SlideShare a Scribd company logo
1 of 11
1
R E S U M E
DESIRED POSITION
OTHER POSITION
DESIRED
Electrical & Instrumentation Foreman
Construction/Commissioning & Maintenance jobs
MICROSOFTWORD & EXEL OFFICESKILLS
QUALITY CONTROL/ INSPECTION
TOOLS & WAREHOUSE CONTROLER
WELDER/FABRICATOR
EQUIPMENT/DRIVING OPERATOR
PIPE FITTING/FABRICATOR
MECHANICAL FITTER
STRACTURAL FITTER & IRON WORKER FABRICATOR
RIGGING/ERECTOR
SCAFFOLDING ERECTOR
BLASTING/PAINTING WORKER
CIVIL & CALPENTRY WORKER
HEALTH SAFETY & RESCUE/DISASTER MANAGEMENT
23 Years of Field Experience for the Construction installation-Commissioning and Maintenance
JOBS in the deferent project & industries as Electrical & instrumentation Supervisory. such as:
Modular Substation-LER/LIR instrument room assembler Project Facilities
L.N.G. GAS PLANT, POWER GENERATION PLANT, MINING PROCESSINNG & RECOVERY PLANT,
MTBE-METHANOL PLANT PACILITIES, PETROCEMICAL PLANT, INDUSTRIAL BUILDING AUTOMATION PLANT
FACILITIES, CANNING INDUSTRIES, RENOVATION LNG PROJECT, AIR NAVIGATION FACILITIES,
HYDRO POWER PLANT, COAL POWER PLANT, AIRPORT FACILITIES, RAILWAYS, SEAPORTS, OIL FIELD
OFFSHORE/ONSHORE PROJECT. PIPELINE PROJECT, ROAD HIWAYS PROJECT,
CEMENT PLANT, STEEL PROCESSING PLANT, TOWER BUILDINGS & COMMUNICATION.
PETROLIUM PLANT DEPOT PROJECT, POWER DISTRIBUTION LINE, COMBINED CYCLE POWER PLANT, SEAWEDS-
TREATMENT & DESALINATION PLANT, DRY DUCKS PROJECT, GAS TURBINE, SOLAR PANEL/ POWER SYSTEM
Contact no. : +63 9154198356/+63 9292177429
Email add. : noli.donez@yahoo.com/ Skype: nolidonez2
PERSONAL DATA
NAME : MR. Noli S. Doñez
ADDRESS : No. 32 Shell GK Village New San Vicente Libjo Batangas City
4200 PHILIPPINES
NATIONALITY : Filipino
AGE : 50 years Old
SEX : Male
HEIGHT : 5’7”
WEIGHT : 82 kg
DATE OF BIRTH : December 10, 1964
PLACE OF BIRTH : Gamay Northern Samar
RELIGION : Roman Catholic
STATUS : Married
2
NAME OF SPOUSE : Marcelina Charito Donez
NAME OF FATHER : Urbano Y. Donez
NAME OF MOTHER : Dolores B. Sidro ( Passed Away)
PASSPORT NUMBER : EB7752457
PASSPORT VALIDITY : 26, March 2018
AVAILABILITY : Immediately Available
DESIRED SALARY : Negotiable
EDUCATIONAL ATTAINMENT
NAME OF SCHOOL DATES ATTENDED COURSE./DEGREE
ELEMENTARY : Gamay Elementary School 1970-1986 Primary Graduate
HIGH SCHOOL : GALA Vocational HighSchool 1986-1980 Secondary Graduate
VOCATIONAL
RECOGNITION
: NMYC/RMTC REGION-8
AWARD/CERTIFICATE OF
ACCOMPLISHMENT
1987-1988
23 MAY 2015
28 MAY 2015
17 JUNE 2015
24 JUNE 2015
01 JULY 2015
Vocational Technical
Graduate.
GOVERNMENT EXAMS TAKEN (PASSED)
From: ELECTRICAL INSTALLATION & MAINTENA NCE (EIM) TESDA NC-II License no. 11040102005655
TRAININGS / SEMINARS ATTENDED
Professional Driving Competency TESDA/Land Transportation Office (L.T.O.
Exclusive date : 20 October 2014
SFAT, BLS, CPR, HCP Standard First Aid & Basic Life Support-Cardiopulmonary
Exclusive Date : From 12 to 17 May 2014
CB&I Foreman and Safety Leader Ship Training with Certificate
Exclusive Date : 20 June to 27 July 2014
Electrical Installation & Maintenance EIM TESDA with NC-II Certificate
Exclusive Date : 28 March to 01 April 2011
Basic DisasterRescue Management Team with Training Certificate of Philippine Red Cross
Exclusive Date : 18 May 2011
3
Basic Occupational Safety Health with BOSH Certificate
Exclusive Date : From 30 March to 03 April 2009 (40hrs)
Scaffolding Erection with Training & NC-II Certificate
Exclusive Date : From 02 to 22 February 2009 (162hrs)
Basic Computer Networking System
Exclusive Date : From 26 November To 30 December 2003
TOTAL QUALITY MANAGEMENT Training with Certificate
Exclusive Date : 28 Mach 1999
FAMILIAR IN AUSTRALIAN & NEW ZEALAND ELECTRICAL WIRING STANDARD
EMPLOYMENT HISTORY FROM DEFERENT COMPANY:
COMPANY : ATLANTIC GULF & PACIFIC (AG&P) JOINT VENTURE PROJECT With
JGC, KBR, CHIYODA, & ABB, For DARWIN INPEX AUSTRALIA
ICHTHYS ONSHORE LNG FACILITIES MODULAR PROJECT
POSITION : E&I field Foreman
EXCLUSIVE DATES: From 22 April 2015 up to 31 of December 2015
JOB DISCRIPTION: •
Read and interpret of Electrical Drawings & not limited of the single line-
Diagrams, cable schedule power& control cable termination and instrument
Variable installation and Hook-up drawing, tubing and bench supports, and
Installation of cable trays, cabling, lighting poles, feeder & Distribution-
Panels, Switchgear, transformers, PLC, DCS, SCADA, Marshaling Cabinet.
Supervision & Leads groups and distribute the work as per priority, and-
Able to Organized all Activities of Electrical & Instrument installation work
Communicate to the consultant Client, respective supervisors and manager.
Office work and paper works, and able to report of activity and progress.
Writing and speak English communication and good example to workforce
LEAD Perform and Supervise of Fire & Gas Alarm System Installation to the-
LIR& LER Module building facilities, with fabrication and installation of main-
Ladder straight sectional horizontal/ vertical and 90 bend & fittings Cable tray &
Bracket Supports and fittings. And installation of instrument devices such as
Optical smoke detector addressable type, and duct mounted addressable type
Manual call point addressable type, flammable Gas detector, fire alarm beacon
Gas alarm beacon, fire & Gas alarm horn, fire alarm indicator panels, loop
Isolator module, addressable monitor module, explosion proof device,
Intrinsic safe barrier module, high sensitivity smoke detection panels, fire & gas
Detector junction boxes.
And installation and lay-out of Lighting fixtures and bracket supports and fitting
For power & receptacles outlets. And welding outlets.
Perform and assignto Pre-Commissioning work and modification work and
4
Assist to ABB Vendor for PANEL set up and Internal Tie-off equipment
And ensure all cable incoming and glanding / Termination of all devices and
Control Pannels connection are completed form from engineering specifi-
cation and vendor approved, and verifying against drawing
perform of line checking of all wirings and cable loop to panels and controls
ISOLATION & CONTINUITY RESISTANCE TESTING and physical Test
The internal wiring panel connection. Equipment and device control system
Perform and assign for supervision the cable cutting Management and-
Supply of the cable drums of all modules for cable pulling internal wiring
And coordinate to all foreman & group of cable pulling monitoring of all request
Set up all details task step by step work execution to ensure that proper materials
And equipment’s are available and are approved for use as well as the approved
Drawings. And verify the accessibility of work area. And prepare the necessary-
Tools & equipment’s and make sure that they are in good condition.
Coordinate and request the lifting tools and equipment for cable pulling works.
Transport cable to laying area and first upon entering the module. Check and
Clear the cable route prior cable pulling and place cable rollers on required cable
Routes. And pull the cables on designated routes based on IFC Drawing.
Test cables for insulation resistance and continuity test and seal the open ends of
The cable to prepare termination work. And glanding works.
Raise & request for inspection to QC Department and perform the require the I/R
Conduct toolbox talk with TSTI and prepare to complete sign of permit to work-
Step back 5by5 cards Before the execution of work and implement required PPE
Maintain of Safety rules & coordination the work force, to maintain the safe act
Condition and job hazards and job safety analysis for every task assignment
And Comply of Client & company safety Rules & regulation
Paper work Activity report of the quantity and productivity reports
material take off & request of tools and equipment preparation of jobs activities
COMPANY : CHICAGO BRIDGE & IRON CLOUGH JV (CB&I-JV)
SOUTHERN HIGH LAND AREA. PAPUA NEW GUINEA LNG EPC-4
PROJECT
POSITION : E&I Field Foreman Facilities Maintenance
INCLUSIVE DATES : From 30 May 2013 To 08 April 2014
JOB DESCRIPTION :  installation of new FIRE ALARM PROTECTION and FIRE & GAS SAFETY
COMMUNICATION SYSTEM FOR EPC-4 HIDE GAS CONDITIONING PLANT
FACILITIES. Preventive maintenance and servicing of equipment system
such as power generator, breaker, switchgears, motor controls, and
protection station use of service transformer, MCC and Panel lighting and IP
service socket outlets, and air-conditioning. Conduct Physical inspection
periodic check up and testing of auxiliary equipment/machineries system
control protection. Physical inspection repair and trouble shooting of faulty
power equipment such as welding machines, power drills, power grinders,
drop saw, bench saw, bench drill etc. replace of any defective parts
mechanical bearings, of motor and device & accessories and isolation and
lubricating oil Of gear motor. Functioning And phase rotation and solo run
test of motor. Perform testing and loop checking/line check IR Test and
meggering,test of cable & termination. high pot testing of high voltage cable.
5
Bus bar bus duct and transformer bolt tighten
 Perform Cable pulling installation and Glanding dressing splicing & termination
Of high voltage, medium voltage, low voltage cable.
Installation of instrument bench & process variables such as flow, pressures,
temperature, & level transmitter. Control valves, and installation of
instrument tubing and fittings and supports.
Fabrication assembles of perforated cable tray/ducting cables/cable
trayladders and installation work.
READ and INTERPRET ELECTRICAL PLANS, Circuit diagrams and industrial
plant design and P&ID Drawings.
Familiar with understand the electrical codes and provision for industrial &
building wiring and equipment installation
Fabrication of lighting fixtures support, conduit and cable trays, and fittings,
including bracket and support.
Perform conduit pipe threading & bending using electric & manual and
hydraulic bender. Perform installation of Switchgear, MCC Panels,
Transformers, Panel boards, bus duct, lighting and power divices
Perform above ground and under ground cable pulling of power on conduit &
cable trays/ trenches, perform instrument tubing and stanchion support, and
instrument variables such as flow, pressure, level, temperature, & control
valves. Familiar with general practices and lock-out/tag-out and permit entry
procedures.
COMPANY : KENTZ JORDAN ENGINEERS LTD CO.
POSITION : E&I Field Commissioning Foreman
INCLUSIVE DATES : From 01 October 2012 to 01 March 2013
JOB DESCRIPTION :  LEAD & PERFORM Of Commissioning & Pre-Commissioning activities such as
work & test pack record inspection and physical inspection of instrument field
variables and control valves equipment. inspection and perform of punchlist
work. Check the termination from the panel and terminal block incomplete
cable/core tagging check & inspection of field instrument incomplete
installation of equipment accessories. Check the instrument/valve & flow
orientation,& instrument incomplete tubing and fittings and re-modification
and re-punchlis work. tracking of punchlist work pack certificate the P&ID
Drawing, Calibration Certificate and ISO Drawing and LOCATION for QC/QC
and CLIENT final inspection from progress construction installation. Assist to
equipment supplier for pre-commissioning of equipment and modification
works. Perform of the installation of instrument tubing and fittings, valves
and supports, for Ammonia line
 perform installation of HEAT TRACE CABLE and equipment
element/accessories with termination work.
 Perform cable tray/fittings and fix of support installation work
 Cable Loop and line checking of FIRE ALARM & GAS COMMUNICATION.
6
COMPANY : KUMYANG ELECTRIC CO/JG- SUMMIT PETROCHEMICAL PLANT
POSITION : Electrical Project Installation Foreman
INCLUSIVE DATES : From 03 May 2012 28, September 2012
JOB DESCRIPTION :  Lead and supervised and perform installation of perforated and ladder cable
trays and supports. And cable pulling work and glanding termination work of
panels.
 Installation of conduit pipe and supports of lighting fixtures and power
receptacle outlets all vessel tank and access ways and perform installation of
lightning grounding system protection.
 Perform and installation of MCC PANELS, SWITCHGEARS, TRANSFORMER,
and DISTRIBUTION BOXES.
 LEAD and Perform cable loop checking and meggering/Isolation test and
HIGH POT Testing of HIGH VOLTAGE CABLE
 Perform installation of FIRE & GAS COMMUNICATION SYSTEM petrochemical
COMPANY : KENTZ ENGINEERS DR LCC /FLOUR BARRICK GOLD MINING
POSITION : INSTRUMENT Field TECHNICIAN
INCLUSIVE DATES : From 21 August 2011 to 19 March 2012
JOB DESCRIPTION :  Instrument cable GLANDING & termination to DCS, PLC, MARSHALLING
CABINET, field Distribution Boxes, Local Panels, Field instrument & Sensors,
Interlocking switches and control switches.
Installation of instrument tubing and fittings.
Cable loop/line checking and meggering test andcable tagging dressing work.
Perform installation of field instrument process variables and instrument
bench bracket and supports.
Perform cable tray installation and fabrication work.
COMPANY : ATLANTIC GULF & PACIFIC CO/POSTER WHEELER PROJECT
POSITION : E&I Field PROJECT Foreman
INCLUSIVE DATES : From 05 May 2010 to 31 May 2011
JOB DESCRIPTION :  Lead and supervised of E&I modular project assembles.
 Implement safety and toolbox meeting before start of work and implementing
of safety rules to workforce with JSA-JHA
 Perform installation of conduit and cable trays & supports and installation field
instrument control panels/junction boxes instrument field process variables,
sensors, instrument tubing and fittings assembles and installation works.
 Distribution of work and progress report to field supervisor and
superintendent, and weekly attend for management staff assembly meeting.
 Lead and supervised to perform of the cable pulling works and cable glanding
and termination
COMPANY : L. ARMANI TRADING & GENERAL SEVICES/SAN PABLO GEN. HOSPITAL
POSITION : ELECTRICAL Field PROJECT FOREMAN
INCLUSIVE DATES : From 18 December 2008 to 27 November 2009
JOB DESCRIPTION :  Installation of FIRE ALARM SYSTEM And INTER-Communication UNIT
 Installation and lay-out of lighting fixtures signage receptacle outlets, air-
conditioning, panel board switch board, switches, internet outlets, and
7
transformer/power emergency generator, conduit and junction boxes.
COMPANY : EEI CORP.GORO NICKEL PLANT MINING PROJECT NEW CALEDONIA
POSITION : Field INDUSTRIAL ELECTRICAL FORMENAN
INCLUSIVE DATES :
From 10 January 2008 to 27 November 2008
JOB DESCRIPTION
COMPANY
POSTION
EXCLOSIVE DATES
JOB DISRIPTION
COMPANY
POSITION
EXCLUSIVE DATES
JOB DICRIPTION
 LEAD and Supervised for installation of all interlocking switches, sensors
conveyor, access lightings fixtures, receptacle outlets, FIRE ALARM & GAS
COMMUNICATION SYSTEM, CONDUIT TUBING installation works, cable tray
installation, instrument tubing and fittings installation, stanchion bracket
supports, installation, cable puling, cable loop/line checking glanding, and
termanition works, cable tray perforated and support installation work.
MOHAMMED H. HAMMAM CO./SAUDI ARAMCO OFFSHORE OILFIED
PROJECT
Field INSTRUMENT TECHNICIAN/FABRICATOR
From 02 April 2005 To 24 September 2007
Installation of instrument Variables, such as flow pressure, level, & temperature
transmitter, with installation of stanchion bench bracket/supports. Termination
and glanding work of control distribution boxes/DCS, PLC, MARSHALLING Cabinet
CONTROLLER Switches. installation of cable trays perforated trays supports,
instrument tubing and fittings, cable loop/line checking continuity test of cables
INSTALLATION OF FIRE & GAS COMMUNICATION SYSTEM.
EEI AL RUSHAID CONTRUCTION CO/JOBAIL PETROCHEMICAL PLANT
PROJECT
Field INDUSTRIAL ELECTRICIAN
From 11 July 2003 To 25 May 2004
Responsible & perform installation of electrical equipments such as MCC, Panels
Boards, Switchgears, transformer, lifting and assemble installing of bus bar/bus
duct and fittings. and perform of cable trays and fittings support installation,
fabrication and circuit wiring connection based on diagram. Glanding &
Termination of lighting system, installation of grounding & lightning protection
system, and auxiliary system, such as CCTV & FIRE ALARM System. And perform
testing of cables, motors, transformers, MCC & switchgear Panels. Proper use
and operation of testing equipment/instrument such as multi meter isulation
resistance tester, phase rotation tester, kyoritsu multi functional tester, vibration
8
COMPANY
POSITION
EXCLUSIVE DATES
JOB DISCRIPTION
COMPANY
POSITION
EXCLUSIVE DATES
JOB DISCRIPTION
COMPANY
POSITION
EXCLUSIVE DATES
JOB DISCRIPTION
meter, clamp meter, tacho meter, thermometer, duct tester, and perform of
commissioning & pre- commissioning works start up.
KIMBERLY CLARK HAUNI MASCHINEAU/PHILIP MORRIS AUTOMATION
PROJECT
Field INDUSTRIAL ELECTRICIAN CHARGEHAND
From 04 September 2002 To 25, May 2003
Lead and perform of installation of conduit pipe, cable tray, supports, installation
of MCC, & switchgear panels, PLC, DCS, cable pulling, glanding & termination OF
Control cables, power cables, perform loop checking and meggering test, and
installation of equipments, instrument variables, sensors and switches etc. assist
of equipment vendor/ supplier and pre- commissioning work/modification work.
And assist for start up of motor/equipment. Installation of CCTV & FIRE ALARM
System.
Nacap Drilling/MC connel Dowell co.
Drilling Electrical Technician
From 19 November 1999 To 28 February 2000
Carries out preventive maintenance servicing and repair of Electrical drilling
equipment, solinoid valves, motor pump, generator hydraulic equipment,
lightings, receptacle outlets, airconditioner, and physical inspection auxiliary
equipment machines alarm system. Perform other duties maybe assigned and
observes an follow of safety rules and regulations.
DARWISH CHIYODA KEISO CORPORATION/QAFAC MTBE METHANOL
PLANT PROJ.
Field ELECTRICAL TECHNICIAN PRE-COMMISSIONING
From 21 October 1998 To 26 April 1999
Perform testing loop/line checking cables 33kv 6.6kv meggering test Hi pot
testing, functioning test, motor phase rotation testing motor solo run test, and
physical inspection of MCC, SWITCHGEAR PANEL, MOTOR WINDING Test
9
COMPANY
POSITION
EXCLUSIVE DATES
JOB DISCRIPTION
COMPANY
POSITION
EXCLUSIVE DATES
JOB DISCRIPTION
COMPANY
POSITION
EXCLUSIVE DATES
JOB DISCRIPTION
Transformer, and bolt tightening of bus bar/ bus duct internal connection.
Familiar of general safety procedures such as LOCT-OUT & TAG OUT Of live
equipment. And permit procedures, and entry permit. assist to equipment
vendor/supplier for activities of punchlist work and modification work. FIRE
ALARM & GAS Testing and pre inspection of safety alarm communication system.
Lighting fixtures lamination test, cathodic protection and grounding lightning
system testing & assist inspection with QA/QC & CLIENT inspection.
EEI CORP.BECHTEL GL-1 NATURAL GAS PLANT RENOVATION ALGERIA
Field INDUSTRIAL ELECTRICIAN
From 14 September 1995 To 13 September 1996
Perform physical inspection of live cables and equipment. And isolation
disconnection and renovation work of all equipment and panels. And fabrication
& re installation of conduit pipe, cable trays, stanchion supports, and re-cable
installation pulling work and glanding termination dressing work. Installation of
new MCC, Switchgear panel, plc, dcs, marshaling cabinet, motor equipment etc.
FIRE ALARM & GAS CCTV equipment installation
EEI CORP/BVI INT’L CO. HOPEWELL COAL POWER PLANT PROJECT
Field INDUSTRIAL ELECTRICIAN
From 10 November 1994 To 10 September 1995
Conduit pipe and cable trays installation work, and perform cable pulling glanding
& termination medium low voltage cables, and splicing work of power and control
cables, installation of grounding and lightning protection and auxiliary system
such as CCTV FIRE ALARM SYSTEM. Perform testing of cables, motor,
transformers, MCC & SWITCHGEAR PANELS.
FLOUR DANIEL PACIFIC CO./SHELL REFINERY EXPANSION PROJEC
Field ELECTRICAL TECHNICIAN PRE-COMMISIONING
From 09 November 1993 To 15 September 1994
Responsible for the correctness of all items from quality, and technical installation
10
aspects of the control system. And perform test of the following 3.8kv Sf6 &
34.5kv switchgear according to the client procedure. CT’s Saturation test, burden
test, polarity test, of 86 lock-lock relay & inter trip of switchgear control circuits.
Functional check of motor operated valve (MOV) Rotor & limit of bolt torque
checking. To perform cut of 13.8kv SF6 oil switch & phasing check of existing
high potential test of medium voltage cable as per client standard. And loop
checking point to point field instrument to remote control system trouble shoot of
faulty instrument defect. As-built of instrument loop diagram process ILD & P&ID
Preparation of loop package for cut-over. And perform commission breaker to trip
testing using of primary current injection system. Perform testing of power
reactor limiting current 13.8kv to 15kv synchronized check & testing of steam
turbine generator. & phasing check of normal power and replace of oil
transformer & testing winding resistance & insulation test. As-built of electrical
circuit & one line diagram of as per drawing. Maintain the electrical equipment as
required in full operation by the company. Installation of power & lighting
auxiliaries & public address system. & ALARM COMMUNICATION system.
Insulation & megger test of low voltage cable to makesure the cable no defect.
Trouble shooting of systems including FIRE ALARM CONTROL SYSTEMS and
inspection of wiring installations. And maintain the electrical equipment required
in full operation by the company any other adhoc duties as assigned from time to
time. And maintain of safety procedure implementing & including lock-out & tag-
out and safety entry permit procedures.
11

More Related Content

What's hot

Internship completion letter
Internship completion letterInternship completion letter
Internship completion letterRaj Uttam
 
EXPERIENCE CERTIFICATE
EXPERIENCE CERTIFICATEEXPERIENCE CERTIFICATE
EXPERIENCE CERTIFICATEjubin francis
 
JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)jeyaraj selvaraj
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEsekar palani
 
EDUARDO H. PARE WORK EXPERIENCE CERTIFICATE – LAHMEYER INTERNATIONAL QATAR (2...
EDUARDO H. PARE WORK EXPERIENCE CERTIFICATE – LAHMEYER INTERNATIONAL QATAR (2...EDUARDO H. PARE WORK EXPERIENCE CERTIFICATE – LAHMEYER INTERNATIONAL QATAR (2...
EDUARDO H. PARE WORK EXPERIENCE CERTIFICATE – LAHMEYER INTERNATIONAL QATAR (2...Eduardo H. Pare
 
CV as Maintenance Technician (Armando Malasan)
CV as Maintenance Technician (Armando Malasan)CV as Maintenance Technician (Armando Malasan)
CV as Maintenance Technician (Armando Malasan)Armando Malasan
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument EngineerMukhtar Ahmad
 
Experience Certificate - Saudi Cable
Experience Certificate - Saudi CableExperience Certificate - Saudi Cable
Experience Certificate - Saudi CableRaja manickam
 
Internship certificate iima.PDF
Internship certificate iima.PDFInternship certificate iima.PDF
Internship certificate iima.PDFAnamitra Kahali
 
Certificate of Employment
Certificate of EmploymentCertificate of Employment
Certificate of EmploymentMichael John Nu
 
BNMurthy-Updated CV- QC Inspector
BNMurthy-Updated CV- QC InspectorBNMurthy-Updated CV- QC Inspector
BNMurthy-Updated CV- QC Inspectornarasimha murthy
 

What's hot (20)

Internship completion letter
Internship completion letterInternship completion letter
Internship completion letter
 
EXPERIENCE CERTIFICATE
EXPERIENCE CERTIFICATEEXPERIENCE CERTIFICATE
EXPERIENCE CERTIFICATE
 
JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)
 
HSSC Certificate
HSSC CertificateHSSC Certificate
HSSC Certificate
 
provisional certificate
provisional certificateprovisional certificate
provisional certificate
 
Internship completion letter
Internship completion letterInternship completion letter
Internship completion letter
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 
QS - CV
QS - CVQS - CV
QS - CV
 
2 - Experience Certificate
2 - Experience Certificate2 - Experience Certificate
2 - Experience Certificate
 
EDUARDO H. PARE WORK EXPERIENCE CERTIFICATE – LAHMEYER INTERNATIONAL QATAR (2...
EDUARDO H. PARE WORK EXPERIENCE CERTIFICATE – LAHMEYER INTERNATIONAL QATAR (2...EDUARDO H. PARE WORK EXPERIENCE CERTIFICATE – LAHMEYER INTERNATIONAL QATAR (2...
EDUARDO H. PARE WORK EXPERIENCE CERTIFICATE – LAHMEYER INTERNATIONAL QATAR (2...
 
CV as Maintenance Technician (Armando Malasan)
CV as Maintenance Technician (Armando Malasan)CV as Maintenance Technician (Armando Malasan)
CV as Maintenance Technician (Armando Malasan)
 
ssc result
ssc resultssc result
ssc result
 
Employment Cert KSA
Employment Cert KSAEmployment Cert KSA
Employment Cert KSA
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument Engineer
 
Experience Certificate - Saudi Cable
Experience Certificate - Saudi CableExperience Certificate - Saudi Cable
Experience Certificate - Saudi Cable
 
Internship certificate iima.PDF
Internship certificate iima.PDFInternship certificate iima.PDF
Internship certificate iima.PDF
 
Bachelor Degree
Bachelor DegreeBachelor Degree
Bachelor Degree
 
Experience certificate
Experience certificateExperience certificate
Experience certificate
 
Certificate of Employment
Certificate of EmploymentCertificate of Employment
Certificate of Employment
 
BNMurthy-Updated CV- QC Inspector
BNMurthy-Updated CV- QC InspectorBNMurthy-Updated CV- QC Inspector
BNMurthy-Updated CV- QC Inspector
 

Viewers also liked

ARCHIE ALVAREZ - cv (1)
ARCHIE ALVAREZ - cv (1)ARCHIE ALVAREZ - cv (1)
ARCHIE ALVAREZ - cv (1)Archie Alvarez
 
Vivencio Atienza updated resume 2016
Vivencio Atienza updated resume 2016Vivencio Atienza updated resume 2016
Vivencio Atienza updated resume 2016Vhen Atienza
 
Ryan P. Quilala CV
Ryan P. Quilala CVRyan P. Quilala CV
Ryan P. Quilala CVRyan Quilala
 
Davis Calonsag Resume 2003 Word 2
Davis Calonsag Resume 2003 Word 2Davis Calonsag Resume 2003 Word 2
Davis Calonsag Resume 2003 Word 2Davis Calonsag
 
ROMER ENOVA SURETA ( latest resume PDF)
ROMER ENOVA SURETA ( latest resume  PDF)ROMER ENOVA SURETA ( latest resume  PDF)
ROMER ENOVA SURETA ( latest resume PDF)Romer Sureta
 
Cv c d'urbal-technical supervisor(°°)
Cv c d'urbal-technical supervisor(°°)Cv c d'urbal-technical supervisor(°°)
Cv c d'urbal-technical supervisor(°°)Durbal
 
Latest Comprehensive Resume
Latest Comprehensive ResumeLatest Comprehensive Resume
Latest Comprehensive ResumeDennis Mendoza
 

Viewers also liked (11)

ARCHIE ALVAREZ - cv (1)
ARCHIE ALVAREZ - cv (1)ARCHIE ALVAREZ - cv (1)
ARCHIE ALVAREZ - cv (1)
 
Vivencio Atienza updated resume 2016
Vivencio Atienza updated resume 2016Vivencio Atienza updated resume 2016
Vivencio Atienza updated resume 2016
 
Ryan P. Quilala CV
Ryan P. Quilala CVRyan P. Quilala CV
Ryan P. Quilala CV
 
Davis Calonsag Resume 2003 Word 2
Davis Calonsag Resume 2003 Word 2Davis Calonsag Resume 2003 Word 2
Davis Calonsag Resume 2003 Word 2
 
ROMER ENOVA SURETA ( latest resume PDF)
ROMER ENOVA SURETA ( latest resume  PDF)ROMER ENOVA SURETA ( latest resume  PDF)
ROMER ENOVA SURETA ( latest resume PDF)
 
Infrastructure engineer. CV
Infrastructure engineer. CVInfrastructure engineer. CV
Infrastructure engineer. CV
 
Cv c d'urbal-technical supervisor(°°)
Cv c d'urbal-technical supervisor(°°)Cv c d'urbal-technical supervisor(°°)
Cv c d'urbal-technical supervisor(°°)
 
General foreman cv of rakesh
General foreman cv of rakeshGeneral foreman cv of rakesh
General foreman cv of rakesh
 
Latest Comprehensive Resume
Latest Comprehensive ResumeLatest Comprehensive Resume
Latest Comprehensive Resume
 
CV Site Engineer Civil
CV Site Engineer CivilCV Site Engineer Civil
CV Site Engineer Civil
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
 

Similar to Noli updated Resume (20)

SATHISH KUMAR - E&I
SATHISH KUMAR - E&ISATHISH KUMAR - E&I
SATHISH KUMAR - E&I
 
M Imran
M ImranM Imran
M Imran
 
Tamil E&I Compex inspector
Tamil E&I Compex  inspectorTamil E&I Compex  inspector
Tamil E&I Compex inspector
 
Commissioning Technician
Commissioning TechnicianCommissioning Technician
Commissioning Technician
 
Resume Ronald z.Amban (1) (1)
Resume Ronald z.Amban (1) (1)Resume Ronald z.Amban (1) (1)
Resume Ronald z.Amban (1) (1)
 
asif sup new (4)
asif sup new (4)asif sup new (4)
asif sup new (4)
 
LATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV RLATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV R
 
RA CV Current
RA CV CurrentRA CV Current
RA CV Current
 
1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years exp1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years exp
 
NESTOR-UPDATED-CV-1 ALEGA
NESTOR-UPDATED-CV-1 ALEGANESTOR-UPDATED-CV-1 ALEGA
NESTOR-UPDATED-CV-1 ALEGA
 
FILTHER RIEOALEX
FILTHER RIEOALEXFILTHER RIEOALEX
FILTHER RIEOALEX
 
CV Electrical Technician
CV Electrical TechnicianCV Electrical Technician
CV Electrical Technician
 
roshan-CV1
roshan-CV1roshan-CV1
roshan-CV1
 
ZISHAN
ZISHANZISHAN
ZISHAN
 
MANSOOR_ALI_CV -QA QC
MANSOOR_ALI_CV -QA QCMANSOOR_ALI_CV -QA QC
MANSOOR_ALI_CV -QA QC
 
DARIUS RODRIGUEZ ANGELES 2016 resume
DARIUS RODRIGUEZ ANGELES 2016 resumeDARIUS RODRIGUEZ ANGELES 2016 resume
DARIUS RODRIGUEZ ANGELES 2016 resume
 
Electrical QA QC Engineer
Electrical QA QC EngineerElectrical QA QC Engineer
Electrical QA QC Engineer
 
Commission resume
Commission resumeCommission resume
Commission resume
 
Edwin b 1.baldelovar resume
Edwin b 1.baldelovar resumeEdwin b 1.baldelovar resume
Edwin b 1.baldelovar resume
 
Nadeem CV
Nadeem CVNadeem CV
Nadeem CV
 

Noli updated Resume

  • 1. 1 R E S U M E DESIRED POSITION OTHER POSITION DESIRED Electrical & Instrumentation Foreman Construction/Commissioning & Maintenance jobs MICROSOFTWORD & EXEL OFFICESKILLS QUALITY CONTROL/ INSPECTION TOOLS & WAREHOUSE CONTROLER WELDER/FABRICATOR EQUIPMENT/DRIVING OPERATOR PIPE FITTING/FABRICATOR MECHANICAL FITTER STRACTURAL FITTER & IRON WORKER FABRICATOR RIGGING/ERECTOR SCAFFOLDING ERECTOR BLASTING/PAINTING WORKER CIVIL & CALPENTRY WORKER HEALTH SAFETY & RESCUE/DISASTER MANAGEMENT 23 Years of Field Experience for the Construction installation-Commissioning and Maintenance JOBS in the deferent project & industries as Electrical & instrumentation Supervisory. such as: Modular Substation-LER/LIR instrument room assembler Project Facilities L.N.G. GAS PLANT, POWER GENERATION PLANT, MINING PROCESSINNG & RECOVERY PLANT, MTBE-METHANOL PLANT PACILITIES, PETROCEMICAL PLANT, INDUSTRIAL BUILDING AUTOMATION PLANT FACILITIES, CANNING INDUSTRIES, RENOVATION LNG PROJECT, AIR NAVIGATION FACILITIES, HYDRO POWER PLANT, COAL POWER PLANT, AIRPORT FACILITIES, RAILWAYS, SEAPORTS, OIL FIELD OFFSHORE/ONSHORE PROJECT. PIPELINE PROJECT, ROAD HIWAYS PROJECT, CEMENT PLANT, STEEL PROCESSING PLANT, TOWER BUILDINGS & COMMUNICATION. PETROLIUM PLANT DEPOT PROJECT, POWER DISTRIBUTION LINE, COMBINED CYCLE POWER PLANT, SEAWEDS- TREATMENT & DESALINATION PLANT, DRY DUCKS PROJECT, GAS TURBINE, SOLAR PANEL/ POWER SYSTEM Contact no. : +63 9154198356/+63 9292177429 Email add. : noli.donez@yahoo.com/ Skype: nolidonez2 PERSONAL DATA NAME : MR. Noli S. Doñez ADDRESS : No. 32 Shell GK Village New San Vicente Libjo Batangas City 4200 PHILIPPINES NATIONALITY : Filipino AGE : 50 years Old SEX : Male HEIGHT : 5’7” WEIGHT : 82 kg DATE OF BIRTH : December 10, 1964 PLACE OF BIRTH : Gamay Northern Samar RELIGION : Roman Catholic STATUS : Married
  • 2. 2 NAME OF SPOUSE : Marcelina Charito Donez NAME OF FATHER : Urbano Y. Donez NAME OF MOTHER : Dolores B. Sidro ( Passed Away) PASSPORT NUMBER : EB7752457 PASSPORT VALIDITY : 26, March 2018 AVAILABILITY : Immediately Available DESIRED SALARY : Negotiable EDUCATIONAL ATTAINMENT NAME OF SCHOOL DATES ATTENDED COURSE./DEGREE ELEMENTARY : Gamay Elementary School 1970-1986 Primary Graduate HIGH SCHOOL : GALA Vocational HighSchool 1986-1980 Secondary Graduate VOCATIONAL RECOGNITION : NMYC/RMTC REGION-8 AWARD/CERTIFICATE OF ACCOMPLISHMENT 1987-1988 23 MAY 2015 28 MAY 2015 17 JUNE 2015 24 JUNE 2015 01 JULY 2015 Vocational Technical Graduate. GOVERNMENT EXAMS TAKEN (PASSED) From: ELECTRICAL INSTALLATION & MAINTENA NCE (EIM) TESDA NC-II License no. 11040102005655 TRAININGS / SEMINARS ATTENDED Professional Driving Competency TESDA/Land Transportation Office (L.T.O. Exclusive date : 20 October 2014 SFAT, BLS, CPR, HCP Standard First Aid & Basic Life Support-Cardiopulmonary Exclusive Date : From 12 to 17 May 2014 CB&I Foreman and Safety Leader Ship Training with Certificate Exclusive Date : 20 June to 27 July 2014 Electrical Installation & Maintenance EIM TESDA with NC-II Certificate Exclusive Date : 28 March to 01 April 2011 Basic DisasterRescue Management Team with Training Certificate of Philippine Red Cross Exclusive Date : 18 May 2011
  • 3. 3 Basic Occupational Safety Health with BOSH Certificate Exclusive Date : From 30 March to 03 April 2009 (40hrs) Scaffolding Erection with Training & NC-II Certificate Exclusive Date : From 02 to 22 February 2009 (162hrs) Basic Computer Networking System Exclusive Date : From 26 November To 30 December 2003 TOTAL QUALITY MANAGEMENT Training with Certificate Exclusive Date : 28 Mach 1999 FAMILIAR IN AUSTRALIAN & NEW ZEALAND ELECTRICAL WIRING STANDARD EMPLOYMENT HISTORY FROM DEFERENT COMPANY: COMPANY : ATLANTIC GULF & PACIFIC (AG&P) JOINT VENTURE PROJECT With JGC, KBR, CHIYODA, & ABB, For DARWIN INPEX AUSTRALIA ICHTHYS ONSHORE LNG FACILITIES MODULAR PROJECT POSITION : E&I field Foreman EXCLUSIVE DATES: From 22 April 2015 up to 31 of December 2015 JOB DISCRIPTION: • Read and interpret of Electrical Drawings & not limited of the single line- Diagrams, cable schedule power& control cable termination and instrument Variable installation and Hook-up drawing, tubing and bench supports, and Installation of cable trays, cabling, lighting poles, feeder & Distribution- Panels, Switchgear, transformers, PLC, DCS, SCADA, Marshaling Cabinet. Supervision & Leads groups and distribute the work as per priority, and- Able to Organized all Activities of Electrical & Instrument installation work Communicate to the consultant Client, respective supervisors and manager. Office work and paper works, and able to report of activity and progress. Writing and speak English communication and good example to workforce LEAD Perform and Supervise of Fire & Gas Alarm System Installation to the- LIR& LER Module building facilities, with fabrication and installation of main- Ladder straight sectional horizontal/ vertical and 90 bend & fittings Cable tray & Bracket Supports and fittings. And installation of instrument devices such as Optical smoke detector addressable type, and duct mounted addressable type Manual call point addressable type, flammable Gas detector, fire alarm beacon Gas alarm beacon, fire & Gas alarm horn, fire alarm indicator panels, loop Isolator module, addressable monitor module, explosion proof device, Intrinsic safe barrier module, high sensitivity smoke detection panels, fire & gas Detector junction boxes. And installation and lay-out of Lighting fixtures and bracket supports and fitting For power & receptacles outlets. And welding outlets. Perform and assignto Pre-Commissioning work and modification work and
  • 4. 4 Assist to ABB Vendor for PANEL set up and Internal Tie-off equipment And ensure all cable incoming and glanding / Termination of all devices and Control Pannels connection are completed form from engineering specifi- cation and vendor approved, and verifying against drawing perform of line checking of all wirings and cable loop to panels and controls ISOLATION & CONTINUITY RESISTANCE TESTING and physical Test The internal wiring panel connection. Equipment and device control system Perform and assign for supervision the cable cutting Management and- Supply of the cable drums of all modules for cable pulling internal wiring And coordinate to all foreman & group of cable pulling monitoring of all request Set up all details task step by step work execution to ensure that proper materials And equipment’s are available and are approved for use as well as the approved Drawings. And verify the accessibility of work area. And prepare the necessary- Tools & equipment’s and make sure that they are in good condition. Coordinate and request the lifting tools and equipment for cable pulling works. Transport cable to laying area and first upon entering the module. Check and Clear the cable route prior cable pulling and place cable rollers on required cable Routes. And pull the cables on designated routes based on IFC Drawing. Test cables for insulation resistance and continuity test and seal the open ends of The cable to prepare termination work. And glanding works. Raise & request for inspection to QC Department and perform the require the I/R Conduct toolbox talk with TSTI and prepare to complete sign of permit to work- Step back 5by5 cards Before the execution of work and implement required PPE Maintain of Safety rules & coordination the work force, to maintain the safe act Condition and job hazards and job safety analysis for every task assignment And Comply of Client & company safety Rules & regulation Paper work Activity report of the quantity and productivity reports material take off & request of tools and equipment preparation of jobs activities COMPANY : CHICAGO BRIDGE & IRON CLOUGH JV (CB&I-JV) SOUTHERN HIGH LAND AREA. PAPUA NEW GUINEA LNG EPC-4 PROJECT POSITION : E&I Field Foreman Facilities Maintenance INCLUSIVE DATES : From 30 May 2013 To 08 April 2014 JOB DESCRIPTION :  installation of new FIRE ALARM PROTECTION and FIRE & GAS SAFETY COMMUNICATION SYSTEM FOR EPC-4 HIDE GAS CONDITIONING PLANT FACILITIES. Preventive maintenance and servicing of equipment system such as power generator, breaker, switchgears, motor controls, and protection station use of service transformer, MCC and Panel lighting and IP service socket outlets, and air-conditioning. Conduct Physical inspection periodic check up and testing of auxiliary equipment/machineries system control protection. Physical inspection repair and trouble shooting of faulty power equipment such as welding machines, power drills, power grinders, drop saw, bench saw, bench drill etc. replace of any defective parts mechanical bearings, of motor and device & accessories and isolation and lubricating oil Of gear motor. Functioning And phase rotation and solo run test of motor. Perform testing and loop checking/line check IR Test and meggering,test of cable & termination. high pot testing of high voltage cable.
  • 5. 5 Bus bar bus duct and transformer bolt tighten  Perform Cable pulling installation and Glanding dressing splicing & termination Of high voltage, medium voltage, low voltage cable. Installation of instrument bench & process variables such as flow, pressures, temperature, & level transmitter. Control valves, and installation of instrument tubing and fittings and supports. Fabrication assembles of perforated cable tray/ducting cables/cable trayladders and installation work. READ and INTERPRET ELECTRICAL PLANS, Circuit diagrams and industrial plant design and P&ID Drawings. Familiar with understand the electrical codes and provision for industrial & building wiring and equipment installation Fabrication of lighting fixtures support, conduit and cable trays, and fittings, including bracket and support. Perform conduit pipe threading & bending using electric & manual and hydraulic bender. Perform installation of Switchgear, MCC Panels, Transformers, Panel boards, bus duct, lighting and power divices Perform above ground and under ground cable pulling of power on conduit & cable trays/ trenches, perform instrument tubing and stanchion support, and instrument variables such as flow, pressure, level, temperature, & control valves. Familiar with general practices and lock-out/tag-out and permit entry procedures. COMPANY : KENTZ JORDAN ENGINEERS LTD CO. POSITION : E&I Field Commissioning Foreman INCLUSIVE DATES : From 01 October 2012 to 01 March 2013 JOB DESCRIPTION :  LEAD & PERFORM Of Commissioning & Pre-Commissioning activities such as work & test pack record inspection and physical inspection of instrument field variables and control valves equipment. inspection and perform of punchlist work. Check the termination from the panel and terminal block incomplete cable/core tagging check & inspection of field instrument incomplete installation of equipment accessories. Check the instrument/valve & flow orientation,& instrument incomplete tubing and fittings and re-modification and re-punchlis work. tracking of punchlist work pack certificate the P&ID Drawing, Calibration Certificate and ISO Drawing and LOCATION for QC/QC and CLIENT final inspection from progress construction installation. Assist to equipment supplier for pre-commissioning of equipment and modification works. Perform of the installation of instrument tubing and fittings, valves and supports, for Ammonia line  perform installation of HEAT TRACE CABLE and equipment element/accessories with termination work.  Perform cable tray/fittings and fix of support installation work  Cable Loop and line checking of FIRE ALARM & GAS COMMUNICATION.
  • 6. 6 COMPANY : KUMYANG ELECTRIC CO/JG- SUMMIT PETROCHEMICAL PLANT POSITION : Electrical Project Installation Foreman INCLUSIVE DATES : From 03 May 2012 28, September 2012 JOB DESCRIPTION :  Lead and supervised and perform installation of perforated and ladder cable trays and supports. And cable pulling work and glanding termination work of panels.  Installation of conduit pipe and supports of lighting fixtures and power receptacle outlets all vessel tank and access ways and perform installation of lightning grounding system protection.  Perform and installation of MCC PANELS, SWITCHGEARS, TRANSFORMER, and DISTRIBUTION BOXES.  LEAD and Perform cable loop checking and meggering/Isolation test and HIGH POT Testing of HIGH VOLTAGE CABLE  Perform installation of FIRE & GAS COMMUNICATION SYSTEM petrochemical COMPANY : KENTZ ENGINEERS DR LCC /FLOUR BARRICK GOLD MINING POSITION : INSTRUMENT Field TECHNICIAN INCLUSIVE DATES : From 21 August 2011 to 19 March 2012 JOB DESCRIPTION :  Instrument cable GLANDING & termination to DCS, PLC, MARSHALLING CABINET, field Distribution Boxes, Local Panels, Field instrument & Sensors, Interlocking switches and control switches. Installation of instrument tubing and fittings. Cable loop/line checking and meggering test andcable tagging dressing work. Perform installation of field instrument process variables and instrument bench bracket and supports. Perform cable tray installation and fabrication work. COMPANY : ATLANTIC GULF & PACIFIC CO/POSTER WHEELER PROJECT POSITION : E&I Field PROJECT Foreman INCLUSIVE DATES : From 05 May 2010 to 31 May 2011 JOB DESCRIPTION :  Lead and supervised of E&I modular project assembles.  Implement safety and toolbox meeting before start of work and implementing of safety rules to workforce with JSA-JHA  Perform installation of conduit and cable trays & supports and installation field instrument control panels/junction boxes instrument field process variables, sensors, instrument tubing and fittings assembles and installation works.  Distribution of work and progress report to field supervisor and superintendent, and weekly attend for management staff assembly meeting.  Lead and supervised to perform of the cable pulling works and cable glanding and termination COMPANY : L. ARMANI TRADING & GENERAL SEVICES/SAN PABLO GEN. HOSPITAL POSITION : ELECTRICAL Field PROJECT FOREMAN INCLUSIVE DATES : From 18 December 2008 to 27 November 2009 JOB DESCRIPTION :  Installation of FIRE ALARM SYSTEM And INTER-Communication UNIT  Installation and lay-out of lighting fixtures signage receptacle outlets, air- conditioning, panel board switch board, switches, internet outlets, and
  • 7. 7 transformer/power emergency generator, conduit and junction boxes. COMPANY : EEI CORP.GORO NICKEL PLANT MINING PROJECT NEW CALEDONIA POSITION : Field INDUSTRIAL ELECTRICAL FORMENAN INCLUSIVE DATES : From 10 January 2008 to 27 November 2008 JOB DESCRIPTION COMPANY POSTION EXCLOSIVE DATES JOB DISRIPTION COMPANY POSITION EXCLUSIVE DATES JOB DICRIPTION  LEAD and Supervised for installation of all interlocking switches, sensors conveyor, access lightings fixtures, receptacle outlets, FIRE ALARM & GAS COMMUNICATION SYSTEM, CONDUIT TUBING installation works, cable tray installation, instrument tubing and fittings installation, stanchion bracket supports, installation, cable puling, cable loop/line checking glanding, and termanition works, cable tray perforated and support installation work. MOHAMMED H. HAMMAM CO./SAUDI ARAMCO OFFSHORE OILFIED PROJECT Field INSTRUMENT TECHNICIAN/FABRICATOR From 02 April 2005 To 24 September 2007 Installation of instrument Variables, such as flow pressure, level, & temperature transmitter, with installation of stanchion bench bracket/supports. Termination and glanding work of control distribution boxes/DCS, PLC, MARSHALLING Cabinet CONTROLLER Switches. installation of cable trays perforated trays supports, instrument tubing and fittings, cable loop/line checking continuity test of cables INSTALLATION OF FIRE & GAS COMMUNICATION SYSTEM. EEI AL RUSHAID CONTRUCTION CO/JOBAIL PETROCHEMICAL PLANT PROJECT Field INDUSTRIAL ELECTRICIAN From 11 July 2003 To 25 May 2004 Responsible & perform installation of electrical equipments such as MCC, Panels Boards, Switchgears, transformer, lifting and assemble installing of bus bar/bus duct and fittings. and perform of cable trays and fittings support installation, fabrication and circuit wiring connection based on diagram. Glanding & Termination of lighting system, installation of grounding & lightning protection system, and auxiliary system, such as CCTV & FIRE ALARM System. And perform testing of cables, motors, transformers, MCC & switchgear Panels. Proper use and operation of testing equipment/instrument such as multi meter isulation resistance tester, phase rotation tester, kyoritsu multi functional tester, vibration
  • 8. 8 COMPANY POSITION EXCLUSIVE DATES JOB DISCRIPTION COMPANY POSITION EXCLUSIVE DATES JOB DISCRIPTION COMPANY POSITION EXCLUSIVE DATES JOB DISCRIPTION meter, clamp meter, tacho meter, thermometer, duct tester, and perform of commissioning & pre- commissioning works start up. KIMBERLY CLARK HAUNI MASCHINEAU/PHILIP MORRIS AUTOMATION PROJECT Field INDUSTRIAL ELECTRICIAN CHARGEHAND From 04 September 2002 To 25, May 2003 Lead and perform of installation of conduit pipe, cable tray, supports, installation of MCC, & switchgear panels, PLC, DCS, cable pulling, glanding & termination OF Control cables, power cables, perform loop checking and meggering test, and installation of equipments, instrument variables, sensors and switches etc. assist of equipment vendor/ supplier and pre- commissioning work/modification work. And assist for start up of motor/equipment. Installation of CCTV & FIRE ALARM System. Nacap Drilling/MC connel Dowell co. Drilling Electrical Technician From 19 November 1999 To 28 February 2000 Carries out preventive maintenance servicing and repair of Electrical drilling equipment, solinoid valves, motor pump, generator hydraulic equipment, lightings, receptacle outlets, airconditioner, and physical inspection auxiliary equipment machines alarm system. Perform other duties maybe assigned and observes an follow of safety rules and regulations. DARWISH CHIYODA KEISO CORPORATION/QAFAC MTBE METHANOL PLANT PROJ. Field ELECTRICAL TECHNICIAN PRE-COMMISSIONING From 21 October 1998 To 26 April 1999 Perform testing loop/line checking cables 33kv 6.6kv meggering test Hi pot testing, functioning test, motor phase rotation testing motor solo run test, and physical inspection of MCC, SWITCHGEAR PANEL, MOTOR WINDING Test
  • 9. 9 COMPANY POSITION EXCLUSIVE DATES JOB DISCRIPTION COMPANY POSITION EXCLUSIVE DATES JOB DISCRIPTION COMPANY POSITION EXCLUSIVE DATES JOB DISCRIPTION Transformer, and bolt tightening of bus bar/ bus duct internal connection. Familiar of general safety procedures such as LOCT-OUT & TAG OUT Of live equipment. And permit procedures, and entry permit. assist to equipment vendor/supplier for activities of punchlist work and modification work. FIRE ALARM & GAS Testing and pre inspection of safety alarm communication system. Lighting fixtures lamination test, cathodic protection and grounding lightning system testing & assist inspection with QA/QC & CLIENT inspection. EEI CORP.BECHTEL GL-1 NATURAL GAS PLANT RENOVATION ALGERIA Field INDUSTRIAL ELECTRICIAN From 14 September 1995 To 13 September 1996 Perform physical inspection of live cables and equipment. And isolation disconnection and renovation work of all equipment and panels. And fabrication & re installation of conduit pipe, cable trays, stanchion supports, and re-cable installation pulling work and glanding termination dressing work. Installation of new MCC, Switchgear panel, plc, dcs, marshaling cabinet, motor equipment etc. FIRE ALARM & GAS CCTV equipment installation EEI CORP/BVI INT’L CO. HOPEWELL COAL POWER PLANT PROJECT Field INDUSTRIAL ELECTRICIAN From 10 November 1994 To 10 September 1995 Conduit pipe and cable trays installation work, and perform cable pulling glanding & termination medium low voltage cables, and splicing work of power and control cables, installation of grounding and lightning protection and auxiliary system such as CCTV FIRE ALARM SYSTEM. Perform testing of cables, motor, transformers, MCC & SWITCHGEAR PANELS. FLOUR DANIEL PACIFIC CO./SHELL REFINERY EXPANSION PROJEC Field ELECTRICAL TECHNICIAN PRE-COMMISIONING From 09 November 1993 To 15 September 1994 Responsible for the correctness of all items from quality, and technical installation
  • 10. 10 aspects of the control system. And perform test of the following 3.8kv Sf6 & 34.5kv switchgear according to the client procedure. CT’s Saturation test, burden test, polarity test, of 86 lock-lock relay & inter trip of switchgear control circuits. Functional check of motor operated valve (MOV) Rotor & limit of bolt torque checking. To perform cut of 13.8kv SF6 oil switch & phasing check of existing high potential test of medium voltage cable as per client standard. And loop checking point to point field instrument to remote control system trouble shoot of faulty instrument defect. As-built of instrument loop diagram process ILD & P&ID Preparation of loop package for cut-over. And perform commission breaker to trip testing using of primary current injection system. Perform testing of power reactor limiting current 13.8kv to 15kv synchronized check & testing of steam turbine generator. & phasing check of normal power and replace of oil transformer & testing winding resistance & insulation test. As-built of electrical circuit & one line diagram of as per drawing. Maintain the electrical equipment as required in full operation by the company. Installation of power & lighting auxiliaries & public address system. & ALARM COMMUNICATION system. Insulation & megger test of low voltage cable to makesure the cable no defect. Trouble shooting of systems including FIRE ALARM CONTROL SYSTEMS and inspection of wiring installations. And maintain the electrical equipment required in full operation by the company any other adhoc duties as assigned from time to time. And maintain of safety procedure implementing & including lock-out & tag- out and safety entry permit procedures.
  • 11. 11