SlideShare a Scribd company logo
1 of 8
ASTERIO GUTIB BANDOQUILLO
San Francisco, Sta. Catalina Negros Oriental, 6220 Philippines
E-mail: astreband@gmail.com
Mobile No. (63)9999334949 (63)9983724539
POSITION DESIRE: ELECTRICAL TECHNICIAN
CAREER OBJECTIVES:
To pursue a highly rewarding career, seeking for a job in a challenging work
environment where I can utilize my skills, knowledge, trainings, experience,
Initiatives, associated with good attitude to show my full potential and gain
another level of experiences with sheer determination and commitment.
WORK SUMMARY
20 years in Electrical field with Knowledge also in Instrumentation and controls,
with local and overseas experience in the Oil & Gas industries, Offshore, Jetty,
Refineries, LNG, Mining, High Rise Building, Commercial and Residential Building.
Knowledge of both Onshore and Offshore construction and commissioning.
WORK EXPERIENCE
SUB CONTRACTOR (HOUSE WIRING AND INSTALLATION)
Position : Lead/Electrician
Duration : November 12, 2013 to Present
Location : Philippines
Project : Construction (Residential Building, Gymnasium)
JOB DISCRIPTION:
• Concealed lay outs (slabing works) of pvc pipes for lightings, socket outlets,
Communication and auxiliary provision as per drawing instruction and details
• Installation of IMC/RSC/EMT conduit for expose lay out, service entrance,and open ceiling area
• Installation of Panel Board and other electrical devices
• Place conduit (PVC/EMT) inside designated partitions, walls, or other concealed areas,
and pull insulated wires or cables through the conduit to complete circuits between boxes
• Fasten small metal or plastic boxes to walls to house electrical switches or outlets.
• Wiring and termination of circuit homerun to designated circuit breaker
• Installation of lighting fixtures, switches (single, 3way, 4way and dimmer switch)
• Installation of window type air-condition units
• Lay out and installation of push button, door bell, telephone lines, intercom, and catv
• Lay out and installation of post lamp and parameter lights
COMPANY : BAM CLOUGH JV/ ORION PROJECT SERVICES (PNG) LTD.
Location : Papua New Guinea
Designation : Electrical Technician
Duration : Dec. 1, 2012- Oct. 9, 2013 (10 months)
Client : EXXON MOBIL/ CHIYODA JGC JV
Project : PNG / LNG JETTY PROJECT
JOB DISCRIPTION:
• Fabrication and installation of supports for cable ladders, cable trays, panels, junction boxes
• Installation of stainless steel cable tray(perforated and ladder type)
• Construction works at substation, fabrication and installation of glanding box for cable entry
• Glanding and termination of power and control cables
• Prior to termination, cables must be checked for continuity and insulation resistance located at
their respective panels/ compartments and strength and insures they are rightly phases
confirmed.
• Installation of offshore navigation aid equipments such as battery, pelican box, GPS, lantern
lights, solar panel at all offshore navigation aids.
• Installation of public address and general alarm system(PAGA) such as speaker, fire alarm, smoke
and heat detector, beacon lights and horns, camears and telecom
• Installation of lightning protection, grounding system and cathodic protection(marine type)
• ALLOCATED IN LOOP CHECK TEAM(INSTRUMENT COMMISSIONING GROUP)
• Giving information on the field status in loading arm panel to control room
• Loop check, function check and troubleshooting of fire monitoring system
• Prepared list of instruments and points to be loop and confirm all instrument check sheets are
complete with no outstanding punch list items
• Valve stroke check, loop checking using hart communicator, simulation, calibration of various
process control instruments
• Assisting vendor representative for troubleshooting on wave and current sensor, loop checking
and troubleshooting on marine mooring system(Trelleborg)
• Assisting walk downs and punch listing of systems for hand over purposes
• Assigned as in charge to punch list works prior to start up and energization includes modification
and relocation including additional works
• Involve in organizing loop folder and other documents need for loop folders
COMPANY : KENTZ CARIBBEAN DR, LLC
Location : Cotui, Dominican Republic
Designation : Electrical Technician
Duration : Aug. 18, 2011-july 31, 2012 (11 months)
Client : BARRICK GOLD CORPORATION
Project : PUEBLO VIEJO GOLD MINING PROJECT
JOB DISCRIPTION : TESTING GROUP (E&I)
• Preparing STA before starting the job
• Performed testing activities for medium voltage circuit breakers and contactors such as hi-pot
test, breaker timing test, ductor test, insulation resistance test
• Performed primary injection test for metering/protection current transformer and voltage
transformer as well as ratio test and polarity test, Oil Filled Power transformer testing that
includes oil dielectric breakdown test, transformer turns ratio test, winding resistance etc.
• Perform Continuity test & Insulation resistance test (meggering) of electrical &Instrument cables.
• Conduct Grounding Insulation resistance test of motor winding & Transformer
• High potential testing (Hi-Pot) of MV and HV cables
• Line check & Loop checking of instruments
• Preparing test reports
INVOLVE IN PRE-OPERATION TEAM
• Motor uncoupled/coupled run test (take reading on motor starting current, motor vibration
(vertical
& horizontal), bearing temperature of 415V, 6.6kV motors. That includes operational and
functional test on the motor control
INVOLVE IN INSTRUMENTATION GROUP
• Instrument cable termination and testing PNI Panel, junction boxes (JBI) and instrument field side
termination
• Instrument Commissioning
• Cold loop testing of instrument cables from instrument itself to junction box and from
junction box to marshalling cabinet.
• Hot loops testing of instrument from the field to DCS by simulating 4-20mA signal
• Loop verification of all instrumentation, incorporating sequence, checks of motors and pumps
with Electrical Department Commissioning and other associated control instrumentation.
• Involve in trouble shooting team for commissioning group for DCS configuration from CCR to PNI
to different field area
• Field calibration and functional testing of process instrument, and signal checking to central
control room
• Perform internal loop checking, continuity and signal checking from DCS to instrument process
area
• Assisting the vendor for termination of secondary cable and functional testing for fire alarm and
gas detector
• Involves in organizing loop checking folders and other documents needed for loop folders
COMPANY: CAPE INDUSTRIAL SERVICES INC.
Location: MALAMPAYA OFFSHORE GAS PLANT- PALAWAN
Designation: ELECTRICAN TECHNICIAN
Duration: Nov 23, 2009-July 15, 2010 (8 months)
Client: SHELL MALAMPAYA
Project: HUC (Hook up and Commissioning) PROJECT
JOB DISCRIPTION : ELECTRICAL and INSTRUMENTATION
• Person In charge @ Worksite (PICWS)
• Discussed safety precautions as stated on the permit and certificates before start at work
• Construction Scope of works: Fabrication of cable tray support, Installation of cable trays, cable
pulling of different sizes of electrical and instrument cables ( including 535/4C, 444/4C,262/4C sizes
of main power cables) Cable dressing, Installed cable glands. Erection of different panels: PAS-
process automation system, MCC tie in activities. Gas Heater panel, IRP-interposing relay panel,
Installation of grounding cables. Installation of MCT-multi-cable transit for wall penetration going
in to switch gear room. Installation of weather proof type lighting fixture. Cable termination for JB
Turbine Lube oil cooler control.
• Pre Commissioning Activities: Conduct continuity, loop check and IR (insulation resistance) test,
cable termination at MCC-motor control center,
 VITAL SCOPE OF JOB COMPLETED DURING THE PROJECT.
• TURBINE LUBE OIL COOLER (for gas turbine ),INSTRUMENT AIR COMPRESSOR, DEW POINT ANALYZER,
FUEL GAS HEATER, MCC-tie in, NITROGEN PACKAGE
• Observe closely the good housekeeping practice as well as the safety for self, safety of the others,
and safety of the proprietors
COMPANY : STAFF BURO STAFFING (SBS)
Location : Modderfortein, South Africa
Designation : Cable Terminator
Duration : Dec. 14, 2008- May 24, 2009 (5 months)
Client : GLOBAL RESOURCES AND DEVELOPMENT (GRD)
Project : TENKE FUNGURUME MINING, CONGO
JOB DISCRIPTION
• Involve in High voltage Termination Group, Cable Laying, Cable jointing .Cable splicing
• Installation of Power Transformers, Switchgears, Panel boards, Distribution Panel Boards
• Installation of perforated and ladder type cable trays and its supports
• Cable pulling, cable dressing, glanding and termination of LV and control cables
• Conduct the following test during inspection with QC and client inspectors
• Meggering (Insulation-Resistance Test) of control, LV and MV cables
• High-Potential test of MV and HV cables
• Meggering (Insulation-Resistance Test) of bus bar and bus duct
• Contact Resistance(Ductor) Test of bus bar and bus duct joints
• Testing and Commissioning
COMPANY : SK ENGINEERING & CONSTRUCTION CO.
Location : Al Mangaf, Kuwait
Designation : Instrument Technician
Duration : June 03, 2007- May 31, 2008 (1 year)
Client : KUWAIT OIL COMPANY
Project : KOC GC PROJECT
JOB DESCRIPTION
INSTRUMENT INSTALLATION AND TUBING
• Involves with installation of instruments and accessories.
• Tracking of tapping point for instrument installation using P and ID and piping arrangement
drawing
• Fittings and bending of tube for impulse tubing and valves air supply
INSTRUMENT CABLE TERMINATION AND TESTING
• Termination of Instrument Cable, Internal wiring for the DCS cable lying of the system
cable & termination of primary & secondary cable to junction box Conduct loop
connected to the DCS & local control
• Marshalling cabinet, junction boxes, and instrument field side cable termination
• IR Test (meggering) of instrument cables
INSTRUMENT COMMISIONING
• Involve in troubleshooting team for commissioning group for DCS configuration from CCR to PIB to
different field area
• Perform dry Commissioning on electrical instrument function test to DCS display.
• Field calibration and functional testing of process instrument, and signal checking to central
control room (CCR).
• Perform internal loop checking, continuity and signal checking from DCS to instrument process
area
• Assisting the vendor for termination of secondary cable and functional testing for fire alarm and
gas detector
• Involves in organizing loop checking folders and other documents needed for loop folders
• Observe closely the good housekeeping practice as well as the safety rules and regulation of the
company
COMPANY : NESMA & PARTNERS CONTRACTING COMPANY
Location : Alkhobar, Kingdom of Saudi Arabia
Designation : Industrial Electrician
Duration : October 01, 2004 to Dec. 16, 2006 (26 months)
Client : SAUDI ARAMCO
Project : SAUDI ARAMCO PROJECT
JOB DESCRIPTION:
• Termination,Installation of Cable Trays, Cable Ladders, Cable Trunking, Bus Duct, Lighting
Fixtures,
• Installation of Switchgear, Switch Board, Panel Board, Distribution Board,
• Cabling Works, Trouble Shooting, Transformer Banking,
• Motor Control, Install / Termination of ESD & PLC Panel
• Installation and fabrication of cable trays and ladders according to the lay-out drawings
• Performed cable glanding, cable termination as well as cable pulling
March 27, 2001 to Sept 12, 2004 : Cross Cut Int’l Contactor
#75 Mabilis St.,Brgy. Pinahan, Queson City, Phil’s
Position: Electrician
Projects: High rise Commercial and Residential Building
JOB DESCRIPTION:
• Installation of: Conduits, Pvc pipes, Panel Board, Transfer switch
• wiring, Termination, Trouble Shooting,
• Installation of Lighting fixtures, socket outlets, telephone, intercom
February18, 2000 to March 16, 2001: T-8 Lighting’s & Electrical Fittings
52 D. Tuazon Ave., Quezon City, Phil’s.
Position: Head Electrician
JOB DESCRIPTION : Electrician on Call
• Electrical servicing, Assemble of lightings, Installation of lighting fixtures, Fabrication
of lighting fixtures, telephone, intercom,
August1, 1997 to May 11, 1999 : AP Domingo Builders corp.
Rm406 4/F West City Plaza Bldg. 66 West Ave. Quezon City, Phil’s.
Position: Electrician (A)
JOB DESCRIPTION : SM Projects
• Installation of Conduit pipes, wiring, termination, Trouble shooting, Light fixing, Conduiting and
wiring of telephone and intercom cables, T7 cables, coaxial cables, and paging system
April 04, 1996 to April 19, 1997 : MC Associates (Kampo)
47 Timog Ave., Quezon city, Phil’s.
Position: Electrician
JOB DESCRIPTION: Electrical maintenance,
Fixing of lighting fixtures, replacing of defective parts, repairing of electrical devices and equipment
August 21, 1994 to March 08, 1996 : Ayin contractor & Trading Corp.
265-Q 2/F Tomas Morato Ave. Cor. Scout Fernandez Quezon City Phil’s
Position: Electrician
JOB DESCRIPTION : Commercial and High Rise Bldg. Projects
• Installation of conduits, Pvc pipes, wiring,lighting fixtures, intercom, telephone, data and
socket outlets, BMS installation, Termination, Troubleshooting
May 10, 1992 to August 15, 1994: SM Delos Santos Const. Corp.
Blk.59 Lot. 50 La Naval St., Lagro, Novaliches Quezon City, Phil’s.
Position: Electrician
JOB DESCRIPTION : Residential and Commercial Projects
• Installation of Conduits, Pvc pipes, BMS, wiring, Termination,
lighting fixtures, Intercom, telephone, socket outlets, trouble shooting,
EDUCATIONAL BACKGROUND
1990-1992: Guzman College of Science & Technology, Manila, Philippines Vocational
Practical Electricity Course
1986-1990: Villaflores College, Tanjay City Negros Oriental Secondary
1980-1986: Villaflores College, Tanjay City Negros Oriental Primary
TECHNICAL TRAINING ATTENDED
MFI FOUNDATION INCORPORATED, MFI Bldg. Ortigas Ave.1605 Pasig City, Phils.
1) Certificate of Completion : INDUSTRIAL ELECTRICIAN May 30, 1998
2) Certificate of Completion : BUILDING WIRING INSTALLATION AND MAINTENANCE /2009
3) Certificate of Completion : Electrical control wiring Installation and Troubleshooting
4) Certificate of Completion : ADVANCE INDUSTRIAL MOTOR CONTROL / 2009
5) Certificate of Completion : REFRIGERATION AND AIRCON MECHANIC / 2009
6) Certificate of Completion : CALIBRATION FOR PROCESS INSTRUMENTATION July 26, 2008
7) Certificate of Completion : PROGRAMMABLE LOGIC CONTROLS September 4, 2008
8) Certificate of Completion : MICROSOFT UNLIMITED POTENTIAL
9) Certificate of Training : MECHATRONICS SERVICING NC II October 14, 2009
Tesda Certificates
1.Instrumentation and Controls NC II April 5, 2010
Certificate No. 0913140236351
2.Mechatronics Servicing NC II April 5, 2010
Certificate No. 1013140204687
ADDITIONAL SKILLS
- Computer Literate
- Can operate various types of electrical testing equipment’s
- Can Operate Man lift, Scissors lift
- Can read P&ID Block diagram, single line diagram, schematic
Diagram, wiring diagram and cable schedule
- Can read, write and communicate with English, language.
- Can work under minimum supervision
SIMINARS ATTENDED
IDESS MARITIME CENTRE (SUBIC) PHILIPPINES
- Basic Offshore Safety Induction and Emergency Training (BOSIET)
- Person In charge @ Work Site (PICWS)
- H2S Gas Training, Permit To Work (PTW)
- Safety Task Assignment (STA)
- Confined Space Entrant, Fire Watcher, Fire Fighting
- Lockout Tag out (LOTO), In-house Training
PERSONAL IMFORMATION
Date of Birth : August 10, 1972 Place of Birth :Pamplona Negros Oriental
Age : 41 y/o Height : 5’4”
Weight: 56 kg Nationality: Filipino
Marital Status: Married Gender: Male
Passport No.: EC3558333 Expiry Date: 27 Feb 20
ELECTRICAL TECHNICIAN

More Related Content

What's hot

E&I QA QC SUPERVISOR....ORGINAL 2
E&I QA QC  SUPERVISOR....ORGINAL 2E&I QA QC  SUPERVISOR....ORGINAL 2
E&I QA QC SUPERVISOR....ORGINAL 2mohammad tanweer
 
QC INSPECTOR E&I
QC INSPECTOR E&IQC INSPECTOR E&I
QC INSPECTOR E&INASIM NEZAM
 
INSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORINSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORRegu Mkc
 
Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)Kiran Y V N Rao
 
TESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEERTESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEERsaravanan muthu
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEsekar palani
 
VG check list for OHE foundation
VG check list for OHE foundation VG check list for OHE foundation
VG check list for OHE foundation Varadharajalu Gopal
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resumeVEERABHARATHI MUNI
 
Resume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineerResume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineerSrivenkatesh Padmanaban
 
Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerJitendra Shende
 
Instrumentation supervisor cv
Instrumentation supervisor cv Instrumentation supervisor cv
Instrumentation supervisor cv Yacine Sayad
 
ELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISORELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISORIKRAM HUSSAIN
 
Instrument Technician.
Instrument Technician.Instrument Technician.
Instrument Technician.Naushad Alam
 
Ravi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar
 

What's hot (20)

E&I QA QC SUPERVISOR....ORGINAL 2
E&I QA QC  SUPERVISOR....ORGINAL 2E&I QA QC  SUPERVISOR....ORGINAL 2
E&I QA QC SUPERVISOR....ORGINAL 2
 
QC INSPECTOR E&I
QC INSPECTOR E&IQC INSPECTOR E&I
QC INSPECTOR E&I
 
INSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTORINSTRUMENT QA QC INSPECTOR
INSTRUMENT QA QC INSPECTOR
 
Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)
 
Thyrister/SCR
Thyrister/SCRThyrister/SCR
Thyrister/SCR
 
TESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEERTESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEER
 
Cover letter
Cover letterCover letter
Cover letter
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 
VG check list for OHE foundation
VG check list for OHE foundation VG check list for OHE foundation
VG check list for OHE foundation
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resume
 
Resume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineerResume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineer
 
Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping Engineer
 
cv Instrument Commissioning Engineer
cv Instrument Commissioning Engineercv Instrument Commissioning Engineer
cv Instrument Commissioning Engineer
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
Instrumentation supervisor cv
Instrumentation supervisor cv Instrumentation supervisor cv
Instrumentation supervisor cv
 
ELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISORELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISOR
 
Instrument Technician.
Instrument Technician.Instrument Technician.
Instrument Technician.
 
Ravi Shankar_I&C Engineer
Ravi Shankar_I&C EngineerRavi Shankar_I&C Engineer
Ravi Shankar_I&C Engineer
 
INSTRUMENT SUPERVISOR
INSTRUMENT SUPERVISORINSTRUMENT SUPERVISOR
INSTRUMENT SUPERVISOR
 
Ravishankar-CV
Ravishankar-CVRavishankar-CV
Ravishankar-CV
 

Viewers also liked

Step 1 Empathy INF GA 01
Step 1 Empathy INF GA 01Step 1 Empathy INF GA 01
Step 1 Empathy INF GA 01sesevh
 
Бранислав Нушић, Народни посланик
Бранислав Нушић, Народни посланикБранислав Нушић, Народни посланик
Бранислав Нушић, Народни посланикВања Вулин
 
Информационные технологии в деятельности психолога практика: повышение квалиф...
Информационные технологии в деятельности психолога практика: повышение квалиф...Информационные технологии в деятельности психолога практика: повышение квалиф...
Информационные технологии в деятельности психолога практика: повышение квалиф...Ilya Perminov
 
Evaluation question 7
Evaluation question 7Evaluation question 7
Evaluation question 7maxdellimayo
 
auto biography of nelson mandela
auto biography of nelson mandelaauto biography of nelson mandela
auto biography of nelson mandelagurleenkwaraich
 
Elementos finales de control
Elementos finales de controlElementos finales de control
Elementos finales de controldaniel_zg
 
Smendy presentation
Smendy presentationSmendy presentation
Smendy presentationIntouch
 
Islami andolan-foroj-keno
Islami andolan-foroj-kenoIslami andolan-foroj-keno
Islami andolan-foroj-kenoAla uddin
 
Website health care
Website health careWebsite health care
Website health careRavi Malik
 
MT Throwback Thursday Proposal
MT Throwback Thursday ProposalMT Throwback Thursday Proposal
MT Throwback Thursday ProposalEmily Robertson
 
Procsa Webinar Series 2015
Procsa Webinar Series 2015Procsa Webinar Series 2015
Procsa Webinar Series 2015CODsouthafrica
 
Warsztat inno baltica_03_2015_gdansk
Warsztat inno baltica_03_2015_gdanskWarsztat inno baltica_03_2015_gdansk
Warsztat inno baltica_03_2015_gdanskamajm
 

Viewers also liked (18)

e-Waste and the Importance of Recycling
e-Waste and the Importance of Recyclinge-Waste and the Importance of Recycling
e-Waste and the Importance of Recycling
 
Step 1 Empathy INF GA 01
Step 1 Empathy INF GA 01Step 1 Empathy INF GA 01
Step 1 Empathy INF GA 01
 
Бранислав Нушић, Народни посланик
Бранислав Нушић, Народни посланикБранислав Нушић, Народни посланик
Бранислав Нушић, Народни посланик
 
Cv
CvCv
Cv
 
Информационные технологии в деятельности психолога практика: повышение квалиф...
Информационные технологии в деятельности психолога практика: повышение квалиф...Информационные технологии в деятельности психолога практика: повышение квалиф...
Информационные технологии в деятельности психолога практика: повышение квалиф...
 
Evaluation question 7
Evaluation question 7Evaluation question 7
Evaluation question 7
 
auto biography of nelson mandela
auto biography of nelson mandelaauto biography of nelson mandela
auto biography of nelson mandela
 
Elementos finales de control
Elementos finales de controlElementos finales de control
Elementos finales de control
 
Smendy presentation
Smendy presentationSmendy presentation
Smendy presentation
 
Islami andolan-foroj-keno
Islami andolan-foroj-kenoIslami andolan-foroj-keno
Islami andolan-foroj-keno
 
Website health care
Website health careWebsite health care
Website health care
 
MT Throwback Thursday Proposal
MT Throwback Thursday ProposalMT Throwback Thursday Proposal
MT Throwback Thursday Proposal
 
Procsa Webinar Series 2015
Procsa Webinar Series 2015Procsa Webinar Series 2015
Procsa Webinar Series 2015
 
RESUME7
RESUME7RESUME7
RESUME7
 
Chap6 Hades
Chap6 HadesChap6 Hades
Chap6 Hades
 
CV-Hussam
CV-HussamCV-Hussam
CV-Hussam
 
MARTIN R (2)
MARTIN R (2)MARTIN R (2)
MARTIN R (2)
 
Warsztat inno baltica_03_2015_gdansk
Warsztat inno baltica_03_2015_gdanskWarsztat inno baltica_03_2015_gdansk
Warsztat inno baltica_03_2015_gdansk
 

Similar to ELECTRICAL TECHNICIAN

Electrical Inspector CV
Electrical Inspector CVElectrical Inspector CV
Electrical Inspector CVAbdul Hakkim
 
Sr.Electrical Engineer
Sr.Electrical EngineerSr.Electrical Engineer
Sr.Electrical Engineernomanqudrat
 
Electrical QA QC Engineer
Electrical QA QC EngineerElectrical QA QC Engineer
Electrical QA QC EngineerSalman Faris
 
A year with Larsen & Toubro
A year with  Larsen & ToubroA year with  Larsen & Toubro
A year with Larsen & ToubroJAIPRAKASH PATIL
 
Noli updated Resume
Noli updated ResumeNoli updated Resume
Noli updated Resumenoli donez
 
Edwin b 1.baldelovar resume
Edwin b 1.baldelovar resumeEdwin b 1.baldelovar resume
Edwin b 1.baldelovar resumeEdwin Baldelovar
 
Khalid -cv_electrical_engineer (1)
Khalid  -cv_electrical_engineer (1)Khalid  -cv_electrical_engineer (1)
Khalid -cv_electrical_engineer (1)Khalid Eltahir
 
Ryan P. Quilala CV
Ryan P. Quilala CVRyan P. Quilala CV
Ryan P. Quilala CVRyan Quilala
 
Rana Maqsood Alam Resume (E&I)
Rana Maqsood Alam  Resume (E&I)Rana Maqsood Alam  Resume (E&I)
Rana Maqsood Alam Resume (E&I)rana maqsood
 
Rana maqsood alam resume (e&i) and construction
Rana maqsood alam  resume (e&i) and constructionRana maqsood alam  resume (e&i) and construction
Rana maqsood alam resume (e&i) and constructionrana maqsood
 

Similar to ELECTRICAL TECHNICIAN (20)

Electrical Inspector CV
Electrical Inspector CVElectrical Inspector CV
Electrical Inspector CV
 
E&I inspector cv
E&I inspector cvE&I inspector cv
E&I inspector cv
 
Irfan - Elec Engr
Irfan - Elec EngrIrfan - Elec Engr
Irfan - Elec Engr
 
Khaled elhag cv
Khaled elhag cvKhaled elhag cv
Khaled elhag cv
 
CURRICULUM VITAE doc
CURRICULUM VITAE docCURRICULUM VITAE doc
CURRICULUM VITAE doc
 
Commission resume
Commission resumeCommission resume
Commission resume
 
RESUME-Sijin
RESUME-SijinRESUME-Sijin
RESUME-Sijin
 
Sr.Electrical Engineer
Sr.Electrical EngineerSr.Electrical Engineer
Sr.Electrical Engineer
 
Electrical QA QC Engineer
Electrical QA QC EngineerElectrical QA QC Engineer
Electrical QA QC Engineer
 
A year with Larsen & Toubro
A year with  Larsen & ToubroA year with  Larsen & Toubro
A year with Larsen & Toubro
 
Noli updated Resume
Noli updated ResumeNoli updated Resume
Noli updated Resume
 
ugandhar CompEx resume
ugandhar CompEx resumeugandhar CompEx resume
ugandhar CompEx resume
 
M Imran
M ImranM Imran
M Imran
 
Edwin b 1.baldelovar resume
Edwin b 1.baldelovar resumeEdwin b 1.baldelovar resume
Edwin b 1.baldelovar resume
 
Khalid -cv_electrical_engineer (1)
Khalid  -cv_electrical_engineer (1)Khalid  -cv_electrical_engineer (1)
Khalid -cv_electrical_engineer (1)
 
Ryan P. Quilala CV
Ryan P. Quilala CVRyan P. Quilala CV
Ryan P. Quilala CV
 
saif.resume dxb
saif.resume dxbsaif.resume dxb
saif.resume dxb
 
CV of Tahir Mahmood
CV of Tahir MahmoodCV of Tahir Mahmood
CV of Tahir Mahmood
 
Rana Maqsood Alam Resume (E&I)
Rana Maqsood Alam  Resume (E&I)Rana Maqsood Alam  Resume (E&I)
Rana Maqsood Alam Resume (E&I)
 
Rana maqsood alam resume (e&i) and construction
Rana maqsood alam  resume (e&i) and constructionRana maqsood alam  resume (e&i) and construction
Rana maqsood alam resume (e&i) and construction
 

ELECTRICAL TECHNICIAN

  • 1. ASTERIO GUTIB BANDOQUILLO San Francisco, Sta. Catalina Negros Oriental, 6220 Philippines E-mail: astreband@gmail.com Mobile No. (63)9999334949 (63)9983724539 POSITION DESIRE: ELECTRICAL TECHNICIAN CAREER OBJECTIVES: To pursue a highly rewarding career, seeking for a job in a challenging work environment where I can utilize my skills, knowledge, trainings, experience, Initiatives, associated with good attitude to show my full potential and gain another level of experiences with sheer determination and commitment. WORK SUMMARY 20 years in Electrical field with Knowledge also in Instrumentation and controls, with local and overseas experience in the Oil & Gas industries, Offshore, Jetty, Refineries, LNG, Mining, High Rise Building, Commercial and Residential Building. Knowledge of both Onshore and Offshore construction and commissioning. WORK EXPERIENCE SUB CONTRACTOR (HOUSE WIRING AND INSTALLATION) Position : Lead/Electrician Duration : November 12, 2013 to Present Location : Philippines Project : Construction (Residential Building, Gymnasium) JOB DISCRIPTION: • Concealed lay outs (slabing works) of pvc pipes for lightings, socket outlets, Communication and auxiliary provision as per drawing instruction and details • Installation of IMC/RSC/EMT conduit for expose lay out, service entrance,and open ceiling area • Installation of Panel Board and other electrical devices • Place conduit (PVC/EMT) inside designated partitions, walls, or other concealed areas, and pull insulated wires or cables through the conduit to complete circuits between boxes • Fasten small metal or plastic boxes to walls to house electrical switches or outlets. • Wiring and termination of circuit homerun to designated circuit breaker • Installation of lighting fixtures, switches (single, 3way, 4way and dimmer switch) • Installation of window type air-condition units • Lay out and installation of push button, door bell, telephone lines, intercom, and catv • Lay out and installation of post lamp and parameter lights
  • 2. COMPANY : BAM CLOUGH JV/ ORION PROJECT SERVICES (PNG) LTD. Location : Papua New Guinea Designation : Electrical Technician Duration : Dec. 1, 2012- Oct. 9, 2013 (10 months) Client : EXXON MOBIL/ CHIYODA JGC JV Project : PNG / LNG JETTY PROJECT JOB DISCRIPTION: • Fabrication and installation of supports for cable ladders, cable trays, panels, junction boxes • Installation of stainless steel cable tray(perforated and ladder type) • Construction works at substation, fabrication and installation of glanding box for cable entry • Glanding and termination of power and control cables • Prior to termination, cables must be checked for continuity and insulation resistance located at their respective panels/ compartments and strength and insures they are rightly phases confirmed. • Installation of offshore navigation aid equipments such as battery, pelican box, GPS, lantern lights, solar panel at all offshore navigation aids. • Installation of public address and general alarm system(PAGA) such as speaker, fire alarm, smoke and heat detector, beacon lights and horns, camears and telecom • Installation of lightning protection, grounding system and cathodic protection(marine type) • ALLOCATED IN LOOP CHECK TEAM(INSTRUMENT COMMISSIONING GROUP) • Giving information on the field status in loading arm panel to control room • Loop check, function check and troubleshooting of fire monitoring system • Prepared list of instruments and points to be loop and confirm all instrument check sheets are complete with no outstanding punch list items • Valve stroke check, loop checking using hart communicator, simulation, calibration of various process control instruments • Assisting vendor representative for troubleshooting on wave and current sensor, loop checking and troubleshooting on marine mooring system(Trelleborg) • Assisting walk downs and punch listing of systems for hand over purposes • Assigned as in charge to punch list works prior to start up and energization includes modification and relocation including additional works • Involve in organizing loop folder and other documents need for loop folders COMPANY : KENTZ CARIBBEAN DR, LLC Location : Cotui, Dominican Republic Designation : Electrical Technician Duration : Aug. 18, 2011-july 31, 2012 (11 months) Client : BARRICK GOLD CORPORATION Project : PUEBLO VIEJO GOLD MINING PROJECT JOB DISCRIPTION : TESTING GROUP (E&I) • Preparing STA before starting the job
  • 3. • Performed testing activities for medium voltage circuit breakers and contactors such as hi-pot test, breaker timing test, ductor test, insulation resistance test • Performed primary injection test for metering/protection current transformer and voltage transformer as well as ratio test and polarity test, Oil Filled Power transformer testing that includes oil dielectric breakdown test, transformer turns ratio test, winding resistance etc. • Perform Continuity test & Insulation resistance test (meggering) of electrical &Instrument cables. • Conduct Grounding Insulation resistance test of motor winding & Transformer • High potential testing (Hi-Pot) of MV and HV cables • Line check & Loop checking of instruments • Preparing test reports INVOLVE IN PRE-OPERATION TEAM • Motor uncoupled/coupled run test (take reading on motor starting current, motor vibration (vertical & horizontal), bearing temperature of 415V, 6.6kV motors. That includes operational and functional test on the motor control INVOLVE IN INSTRUMENTATION GROUP • Instrument cable termination and testing PNI Panel, junction boxes (JBI) and instrument field side termination • Instrument Commissioning • Cold loop testing of instrument cables from instrument itself to junction box and from junction box to marshalling cabinet. • Hot loops testing of instrument from the field to DCS by simulating 4-20mA signal • Loop verification of all instrumentation, incorporating sequence, checks of motors and pumps with Electrical Department Commissioning and other associated control instrumentation. • Involve in trouble shooting team for commissioning group for DCS configuration from CCR to PNI to different field area • Field calibration and functional testing of process instrument, and signal checking to central control room • Perform internal loop checking, continuity and signal checking from DCS to instrument process area • Assisting the vendor for termination of secondary cable and functional testing for fire alarm and gas detector • Involves in organizing loop checking folders and other documents needed for loop folders COMPANY: CAPE INDUSTRIAL SERVICES INC. Location: MALAMPAYA OFFSHORE GAS PLANT- PALAWAN Designation: ELECTRICAN TECHNICIAN Duration: Nov 23, 2009-July 15, 2010 (8 months) Client: SHELL MALAMPAYA Project: HUC (Hook up and Commissioning) PROJECT JOB DISCRIPTION : ELECTRICAL and INSTRUMENTATION
  • 4. • Person In charge @ Worksite (PICWS) • Discussed safety precautions as stated on the permit and certificates before start at work • Construction Scope of works: Fabrication of cable tray support, Installation of cable trays, cable pulling of different sizes of electrical and instrument cables ( including 535/4C, 444/4C,262/4C sizes of main power cables) Cable dressing, Installed cable glands. Erection of different panels: PAS- process automation system, MCC tie in activities. Gas Heater panel, IRP-interposing relay panel, Installation of grounding cables. Installation of MCT-multi-cable transit for wall penetration going in to switch gear room. Installation of weather proof type lighting fixture. Cable termination for JB Turbine Lube oil cooler control. • Pre Commissioning Activities: Conduct continuity, loop check and IR (insulation resistance) test, cable termination at MCC-motor control center,  VITAL SCOPE OF JOB COMPLETED DURING THE PROJECT. • TURBINE LUBE OIL COOLER (for gas turbine ),INSTRUMENT AIR COMPRESSOR, DEW POINT ANALYZER, FUEL GAS HEATER, MCC-tie in, NITROGEN PACKAGE • Observe closely the good housekeeping practice as well as the safety for self, safety of the others, and safety of the proprietors COMPANY : STAFF BURO STAFFING (SBS) Location : Modderfortein, South Africa Designation : Cable Terminator Duration : Dec. 14, 2008- May 24, 2009 (5 months) Client : GLOBAL RESOURCES AND DEVELOPMENT (GRD) Project : TENKE FUNGURUME MINING, CONGO JOB DISCRIPTION • Involve in High voltage Termination Group, Cable Laying, Cable jointing .Cable splicing • Installation of Power Transformers, Switchgears, Panel boards, Distribution Panel Boards • Installation of perforated and ladder type cable trays and its supports • Cable pulling, cable dressing, glanding and termination of LV and control cables • Conduct the following test during inspection with QC and client inspectors • Meggering (Insulation-Resistance Test) of control, LV and MV cables • High-Potential test of MV and HV cables • Meggering (Insulation-Resistance Test) of bus bar and bus duct • Contact Resistance(Ductor) Test of bus bar and bus duct joints • Testing and Commissioning COMPANY : SK ENGINEERING & CONSTRUCTION CO. Location : Al Mangaf, Kuwait Designation : Instrument Technician Duration : June 03, 2007- May 31, 2008 (1 year) Client : KUWAIT OIL COMPANY Project : KOC GC PROJECT
  • 5. JOB DESCRIPTION INSTRUMENT INSTALLATION AND TUBING • Involves with installation of instruments and accessories. • Tracking of tapping point for instrument installation using P and ID and piping arrangement drawing • Fittings and bending of tube for impulse tubing and valves air supply INSTRUMENT CABLE TERMINATION AND TESTING • Termination of Instrument Cable, Internal wiring for the DCS cable lying of the system cable & termination of primary & secondary cable to junction box Conduct loop connected to the DCS & local control • Marshalling cabinet, junction boxes, and instrument field side cable termination • IR Test (meggering) of instrument cables INSTRUMENT COMMISIONING • Involve in troubleshooting team for commissioning group for DCS configuration from CCR to PIB to different field area • Perform dry Commissioning on electrical instrument function test to DCS display. • Field calibration and functional testing of process instrument, and signal checking to central control room (CCR). • Perform internal loop checking, continuity and signal checking from DCS to instrument process area • Assisting the vendor for termination of secondary cable and functional testing for fire alarm and gas detector • Involves in organizing loop checking folders and other documents needed for loop folders • Observe closely the good housekeeping practice as well as the safety rules and regulation of the company COMPANY : NESMA & PARTNERS CONTRACTING COMPANY Location : Alkhobar, Kingdom of Saudi Arabia Designation : Industrial Electrician Duration : October 01, 2004 to Dec. 16, 2006 (26 months) Client : SAUDI ARAMCO Project : SAUDI ARAMCO PROJECT JOB DESCRIPTION: • Termination,Installation of Cable Trays, Cable Ladders, Cable Trunking, Bus Duct, Lighting Fixtures, • Installation of Switchgear, Switch Board, Panel Board, Distribution Board, • Cabling Works, Trouble Shooting, Transformer Banking, • Motor Control, Install / Termination of ESD & PLC Panel • Installation and fabrication of cable trays and ladders according to the lay-out drawings • Performed cable glanding, cable termination as well as cable pulling
  • 6. March 27, 2001 to Sept 12, 2004 : Cross Cut Int’l Contactor #75 Mabilis St.,Brgy. Pinahan, Queson City, Phil’s Position: Electrician Projects: High rise Commercial and Residential Building JOB DESCRIPTION: • Installation of: Conduits, Pvc pipes, Panel Board, Transfer switch • wiring, Termination, Trouble Shooting, • Installation of Lighting fixtures, socket outlets, telephone, intercom February18, 2000 to March 16, 2001: T-8 Lighting’s & Electrical Fittings 52 D. Tuazon Ave., Quezon City, Phil’s. Position: Head Electrician JOB DESCRIPTION : Electrician on Call • Electrical servicing, Assemble of lightings, Installation of lighting fixtures, Fabrication of lighting fixtures, telephone, intercom, August1, 1997 to May 11, 1999 : AP Domingo Builders corp. Rm406 4/F West City Plaza Bldg. 66 West Ave. Quezon City, Phil’s. Position: Electrician (A) JOB DESCRIPTION : SM Projects • Installation of Conduit pipes, wiring, termination, Trouble shooting, Light fixing, Conduiting and wiring of telephone and intercom cables, T7 cables, coaxial cables, and paging system April 04, 1996 to April 19, 1997 : MC Associates (Kampo) 47 Timog Ave., Quezon city, Phil’s. Position: Electrician JOB DESCRIPTION: Electrical maintenance, Fixing of lighting fixtures, replacing of defective parts, repairing of electrical devices and equipment August 21, 1994 to March 08, 1996 : Ayin contractor & Trading Corp. 265-Q 2/F Tomas Morato Ave. Cor. Scout Fernandez Quezon City Phil’s Position: Electrician JOB DESCRIPTION : Commercial and High Rise Bldg. Projects • Installation of conduits, Pvc pipes, wiring,lighting fixtures, intercom, telephone, data and socket outlets, BMS installation, Termination, Troubleshooting May 10, 1992 to August 15, 1994: SM Delos Santos Const. Corp. Blk.59 Lot. 50 La Naval St., Lagro, Novaliches Quezon City, Phil’s. Position: Electrician JOB DESCRIPTION : Residential and Commercial Projects • Installation of Conduits, Pvc pipes, BMS, wiring, Termination, lighting fixtures, Intercom, telephone, socket outlets, trouble shooting, EDUCATIONAL BACKGROUND 1990-1992: Guzman College of Science & Technology, Manila, Philippines Vocational Practical Electricity Course 1986-1990: Villaflores College, Tanjay City Negros Oriental Secondary 1980-1986: Villaflores College, Tanjay City Negros Oriental Primary
  • 7. TECHNICAL TRAINING ATTENDED MFI FOUNDATION INCORPORATED, MFI Bldg. Ortigas Ave.1605 Pasig City, Phils. 1) Certificate of Completion : INDUSTRIAL ELECTRICIAN May 30, 1998 2) Certificate of Completion : BUILDING WIRING INSTALLATION AND MAINTENANCE /2009 3) Certificate of Completion : Electrical control wiring Installation and Troubleshooting 4) Certificate of Completion : ADVANCE INDUSTRIAL MOTOR CONTROL / 2009 5) Certificate of Completion : REFRIGERATION AND AIRCON MECHANIC / 2009 6) Certificate of Completion : CALIBRATION FOR PROCESS INSTRUMENTATION July 26, 2008 7) Certificate of Completion : PROGRAMMABLE LOGIC CONTROLS September 4, 2008 8) Certificate of Completion : MICROSOFT UNLIMITED POTENTIAL 9) Certificate of Training : MECHATRONICS SERVICING NC II October 14, 2009 Tesda Certificates 1.Instrumentation and Controls NC II April 5, 2010 Certificate No. 0913140236351 2.Mechatronics Servicing NC II April 5, 2010 Certificate No. 1013140204687 ADDITIONAL SKILLS - Computer Literate - Can operate various types of electrical testing equipment’s - Can Operate Man lift, Scissors lift - Can read P&ID Block diagram, single line diagram, schematic Diagram, wiring diagram and cable schedule - Can read, write and communicate with English, language. - Can work under minimum supervision SIMINARS ATTENDED IDESS MARITIME CENTRE (SUBIC) PHILIPPINES - Basic Offshore Safety Induction and Emergency Training (BOSIET) - Person In charge @ Work Site (PICWS) - H2S Gas Training, Permit To Work (PTW) - Safety Task Assignment (STA) - Confined Space Entrant, Fire Watcher, Fire Fighting - Lockout Tag out (LOTO), In-house Training PERSONAL IMFORMATION Date of Birth : August 10, 1972 Place of Birth :Pamplona Negros Oriental Age : 41 y/o Height : 5’4” Weight: 56 kg Nationality: Filipino Marital Status: Married Gender: Male Passport No.: EC3558333 Expiry Date: 27 Feb 20