SlideShare a Scribd company logo
1 of 5
Mujahid Nawaz - Page 1 of 5
MUJAHID NAWAZ
Electrical Site Engineer / Sr. Supervisor
Samsung Engineering
Abu Dhabi-UAE
Mobile: + 971 56 6841 102
+ 971 50 8344 941
E-MAIL: mujahid73.nawaz @ samsung.com
engineer_mujahid1973 @ yahoo.com
______________________________________________________________________________
Objective -
With more than 19 years of experience in Electrical Systems installations for various
Petrochemical plants, Refineries, Desalination Units and RO (Reverse Osmosis) Plant.
Seeking position as an Electrical Superintendent / Engineer in a growth-centric
organization, primarily in Oil & Gas / Petrochemical sector, and also to take the
responsibilities in other sectors as assigned.
Areas of Competencies -
 19+ years of experience in the field of E&I Engineering in multibillion Dollars
Petrochemical, Refinery, Cement Plants , Fertilizer Plant and Power & Utility
Projects.
 Expertise in managing Electrical Interface / Turn Around / Revamping work (OSBLE)
for EPCC, Conventional and Package Contracts..
 Supervision of Construction, Pre-Commissioning, Commissioning and Energization
activities for complete Electrical Systems.
 Support development of Project, Contracts & Procurement statistics and strategies
for Electrical work.
 Execution of works with all safety aspects in every moment in order to achieve safety
goals.
 Coordination with Client, Consultant and Sub-Contractors for timely completion of
project activities.
Professional Background –
1. Position: Electrical Construction / Pre-Commissioning Engineer
Company: Samsung Engineering Company
Project: Carbon Black –Delayed Cooker Project, Ruwais, UAE
Client: Abu Dhabi National Oil Company Takreer.
Duration: May- 2015 to till date
Mujahid Nawaz - Page 2 of 5
2. Position: Electrical / HVAC Construction / Pre-Commissioning Engineer
Company: Tecnimont/ Samsung Joint venture TSJ
Project: Borouge-3 PO& LDPE Project, Ruwais, UAE
Client: Abu Dhabi Polymers Company
Duration: June 2013 to March-2015
3. Position: Electrical Site Engineer
(Planning, Coordination and Execution)
Company: Samsung Engineering Company
Project: Fertil-2 Ammonia / Urea Expansion, Ruwais, UAE
Client: Ruwais Fertilizer Industries (Fertil), ADNOC Group
Duration: January 2011 to 31- May, 2013
4. Position: E&I Site Engineer
Company: Samsung Engineering Company
Project: Borouge-2 OCU Project, Ruwais, UAE.
Client: Abu Dhabi Polymers Company, U.A.E
Duration: November 2008 to April, 2010
5. Position: Sr.Supervisor E&I
Company: Saudi Bin Laden Group (Petrochemical Mining)
Project: Yanbu National Petrochemical Complex (YANSAB), K.S.A
Client: SABIC / Fluor Arabia
Project: Desalination Unit R.O-1 (Reverse Osmosis)
Client: MARAFIQ, Royal Commission Yanbu, Saudi Arabia
Duration: February 2005 to Nov 2008
6. Position: Supervisor (Electrical Installation & Maintenance)
Company: Popular Spinning Mills Sind, Pakistan
Project: Spinning Unit Maintenance/ Installations Project
Client: Popular Group of Industries, Pakistan
Duration: October, 1997 to December, 2004
7. Position: Supervisor (Electrical)
Company: Descon Engineering, Pakistan
Project: A.E.S Power Plant Project (Lal Pir)
Client: American Engineering Services (USA) / Nichiman
Corporation (MHI, Japan)
Mujahid Nawaz - Page 3 of 5
Project: Lucky Cement Plant, (Lucky Mar watt)
Client: Lucky Cemen
Duration: June, 1995 to September 1997
8. Position: Line Superintendent
Company: Water & Power Development Authority (WAPDA)
Project: National Highway Authority (N.H.A), 11KV Transmission Line
Duration: April 1994 to May 1995
Duties and Responsibilities -
- Review and approve Method Statements, Job Safety Analysis (JSA) reports,
Inspection & Test Plans (ITP) and Request for Inspections (RFI) submitted by
subcontractor to ensure that an electrical standard, safety, specification and
vendor recommendation has been implemented on job site. In addition to this,
holds responsibility to supervise the Electrical works on assigned projects, assist
the Project Engineering team in distribution of manpower based on Construction
schedule and to carry out Site Inspections with Client for the job delivered by
Subcontractors.
- Accountable to provide corrective measure for the errors found in electrical
design and plans, to prepare as built drawing based on actual installation based
on site conditions and Coordination with the consultants for any discrepancies in
the Engineering Plans and Project Specifications.
Prepare and submit Project accomplishment and look ahead schedules to Client
and consultants; And also to carry out Material Take offs for procurement and
preparation of Monthly progress billing for final evaluation based on monthly
progress report and schedule.
- Involved in management meetings with other Contractors, Consultant and
Clients for project status, design issues and technical analysis to find out possible
ways to minimize the Site Interferences.
Furthermore,
- Review and prepared schedule area by area based on the priority to be turn over
to the pre mechanical commissioning.
- Review Bill of Quantity (BOQ), contract and documents to provide Corrective
Measures.
- Conduct on-site observations and spot checking of the works with respect to the
requirements of the contract.
- Daily monitoring or break account of work accomplished based on the Project
Schedule.
- Interpret drawings and details, computation, estimation, materials take-off.
Mujahid Nawaz - Page 4 of 5
Skilled in Cathodic protection CP System installation:
On - Shore
- Pipe Line CP (Temporary / permanent )
- Concrete buried foundation CP
- Tank bottom CP
- Dual media filters / Desalination plant
Off - Shore
- Tubular pile CP Temporary / Permanent
- Deck slab CP Installations, Testing & Commissioning
Duties and Responsibilities Accomplished In QC Field -
 Inspecting and witnessing all major testing activities in substations of MCCs,
Batteries, Motors, Transformer and all other electrical equipments.
 Prepare documents for Inspection (Installation check list, Testing reports and
Method statements).
 Carrying various test, Inspections, Trials and Defect rectifications.
 Investigation of various systems / Equipment Assemblies, Insulation
Resistance Test (Megger) MV/LV cable and Hi-Pot Tests of Power cables.
 Conduct inspection for the installation of electrical activities in conformance
with the approved construction drawings, with the client and contractor
representative.
 Witness all major testing activities such as Electrical Substations and Main
Electrical Motors, 11 KV, 3.3 kV, MV/LV cable test, Meggering and Hi-pot test.
 Responsible for inspections of manufactured and sub-contractor
product wi th coordination with the client and to prepare final Inspection test
report.
 Inspecting cable pulling for and terminations for power supply in Panel boards,
Junction boxes and Transformer rectifiers.
 Conducting inspection of incoming materials and equipment’s of electrical with
the client or consultant.
 Monitor site activities of electrical installation, testing and commissioning,
 Review documents of Material approvals, Test reports, Mill certificates,
Inspection release certificate and Shipping notifications.
Qualification -
Degree in Associate Engineering, (Electrical), 1993
Training -
Mujahid Nawaz - Page 5 of 5
1. Knowledge in Safe Work Authorization (SWA), Systems like Cold Work, Hot Work,
and Confined Space Entry & Attendant.
2. Additional Training in Lock out & Tag out (LOTO) procedure.
3. Knowledge in First Aid treatment.
4. Fire Fighting training. Local Incident Commanding Systems, ADNOC
5. PTW Training Certified (ADNOC )
6. PTW Training (Fertil-1) Ruwais Fertilizer Industry - ADNOC
7. PTW Training (Takreer- Ruwais Refinery ) - ADNOC
Software -
Advanced Computer Skills (MS Office Word, MS Office Excel)
Personal Details -
1. Date Of Birth: 01-January -1973
2. Language Proficiency: Urdu, Hindi, English and Arabic
3. Nationality: Pakistani
4. Marital Status Married
5. Pass port Validity: 04 -NOV, 2024
6. Visa validity: 10- December, 2016 (UAE)
7. Current Address: Samsung Engineering Company PVT LTD.
Abu Dhabi National Oil Company Takreer
CBDC Project Ruwais Abu Dhabi
8. Driving License: UAE Valid till 2023
D

More Related Content

What's hot

ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEsekar palani
 
Sr.Electrical Engineer_13years of Experinece
Sr.Electrical Engineer_13years of ExperineceSr.Electrical Engineer_13years of Experinece
Sr.Electrical Engineer_13years of ExperineceNagaraj Maradi
 
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionvineeth ravi
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMahesh Narayanan
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultantdilish pareed
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpSubhash +966535838322
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016Khadar Ali Shaik, P.Eng
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer ResumeAbdul Rahiman
 
Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)sajid akram
 
Khalid -cv_electrical_engineer (1)
Khalid  -cv_electrical_engineer (1)Khalid  -cv_electrical_engineer (1)
Khalid -cv_electrical_engineer (1)Khalid Eltahir
 
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDINSenior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDINHossam Fattah
 
Electrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, ElectricianElectrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, Electricianjesegbue
 
JOHN- Senior Electrical engineer
JOHN- Senior Electrical engineerJOHN- Senior Electrical engineer
JOHN- Senior Electrical engineerjohn britto
 
Eng Samer Ali CV
Eng Samer Ali CVEng Samer Ali CV
Eng Samer Ali CVSamer Ali
 
ELECTRICAL DESIGN ENGINEER - RESUME
ELECTRICAL DESIGN ENGINEER -  RESUMEELECTRICAL DESIGN ENGINEER -  RESUME
ELECTRICAL DESIGN ENGINEER - RESUMEVEERABHARATHI MUNI
 
Arman, Resume - edited - Copy
Arman, Resume - edited - CopyArman, Resume - edited - Copy
Arman, Resume - edited - Copyarmando doria
 

What's hot (20)

CV-Electrical-Engineer (1)
CV-Electrical-Engineer (1)CV-Electrical-Engineer (1)
CV-Electrical-Engineer (1)
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 
Sr.Electrical Engineer_13years of Experinece
Sr.Electrical Engineer_13years of ExperineceSr.Electrical Engineer_13years of Experinece
Sr.Electrical Engineer_13years of Experinece
 
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripition
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEER
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
 
CV OF ELECTRICAL ENGINEER
CV OF ELECTRICAL ENGINEERCV OF ELECTRICAL ENGINEER
CV OF ELECTRICAL ENGINEER
 
Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)
 
Khalid -cv_electrical_engineer (1)
Khalid  -cv_electrical_engineer (1)Khalid  -cv_electrical_engineer (1)
Khalid -cv_electrical_engineer (1)
 
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDINSenior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
 
Electrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, ElectricianElectrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, Electrician
 
JOHN- Senior Electrical engineer
JOHN- Senior Electrical engineerJOHN- Senior Electrical engineer
JOHN- Senior Electrical engineer
 
Anish's CV
Anish's CV Anish's CV
Anish's CV
 
Eng Samer Ali CV
Eng Samer Ali CVEng Samer Ali CV
Eng Samer Ali CV
 
ELECTRICAL DESIGN ENGINEER - RESUME
ELECTRICAL DESIGN ENGINEER -  RESUMEELECTRICAL DESIGN ENGINEER -  RESUME
ELECTRICAL DESIGN ENGINEER - RESUME
 
SAGAR RESUME
SAGAR RESUMESAGAR RESUME
SAGAR RESUME
 
Arman, Resume - edited - Copy
Arman, Resume - edited - CopyArman, Resume - edited - Copy
Arman, Resume - edited - Copy
 

Viewers also liked

Safi-Ullah HSE Resume
Safi-Ullah HSE ResumeSafi-Ullah HSE Resume
Safi-Ullah HSE Resumesaif jutt
 
Top 8 mep engineer resume samples
Top 8 mep engineer resume samplesTop 8 mep engineer resume samples
Top 8 mep engineer resume samplesgedihutes
 
Absolute inequalities
Absolute inequalitiesAbsolute inequalities
Absolute inequalitiesSpainhour
 
Otstapka 1
Otstapka 1Otstapka 1
Otstapka 1pneykov
 
Climatic Changes and Yellow Rust Outbreak in Syria
Climatic Changes and Yellow Rust Outbreak in SyriaClimatic Changes and Yellow Rust Outbreak in Syria
Climatic Changes and Yellow Rust Outbreak in SyriaICARDA
 
2012 SAP Retail Forum
2012 SAP Retail Forum2012 SAP Retail Forum
2012 SAP Retail ForumKCIEvents
 
香港六合彩
香港六合彩香港六合彩
香港六合彩weige
 
2.1. Col. Jeffrey Yarvis - Reintegrating Returning Warriors
2.1. Col. Jeffrey Yarvis - Reintegrating Returning Warriors2.1. Col. Jeffrey Yarvis - Reintegrating Returning Warriors
2.1. Col. Jeffrey Yarvis - Reintegrating Returning WarriorsNSPA Office in Ukraine
 
Projects2012
Projects2012Projects2012
Projects2012jarising
 
Culturally Diverse Strategies
Culturally Diverse StrategiesCulturally Diverse Strategies
Culturally Diverse StrategiesCatherine Collier
 
Google new trends
Google new trends Google new trends
Google new trends Sally Jarkas
 
Hydrological modeling of sustainable land management interventions in the Miz...
Hydrological modeling of sustainable land management interventions in the Miz...Hydrological modeling of sustainable land management interventions in the Miz...
Hydrological modeling of sustainable land management interventions in the Miz...essp2
 
Blog aziendali per la comunicazione e il business – Davide Basile
Blog aziendali per la comunicazione e il business – Davide Basile  Blog aziendali per la comunicazione e il business – Davide Basile
Blog aziendali per la comunicazione e il business – Davide Basile Young Digital Lab
 
Favorite weapons of the devil against us
Favorite weapons of the devil against usFavorite weapons of the devil against us
Favorite weapons of the devil against usVan Nagac
 
Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...
Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...
Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...Kevin Perry
 

Viewers also liked (20)

CV_SHIBU.NS_19-01-2016
CV_SHIBU.NS_19-01-2016CV_SHIBU.NS_19-01-2016
CV_SHIBU.NS_19-01-2016
 
Safi-Ullah HSE Resume
Safi-Ullah HSE ResumeSafi-Ullah HSE Resume
Safi-Ullah HSE Resume
 
Top 8 mep engineer resume samples
Top 8 mep engineer resume samplesTop 8 mep engineer resume samples
Top 8 mep engineer resume samples
 
Absolute inequalities
Absolute inequalitiesAbsolute inequalities
Absolute inequalities
 
Otstapka 1
Otstapka 1Otstapka 1
Otstapka 1
 
Vayu, the Ayurvedic neurology.
Vayu, the Ayurvedic neurology.Vayu, the Ayurvedic neurology.
Vayu, the Ayurvedic neurology.
 
Climatic Changes and Yellow Rust Outbreak in Syria
Climatic Changes and Yellow Rust Outbreak in SyriaClimatic Changes and Yellow Rust Outbreak in Syria
Climatic Changes and Yellow Rust Outbreak in Syria
 
Final sbi project
Final sbi projectFinal sbi project
Final sbi project
 
2012 SAP Retail Forum
2012 SAP Retail Forum2012 SAP Retail Forum
2012 SAP Retail Forum
 
香港六合彩
香港六合彩香港六合彩
香港六合彩
 
2.1. Col. Jeffrey Yarvis - Reintegrating Returning Warriors
2.1. Col. Jeffrey Yarvis - Reintegrating Returning Warriors2.1. Col. Jeffrey Yarvis - Reintegrating Returning Warriors
2.1. Col. Jeffrey Yarvis - Reintegrating Returning Warriors
 
Projects2012
Projects2012Projects2012
Projects2012
 
08 mughals
08 mughals08 mughals
08 mughals
 
Culturally Diverse Strategies
Culturally Diverse StrategiesCulturally Diverse Strategies
Culturally Diverse Strategies
 
Pin, Post, Push to Promote Planning
Pin, Post, Push to Promote PlanningPin, Post, Push to Promote Planning
Pin, Post, Push to Promote Planning
 
Google new trends
Google new trends Google new trends
Google new trends
 
Hydrological modeling of sustainable land management interventions in the Miz...
Hydrological modeling of sustainable land management interventions in the Miz...Hydrological modeling of sustainable land management interventions in the Miz...
Hydrological modeling of sustainable land management interventions in the Miz...
 
Blog aziendali per la comunicazione e il business – Davide Basile
Blog aziendali per la comunicazione e il business – Davide Basile  Blog aziendali per la comunicazione e il business – Davide Basile
Blog aziendali per la comunicazione e il business – Davide Basile
 
Favorite weapons of the devil against us
Favorite weapons of the devil against usFavorite weapons of the devil against us
Favorite weapons of the devil against us
 
Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...
Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...
Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...
 

Similar to Nawaz CV as of 10-Jan- 16

Similar to Nawaz CV as of 10-Jan- 16 (20)

MANZAR_CVH
MANZAR_CVHMANZAR_CVH
MANZAR_CVH
 
Nadeem CV
Nadeem CVNadeem CV
Nadeem CV
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2
 
CV-Sandeep Kumar Updated
CV-Sandeep Kumar UpdatedCV-Sandeep Kumar Updated
CV-Sandeep Kumar Updated
 
Engr iqbal resume ,
Engr  iqbal  resume ,Engr  iqbal  resume ,
Engr iqbal resume ,
 
mubashir Electrical engineer
mubashir Electrical engineermubashir Electrical engineer
mubashir Electrical engineer
 
nestor
nestornestor
nestor
 
CV_WALEED
CV_WALEEDCV_WALEED
CV_WALEED
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)
 
F. CV
F. CVF. CV
F. CV
 
RAMASAMY NACE CP LEVEL II ENGINEER
RAMASAMY NACE CP LEVEL II ENGINEERRAMASAMY NACE CP LEVEL II ENGINEER
RAMASAMY NACE CP LEVEL II ENGINEER
 
talhadiploma.doc
talhadiploma.doctalhadiploma.doc
talhadiploma.doc
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer)
 
Estimation&Proposal Manager
Estimation&Proposal  ManagerEstimation&Proposal  Manager
Estimation&Proposal Manager
 
Rama Rao MW CV
Rama Rao  MW CVRama Rao  MW CV
Rama Rao MW CV
 
NACE CP LEVEL II ENGINEER
NACE CP LEVEL II ENGINEERNACE CP LEVEL II ENGINEER
NACE CP LEVEL II ENGINEER
 
tufail CV dxb
tufail CV dxbtufail CV dxb
tufail CV dxb
 

Nawaz CV as of 10-Jan- 16

  • 1. Mujahid Nawaz - Page 1 of 5 MUJAHID NAWAZ Electrical Site Engineer / Sr. Supervisor Samsung Engineering Abu Dhabi-UAE Mobile: + 971 56 6841 102 + 971 50 8344 941 E-MAIL: mujahid73.nawaz @ samsung.com engineer_mujahid1973 @ yahoo.com ______________________________________________________________________________ Objective - With more than 19 years of experience in Electrical Systems installations for various Petrochemical plants, Refineries, Desalination Units and RO (Reverse Osmosis) Plant. Seeking position as an Electrical Superintendent / Engineer in a growth-centric organization, primarily in Oil & Gas / Petrochemical sector, and also to take the responsibilities in other sectors as assigned. Areas of Competencies -  19+ years of experience in the field of E&I Engineering in multibillion Dollars Petrochemical, Refinery, Cement Plants , Fertilizer Plant and Power & Utility Projects.  Expertise in managing Electrical Interface / Turn Around / Revamping work (OSBLE) for EPCC, Conventional and Package Contracts..  Supervision of Construction, Pre-Commissioning, Commissioning and Energization activities for complete Electrical Systems.  Support development of Project, Contracts & Procurement statistics and strategies for Electrical work.  Execution of works with all safety aspects in every moment in order to achieve safety goals.  Coordination with Client, Consultant and Sub-Contractors for timely completion of project activities. Professional Background – 1. Position: Electrical Construction / Pre-Commissioning Engineer Company: Samsung Engineering Company Project: Carbon Black –Delayed Cooker Project, Ruwais, UAE Client: Abu Dhabi National Oil Company Takreer. Duration: May- 2015 to till date
  • 2. Mujahid Nawaz - Page 2 of 5 2. Position: Electrical / HVAC Construction / Pre-Commissioning Engineer Company: Tecnimont/ Samsung Joint venture TSJ Project: Borouge-3 PO& LDPE Project, Ruwais, UAE Client: Abu Dhabi Polymers Company Duration: June 2013 to March-2015 3. Position: Electrical Site Engineer (Planning, Coordination and Execution) Company: Samsung Engineering Company Project: Fertil-2 Ammonia / Urea Expansion, Ruwais, UAE Client: Ruwais Fertilizer Industries (Fertil), ADNOC Group Duration: January 2011 to 31- May, 2013 4. Position: E&I Site Engineer Company: Samsung Engineering Company Project: Borouge-2 OCU Project, Ruwais, UAE. Client: Abu Dhabi Polymers Company, U.A.E Duration: November 2008 to April, 2010 5. Position: Sr.Supervisor E&I Company: Saudi Bin Laden Group (Petrochemical Mining) Project: Yanbu National Petrochemical Complex (YANSAB), K.S.A Client: SABIC / Fluor Arabia Project: Desalination Unit R.O-1 (Reverse Osmosis) Client: MARAFIQ, Royal Commission Yanbu, Saudi Arabia Duration: February 2005 to Nov 2008 6. Position: Supervisor (Electrical Installation & Maintenance) Company: Popular Spinning Mills Sind, Pakistan Project: Spinning Unit Maintenance/ Installations Project Client: Popular Group of Industries, Pakistan Duration: October, 1997 to December, 2004 7. Position: Supervisor (Electrical) Company: Descon Engineering, Pakistan Project: A.E.S Power Plant Project (Lal Pir) Client: American Engineering Services (USA) / Nichiman Corporation (MHI, Japan)
  • 3. Mujahid Nawaz - Page 3 of 5 Project: Lucky Cement Plant, (Lucky Mar watt) Client: Lucky Cemen Duration: June, 1995 to September 1997 8. Position: Line Superintendent Company: Water & Power Development Authority (WAPDA) Project: National Highway Authority (N.H.A), 11KV Transmission Line Duration: April 1994 to May 1995 Duties and Responsibilities - - Review and approve Method Statements, Job Safety Analysis (JSA) reports, Inspection & Test Plans (ITP) and Request for Inspections (RFI) submitted by subcontractor to ensure that an electrical standard, safety, specification and vendor recommendation has been implemented on job site. In addition to this, holds responsibility to supervise the Electrical works on assigned projects, assist the Project Engineering team in distribution of manpower based on Construction schedule and to carry out Site Inspections with Client for the job delivered by Subcontractors. - Accountable to provide corrective measure for the errors found in electrical design and plans, to prepare as built drawing based on actual installation based on site conditions and Coordination with the consultants for any discrepancies in the Engineering Plans and Project Specifications. Prepare and submit Project accomplishment and look ahead schedules to Client and consultants; And also to carry out Material Take offs for procurement and preparation of Monthly progress billing for final evaluation based on monthly progress report and schedule. - Involved in management meetings with other Contractors, Consultant and Clients for project status, design issues and technical analysis to find out possible ways to minimize the Site Interferences. Furthermore, - Review and prepared schedule area by area based on the priority to be turn over to the pre mechanical commissioning. - Review Bill of Quantity (BOQ), contract and documents to provide Corrective Measures. - Conduct on-site observations and spot checking of the works with respect to the requirements of the contract. - Daily monitoring or break account of work accomplished based on the Project Schedule. - Interpret drawings and details, computation, estimation, materials take-off.
  • 4. Mujahid Nawaz - Page 4 of 5 Skilled in Cathodic protection CP System installation: On - Shore - Pipe Line CP (Temporary / permanent ) - Concrete buried foundation CP - Tank bottom CP - Dual media filters / Desalination plant Off - Shore - Tubular pile CP Temporary / Permanent - Deck slab CP Installations, Testing & Commissioning Duties and Responsibilities Accomplished In QC Field -  Inspecting and witnessing all major testing activities in substations of MCCs, Batteries, Motors, Transformer and all other electrical equipments.  Prepare documents for Inspection (Installation check list, Testing reports and Method statements).  Carrying various test, Inspections, Trials and Defect rectifications.  Investigation of various systems / Equipment Assemblies, Insulation Resistance Test (Megger) MV/LV cable and Hi-Pot Tests of Power cables.  Conduct inspection for the installation of electrical activities in conformance with the approved construction drawings, with the client and contractor representative.  Witness all major testing activities such as Electrical Substations and Main Electrical Motors, 11 KV, 3.3 kV, MV/LV cable test, Meggering and Hi-pot test.  Responsible for inspections of manufactured and sub-contractor product wi th coordination with the client and to prepare final Inspection test report.  Inspecting cable pulling for and terminations for power supply in Panel boards, Junction boxes and Transformer rectifiers.  Conducting inspection of incoming materials and equipment’s of electrical with the client or consultant.  Monitor site activities of electrical installation, testing and commissioning,  Review documents of Material approvals, Test reports, Mill certificates, Inspection release certificate and Shipping notifications. Qualification - Degree in Associate Engineering, (Electrical), 1993 Training -
  • 5. Mujahid Nawaz - Page 5 of 5 1. Knowledge in Safe Work Authorization (SWA), Systems like Cold Work, Hot Work, and Confined Space Entry & Attendant. 2. Additional Training in Lock out & Tag out (LOTO) procedure. 3. Knowledge in First Aid treatment. 4. Fire Fighting training. Local Incident Commanding Systems, ADNOC 5. PTW Training Certified (ADNOC ) 6. PTW Training (Fertil-1) Ruwais Fertilizer Industry - ADNOC 7. PTW Training (Takreer- Ruwais Refinery ) - ADNOC Software - Advanced Computer Skills (MS Office Word, MS Office Excel) Personal Details - 1. Date Of Birth: 01-January -1973 2. Language Proficiency: Urdu, Hindi, English and Arabic 3. Nationality: Pakistani 4. Marital Status Married 5. Pass port Validity: 04 -NOV, 2024 6. Visa validity: 10- December, 2016 (UAE) 7. Current Address: Samsung Engineering Company PVT LTD. Abu Dhabi National Oil Company Takreer CBDC Project Ruwais Abu Dhabi 8. Driving License: UAE Valid till 2023 D