This document provides a summary of Asterio Gutib Bandoquillo's work experience and qualifications. He has over 20 years of experience in the electrical field working on various projects in the oil and gas, mining, and construction industries. His experience includes working as an electrical technician on offshore projects in Papua New Guinea and the Dominican Republic. He also has experience terminating cables, commissioning instrumentation, and testing electrical equipment.
Rana maqsood alam resume (e&i) and construction
ELECTRICAL TECHNICIAN
1. ASTERIO GUTIB BANDOQUILLO
San Francisco, Sta. Catalina Negros Oriental, 6220 Philippines
E-mail: astreband@gmail.com
Mobile No. (63)9999334949 (63)9983724539
POSITION DESIRE: ELECTRICAL TECHNICIAN
CAREER OBJECTIVES:
To pursue a highly rewarding career, seeking for a job in a challenging work
environment where I can utilize my skills, knowledge, trainings, experience,
Initiatives, associated with good attitude to show my full potential and gain
another level of experiences with sheer determination and commitment.
WORK SUMMARY
20 years in Electrical field with Knowledge also in Instrumentation and controls,
with local and overseas experience in the Oil & Gas industries, Offshore, Jetty,
Refineries, LNG, Mining, High Rise Building, Commercial and Residential Building.
Knowledge of both Onshore and Offshore construction and commissioning.
WORK EXPERIENCE
SUB CONTRACTOR (HOUSE WIRING AND INSTALLATION)
Position : Lead/Electrician
Duration : November 12, 2013 to Present
Location : Philippines
Project : Construction (Residential Building, Gymnasium)
JOB DISCRIPTION:
• Concealed lay outs (slabing works) of pvc pipes for lightings, socket outlets,
Communication and auxiliary provision as per drawing instruction and details
• Installation of IMC/RSC/EMT conduit for expose lay out, service entrance,and open ceiling area
• Installation of Panel Board and other electrical devices
• Place conduit (PVC/EMT) inside designated partitions, walls, or other concealed areas,
and pull insulated wires or cables through the conduit to complete circuits between boxes
• Fasten small metal or plastic boxes to walls to house electrical switches or outlets.
• Wiring and termination of circuit homerun to designated circuit breaker
• Installation of lighting fixtures, switches (single, 3way, 4way and dimmer switch)
• Installation of window type air-condition units
• Lay out and installation of push button, door bell, telephone lines, intercom, and catv
• Lay out and installation of post lamp and parameter lights
2. COMPANY : BAM CLOUGH JV/ ORION PROJECT SERVICES (PNG) LTD.
Location : Papua New Guinea
Designation : Electrical Technician
Duration : Dec. 1, 2012- Oct. 9, 2013 (10 months)
Client : EXXON MOBIL/ CHIYODA JGC JV
Project : PNG / LNG JETTY PROJECT
JOB DISCRIPTION:
• Fabrication and installation of supports for cable ladders, cable trays, panels, junction boxes
• Installation of stainless steel cable tray(perforated and ladder type)
• Construction works at substation, fabrication and installation of glanding box for cable entry
• Glanding and termination of power and control cables
• Prior to termination, cables must be checked for continuity and insulation resistance located at
their respective panels/ compartments and strength and insures they are rightly phases
confirmed.
• Installation of offshore navigation aid equipments such as battery, pelican box, GPS, lantern
lights, solar panel at all offshore navigation aids.
• Installation of public address and general alarm system(PAGA) such as speaker, fire alarm, smoke
and heat detector, beacon lights and horns, camears and telecom
• Installation of lightning protection, grounding system and cathodic protection(marine type)
• ALLOCATED IN LOOP CHECK TEAM(INSTRUMENT COMMISSIONING GROUP)
• Giving information on the field status in loading arm panel to control room
• Loop check, function check and troubleshooting of fire monitoring system
• Prepared list of instruments and points to be loop and confirm all instrument check sheets are
complete with no outstanding punch list items
• Valve stroke check, loop checking using hart communicator, simulation, calibration of various
process control instruments
• Assisting vendor representative for troubleshooting on wave and current sensor, loop checking
and troubleshooting on marine mooring system(Trelleborg)
• Assisting walk downs and punch listing of systems for hand over purposes
• Assigned as in charge to punch list works prior to start up and energization includes modification
and relocation including additional works
• Involve in organizing loop folder and other documents need for loop folders
COMPANY : KENTZ CARIBBEAN DR, LLC
Location : Cotui, Dominican Republic
Designation : Electrical Technician
Duration : Aug. 18, 2011-july 31, 2012 (11 months)
Client : BARRICK GOLD CORPORATION
Project : PUEBLO VIEJO GOLD MINING PROJECT
JOB DISCRIPTION : TESTING GROUP (E&I)
• Preparing STA before starting the job
3. • Performed testing activities for medium voltage circuit breakers and contactors such as hi-pot
test, breaker timing test, ductor test, insulation resistance test
• Performed primary injection test for metering/protection current transformer and voltage
transformer as well as ratio test and polarity test, Oil Filled Power transformer testing that
includes oil dielectric breakdown test, transformer turns ratio test, winding resistance etc.
• Perform Continuity test & Insulation resistance test (meggering) of electrical &Instrument cables.
• Conduct Grounding Insulation resistance test of motor winding & Transformer
• High potential testing (Hi-Pot) of MV and HV cables
• Line check & Loop checking of instruments
• Preparing test reports
INVOLVE IN PRE-OPERATION TEAM
• Motor uncoupled/coupled run test (take reading on motor starting current, motor vibration
(vertical
& horizontal), bearing temperature of 415V, 6.6kV motors. That includes operational and
functional test on the motor control
INVOLVE IN INSTRUMENTATION GROUP
• Instrument cable termination and testing PNI Panel, junction boxes (JBI) and instrument field side
termination
• Instrument Commissioning
• Cold loop testing of instrument cables from instrument itself to junction box and from
junction box to marshalling cabinet.
• Hot loops testing of instrument from the field to DCS by simulating 4-20mA signal
• Loop verification of all instrumentation, incorporating sequence, checks of motors and pumps
with Electrical Department Commissioning and other associated control instrumentation.
• Involve in trouble shooting team for commissioning group for DCS configuration from CCR to PNI
to different field area
• Field calibration and functional testing of process instrument, and signal checking to central
control room
• Perform internal loop checking, continuity and signal checking from DCS to instrument process
area
• Assisting the vendor for termination of secondary cable and functional testing for fire alarm and
gas detector
• Involves in organizing loop checking folders and other documents needed for loop folders
COMPANY: CAPE INDUSTRIAL SERVICES INC.
Location: MALAMPAYA OFFSHORE GAS PLANT- PALAWAN
Designation: ELECTRICAN TECHNICIAN
Duration: Nov 23, 2009-July 15, 2010 (8 months)
Client: SHELL MALAMPAYA
Project: HUC (Hook up and Commissioning) PROJECT
JOB DISCRIPTION : ELECTRICAL and INSTRUMENTATION
4. • Person In charge @ Worksite (PICWS)
• Discussed safety precautions as stated on the permit and certificates before start at work
• Construction Scope of works: Fabrication of cable tray support, Installation of cable trays, cable
pulling of different sizes of electrical and instrument cables ( including 535/4C, 444/4C,262/4C sizes
of main power cables) Cable dressing, Installed cable glands. Erection of different panels: PAS-
process automation system, MCC tie in activities. Gas Heater panel, IRP-interposing relay panel,
Installation of grounding cables. Installation of MCT-multi-cable transit for wall penetration going
in to switch gear room. Installation of weather proof type lighting fixture. Cable termination for JB
Turbine Lube oil cooler control.
• Pre Commissioning Activities: Conduct continuity, loop check and IR (insulation resistance) test,
cable termination at MCC-motor control center,
VITAL SCOPE OF JOB COMPLETED DURING THE PROJECT.
• TURBINE LUBE OIL COOLER (for gas turbine ),INSTRUMENT AIR COMPRESSOR, DEW POINT ANALYZER,
FUEL GAS HEATER, MCC-tie in, NITROGEN PACKAGE
• Observe closely the good housekeeping practice as well as the safety for self, safety of the others,
and safety of the proprietors
COMPANY : STAFF BURO STAFFING (SBS)
Location : Modderfortein, South Africa
Designation : Cable Terminator
Duration : Dec. 14, 2008- May 24, 2009 (5 months)
Client : GLOBAL RESOURCES AND DEVELOPMENT (GRD)
Project : TENKE FUNGURUME MINING, CONGO
JOB DISCRIPTION
• Involve in High voltage Termination Group, Cable Laying, Cable jointing .Cable splicing
• Installation of Power Transformers, Switchgears, Panel boards, Distribution Panel Boards
• Installation of perforated and ladder type cable trays and its supports
• Cable pulling, cable dressing, glanding and termination of LV and control cables
• Conduct the following test during inspection with QC and client inspectors
• Meggering (Insulation-Resistance Test) of control, LV and MV cables
• High-Potential test of MV and HV cables
• Meggering (Insulation-Resistance Test) of bus bar and bus duct
• Contact Resistance(Ductor) Test of bus bar and bus duct joints
• Testing and Commissioning
COMPANY : SK ENGINEERING & CONSTRUCTION CO.
Location : Al Mangaf, Kuwait
Designation : Instrument Technician
Duration : June 03, 2007- May 31, 2008 (1 year)
Client : KUWAIT OIL COMPANY
Project : KOC GC PROJECT
5. JOB DESCRIPTION
INSTRUMENT INSTALLATION AND TUBING
• Involves with installation of instruments and accessories.
• Tracking of tapping point for instrument installation using P and ID and piping arrangement
drawing
• Fittings and bending of tube for impulse tubing and valves air supply
INSTRUMENT CABLE TERMINATION AND TESTING
• Termination of Instrument Cable, Internal wiring for the DCS cable lying of the system
cable & termination of primary & secondary cable to junction box Conduct loop
connected to the DCS & local control
• Marshalling cabinet, junction boxes, and instrument field side cable termination
• IR Test (meggering) of instrument cables
INSTRUMENT COMMISIONING
• Involve in troubleshooting team for commissioning group for DCS configuration from CCR to PIB to
different field area
• Perform dry Commissioning on electrical instrument function test to DCS display.
• Field calibration and functional testing of process instrument, and signal checking to central
control room (CCR).
• Perform internal loop checking, continuity and signal checking from DCS to instrument process
area
• Assisting the vendor for termination of secondary cable and functional testing for fire alarm and
gas detector
• Involves in organizing loop checking folders and other documents needed for loop folders
• Observe closely the good housekeeping practice as well as the safety rules and regulation of the
company
COMPANY : NESMA & PARTNERS CONTRACTING COMPANY
Location : Alkhobar, Kingdom of Saudi Arabia
Designation : Industrial Electrician
Duration : October 01, 2004 to Dec. 16, 2006 (26 months)
Client : SAUDI ARAMCO
Project : SAUDI ARAMCO PROJECT
JOB DESCRIPTION:
• Termination,Installation of Cable Trays, Cable Ladders, Cable Trunking, Bus Duct, Lighting
Fixtures,
• Installation of Switchgear, Switch Board, Panel Board, Distribution Board,
• Cabling Works, Trouble Shooting, Transformer Banking,
• Motor Control, Install / Termination of ESD & PLC Panel
• Installation and fabrication of cable trays and ladders according to the lay-out drawings
• Performed cable glanding, cable termination as well as cable pulling
6. March 27, 2001 to Sept 12, 2004 : Cross Cut Int’l Contactor
#75 Mabilis St.,Brgy. Pinahan, Queson City, Phil’s
Position: Electrician
Projects: High rise Commercial and Residential Building
JOB DESCRIPTION:
• Installation of: Conduits, Pvc pipes, Panel Board, Transfer switch
• wiring, Termination, Trouble Shooting,
• Installation of Lighting fixtures, socket outlets, telephone, intercom
February18, 2000 to March 16, 2001: T-8 Lighting’s & Electrical Fittings
52 D. Tuazon Ave., Quezon City, Phil’s.
Position: Head Electrician
JOB DESCRIPTION : Electrician on Call
• Electrical servicing, Assemble of lightings, Installation of lighting fixtures, Fabrication
of lighting fixtures, telephone, intercom,
August1, 1997 to May 11, 1999 : AP Domingo Builders corp.
Rm406 4/F West City Plaza Bldg. 66 West Ave. Quezon City, Phil’s.
Position: Electrician (A)
JOB DESCRIPTION : SM Projects
• Installation of Conduit pipes, wiring, termination, Trouble shooting, Light fixing, Conduiting and
wiring of telephone and intercom cables, T7 cables, coaxial cables, and paging system
April 04, 1996 to April 19, 1997 : MC Associates (Kampo)
47 Timog Ave., Quezon city, Phil’s.
Position: Electrician
JOB DESCRIPTION: Electrical maintenance,
Fixing of lighting fixtures, replacing of defective parts, repairing of electrical devices and equipment
August 21, 1994 to March 08, 1996 : Ayin contractor & Trading Corp.
265-Q 2/F Tomas Morato Ave. Cor. Scout Fernandez Quezon City Phil’s
Position: Electrician
JOB DESCRIPTION : Commercial and High Rise Bldg. Projects
• Installation of conduits, Pvc pipes, wiring,lighting fixtures, intercom, telephone, data and
socket outlets, BMS installation, Termination, Troubleshooting
May 10, 1992 to August 15, 1994: SM Delos Santos Const. Corp.
Blk.59 Lot. 50 La Naval St., Lagro, Novaliches Quezon City, Phil’s.
Position: Electrician
JOB DESCRIPTION : Residential and Commercial Projects
• Installation of Conduits, Pvc pipes, BMS, wiring, Termination,
lighting fixtures, Intercom, telephone, socket outlets, trouble shooting,
EDUCATIONAL BACKGROUND
1990-1992: Guzman College of Science & Technology, Manila, Philippines Vocational
Practical Electricity Course
1986-1990: Villaflores College, Tanjay City Negros Oriental Secondary
1980-1986: Villaflores College, Tanjay City Negros Oriental Primary
7. TECHNICAL TRAINING ATTENDED
MFI FOUNDATION INCORPORATED, MFI Bldg. Ortigas Ave.1605 Pasig City, Phils.
1) Certificate of Completion : INDUSTRIAL ELECTRICIAN May 30, 1998
2) Certificate of Completion : BUILDING WIRING INSTALLATION AND MAINTENANCE /2009
3) Certificate of Completion : Electrical control wiring Installation and Troubleshooting
4) Certificate of Completion : ADVANCE INDUSTRIAL MOTOR CONTROL / 2009
5) Certificate of Completion : REFRIGERATION AND AIRCON MECHANIC / 2009
6) Certificate of Completion : CALIBRATION FOR PROCESS INSTRUMENTATION July 26, 2008
7) Certificate of Completion : PROGRAMMABLE LOGIC CONTROLS September 4, 2008
8) Certificate of Completion : MICROSOFT UNLIMITED POTENTIAL
9) Certificate of Training : MECHATRONICS SERVICING NC II October 14, 2009
Tesda Certificates
1.Instrumentation and Controls NC II April 5, 2010
Certificate No. 0913140236351
2.Mechatronics Servicing NC II April 5, 2010
Certificate No. 1013140204687
ADDITIONAL SKILLS
- Computer Literate
- Can operate various types of electrical testing equipment’s
- Can Operate Man lift, Scissors lift
- Can read P&ID Block diagram, single line diagram, schematic
Diagram, wiring diagram and cable schedule
- Can read, write and communicate with English, language.
- Can work under minimum supervision
SIMINARS ATTENDED
IDESS MARITIME CENTRE (SUBIC) PHILIPPINES
- Basic Offshore Safety Induction and Emergency Training (BOSIET)
- Person In charge @ Work Site (PICWS)
- H2S Gas Training, Permit To Work (PTW)
- Safety Task Assignment (STA)
- Confined Space Entrant, Fire Watcher, Fire Fighting
- Lockout Tag out (LOTO), In-house Training
PERSONAL IMFORMATION
Date of Birth : August 10, 1972 Place of Birth :Pamplona Negros Oriental
Age : 41 y/o Height : 5’4”
Weight: 56 kg Nationality: Filipino
Marital Status: Married Gender: Male
Passport No.: EC3558333 Expiry Date: 27 Feb 20