To: Sep.2004
MAIN CONTRACTOR : KBR (USA/UK)/ JGC (Japan)/ Technicas Reunidas (Spain)
CONTRACTOR : PPC (Power Planet Control S.A.E.)
PROJECT : Damietta LNG Plant (SEGAS)
POSITION : Electrical Construction Engineer.
Total Man-hours : 1,150,000 hr.
Work Description: Responsible for Electrical system installation (Substation Equipments,
earthing, Lightening, HV and LV Cable laying and termination, cable ladders
and trays, Lighting system.
PERIOD : From: Aug. 2002 To: Mar. 2003
MAIN CONTRACTOR : KBR (USA/UK)/ JGC (Japan)/ Technicas Reunidas (Spain)
CONTRACTOR : PPC (Power Planet Control S.A.E.)
PROJECT : Design & Erection of Electrical Temporary site facilities
POSITION : Electrical Construction Engineer.
Total Man-hours : 140,000 hr.
Work Description: Responsible for design and erection of temporary site facilities including ring
main unit installation, HV and LV cable lying and termination, LV panel
installation, Emergency Diesel Generator and UPS Installation.

More Related Content

What's hot

Eng_hakim.cv (1) (1)
Eng_hakim.cv (1) (1)Eng_hakim.cv (1) (1)
Eng_hakim.cv (1) (1)Hakim Makram
 
Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015???? ?????
 
Abbas fadhil resume
Abbas fadhil resumeAbbas fadhil resume
Abbas fadhil resumeAbbas Fadhil
 
Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - ManagerCraig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - ManagerCraig Sparks
 
Mushtaq Electrical_ENGINEER 2016
Mushtaq Electrical_ENGINEER 2016Mushtaq Electrical_ENGINEER 2016
Mushtaq Electrical_ENGINEER 2016dil mus
 
CompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua ClarkCompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua ClarkJoshua Clark
 
Electrical QA QC Engineer
Electrical QA QC EngineerElectrical QA QC Engineer
Electrical QA QC EngineerSalman Faris
 

What's hot (19)

Thomas vincent cv
Thomas vincent cvThomas vincent cv
Thomas vincent cv
 
Khaled elhag cv
Khaled elhag cvKhaled elhag cv
Khaled elhag cv
 
MUHAMMAD AMIN CV
MUHAMMAD AMIN CVMUHAMMAD AMIN CV
MUHAMMAD AMIN CV
 
Eng_hakim.cv (1) (1)
Eng_hakim.cv (1) (1)Eng_hakim.cv (1) (1)
Eng_hakim.cv (1) (1)
 
Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015
 
Abbas fadhil resume
Abbas fadhil resumeAbbas fadhil resume
Abbas fadhil resume
 
Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - ManagerCraig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager
 
Cover letter 20 dec.2014
Cover letter 20 dec.2014Cover letter 20 dec.2014
Cover letter 20 dec.2014
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Mushtaq Electrical_ENGINEER 2016
Mushtaq Electrical_ENGINEER 2016Mushtaq Electrical_ENGINEER 2016
Mushtaq Electrical_ENGINEER 2016
 
THOWFIC AHAMED CV
THOWFIC AHAMED CVTHOWFIC AHAMED CV
THOWFIC AHAMED CV
 
Hossam salah-cv
Hossam salah-cvHossam salah-cv
Hossam salah-cv
 
CompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua ClarkCompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua Clark
 
Electrical QA QC Engineer
Electrical QA QC EngineerElectrical QA QC Engineer
Electrical QA QC Engineer
 
Deepak Resume
Deepak ResumeDeepak Resume
Deepak Resume
 
ajay
ajayajay
ajay
 
RESUME - Copy
RESUME - CopyRESUME - Copy
RESUME - Copy
 
Moh'd Gaweish_CV
Moh'd Gaweish_CVMoh'd Gaweish_CV
Moh'd Gaweish_CV
 
C.v. p maidens
C.v. p maidensC.v. p maidens
C.v. p maidens
 

Similar to Sameh Hassan Aly Detailed CV2

Similar to Sameh Hassan Aly Detailed CV2 (20)

ali mostafa cv
ali mostafa cvali mostafa cv
ali mostafa cv
 
Vivencio Atienza updated resume 2016
Vivencio Atienza updated resume 2016Vivencio Atienza updated resume 2016
Vivencio Atienza updated resume 2016
 
C.v gaber a. elrazek
C.v   gaber a. elrazekC.v   gaber a. elrazek
C.v gaber a. elrazek
 
CV - RAMADAN 2016
CV - RAMADAN 2016CV - RAMADAN 2016
CV - RAMADAN 2016
 
abdallah_ghonaimat_CV
abdallah_ghonaimat_CVabdallah_ghonaimat_CV
abdallah_ghonaimat_CV
 
Hani Shaker mep
Hani Shaker mepHani Shaker mep
Hani Shaker mep
 
CV souvanna.2.2
CV souvanna.2.2CV souvanna.2.2
CV souvanna.2.2
 
CV Inesh
CV IneshCV Inesh
CV Inesh
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
MujibCV
MujibCVMujibCV
MujibCV
 
Resume-Venkata Vamsi Krishna Y
Resume-Venkata Vamsi Krishna YResume-Venkata Vamsi Krishna Y
Resume-Venkata Vamsi Krishna Y
 
ahmed Hamdy -Resume
ahmed  Hamdy -Resumeahmed  Hamdy -Resume
ahmed Hamdy -Resume
 
consultant eng Ali sman CV A 11
consultant eng Ali sman CV A 11consultant eng Ali sman CV A 11
consultant eng Ali sman CV A 11
 
khalid obaidullah resume
khalid obaidullah resumekhalid obaidullah resume
khalid obaidullah resume
 
Karl james davis cv new
Karl james davis cv newKarl james davis cv new
Karl james davis cv new
 
Mohammad Riyad-Electrical Engineer
Mohammad Riyad-Electrical EngineerMohammad Riyad-Electrical Engineer
Mohammad Riyad-Electrical Engineer
 
Basil Resume
Basil Resume Basil Resume
Basil Resume
 
1 update resume for electrical engineer
1  update resume for electrical engineer1  update resume for electrical engineer
1 update resume for electrical engineer
 
Raniah c.v sep 2018
Raniah c.v sep  2018Raniah c.v sep  2018
Raniah c.v sep 2018
 

Sameh Hassan Aly Detailed CV2

  • 1. Curriculum Vitae E-mail: Sameh.H.Aly@Hotmail.com G E N E R A L Name : Sameh Hassan Aly Date of Birth : September, 30th , 1980. Place of Birth : Alexandria – Egypt Nationality : Egyptian Gender : Male Marital Status : Married. Military Status : Exempted. Telephone : 00201229915862 E D U C A T IO N Graduation Degree : B.Sc. in Electrical Engineering Communications & Electronics Section Alexandria University Graduation year : 2002 Cumulative Grade : Very Good - OSHA Training Course In construction Safety and Health with : ID # 600426384 - Strategic Business Marketing - Certified from Siemens (EGTI) institute in advanced telecommunication training. P r o f i l e S u m m a r y - Working as Electrical and Instrumentation Engineer for 12years in construction field. - Member in Egyptian Engineering Syndicate since 2002 till now membership No. 46/07102 - Certified From Qatar Engineers Committee with Grade B. - Member in Institute of Electrical & Electronic Engineers (IEEE) for two years from 2001 till 2002 Membership No. 41396236 - Member In United Engineers Network since 2010 till Now Membership No. 600. - Very Good English command. - Excellent computer skills. D E T A I L E D E X P E R IE N C E R E C O R D PERIOD : From: July 2014 To: Till Now CONTRACTOR : ACCURATE Electrical Contracting S.A.E. POSITION : Technical Manager in main office. PERIOD : From: Sep. 2013 To: July 2014 Main CONTRACTOR : Petrojet & (BAPETCO Bader El Din Petroleum Co.) CONTRACTOR : ACCURATE Electrical Contracting S.A.E. PROJECT : ASSIL & KARAM Gas Development Plant & 12 Gas well. POSITION : Projects Manager. Total Man-hours : 223,000 hr.
  • 2. Curriculum Vitae E-mail: Sameh.H.Aly@Hotmail.com PERIOD : From: Jan. 2013 To: Aug 2013 Main CONTRACTOR : ASWAN Trading & Contracting (State of Qatar) PROJECT : EPIC for Owiena Camel Race Trace Street Lighting (40Km) POSITION : Project Manager Total Man-hours : 180,000 hr. PERIOD : From: Feb 2012 To: Dec-2012 Main CONTRACTOR : BUTEC Johnson Controls (State of Qatar) PROJECT : New Doha International Airport (NDIA) CP75&CP65 POSITION : Project Manager Total Man-hours : 95,000 hr. PERIOD : From: Jan. 2012 To: Dec-2012 Main CONTRACTOR : AL Jaber & Partners (State of Qatar) PROJECT : AL Jaber Accommodation BLDG (450 personnel) POSITION : Project Manager Total Man-hours : 160,000 hr. PERIOD : From: May. 2011 To: May-2012 Main CONTRACTOR : Al Jaber & Partners (State of Qatar) CONTRACTOR : ACCURATE Electromechanical Projects W.L.L. PROJECT : Truck Marshalling Project NSUT (Qatar Foundation) POSITION : Project Coordinator Total Man-hours : 95,000 hr. Work Description: Responsible for coordination with consultant, main contractor, and MEP subcontractor from material submittals, workshop DWGs, LPO status, supply and installation progress, test reports ect… PERIOD : From: Oct -2011 To: Aug 2012 Owner : UHDE-GMBH / QAPCO (Qatar Petrochemical Company. Main CONTRACTOR : ACCURATE Electromechanical Projects W.L.L. PROJECT : 03-3124 LDPE3 QAPCO POSITION : Project Manager Total Man-hours : 65,000 hr. Work Description: Provisional of Electrical and Instrumentation Commissioning Team QA/QC Inspectors and Construction Work Supervisors . PERIOD : From: Feb -2011 To: Aug 2011 Owner : Q-Chem. Qatar Chemical Co. (State of Qatar) Main CONTRACTOR : ACCURATE Electromechanical Projects W.L.L. PROJECT : EPIC of Q-Chem. Warehouse AC Storage
  • 3. Curriculum Vitae E-mail: Sameh.H.Aly@Hotmail.com POSITION : Project Manager Total Man-hours : 40,000 hr. Work Description: Responsible for follow up design, supply, installation and commissioning of steel structure, walls, electrical, fire alarm and A/C units. PERIOD : From: March. 2010 To: November. 2010 Owner : SCCT “Suez Canal Container Terminal” Main CONTRACTOR : ACCURATE Electrical Contracting S.A.E. PROJECT : EPIC contract for Co2, Foam Fire Fighting and Fire Alarm for No. 36 S/S rooms POSITION : Project Manager. Total Man-hours : 60,000 hr. Work Description: Responsible for follow up procurement, installation and commissioning works of CO2 firefighting system in No. 36 S/S rooms. Follow up procurement, installation and commissioning works of foam firefighting system for fuel tanks. Follow up procurement, installation and commissioning works of fire alarm system for No. 36 S/S rooms. PERIOD : From: May. 2009 To: March 2010 Main CONTRACTOR : Egyptian LNG CONTRACTOR : ACCURATE Electrical Contracting S.A.E. PROJECT : EPIC of Firefighting & Fire Alarm for Refrigerant Bullets POSITION : Site Manager. Total Man-hours : 85,000 hr. Work Description: Responsible for installation and commissioning works of water spray nozzle deluge firefighting system for 7 refrigerant bullets. Follow up installation and commissioning works of fire alarm system for No. 7 refrigerant bullets. PERIOD : From: Nov. 2008 To: May. 2009 Main CONTRACTOR : Petrojet Marine Branch CONTRACTOR : ACCURATE Electrical Contracting S.A.E. PROJECT : Flow Station Y1B Platform / Alkhafji (KJO) FDP Phase I Offshore Facilities POSITION : Site Manager. Total Man-hours : 71,000 hr. Work Description: Responsible for Electrical system installation (Substation Equipments, earthing, HV and LV Cable laying and termination, navigation aids, cable ladders and trays, Lighting system, Telecommunication system (CCTV, Telephony and Public Address and Fire alarm and Gas alarm systems). Instrumentation work installation (Instruments Hook-Up, instruments calibration and loop check) Execution of commissioning and test for all electrical and instrumentation works.
  • 4. Curriculum Vitae E-mail: Sameh.H.Aly@Hotmail.com PERIOD : From: May. 2008 To: Nov.2008 MAIN CONTRACTOR : AFCO Alex Fibre / Aditya Birla Group. CONTRACTOR : ACCURATE Electrical Contracting S.A.E. PROJECT : Alexandria Fibre Company phase II POSITION : Site Manager. Total Man-hours : 150,825 hr. Work Description: Responsible for Electrical system installation (Substation Equipment, earthing, Lightening, HV and LV Cable laying and termination, cable ladders and trays, Lighting system. Instrumentation work installation (Instruments Hook-Up, instruments calibration, Pneumatic process, loop check) Overhauling, Maintenance and Refurbishment of instruments, Measuring devices, Control Valves and DCS Panels. Execution of commissioning and test for all electrical and instrumentation works. PERIOD : From: Apr. 2007 To: May.2008 MAIN CONTRACTOR : ESACO / FLSHMIDT. CONTRACTOR : ACCURATE Electrical Contracting S.A.E. PROJECT : Ramliya Arabian Cement Co. POSITION : E&I Construction Manager. Total Man-hours : 240,000 hr. Work Description: Responsible for Electrical system installation (Substation Equipment, earthing, Lightening, HV and LV Cable laying and termination, cable ladders and trays, Lighting system, Telecommunication system (CCTV, Telephony and Public Address and Fire alarm system). Instrumentation work installation (Instruments Hook-Up, instruments and loop check) Execution of commissioning and test for all electrical and instrumentation works. PERIOD : From: Mar. 2006 To: Apr. 2007 MAIN CONTRACTOR : ABB / UHDE Tyssen Krrup GMBH CONTRACTOR : ACCURATE Electrical Contracting S.A.E. PROJECT : Helwan Fertilizer Company (HFC) POSITION : E&I Construction Manager. Total Man-hours : 140,000 hr. Work Description: Responsible for Electrical system installation (Substation Equipments, earthing, Lightening, LV Cable laying and termination, cable ladders and trays, Lighting system, Instrumentation work installation (Instruments Hook-Up, instruments calibration, Pneumatic process, loop check) Execution of commissioning and test for all electrical and instrumentation works.
  • 5. Curriculum Vitae E-mail: Sameh.H.Aly@Hotmail.com PERIOD : From: Dec.2005 To: Mar. 2006 MAIN CONTRACTOR : UHDE Tyssen Krrup GMBH CONTRACTOR : ABB Automation PROJECT : Egyptian Fertilizer Company (EFC II) POSITION : E&I Construction Manager and (technical office Engineer). Total Man-hours : 130,000 hr. Work Description: Responsible for Electrical system installation (Substation Equipments, earthing, Lightening, LV Cable laying and termination, cable ladders and trays, Lighting system, Instrumentation work installation (Instruments Hook-Up, instruments calibration, Pneumatic process, loop check) Execution of commissioning and test for all electrical and instrumentation works. PERIOD : From: Jun 2005 To: Dec. 2005 MAIN CONTRACTOR : AFCO Alex Fibre / Aditya Birla Group CONTRACTOR : ABB Automation PROJECT : Alex Fibre Company Phase I POSITION : E&I Construction Manager. Total Man-hours : 195,000 hr. Work Description: Responsible for Electrical system installation (Substation Equipments, earthing, Lightening, HV and LV Cable laying and termination, cable ladders and trays, Lighting system. Instrumentation work installation (Instruments Hook-Up, instruments calibration, Pneumatic process, loop check) Overhauling, Maintenance and Refurbishment of instruments, Measuring devices, Control Valves and DCS Panels. Execution of commissioning and test for all electrical and instrumentation works. PERIOD : From: Sep. 2004 To: Jun.2005 MAIN CONTRACTOR : BECHTEL CONTRACTOR : SIEMENS Industrial and Services PROJECT : Egyptian LNG IDKU Train1&Train2 POSITION : Electrical and Telecommunication Engineer. Total Man-hours : 965,000 hr. Work Description:Responsible for Electrical & Telecommunication for Systems (Street Lighting, Main Power feeders for telecom cabinets, CCTV, Card Access Control, Anti-Introgan, UHF, RF, LAN, and Telephony systems), Instrumentation Optical Fibre Backbone, including general supervision for all erection activities, systems commissioning and start up, consultant and designer for this project was NACC North American Controls Corp.
  • 6. Curriculum Vitae E-mail: Sameh.H.Aly@Hotmail.com PERIOD : From: Mar. 2003 To: Sep.2004 MAIN CONTRACTOR : KBR (USA/UK)/ JGC (Japan)/ Technicas Reunidas (Spain) CONTRACTOR : PPC (Power Planet Control S.A.E.) PROJECT : Damietta LNG Plant (SEGAS) POSITION : Electrical Construction Engineer. Total Man-hours : 1,150,000 hr. Work Description: Responsible for Electrical system installation (Substation Equipments, earthing, Lightening, HV and LV Cable laying and termination, cable ladders and trays, Lighting system. PERIOD : From: Aug. 2002 To: Mar. 2003 MAIN CONTRACTOR : KBR (USA/UK)/ JGC (Japan)/ Technicas Reunidas (Spain) CONTRACTOR : PPC (Power Planet Control S.A.E.) PROJECT : Design & Erection of Electrical Temporary site facilities POSITION : Electrical Construction Engineer. Total Man-hours : 140,000 hr. Work Description: Responsible for design and erection of temporary site facilities including ring main unit installation, HV and LV cable lying and termination, LV panel installation, Emergency Diesel Generator and UPS Installation.