1. Page 1 of 3
CURRICULUM VITAE
PERSONAL DATA:
Full Name : Nguyen Van Toan
Date of Birth : 19th Dec, 1983
Place of Birth : Bac Giang
Current Address : Phu My town, Tan Thanh District,
Ba Ria Vung Tau Province, Viet Nam
Nationality : Vietnamese
Sex : Male
Marital Status : Married
ID Card No. : 273 608 783
Date of Issue : 14th February, 2012
Place of Issue : Vung Tau City
Health : Good (Height: 1.67m – Weight: 67kg – Blood Group: A)
Interest : Reading and travel
Language : English, Vietnamese
EDUCATION:
School Name : Thai Nguyen University
Period : From 2001 to 2006
Major : Mechanical Engineer
TRAINING:
CSWIP 3.1_TWI (Welding Inspection with Cer. 71673)
Radiographic Interpretation Level 2 Certificate issued by Centre of Non‐Destructive
Evaluation (RI level II)
Ultrasonic Testing Level 2 certificate issued by Centre of Non‐Destructive Evaluation (UT
level II)
Magnetic Testing Level 2 certificate issued by Centre of Non‐Destructive Evaluation (MT
level II)
Penetrant Testing Level 2 certificate issued by Centre of Non‐Destructive Evaluation (PT
level II)
Basic Offshore Safety Induction And Emergency Training
PROFESSIONAL EXPERIENCE:
01 year experience working as supervisor in AM department for Modec Do Brazil
03 years experience working as QA/QC Engineer in HSEQ Dept. for PTSC Offshore Services
Joint Stock Co., (POS)
More than 07 years experience working as QA/QC Inspector at offshore & onshore projects
2. CURRICULUM VITAE Nguyen Van Toan
Page 2 of 3
More than 01 year experience working as Planning staff
EMPLOYMENT HISTORY:
1. From Mar, 2015 up to now, MODEC at Brasil as a supervisor.
Monitoring fully fabrication job onshore under Modec Do Brasil at sub‐contractor:
STEP, Hariss Pye, TechOcean, PlimSolls, Wood Group,….
2. From Sep, 2011 up to Feb 2015, PTSC Offshore Services JSC:
1.1 Project Thai Binh‐Ham Rong Gas Pipeline Project
Client PVGAS
Period Jun 2014 up to Feb 2015
Position QA/QC Engineer
1.2 Project DIAMOND (Topside installation, Dewatering, N2 purging & packing
in pipeline)
Client Petronas
Period May 2014 up to May 2014
Position QA/QC Engineer
1.3 Project ZAWTIKA at Myanmar/Thai Lan : WP1, WP2, WP3.
Client PTTEPI_Thai lan
Period Nov 2013 up to May 2014
Position QA/QC Engineer
1.4 Project HL Spool Spreader Bars Fabrication
Client Subsea 7_SapuraAcergy
Period Jun 2013 up to Oct 2013
Position QA/QC Engineer
1.5 Project Bien Dong 1 Field Development
Client Bien Dong Petroleum Operating Company
Period Sep 2011up to Jun 2013
Position QA/QC Engineer
1.5.1 Period Nov 2012 to Jun 2013: Double joint Fabrication & pipeline
installation for 12” CRA pipe line.(at Indonesia and Vietnam).
1.5.2 Period Aug to Oct 2012: PQP Hai Thach Jacket & Topside installation.
1.5.3 Period July to Aug 2012: Pipe lay for 20” & 26” pipeline.
1.5.4 Period May to Jun 2012: Hai Thach 1 Jacket installation.
1.5.5 Period Feb to May 2012: WQT & Double Joint Fabrication for 20”&26”
pipeline (at Singapore & Indonesia).
1.5.6 Period Dec 2011 to Jan 2012: Supervisor machining 20” & 26” pipeline.
1.5.7 Period Sep 2011 to Dec 2011: Hookup & Commissioning for Moc Tinh 1
Platform.
3. SAMPYUNG CO.,LTD (Korea company)
3.1 Duration Mar 2011 to Aug 2011
Position QA/QC manager
Project Van Phong Terminal (at Nha Trang Province).
3.2 Duration May 2010 to Mar 2011
Position Planning staff
Project Nhon Trach 2 Combined Cycle Power Plant (at Dong Nai province).
3. CURRICULUM VITAE Nguyen Van Toan
Page 3 of 3
4. BUM HAN VIET NAM CO.,LTD (Korea company)
4.1 Duration Aug 2009 to Apr 2010
Position Piping engineer & QC inspector
Project Doosan boiler factory, J&V workshop (Quang Ngai province).
4.2 Duration Jun 2008 to July 2009
Position Piping engineer & QC inspector
Project Posco – VietNam Cold Rolling Mill (at Phumy_Ba RiaVungTau province).
5. NACAP ASIA PACIFIC SDN BHD CO.,LTD
Duration Oct 2007 to May 2008
Position QC inspector
Project PHU MY‐ HO CHI MINH GAS PIPE LINE (at BRVT, Dong Nai, HCM)
6. HASUNG VIET NAM CO.,LTD
Duration July 2006 to Sep 2007
Position Mechanical engineer
Location Dong Nai Province