1. CURRICULUM VITAE
VUONG TAT THANG
Welding Inspector/QC Engineer
Personal statistics
Citizenship: [Country]
Date of birth: [yyyy-mm-dd]
Personal statistics
Citizenship: Vietnam
Date of birth: February 18th
1983
Gmail:vuongtatthangptew@gmail.com
Hand phone: 01627020513
Language capabilities
Language Level
Vietnamese Native
English Upper intermediate
Academic and professional attainment
Bachelor degree of Mechanical, 2001÷2006
Summary of professional experience
More than 10 years of extensive working experience in various practices involving Welding
engineer/Inspector and QA/QC engineer related to construction of various steel structures, piping,
storage tank, pressure vessels during fabrication. Experience in Prepare WPS/PQR and experience in
managing and controlling QA/QC documents, welding inspection, non-destructive testing (NDT), and
other QA/QC inspection related disciplines centred around construction of the oil & gas storage and
Refinery Involved in supervision of field and shop welding, Quality control and inspection of special CS,
SS, Duplex Stainless Steel & Low Alloy Steel materials.. etc.
Experience in Certification Authority and department disciplines and liaison with the clients of
offshore/onshore Wellhead Platform and Jacket, Plant, Storage....
Familiar American Society of Mechanical Engineers Code (ASME Section IX, VIII, V, II, I, B31.3, B31.1,
B16.1, B16.11, B16.5, STS-1), American Welding Society Code (AWS D1.1, AWS D1.5, A5.1, A5.4, A5.5,
A5.18, A5.20, A5.17, A5.22, A3.0, B1.10, B1.11, B4.0), American Petroleum Institute (API 1104/ 650/
653/ 620/ 611/ 608/ 609/ 521/ 510/ 5L/ 2A/ 2B), British Standard – European Standard Standards (BS-
EN 25817/ 287/ 288, BS 499, EN 20025, EN 10164), American Institute of Steel Construction Code
(AISC), American Society for Testing and Materials Code (ASTM)
2. Present position
QC Engineer/Welding inspector
Professional training
Certificate of Welding Inspector (CSWIP 3.1)- Cer No: 83037
Certificate of Welding Inspector (CWI)- Cer No: CWI CTWEL 1108.02
Certificates according to ASNT/SNT-TC 1A from 2011 and re-qualify in June 2014:
Radiographic Interpretation (RI) Level 2-Cer No: NDE/087-14/RI
Radiographic Testing Level 2 (RT)-Cer No: NDE/198-11/RT
Magnetic Particle Testing Level 2 (MT)-Cer No:NDE/198-11/MT
Liquid Penetrant Testing Level 2 (PT)-Cer No: NDE/087-14/PT
Ultrasonic Testing Level 2 (UT)- Cer No:NDE/035-13/UT
API 510 Certification Preparation “Pressure Vessel”-DNV Cert No:API510/2012
API 570 Inspector For “In-service Piping System”-DNV Cert No: API570/2012
Certificate of Internal Auditor of integrated management systems base on ISO9001:2008,
ISO14001:2004&OHSAS 18001:2007 (International Organization for Standardization)-Cer No: 07316
Certificate of Tropical Basic Offshore Safety Induction and Emergency Training (T-BOSIET)-Cer No:
5501250712003
HAZOD Method and Leader Course-Cert No: Hazod/VN2015-013
Detailed professional experience
Qatar Frijns Structural Steel ME ________________ June 2015 – Present
QC Engineer/welding inspector
Reviewed and interpreted project fabrication documents, project specification, drawings, codes,
standards
Prepared and completed QC document submitted to client as ITP, MAR, QC Forms
Established, reviewed WPS and PQR for submittal to client for approval as code AWS D1.1, BS EN
288, BS EN 15614
Prepared welders qualification and completed certificates following code AWS D1.1, BS EN 287 for
third party certify
Monitoring and witness fit-up, welding, Dimension, NDT, blasting and painting activities as the
approved ITP.
Attended on the inspection of structural assembly with client, third party at the workshop and the
instruction to workers rectified any found defects.
3. Prepared and completed QC report such MTC, MIR, MDVR, NDT report, check list for dossier
handover
DNV GL _____________________________ September2013 – June 2015
Inspection Engineer
Review, audit, inspection and verification of documents and inspection reports, fabrication and construction
for Jacket, Well Head Platform (WHP), piping, tanks and vessel at shop and site and commissioning
related to DNV GL projects.
Reviewed WPS and PQR, and witnessed PQR running for certification
Welder qualification for certification
Reviewed Project fabrication documents, QA/QC documents, RT films, NDT procedures for Project
certification
Witnessed fabrication activities, hydrostatic test, system leak test, NDT
Annual survey/inspection for recertification of offshore/onshore Wellhead Platform and Jacket,
Plant...
Annual survey/inspection for recertification of onshore Plant, Gas Stations...
Project involved (At site):
Cai Mep LPG refrigerated storage Project: Working as Certification Authority Representative
- Reviewed fabrication documents, RT films, WPS and PQR, NDT procedures, QA/AC procedures/documents
- Witnessed PQR running, NDT, hydrostatic test, system leak test.
- Random monitoring fabrication activities
- Random visual inspection for welds
MLS Jacket fabrication project/Certification Authority Representative.
- Reviewed fabrication documents, RT films, WPS and PQR, NDT procedures, QA/AC procedures/documents
- Witnessed PQR running, NDT, hydrostatic test, system leak test.
- Random monitoring fabrication activities
- Random visual inspection for welds
PTSC Offshore Services __________________June 2012–September2013
QA/QC Lead
4. Prepare, review, inspection and verification of documents and inspection reports, fabrication and
construction for Jacket, Well Head Platform (WHP), structure, piping, tanks and vessel at shop and site and
commissioning onshore, offshore related to PTSC Offshore Services projects.
Prepared WPS and PQR, and witnessed PQR running
Welder qualification
Prepared & reviewed Project fabrication documents, QA/QC documents, RT films, NDT procedures for
Project
Checked & witnessed fabrication activities, hydrostatic test, system leak test, NDT, Coating
Prepared & completed final document (Reports, test package, Radiographic) for handover to clients
Project involved
SU TU NAU field development wellhead platform and pipeline project/QA-QC Lead
- Reviewed Project Specification and application Code, Standard
- Interpreted P&ID, Isometric Drawing, Structural Drawing
- Prepared Overall ITP, FQCP, Matric, Hydostatic Test packs, leak test packs, Quality Procedures (Welding
control procedure, welding consumable procedure, welding qualification procedure, welder qualification
procedure,hydrostatic and flushing testing procedure, painting procedure, PWHT procedure, NDT procedure,
bolt tightening procedure, Helium & Nitrogen leak testing procedure… for submitted to client
- Prepared and witnessed on WPS, Welder Qualification
- Supervised& inspectedandreviewed,witnessedallthe projectqualityactivitiesat offshore hookup(Fit up, Weld,
NDT, radiographic interpretation, PWHT, Hydrostatic Test, Bolt Tightening, Leak test, Painting, Insulation)
- Monitors physical all kind of valve as Swing check valve, Double block bleed valve, Ball valve, Gate valve,
Pressure control valve, Globe valve… and instruments such as restriction orifice plate, flange orifice, sampling
connection, corrosion coupon, pressure transmitter… to ensure that work is installed in accordance with P&ID
approved drawings, specifications.
- Coordinated disciplines with others when conflicts arise, resolved problems and prevent delay.
- Attended the progressmeetingswiththe subcontractors(PWHT, NDT, Insulation), Client, Third Partyfor Piping
& Structural discipline with correctional actions for time schedule and the target completion.
- Prepared& Completedfinaldoc ( reports, records, test packs, procedures, drawings mark up, radiographic) for
handover to Client
RBDP-A,B Gas-lift line Project/QA-QC Lead.
- Reviewedprojectspec andapplicationcode,standard.InterpretedP&ID, Isometric Drawing, Structural Drawing
- PreparedOverallITP, FQCP, Matric, Test packs, Project QualityProcedures for submitted to approval of client
- WPS, Welder Qualification
5. - Reviewed& checkedpiping,structure,fitting,equipmentmillcertificates,CO,CQ andchecked material income
at the workshop
- Supervised& inspected, witnessed all the project qualityactivities at onshore fabrication and offshore hook-up
(Fit up, Weld, NDT, PWHT, Hydrostatic Test, Bolt Tightening, Leak test, Painting)
- Monitored physical all kind of valve as Swing check valve, Double block bleed valve, Ball valve, Gate valve,
Pressure control valve, Globe valve and instruments such as restriction orifice plate, flange orifice, sampling
connection, corrosion coupon, pressure transmitter... to ensure that work is installed in accordance with
approved drawings, specifications.
- Coordinated disciplines with others when conflicts arise, resolved problems and prevent delay.
- Attended the daily meetings with the subcontractors, client, third party for piping & structural, equipment
discipline with correctional actions for time schedule and the target completion.
- Toactivelyparticipateinpromotionof Client HSE Golden Rules and other site HSE activities, helping to ensure
a common understanding with all project personnel
- Prepared & Completed final doc( Reports, Records, Test packs, Documents, Drawings) for handover to Client
THANG LONG-DONG DO offshore hook up & commissioning project/QA-QC Lead
- Review Project Specification and application Code, Standard. Interpreted Layout Drawing, P&ID Drawing,
Isometric Drawing, Structural Drawing
- Established overall ITP, matric, project qualitycontrol procedures for submitted to client
- WPS, Welder Qualification
- Supervised& controlled, reviewed all the project quality activities at offshore location (Fit up, Weld, NDT, RT
Film, PWHT, Hydrostatic Test, Bolt Tightening, Leak test, Insulation)
- Coordinates disciplines with others when conflicts arise and resolved, repaired all problems and prevent delay
the progress.
- Attended the daily meetings with the client, third party for piping & structural, equipment disciplines with
correctional actions for time schedule and the target completion.
- Prepared & completed reports, records, Test packs, Documents, Drawings for handover to Client
Block 12 Dua modification project-Emas construction & engineering/QA-QC Lead
- Attend kick off meeting of pre – inspection with Client
- Reviewed Project Specs, Drawings & application Code, standard
- Established and revised ITP, Matrix, QualityControl Procedure for submit to the approval of client
- WPS, Welder Qualification
- Reviewed certificates and Inspected qualityof income materials
6. - Checked and reviewed, witnessed the quality of spool and lifting platform fabrication process (Fit-Up, Weld,
NDT, RT film PWHT, Hydrostatic Testing) at workshop
- Prepared and Completed reports, records, Test packs, Drawings, other documents for handover to client
HAI SU TRANG-DEN offshore hook up & commissioning project/QA-QC Lead
- Reviewed project specification and application code, Standard
- Interpreted Layout Drawing, P&ID drawing, Isometric drawing, structural drawing for using
- Prepared overall ITP, FQCP, matric, project qualitycontrol procedures for submit to approval
- Prepared and qualifyWPS, Welder
- Supervised& inspected,reviewed,witnessallthe projectqualityactivities at offshore location(Fitup,Weld, NDT,
RT film, PWHT, hydrostatic test, bolt tightening, leak test, painting, insulation)
- Monitored physical valve, spool offshore hook up to ensure that work is installed in accordance with drawings,
specifications.
- Coordinated disciplines with others when conflicts arise, resolved problems and prevented delay.
- Attended the progress meetings with the subcontractors, client, third party for piping & structural, equipment
discipline with correctional actions for time schedule and the target completion.
- Toactivelyparticipateinpromotionof client HSE golden rules and other site HSE activities, helping to ensure a
common understanding with all project personnel
TBVN FPSO Air Skid Fabrication project/QA-QC engineer
- Be responsibletoreview and approve qualitycontrolprocedure overall from subcontractor submit (ITP, Matrix,
qualitycontrol procedure)
- Witnessed WPS, Welder qualification
- Reviewed/inspected Certificates of the Project income machine, equipment, tool, material
- Inspected/supervisedandreviewed/witnessed thecompilationandcompletionofAir SkidVessel, Spool, Support
qualitycontrol process (Fit Up, Weld, NDT, RT Film, PWHT, Hydrostatic Testing)
- Reviewed and accepted all of reports, records, documents, drawing, test packages from subcontractor for
handover to Client
- updated and issued the weeklyqualityreport to Project Manager
Da Nang Dragon Bridge Management Board April2011-June2012
(Dragon Bridge Structural Fabrication Project)
Project Quality Control Client Representative
Attended kick off meeting of the pre – fabrication quality with contractor, third party
Reviewed & interpreted the quality control document, drawing, spec, code, standard of Project( AWS
D1.1, D1.5, ASTM, TCVN...).
7. Managed/supervised and reviewed the contractor preparated quality of tool, equipment, material to
meet the project Specs (certificates, sticky, test Report)
Reviewed/revised and approved structure ITP, quality procedures from submitted of the contractor
Witnessed & approved Welder, WPS Qualification
Witness & monitored, reviewed of (Plate, Beam, Channel, Angle) fabrication work & testing work (Fit
up, visual, NDT, RT Film, PWHT, dimension, blasting- painting, bolt tightening)
Co-ordinate with Project Management Team on all quality execution-related matters by establishing
direct communication with all functional department
Attended the progress meetings with contractor, third party for structural discipline with correctional
actions for time schedule and the target completion
Keagnam Enterprise.Ltd(Korean Company)-September 2009-April
2011
(KeagnamTower Project, Ha Noi, Viet Nam)
Mechanical Engineer
Responsible for coordination of all project mechanical activities and leading project mechanical team to
a safe and successful project completion:
Connected to Ha Noi water drainage, Supply company for drainage, supply permission.
Searched mechanical subcontractor, vendor for the Project, contacted for discussion meeting
Interpreted piping plan drawings, shop drawing, procedures, and specifications for using
Supervised cutting, welding, painting, insulation and field inspection in the area of mechanical works
ensuring these are implemented in accordance with shop drawing, design documentation and
company's procedures.
Verified correct installation and of AC piping with all components and equipment (Sleeves, fittings,
traps, thread rod, supports, hangers,(anchor, guide, spring) vibration, isolation, valve, Pumps, AHU,
FCU, chillers, steam boilers, cooling tower, heat exchanger, unit heater, water tank, expansion tank,
Filter etc..)
Verified correct installation and of waste water treatment piping, water supply piping, swimming
pool piping with all components and equipment (Sleeves, fittings, traps, thread rod, supports,
hangers,(anchor, guide, spring) Vibration, valve, micro filter, media filter, carbon filter, UV sterilizer,
balancing tank, hair and fibber trap, ozone mixing chamber, exhaust ozone destroyer, PH sensor, CL
dosing pump, CL tank, reaction tank, multi media filter, etc..)
Verified correct installation and of sprinkler piping system, outdoor hydrant piping system, indoor
hydrant piping system, with all components and equipment (Sleeves, fittings, thread rod, supports,
8. hangers, vibration, valve, flexible joint, water hammer cushion, sprinkler, hydrant cock, fire cabinet,
fire pumps, water tank etc..)
Verified correct installation of AC duct, smoke control duct, ventilation duct with all components
(fitting, sound attenuator, sound chamber, volume dump, fire dump, back draft damper, insect
screen, grill, register, louver, fan, AHU ( Vibration isolator, casing, frame, motor, supply fan, exhaust
fan, cooling coil, air filter, drain pan etc..)
Witnessed all piping construction verifications hydrostatic testing for piping and Leak Test for duct
work.
Assisted client, controlled subcontractor in planning and scheduling work to obtain maximum
efficiency
Formed and maintained good working relationship with Client, Consult and the Company team
personnel
Petroleum Construction Company _________ June 2006–September 2009
QA/QC Engineer
Prepare, review, inspection and verification of documents and inspection reports, fabrication and
construction for structure, piping, tanks and vessel at shop and site related to Petroleum Construction
Company projects.
Prepared WPS and PQR, and witnessed PQR running
Welder qualification
Prepared & revised, reviewed Project fabrication documents, QA/QC documents, RT films, NDT
procedures for Project
Checked & witnessed fabrication activities, hydrostatic test, system leak test, NDT, Painting, Coating
Prepared & completed final document (Reports, test package, Radiographic) for handover to clients
Project involved
2 LPG Spherical Tanks Fabrication And Installation -1500 tons project/Welding Inspector
- Familiarization to the relevant code and specification, procedure (welding procedure specification, post weld
heat treatment, non-destructive testing procedures and report), check welding equipment and calibration
certificates. Material identification, size, type and condition. Consumables type, size, condition, storage and
handling. Review WPS. Check joint preparation, Check pre-heating before welding.
- Checkedweathercondition,clearanceforwelding,welderidentification, check consumables as per WPS used,
welding parameters, Checked distortion control, travel speed, Checked inter-pass cleaning, inter-pass
temperature, check usage of line up clamps, maintain dailylog book.
9. - Performedvisual inspection,checkedweldand welder identification, post weld heat treatment. Non-destructive
testing witness, Acceptance standards of NDT, repair, dimension check as per drawings
- Writing requestNDT,review andrestore NDT reportsfrom NDT Department.DocumentControl-weldingreports.
- Coordinated disciplines with others when conflicts arise, resolved problems and prevent delay.
- Attended the daily meeting with the subcontractors (PWHT, NDT, Insulation), client, third party for vessel
discipline with correctional actions for time schedule and the target completion.
- Prepared& completedfinaldoc (reports, records,procedures,drawingsmark up, radiographic) for handover to
Client
Process and fire fighting piping system fabrication, installation Cu Lao Tao oil storage
project/QC Engineer.
- Received and interpreted P&ID, Isometric, layout drawings and specifications for using
- Calculated quantityof equipment, material for purchased department
- Preparedandordered labours( Engineer,Foreman,welder, fitter, painter...), working equipment and supportive
materials (welding machines, electrodes, ovens, quiver, welding cables, welding clip, clamps, jig tool for fit up
joint, grinding machines, cutting machines, grinding and cutting wheels, oxy, gas cartridge, misalignment
gauges, multi purpose welding gauge, temperature gun, rollers, brush, paint tool...), transportation and lifting
machines (dump truck, crane, side boom...)
- Prepared and witnessed WPS, WQT qualification
- Monitored physicalinstallationstoensurethat work is installed inaccordance with drawings, specifications and
applicable codes (special fire water pump station and process pump station)
- Verified correctweldingofpipingwithallcomponents(Fitting, supports, flexible joint, hangers, valve, filter, foam
tank, fire cock, fire pump and process pump, meter etc..)
- Monitored, witnessed all piping construction activities (Fit up, welding, NDT, PWHT, hydrostatic testing, leak
testing, coating)
- Assured for planning and scheduling work to obtain maximum efficiency
- Attended the progress meetings with the third party, client for Mechanical, Piping, structure discipline with
correctional actions for time schedule and the target completion
Dung Quat oil gas refinery Project/QC engineer
- Preparedfor ITP, FQCP,Qualityprocedure (Weldingcontrol,weldingconsumable,surfacepreparing&painting,
NDT, PWHT, hydrostatic testing, qualityplan, welding qualification, welder qualification, register)
- Interpreted piping P&ID’s; GA’s; piping layouts; isometrics drawings and specifications for using
- WPS, Welder Qualification
- Supervised qualityactivities (Fit Up, Welding, NDT, PWHT, hydrostatic testing, Coating)
10. - Monitored physical spool fabrication and piping, valve, instrument installation to ensure that work is installed in
accordance with drawings, specifications and applicable codes
- Assisted contractor in planning and scheduling work to obtain maximum efficiency
- Prepared of inspection reports such as RFI, QC form, Release note, Test pack, dailyreport, weeklyprogress
reports, informational status of mechanical activities .
- Prepared & completed reports, records, test packs, documents, drawings for handover to Client.
. Date 27st April. 2016
Applicant
VUONG TAT THANG