SlideShare a Scribd company logo
1 of 7
Curriculum Vitae
Name: Richard Kildea.
Home Address: 26 Knave Lane
Doubleview
WA 6018
Australia
Home Phone No: +61 8 6111 2807 (Australia)
+61 432 848 795 (Australian Mobile)
Private email: richardk_857@hotmail.com
Date of Birth: 23 August 1957. (Australian by birth)
Marital Status: Married
Career Summary: A versatile Electrical/Instrument Specialist with 40+ years total EI&C experience,
with nearly 30 years specific Oil & Gas experience from Front End Engineering design
to Detail design and Site Construction supervision and support for offshore and
onshore Oil & Gas facilities.
The past 15 years of assignments have been based in Asia & the Middle East with
approx. 7 of those years in construction supervision and support in Korean Shipyards
in Ulsan and Geoje Island.
Key Skills: * Understands the vital role of supporting a strong Safety culture in the workplace.
* Efficient supervision of local & expatriate manpower resources.
* Effective communication skills to enable quality working relationships.
* Problem solving of design & construction electrical/instrument problems.
* Familiar with a wide range of international codes and standards.
* Adaptable to different and challenging assignments.
* Ability to organize resources to achieve critical milestones and objectives.
* Familiar with contractor Fabrication & Construction project procedures.
* Conversant with preparation of project documentation deliverables.
* Understand the importance of adherence to project specifications & procedures.
* Computer Skills: PDMS/Navisworks, AutoCad 2D & 3D, Microstation, WinPCS, MS
Excel, MS Word, MS Access.
Languages: English
Key Experience: I have worked in Australia & overseas for major consultancies, construction and
operating companies in design, construction and operational environments. The
majority of this technical experience has been specifically electrical discipline
orientated with a number of years instrumentation and control experience. I have
worked for the past 20+ years in lead/supervisory roles for both Electrical &
Instrument disciplines.
1
Career History:
December 2013 – May 2016
ExxonMobil – HHI Ulsan Korea
Senior E&I Supervisor
Part of ExxonMobil’s project management team for the Hebron topsides construction for offshore
Newfoundland Canada. A key member of the site Electrical engineering team resolving queries from the
both HHI subcontractor and construction E&I inspectors. The assignment also involved liaising with
commissioning and operations groups. Working in conjunction with the E&I construction superintendent
but reporting to the Site lead EI&C engineer, the role also included producing site engineering work packs
for design changes, constructability improvements and additional scope in accordance with MoC
procedures. Familiar with Canadian standards and also CSA certification requirements. Regular site
walkdowns & meetings with the subcontractor and EI&C inspectors were commonplace to determine
complexity & scope of issues raised.
De-mobilized at the end on May 2016, with load out & sailway completed in June 2016.
November 2011 – December 2013
ExxonMobil – DSME Okpo Korea
Senior E&I Supervisor
Part of ExxonMobil’s project management team for the Arkutun-Dagi topsides construction for the
Sakhalin field development in Russia. Working in parallel with E&I Construction Superintendent to
supervise and manage a team of local E&I inspectors. Responsible for evaluating and tracking all site
queries highlighted by inspectors and coordinating the most effective method for corrective action. The
role also includes interfacing with Operations and Mechanical Completions to review their action items,
ensuring avoidance of parallel efforts on similar tasks. My duties include extensive on site and PDMS
reviews in consultation with DSME engineering and production teams, as well as third party sub-
contractors, to determine the most effective solutions to the highlighted problems, ensuring all codes,
standards and specifications are adhered to.
November 2008 – August 2011
Qatargas - Qatar
Senior Electrical Engineer
Recruited by ExxonMobil for assignment to the Qatargas Project Management Team the Common Sulfur
Project facility at Ras Laffan Industrial city. The project is a materials handling plant for Sulfur, the
downstream by-product of LNG processing. My roles & responsibilities as part of the site engineering team
included, but were not limited to the following tasks:
• Review of contractor documentation & liaise with contractor’s site engineering team.
• Analysis of Specification Deviation requests by contractor.
• Resolution & closure of Engineering Punch List items in line with specifications & standards.
• Site walkdowns & inspections & formulation of clarification requests to contractor.
• Assisting contractor with electrical design problems & subsequent documentation issues.
• Safety reviews and walkdowns to ensure safety integrity on site.
• Liaise & assist vendors on site with material & resource management.
• Witness and approval of Factory Acceptance Tests on behalf of client.
2
March 2008 – October 2008
PT McDermott Indonesia
Instrument Superintendent
Superintendent for the construction of the ConocoPhilips North Belut gas platform project. Part of project
management team responsible for a squad of instrument engineers producing & issuing construction work
packs & design solutions for the site construction team. Liaising with client engineers & vendors to ensure
construction & design issues are promptly dealt with. Interfacing closely with site construction team to
resolve manpower, material & schedule issues.
October 2007 – March 2008
WorleyParsons Indonesia
Lead Electrical/Instrument Designer
Supervise & coordinate a large team of local designers on the detail design of 2 x Compression platforms
& 2 x Manifold platforms for Total Indonesia’s Tunu North & South fields. Liase & coordinate requirements
with other disciplines & also with other contractors for bridge interface tie ins. Frequently review model
using PDMS Review to highlight potential design problems. Assist & mentor local designers to take
responsibility for detail design requirements & deliverable milestones.
February 2006 – September 2007
ExxonMobil – Ulsan Korea
Electrical Design Specialist.
Part of ExxonMobil’s project management team, responsible for assisting the Hyundai Heavy Industries
Electrical design team to complete the detailed design phase of the NGL extraction platform for the
ExxonMobil Nigeria East Area project. Working role was as a site electrical engineer; duties included
review, check & comment on HHI design deliverables & vendor documentation, ensuring the design
conforms to the required standards & specifications. During the construction phase I was involved with
follow on engineering as well as receiving inspection of vendor equipment. Assisted with site construction
inspections and mark up & drafting of site sketches to forward to HHI engineering for rectification of
construction design faults & non compliance to specifications & codes.
March 2005 – January 2006
PT Ceria Worley - Jakarta
Lead Electrical/Instrumentation Designer
Responsible for a team of Electrical & Instrumentation designers for Front End Engineering Design phase
of the ConocoPhillips North Belut field development in Indonesia. The project consisted of a dual train
Central Processing Platform bridge linked to a Wellhead Platform with a second Wellhead platform sub sea
linked to the CPP. Responsible for the production, checking & timely completion of all Instrument,
Electrical & Telecoms drawing deliverables associated with the project.
September 2004 – March 2005
PT Ceria Worley - Jakarta
As Built Design Coordinator
Responsible for a review & analysis of all procedures relating to all documentation for Kufpec Indonesia
Limited’s onshore Osiel Drilling & Production Facilities at Seram Island Indonesia. The aim was to
streamline procedures to ensure that all documentation is captured & easily traceable, and key
documentation is effectively As Built for the efficient ongoing operations & maintenance of the plant.
3
December 2003 - September 2004
Worley International - Bangkok
Lead Electrical Designer
Unocal Thailand’s Big Oil 2 offshore production platform detail design phase. Responsible for all electrical
drawing deliverables for the unmanned single process train oil production platform with 2 x 6.6kV Solar
generators & Wet Gas Compression facilities.
September 2003 - November 2003
Transfield-Worley Perth
Senior Inlec Designer
Woodside Energy Limited’s North Rankin A MCC replacement project. Responsible for close out
documentation for MCC replacement.
June 2003 - August 2003
Worley Perth
Senior Electrical Designer
Adma Opco Umm Shaif development project.
Front End Engineering design for 5 x new platforms, including Gas compression , Accommodation, 2 x
riser platforms. Contracted towards the tail end of the FEED project to do a detailed electrical material
take off for weight & cost estimate.
November 2002 - May 2003
PT Ceria Worley - Jakarta
Lead Instrument/Electrical Design Supervisor
CococoPhillips – Kerisi Field Development – Front End Engineering Design Phase.
Responsible for a team of 7 designers. Duties included design, checking & issuing for EPCI bid all
electrical, instrument & Telecoms documentation for a two train process platform & Wellhead platform
with a subsea tie in.
March 2002 - August 2002
Worley Limited - Perth
Lead Instrument Designer
Japan Vietnam Petroleum – Rang Dong Field Development – Design Phase.
Responsible for a team of 5 designers. Duties included design, checking & issuing for construction of all
instrument & telecoms documentation for a two train process platform & 2 x wellhead platforms. Control
system by Emerson, shutdown system by Hima
November 1999 - February 2002
Worley Limited- Perth
Unocal Thailand - Batam Indonesia
Lead Electrical Designer/Construction Supervisor
• Unocal Thailand North Pailin Gas production platform project – Design Phase.
• Unocal Thailand North Pailin Gas production platform project – Unocal Project management team,
Batam Indonesia. 12 months.
Equipment included Solar Turbine Generators. Rolls Royce Compressor. Hima shutdown system &
Honeywell control system.
4
February 1999 - November 1999
Prozec Engineering & Drafting Services
Senior E&I Designer/Owner-Manager
September 1997 – February 1999
I & E Systems Pty Ltd
Senior E&I Designer
September 1996 - September 1997
Prozec Engineering & Drafting Services
Senior E&I Designer/Owner-Manager
March 1996 - September 1996
I & E Systems Pty Ltd
Senior E&I Designer
1996 - March 1996
Worley Engineering (Australia) Pty Limited
Inlec Designer
1995 - Jan 1996
Prozec Drafting Service
Inlec Design Draftsperson
1993 - 1995
Worley Engineering (Australia) Pty Limited
Inlec Designer
1989 - 1993
OK Tedi Mining, Papua New Guinea
Senior Electrical/Instrumentation Design Draftsman
1989
BHP Engineering
Senior Electrical/Instrumentation Design Draftsman
1989
OK Tedi Mining Limited, Papua New Guinea
Senior Electrical/Instrumentation Design Draftsman
1988 - 1989
ICC Engineering
Senior Electrical Design Draftsman
1985 - 1988
Woodside Offshore Petroleum
Electrical Design Draftsman
1984 - 1985
Vel Minenco (Joint Venture)
Electrical Design Draftsman
1983 - 1984
Fluor Maunsell (Joint Venture)
Electrical Design Draftsman
5
1982 - 1983
ICI Engineering
Electrical Design Draftsman
1980 - 1981
Worley Engineering (Australia) Pty Limited
Trainee Electrical Draftsman
1979 - 1980
Mental Health Services
Maintenance Electrician
1978 - 1979
Tomlinson Steel
Trainee Electrical Draftsman
1975 - 1978
Westralian Equipment
Apprentice Electrical Fitter
Qualifications: Certificate of Trade Studies, Electrical Fitting 1978 (WA TAFE)
‘A’ grade Western Australian Electrical License
Diploma Electrical Engineering (incomplete – 60%)
Referees: Alan Matthews: Senior Electrical Engineer
Email: matthews_alan@yahoo.com.au
Tony Gleeson: Senior Electrical Engineer.
Email: tnt@iinet.net.au
Michael James: Senior Electrical Engineer
Email:mike.james@wsnelson.com
Bron Skiba: Senior Electrical Engineer
Email:bron.skiba@gmail.com
Arthur Barthel: E&I Construction Superintendent
Email: abart20807@aol.com
6
1982 - 1983
ICI Engineering
Electrical Design Draftsman
1980 - 1981
Worley Engineering (Australia) Pty Limited
Trainee Electrical Draftsman
1979 - 1980
Mental Health Services
Maintenance Electrician
1978 - 1979
Tomlinson Steel
Trainee Electrical Draftsman
1975 - 1978
Westralian Equipment
Apprentice Electrical Fitter
Qualifications: Certificate of Trade Studies, Electrical Fitting 1978 (WA TAFE)
‘A’ grade Western Australian Electrical License
Diploma Electrical Engineering (incomplete – 60%)
Referees: Alan Matthews: Senior Electrical Engineer
Email: matthews_alan@yahoo.com.au
Tony Gleeson: Senior Electrical Engineer.
Email: tnt@iinet.net.au
Michael James: Senior Electrical Engineer
Email:mike.james@wsnelson.com
Bron Skiba: Senior Electrical Engineer
Email:bron.skiba@gmail.com
Arthur Barthel: E&I Construction Superintendent
Email: abart20807@aol.com
6

More Related Content

What's hot

Cv For Sitemanager
Cv For SitemanagerCv For Sitemanager
Cv For Sitemanagermathavan2008
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATRommel Siasat
 
edwin cv for QA-QC Manager
edwin cv for QA-QC Manageredwin cv for QA-QC Manager
edwin cv for QA-QC ManagerEdwin Aguinaldo
 
Resume Built Using Primavera P6
Resume Built Using Primavera P6Resume Built Using Primavera P6
Resume Built Using Primavera P6Mujahid Ali Akhtar
 
Prem CV Oct 2015
Prem CV Oct 2015Prem CV Oct 2015
Prem CV Oct 2015Prem Kumar
 
Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)
Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)
Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)Mark Rodas
 
Hanif cv 2015 Project engineer (electrical)
Hanif cv 2015   Project engineer (electrical)Hanif cv 2015   Project engineer (electrical)
Hanif cv 2015 Project engineer (electrical)Mohd Hanif Abd Hadi
 
Resume_Vijayakumar M
Resume_Vijayakumar MResume_Vijayakumar M
Resume_Vijayakumar MVijayakumar M
 
DaleBanquirigo.UpdatedCV.061516
DaleBanquirigo.UpdatedCV.061516DaleBanquirigo.UpdatedCV.061516
DaleBanquirigo.UpdatedCV.061516Dale Banquirigo
 
d premanatha reddy_original (2)
d premanatha reddy_original (2)d premanatha reddy_original (2)
d premanatha reddy_original (2)Reddy Premnath
 
CV- electrical engineer-Ismail1 (2) (1)
CV- electrical engineer-Ismail1 (2) (1)CV- electrical engineer-Ismail1 (2) (1)
CV- electrical engineer-Ismail1 (2) (1)Mohd ismail
 

What's hot (16)

Cv For Sitemanager
Cv For SitemanagerCv For Sitemanager
Cv For Sitemanager
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
 
edwin cv for QA-QC Manager
edwin cv for QA-QC Manageredwin cv for QA-QC Manager
edwin cv for QA-QC Manager
 
Resume Built Using Primavera P6
Resume Built Using Primavera P6Resume Built Using Primavera P6
Resume Built Using Primavera P6
 
Prem CV Oct 2015
Prem CV Oct 2015Prem CV Oct 2015
Prem CV Oct 2015
 
THOWFIC AHAMED CV
THOWFIC AHAMED CVTHOWFIC AHAMED CV
THOWFIC AHAMED CV
 
Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)
Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)
Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)
 
Hanif cv 2015 Project engineer (electrical)
Hanif cv 2015   Project engineer (electrical)Hanif cv 2015   Project engineer (electrical)
Hanif cv 2015 Project engineer (electrical)
 
Resume_Vijayakumar M
Resume_Vijayakumar MResume_Vijayakumar M
Resume_Vijayakumar M
 
DaleBanquirigo.UpdatedCV.061516
DaleBanquirigo.UpdatedCV.061516DaleBanquirigo.UpdatedCV.061516
DaleBanquirigo.UpdatedCV.061516
 
d premanatha reddy_original (2)
d premanatha reddy_original (2)d premanatha reddy_original (2)
d premanatha reddy_original (2)
 
CV- electrical engineer-Ismail1 (2) (1)
CV- electrical engineer-Ismail1 (2) (1)CV- electrical engineer-Ismail1 (2) (1)
CV- electrical engineer-Ismail1 (2) (1)
 
QAQC-E&I -Resume
QAQC-E&I -ResumeQAQC-E&I -Resume
QAQC-E&I -Resume
 
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEERResume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
 
Cv mm
Cv mmCv mm
Cv mm
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 

Viewers also liked

Curso 3 el community manager tecnicas de comunicacion e informacion
Curso 3 el community manager tecnicas de comunicacion e informacionCurso 3 el community manager tecnicas de comunicacion e informacion
Curso 3 el community manager tecnicas de comunicacion e informacionNicolae Pana
 
1°reunion de apoderados 7°c
1°reunion de apoderados 7°c1°reunion de apoderados 7°c
1°reunion de apoderados 7°cCarolina qui?nes
 
Foto Te O Pili #Teopili part5 ..
Foto Te O Pili #Teopili  part5 ..Foto Te O Pili #Teopili  part5 ..
Foto Te O Pili #Teopili part5 ..Azka Aldric
 
Laboratorio nº3 -vistas,funciones,dml
Laboratorio nº3 -vistas,funciones,dmlLaboratorio nº3 -vistas,funciones,dml
Laboratorio nº3 -vistas,funciones,dmlSoledad Burgos
 
2.El Yatak Odası Alanlar, 2.El Sürgülü Yatak Odası
2.El Yatak Odası Alanlar, 2.El Sürgülü Yatak Odası2.El Yatak Odası Alanlar, 2.El Sürgülü Yatak Odası
2.El Yatak Odası Alanlar, 2.El Sürgülü Yatak Odasıİkinci el eşya alımı
 
RIWC_PARA_A178 Epistemic displacement
RIWC_PARA_A178 Epistemic displacementRIWC_PARA_A178 Epistemic displacement
RIWC_PARA_A178 Epistemic displacementMarco Muscroft
 
Ready To Jump (R2J) oferta programów rozwojowych
Ready To Jump (R2J) oferta programów rozwojowychReady To Jump (R2J) oferta programów rozwojowych
Ready To Jump (R2J) oferta programów rozwojowychMichal Piatkowski
 
2.El LED TV Alanlar, 2.El Kullanılmış Plazma Tv
2.El LED TV Alanlar, 2.El Kullanılmış Plazma Tv2.El LED TV Alanlar, 2.El Kullanılmış Plazma Tv
2.El LED TV Alanlar, 2.El Kullanılmış Plazma Tvİkinci el eşya alımı
 
2013 041. Technique et résultats à court terme de la prothèse PFJ
2013 041. Technique et résultats à court terme de la prothèse PFJ 2013 041. Technique et résultats à court terme de la prothèse PFJ
2013 041. Technique et résultats à court terme de la prothèse PFJ jofdf
 
Tarragona romana
Tarragona romanaTarragona romana
Tarragona romanadavidmanx
 
Oualid chaif trabajo
Oualid chaif trabajoOualid chaif trabajo
Oualid chaif trabajoOUALID CHAIF
 
La educaciòn en àfrica
La educaciòn en àfricaLa educaciòn en àfrica
La educaciòn en àfricaMaribel Narvaez
 

Viewers also liked (20)

ikinci el oymalı koltuk takımı alanlar
ikinci el oymalı koltuk takımı alanlarikinci el oymalı koltuk takımı alanlar
ikinci el oymalı koltuk takımı alanlar
 
referensi apotek hidup Daftar tanaman herbal apotek hidup
referensi apotek hidup Daftar tanaman herbal apotek hidupreferensi apotek hidup Daftar tanaman herbal apotek hidup
referensi apotek hidup Daftar tanaman herbal apotek hidup
 
Pdi
PdiPdi
Pdi
 
Presentación1
Presentación1Presentación1
Presentación1
 
Curso 3 el community manager tecnicas de comunicacion e informacion
Curso 3 el community manager tecnicas de comunicacion e informacionCurso 3 el community manager tecnicas de comunicacion e informacion
Curso 3 el community manager tecnicas de comunicacion e informacion
 
Bcp task 8
Bcp task 8Bcp task 8
Bcp task 8
 
Wordreference2
Wordreference2Wordreference2
Wordreference2
 
1°reunion de apoderados 7°c
1°reunion de apoderados 7°c1°reunion de apoderados 7°c
1°reunion de apoderados 7°c
 
Foto Te O Pili #Teopili part5 ..
Foto Te O Pili #Teopili  part5 ..Foto Te O Pili #Teopili  part5 ..
Foto Te O Pili #Teopili part5 ..
 
Laboratorio nº3 -vistas,funciones,dml
Laboratorio nº3 -vistas,funciones,dmlLaboratorio nº3 -vistas,funciones,dml
Laboratorio nº3 -vistas,funciones,dml
 
2.El Yatak Odası Alanlar, 2.El Sürgülü Yatak Odası
2.El Yatak Odası Alanlar, 2.El Sürgülü Yatak Odası2.El Yatak Odası Alanlar, 2.El Sürgülü Yatak Odası
2.El Yatak Odası Alanlar, 2.El Sürgülü Yatak Odası
 
Operac 11
Operac 11Operac 11
Operac 11
 
RIWC_PARA_A178 Epistemic displacement
RIWC_PARA_A178 Epistemic displacementRIWC_PARA_A178 Epistemic displacement
RIWC_PARA_A178 Epistemic displacement
 
Ready To Jump (R2J) oferta programów rozwojowych
Ready To Jump (R2J) oferta programów rozwojowychReady To Jump (R2J) oferta programów rozwojowych
Ready To Jump (R2J) oferta programów rozwojowych
 
2.El LED TV Alanlar, 2.El Kullanılmış Plazma Tv
2.El LED TV Alanlar, 2.El Kullanılmış Plazma Tv2.El LED TV Alanlar, 2.El Kullanılmış Plazma Tv
2.El LED TV Alanlar, 2.El Kullanılmış Plazma Tv
 
2013 041. Technique et résultats à court terme de la prothèse PFJ
2013 041. Technique et résultats à court terme de la prothèse PFJ 2013 041. Technique et résultats à court terme de la prothèse PFJ
2013 041. Technique et résultats à court terme de la prothèse PFJ
 
Tarragona romana
Tarragona romanaTarragona romana
Tarragona romana
 
Oualid chaif trabajo
Oualid chaif trabajoOualid chaif trabajo
Oualid chaif trabajo
 
Aplicación Project
Aplicación ProjectAplicación Project
Aplicación Project
 
La educaciòn en àfrica
La educaciòn en àfricaLa educaciòn en àfrica
La educaciòn en àfrica
 

Similar to Richard Kildea. CV October 2016

Similar to Richard Kildea. CV October 2016 (20)

Curriculum Vitae of R M Rico
Curriculum Vitae of R M RicoCurriculum Vitae of R M Rico
Curriculum Vitae of R M Rico
 
ADHOZAKPO STANLEY EDITOR cvsr1
ADHOZAKPO STANLEY EDITOR cvsr1ADHOZAKPO STANLEY EDITOR cvsr1
ADHOZAKPO STANLEY EDITOR cvsr1
 
EPLopez RESUME
EPLopez RESUMEEPLopez RESUME
EPLopez RESUME
 
PROFESSIONAL RESUME OF benny
PROFESSIONAL RESUME OF bennyPROFESSIONAL RESUME OF benny
PROFESSIONAL RESUME OF benny
 
William Adams CV_N1_Jan 2016
William Adams CV_N1_Jan 2016William Adams CV_N1_Jan 2016
William Adams CV_N1_Jan 2016
 
ronald coventry cv n5
ronald coventry cv n5ronald coventry cv n5
ronald coventry cv n5
 
Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
 
Jayabalan cv
Jayabalan  cvJayabalan  cv
Jayabalan cv
 
PathakA Resume
PathakA ResumePathakA Resume
PathakA Resume
 
Jim Matthews CV - Nov. 15
Jim Matthews CV - Nov. 15Jim Matthews CV - Nov. 15
Jim Matthews CV - Nov. 15
 
Robert W Kapp Resume
Robert W Kapp Resume Robert W Kapp Resume
Robert W Kapp Resume
 
SimonBaarde_CV2016
SimonBaarde_CV2016SimonBaarde_CV2016
SimonBaarde_CV2016
 
SM CV2016
SM CV2016SM CV2016
SM CV2016
 
Amitava_resume
Amitava_resumeAmitava_resume
Amitava_resume
 
Bassam Shamkhi - UAE
Bassam Shamkhi - UAEBassam Shamkhi - UAE
Bassam Shamkhi - UAE
 
Bill resume
Bill resumeBill resume
Bill resume
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
 
CV2015
CV2015CV2015
CV2015
 
E&i engineer
E&i engineer E&i engineer
E&i engineer
 
SBCV2016
SBCV2016SBCV2016
SBCV2016
 

Richard Kildea. CV October 2016

  • 1. Curriculum Vitae Name: Richard Kildea. Home Address: 26 Knave Lane Doubleview WA 6018 Australia Home Phone No: +61 8 6111 2807 (Australia) +61 432 848 795 (Australian Mobile) Private email: richardk_857@hotmail.com Date of Birth: 23 August 1957. (Australian by birth) Marital Status: Married Career Summary: A versatile Electrical/Instrument Specialist with 40+ years total EI&C experience, with nearly 30 years specific Oil & Gas experience from Front End Engineering design to Detail design and Site Construction supervision and support for offshore and onshore Oil & Gas facilities. The past 15 years of assignments have been based in Asia & the Middle East with approx. 7 of those years in construction supervision and support in Korean Shipyards in Ulsan and Geoje Island. Key Skills: * Understands the vital role of supporting a strong Safety culture in the workplace. * Efficient supervision of local & expatriate manpower resources. * Effective communication skills to enable quality working relationships. * Problem solving of design & construction electrical/instrument problems. * Familiar with a wide range of international codes and standards. * Adaptable to different and challenging assignments. * Ability to organize resources to achieve critical milestones and objectives. * Familiar with contractor Fabrication & Construction project procedures. * Conversant with preparation of project documentation deliverables. * Understand the importance of adherence to project specifications & procedures. * Computer Skills: PDMS/Navisworks, AutoCad 2D & 3D, Microstation, WinPCS, MS Excel, MS Word, MS Access. Languages: English Key Experience: I have worked in Australia & overseas for major consultancies, construction and operating companies in design, construction and operational environments. The majority of this technical experience has been specifically electrical discipline orientated with a number of years instrumentation and control experience. I have worked for the past 20+ years in lead/supervisory roles for both Electrical & Instrument disciplines. 1
  • 2. Career History: December 2013 – May 2016 ExxonMobil – HHI Ulsan Korea Senior E&I Supervisor Part of ExxonMobil’s project management team for the Hebron topsides construction for offshore Newfoundland Canada. A key member of the site Electrical engineering team resolving queries from the both HHI subcontractor and construction E&I inspectors. The assignment also involved liaising with commissioning and operations groups. Working in conjunction with the E&I construction superintendent but reporting to the Site lead EI&C engineer, the role also included producing site engineering work packs for design changes, constructability improvements and additional scope in accordance with MoC procedures. Familiar with Canadian standards and also CSA certification requirements. Regular site walkdowns & meetings with the subcontractor and EI&C inspectors were commonplace to determine complexity & scope of issues raised. De-mobilized at the end on May 2016, with load out & sailway completed in June 2016. November 2011 – December 2013 ExxonMobil – DSME Okpo Korea Senior E&I Supervisor Part of ExxonMobil’s project management team for the Arkutun-Dagi topsides construction for the Sakhalin field development in Russia. Working in parallel with E&I Construction Superintendent to supervise and manage a team of local E&I inspectors. Responsible for evaluating and tracking all site queries highlighted by inspectors and coordinating the most effective method for corrective action. The role also includes interfacing with Operations and Mechanical Completions to review their action items, ensuring avoidance of parallel efforts on similar tasks. My duties include extensive on site and PDMS reviews in consultation with DSME engineering and production teams, as well as third party sub- contractors, to determine the most effective solutions to the highlighted problems, ensuring all codes, standards and specifications are adhered to. November 2008 – August 2011 Qatargas - Qatar Senior Electrical Engineer Recruited by ExxonMobil for assignment to the Qatargas Project Management Team the Common Sulfur Project facility at Ras Laffan Industrial city. The project is a materials handling plant for Sulfur, the downstream by-product of LNG processing. My roles & responsibilities as part of the site engineering team included, but were not limited to the following tasks: • Review of contractor documentation & liaise with contractor’s site engineering team. • Analysis of Specification Deviation requests by contractor. • Resolution & closure of Engineering Punch List items in line with specifications & standards. • Site walkdowns & inspections & formulation of clarification requests to contractor. • Assisting contractor with electrical design problems & subsequent documentation issues. • Safety reviews and walkdowns to ensure safety integrity on site. • Liaise & assist vendors on site with material & resource management. • Witness and approval of Factory Acceptance Tests on behalf of client. 2
  • 3. March 2008 – October 2008 PT McDermott Indonesia Instrument Superintendent Superintendent for the construction of the ConocoPhilips North Belut gas platform project. Part of project management team responsible for a squad of instrument engineers producing & issuing construction work packs & design solutions for the site construction team. Liaising with client engineers & vendors to ensure construction & design issues are promptly dealt with. Interfacing closely with site construction team to resolve manpower, material & schedule issues. October 2007 – March 2008 WorleyParsons Indonesia Lead Electrical/Instrument Designer Supervise & coordinate a large team of local designers on the detail design of 2 x Compression platforms & 2 x Manifold platforms for Total Indonesia’s Tunu North & South fields. Liase & coordinate requirements with other disciplines & also with other contractors for bridge interface tie ins. Frequently review model using PDMS Review to highlight potential design problems. Assist & mentor local designers to take responsibility for detail design requirements & deliverable milestones. February 2006 – September 2007 ExxonMobil – Ulsan Korea Electrical Design Specialist. Part of ExxonMobil’s project management team, responsible for assisting the Hyundai Heavy Industries Electrical design team to complete the detailed design phase of the NGL extraction platform for the ExxonMobil Nigeria East Area project. Working role was as a site electrical engineer; duties included review, check & comment on HHI design deliverables & vendor documentation, ensuring the design conforms to the required standards & specifications. During the construction phase I was involved with follow on engineering as well as receiving inspection of vendor equipment. Assisted with site construction inspections and mark up & drafting of site sketches to forward to HHI engineering for rectification of construction design faults & non compliance to specifications & codes. March 2005 – January 2006 PT Ceria Worley - Jakarta Lead Electrical/Instrumentation Designer Responsible for a team of Electrical & Instrumentation designers for Front End Engineering Design phase of the ConocoPhillips North Belut field development in Indonesia. The project consisted of a dual train Central Processing Platform bridge linked to a Wellhead Platform with a second Wellhead platform sub sea linked to the CPP. Responsible for the production, checking & timely completion of all Instrument, Electrical & Telecoms drawing deliverables associated with the project. September 2004 – March 2005 PT Ceria Worley - Jakarta As Built Design Coordinator Responsible for a review & analysis of all procedures relating to all documentation for Kufpec Indonesia Limited’s onshore Osiel Drilling & Production Facilities at Seram Island Indonesia. The aim was to streamline procedures to ensure that all documentation is captured & easily traceable, and key documentation is effectively As Built for the efficient ongoing operations & maintenance of the plant. 3
  • 4. December 2003 - September 2004 Worley International - Bangkok Lead Electrical Designer Unocal Thailand’s Big Oil 2 offshore production platform detail design phase. Responsible for all electrical drawing deliverables for the unmanned single process train oil production platform with 2 x 6.6kV Solar generators & Wet Gas Compression facilities. September 2003 - November 2003 Transfield-Worley Perth Senior Inlec Designer Woodside Energy Limited’s North Rankin A MCC replacement project. Responsible for close out documentation for MCC replacement. June 2003 - August 2003 Worley Perth Senior Electrical Designer Adma Opco Umm Shaif development project. Front End Engineering design for 5 x new platforms, including Gas compression , Accommodation, 2 x riser platforms. Contracted towards the tail end of the FEED project to do a detailed electrical material take off for weight & cost estimate. November 2002 - May 2003 PT Ceria Worley - Jakarta Lead Instrument/Electrical Design Supervisor CococoPhillips – Kerisi Field Development – Front End Engineering Design Phase. Responsible for a team of 7 designers. Duties included design, checking & issuing for EPCI bid all electrical, instrument & Telecoms documentation for a two train process platform & Wellhead platform with a subsea tie in. March 2002 - August 2002 Worley Limited - Perth Lead Instrument Designer Japan Vietnam Petroleum – Rang Dong Field Development – Design Phase. Responsible for a team of 5 designers. Duties included design, checking & issuing for construction of all instrument & telecoms documentation for a two train process platform & 2 x wellhead platforms. Control system by Emerson, shutdown system by Hima November 1999 - February 2002 Worley Limited- Perth Unocal Thailand - Batam Indonesia Lead Electrical Designer/Construction Supervisor • Unocal Thailand North Pailin Gas production platform project – Design Phase. • Unocal Thailand North Pailin Gas production platform project – Unocal Project management team, Batam Indonesia. 12 months. Equipment included Solar Turbine Generators. Rolls Royce Compressor. Hima shutdown system & Honeywell control system. 4
  • 5. February 1999 - November 1999 Prozec Engineering & Drafting Services Senior E&I Designer/Owner-Manager September 1997 – February 1999 I & E Systems Pty Ltd Senior E&I Designer September 1996 - September 1997 Prozec Engineering & Drafting Services Senior E&I Designer/Owner-Manager March 1996 - September 1996 I & E Systems Pty Ltd Senior E&I Designer 1996 - March 1996 Worley Engineering (Australia) Pty Limited Inlec Designer 1995 - Jan 1996 Prozec Drafting Service Inlec Design Draftsperson 1993 - 1995 Worley Engineering (Australia) Pty Limited Inlec Designer 1989 - 1993 OK Tedi Mining, Papua New Guinea Senior Electrical/Instrumentation Design Draftsman 1989 BHP Engineering Senior Electrical/Instrumentation Design Draftsman 1989 OK Tedi Mining Limited, Papua New Guinea Senior Electrical/Instrumentation Design Draftsman 1988 - 1989 ICC Engineering Senior Electrical Design Draftsman 1985 - 1988 Woodside Offshore Petroleum Electrical Design Draftsman 1984 - 1985 Vel Minenco (Joint Venture) Electrical Design Draftsman 1983 - 1984 Fluor Maunsell (Joint Venture) Electrical Design Draftsman 5
  • 6. 1982 - 1983 ICI Engineering Electrical Design Draftsman 1980 - 1981 Worley Engineering (Australia) Pty Limited Trainee Electrical Draftsman 1979 - 1980 Mental Health Services Maintenance Electrician 1978 - 1979 Tomlinson Steel Trainee Electrical Draftsman 1975 - 1978 Westralian Equipment Apprentice Electrical Fitter Qualifications: Certificate of Trade Studies, Electrical Fitting 1978 (WA TAFE) ‘A’ grade Western Australian Electrical License Diploma Electrical Engineering (incomplete – 60%) Referees: Alan Matthews: Senior Electrical Engineer Email: matthews_alan@yahoo.com.au Tony Gleeson: Senior Electrical Engineer. Email: tnt@iinet.net.au Michael James: Senior Electrical Engineer Email:mike.james@wsnelson.com Bron Skiba: Senior Electrical Engineer Email:bron.skiba@gmail.com Arthur Barthel: E&I Construction Superintendent Email: abart20807@aol.com 6
  • 7. 1982 - 1983 ICI Engineering Electrical Design Draftsman 1980 - 1981 Worley Engineering (Australia) Pty Limited Trainee Electrical Draftsman 1979 - 1980 Mental Health Services Maintenance Electrician 1978 - 1979 Tomlinson Steel Trainee Electrical Draftsman 1975 - 1978 Westralian Equipment Apprentice Electrical Fitter Qualifications: Certificate of Trade Studies, Electrical Fitting 1978 (WA TAFE) ‘A’ grade Western Australian Electrical License Diploma Electrical Engineering (incomplete – 60%) Referees: Alan Matthews: Senior Electrical Engineer Email: matthews_alan@yahoo.com.au Tony Gleeson: Senior Electrical Engineer. Email: tnt@iinet.net.au Michael James: Senior Electrical Engineer Email:mike.james@wsnelson.com Bron Skiba: Senior Electrical Engineer Email:bron.skiba@gmail.com Arthur Barthel: E&I Construction Superintendent Email: abart20807@aol.com 6