SlideShare a Scribd company logo
1 of 22
CurriCulum ViTAE
1. PERSONAL PARTICULARS
Name : EDMUND CHANGNGI (IC NO.561212 – 13 - 5397)
Date of Birth : 12th December 1956
Sex : Male
Race : Iban (Bumiputra)
Marital Status : Married With Two (2) Children
Nationality : Malaysian (Sarawakian)
Residence/Correspondent
Addressed :
Lot 2028, RPR Batu 6,
Lorong Palma 11,
98000 Miri, Sarawak.
0169441708 (H/P)
E-mail Address :
echangngi@yahoo.com
echangngi@gmail.com
2. ACADEMIC QUALIFICATION
A) Qualification : DIPLOMA IN MOTOR TECHNICIAN
Date Completed : November, 1979
Institution : Federal Institute of Technology
Country : Kuala Lumpur
B) Qualification : MCE
Date Completed : December, 1974
Institution : Saint Luke’s Secondary School
Country : Sri Aman, Sarawak
3. TRAINING ATTENDED
A) Place / Location : SHELL REFINERY PULAU BUKUM
Date of Training : 5th May to 5th June 1986
Duty : Refinery Equipment Inspection
Country : Singapore
B) Place / Location : MALAYSIAN SHIPYARD ENGINEERING
Date of Training : 6th June to 7th July 1986
Duty : Fabrication Inspection of SSB Platform
Country : Pasir Gudang - Johor Bahru
4. MEMBER OF SOCIETY
Society
: AMERICAN SOCIETY OF MECHANICAL ENGINEERS
(ASME)
From (Since) : 1st October 1991
Membership Number : 2978328
5. COURSES ATTENDED, PRESENT AND PREVIOUS WORKING EXPERIENCE
- Please refers to the Working Experience, Courses attended and copies of Certificate (Copies
of Certificates will be attached upon request)
Updated: 3 November 2016 Page 1 of 22
EC/file
CurriCulum ViTAE
6. PROFESSIONAL QUALIFICATION/COURSES ATTENDED
NO. COURSES INSTITUTION
DATE PLACE
CONDUCTEDFROM TO
1 SUPERVISORY DEVELOPMENT 1 SSB, LUTONG, MIRI 09/02/83 10/02/83 SSB, TC, LUTONG
2 WELDING SUPERVISORY SSB, LUTONG, MIRI 11/02/84 15/02/84 SSB, TC, LUTONG
3 LATEINER SAFETY CONTROL SSB, LUTONG, MIRI 27/02/84 28/02/84 SSB, TC, LUTONG
4 ULTRASONIC TESTING (ASNT – LEVEL 1) SISIR, SINGAPORE 09/04/84 14/04/84 B.S.P, SERIA, BRUNEI
5 EFFECTIVE WRITING SSB, LUTONG, MIRI 17/07/84 19/07/84 SSB, TC, LUTONG
6 WELDING INSPECTION AND QUALITY CONTOL MEI – AWS 03/09/84 13/09/84 B.S.P, SERIA, BRUNIE
7 TECHNICAL REPORT WRITING SSB, LUTONG, MIRI 26/02/85 27/02/85 SSB, TC, LUTONG
8 MPI & LPI (SNT – TC – 1A LEVEL – II) SISIR, SINGAPORE 22/07/85 26/07/85 B.S.P, SERIA, BRUNEI
9 COMMUNICATION COURSE SSB, LUTONG, MIRI 01/07/86 03/07/86 SSB, TC, LUTONG
10 OFFSHORE INDUCTION SSB, LUTONG, MIRI 24/08/87 25/08/87 SSB, TC, LUTONG
11 BASIC OFFSHORE SAFETY & SURVIVAL SSB, LUTONG, MIRI 17/09/87 18/09/87 SSB, TC, LUTONG
12 UNSAFE ACT AUDITING SSB, LUTONG, MIRI 28/06/88 29/06/88 SSB, LUTONG, MIRI
13 WELDING INSPECTION PART 1 STEEL E DUOBUS UNUM 03/10/88 07/10/88 B.S.P, SERIA, BRUNEI
14 DEFENSIVE DRIVING SMTC, MIRI 14/08/89 15/08/89 BINTULU, SARAWAK
15 LIFTING GEARS INSPECTION / EXAMINATION SPARROWS OFFSHORE 24/08/89 26/08/89 SSB, TC, LUTONG
16 BASIC RADIATION PROTECTION MINT, BANGI 30/07/90 01/08/90 SSB, TC, LUTONG
17 RADIOGRAPHY FILM INTERPRETATION LEVEL 2 MINT, BANGI 04/03/91 09/03/91 BANGI, SELANGOR
18 CP FOR SCAFFOLDING INSPECTION TRIDENT, TC, MIRI 13/05/91 24/05/91 PIASAU, MIRI
19 HELICOPTER UNDERWATER ESCAPE SMTC, MIRI 25/02/93 26/02/93 K.BARAM TC, MIRI
20 FIRST AID FIRE FIGHTING SSB, LUTONG, MIRI 14/08/89 15/08/89 BINTULU, SARAWAK
21 SEA SURVIVAL & OFFSHORE SAFETY PROCEDURE SMTC, MIRI 04/01/96 05/01/96 K.BARAM, TC, MIRI
22 AMMONIA / CHEMICAL SAFETY SEMINAR ABF, BINTULU 20/05/98 20/05/98 TG. KIDURONG, BINT.
23 MS WORD, EXCEL & POWER POINT VIGIL COMPUTER 05/05/98 22/06/98 VIGIL TC, LUTONG
24 COMBINE SEA SURVIVAL & OFFSHORE SAFETY. SMTC, MIRI 10/08/00 11/08/00 K. BARAM, TC, MIRI
25 INTERNAL QUALITY AUDIT (ISO 9000: 2000) The INSEMA Group 18/04/01 20/04/01 Holiday Inn, Kuching
26 CONSTRUCTION WORKER SAFETY TRAINING CIDB, MALAYSIA 10/05/06 10/05/06 TSTC, TERENGGANU
27 CONFINED SPACE SAFETY AKADEMI OSH S/B 02/03/07 03/03/07 EMEPMI TC, PAKA.
28 WELDING INSPECTOR (CSWIP 3.1) TWI SUNGAI BULOH 14/9/09 18/9/09 TWI SUNGAI BULOH.
Updated: 3 November 2016 Page 2 of 22
EC/file
CurriCulum ViTAE
Experience No.: 15 –
Current Employer : USAHAWAN BERSAMA TEKNIK SDN. BHD.
Job Title : QA/QC MANAGER FOR MLNG REJUVENATION
Duration : 8TH
October 2015 to 30TH
November 2016.
Work scope
• Responsible for fabrication, construction, installation, Inspection/testing of Civil works, Structures, Piping’s,
Mechanical Installation and Instrumentation. NDT’S, blasting/painting, Hydrostatic pressure testing. Identify &
prepare welding procedures specification required for fabrication of MLNG UTILITY STEAM TURBINE
GENERATOR RESTORATION (MUSTGEN) PROJECT. CONTRACT NO: SMSO/MLNG/2014/0185
• Prepared Project Quality Procedures, Hydrostatic Pressure Testing Procedure, Civil Work Procedures, Inspection &
Testing plan (ITP) for Civil Work, Piping’s, Steel Structure, Mechanical Installation, Instrumentation, Job Method
Statements (JMS), PQP Procedures and other procedures related to the project. Prepare Project Close Out Document
and quality control report for the attention of Client, Contractor and the Company. Prepare Welding Procedures
Specification (for API 5L GR B/A106, A312-TP316L and A333 GR 6.
• Verified and prepare Quality deliverables in accordance with the contract requirements (i.e. Inspection Test Plans and
project quality procedures). Coordinate with Quality Lead Inspectors to ensure that all QAQC activities will be
executed as specified on approved Inspection Test Plan and project procedures.
• Implement, communicate and maintain a Quality plan throughout the entire organization to bring the Company
Quality Systems sustainable and compliance with ISO9001 Quality System requirement.
• Responsible for relevant QA and QC training for all site Personnel and overseeing all Personnel understanding and
effectively deliver their QA/QC responsibility as per Quality Plan Procedures.
• Review and approved Subcontractors NDT (MT, PT, UT & RT) Reports, WIS, QAQC Documents such as Quality
Plan, ITP’s, Quality related procedures, personnel Qualification, Inspection reports, material certificates, Civil Works
Procedures, Job Method Statements (JMS), and other documents for as-built Dossier.
• Carry out Contract Administration and Construction Supervision to ensure that the Construction works are in
accordance to drawings and specification.
• Problem Solving with customers and in-house personnel regarding product quality issues and initiate work
improvement activities for continuous improvement.
• Lead Team of QA/QC Inspectors to carried out Dimensional check, prepare as Built Drawings, Fit-Up, Visual
inspection/testing on piping’s, steel structures, Civil works, Mechanical Installation, prepare Punchlist for the
project and conduct Internal Quality Audit to ensure that corrective and preventive actions are taken to provide
continuous improvement towards the achievement of organization excellence.
• Conduct Inspection/testing on the incoming/outgoing materials and liaise with purchasing personnel on supplier
Quality issue, prior to accept and issue the material for construction/fabrication site.
• Carried out Final check on piping’s system, as Built Drawings, steel structures connection, Civil works, Mechanical
Installation, removal of positive isolation blinds for leak testing and live connection of control systems and plant
instrument air and firewater systems.
• Conduct Dimensional Check on the completed Piping’s, Steel Structures, Civil Works, instrumentation and
Mechanical Installation as per AFC drawings prior to handover to Contractor/Client for project close out document.
• Attend weekly Progress Meeting or Unplan meeting with Client in regards to the Project Progress, Manpower,
Materials, Quality Matters and Project issues
• Monitor Quality work at site, administrative matters at site/office, including of maintenance of Quality Records and
Welders performance records. Coordinate and Conduct toolbox talk meeting together with the construction
superintendent.
• Coordinate, audit and optimize interdepartmental work flow with standardization and continuous improvement for
the organization long term development.
• Ensure testing works are in compliance with the project standard and plant safety requirements. Responsible for
various inspection jobs such as cable continuity, inspection resistance check, Lifting Tackles Inspection and other
related Quality verifying inspection.
• Prepare and resolve project Equipment’s, Manpower, Raw materials use by the project site and ensure their
availability is adequate. Ensure project Procedures are adequate prior to commence of the Project.
Updated: 3 November 2016 Page 3 of 22
EC/file
CurriCulum ViTAE
Experience No.: 14 –
Previous Employer : EVERSENDAI OIL & GAS (M) SDN. BHD
.
Job Title : QA/QC MANAGER FOR PCSB RAPID PROJECT
Duration : 2ND
February 2015 to 30th
September 2015
Work scope
• Responsible for fabrication, construction, installation, Inspection/testing of Civil Works, Piping’s, Steel Structures,
Mechanical Installation and Instrumentation. NDT’S, blasting/painting, Hydrostatic pressure testing. Identify Prepare
and Conduct Welding Procedures Specification (WPS) required for fabrication of GRE/GRVE, CS and SS Pipes as
per ASME IX/AWS D1.1 for Project activities Contract No.: TGAST 2676 PCSB (RAPID PROJECT), Paka,
Dungun, Terengganu.
• Prepared Project Quality Procedures, Hydrostatic Pressure Testing Procedure, Civil Work Procedures, Inspection &
Testing plan (ITP) for Civil Work, Mechanical Installation, Piping’s, Steel Structure, Instrumentation, Job Method
Statements (JMS), PQP Procedures and other procedures related to the project. Prepare Project Close Out Document
and Quality Control Report for the attention of Client, Contractor and the Company. Prepare Welding Procedures
Specification (for API 5L GR B/A106, A312-TP316L, A333 GR 6, CuNi and DUPLEX (A790 UNS S31803), Repair
procedure for filter, pressure vessel, duplex spools and other procedures related to the project.
• Responsible for relevant QA and QC training for all site Personnel and overseeing all Personnel understanding and
effectively deliver their QA/QC responsibility as per Quality Plan Procedures.
• Advising, guiding and motivating site line management on all QAQC activities and related technical matters.
• Review and approved Subcontractors NDT (MT, PT, UT & RT) Reports, WIS, QAQC Documents such as Quality
Plan, ITP’s, Quality related procedures, personnel Qualification, Inspection reports, material certificates, Civil Works
Procedures, Job Method Statements (JMS), and other documents for as-built Dossier.
• Verified and prepare Quality deliverables in accordance with the contract requirements (i.e. Inspection Test Plans
and project specification procedures. Coordinate with Quality Lead/Inspectors to ensure that all QAQC activities will
be executed as specified on approved Inspection Test Plan and project procedures.
• Prepare, Implement necessary communication strategy for the improvement and awareness of quality issues across
all departments by given priority on the in process quality control management to establish & maintain a full proof
control system to ensure that production processes is carry out strictly as per predetermine standard work
instruction/drawing with the concept of “Do Right Thing at the First Time toward “Zero Defect” goal.
• Conduct Inspection/testing of the incoming/outgoing materials and liaise with purchasing personnel on supplier
Quality issue, prior to accept and issue the material for construction/fabrication site.
• Carried out Final check on piping’s, steel structures connection, Civil Works, Mechanical Installation, removal of
positive isolation blinds, leak testing and live connection of control systems and plant instrument air and firewater
systems.
• Conduct Dimensional Check on the completed Piping’s, Steel Structures, Civil Works as per AFC drawings prior to
handover to Contractor/Client for project close out document.
• Attend weekly Progress Meeting or Unplan meeting with Client in regards to the Project Progress, Manpower,
Materials, Quality Matters and Project issues
• Lead Team of QA/QC Inspectors to carried out Fit-Up/Visual inspection/testing on piping’s, steel structures, Civil
works, Mechanical Installation, prepare as Built Drawings, prepare Punchlist for project activities and conduct
Internal Quality Audit to ensure that corrective and preventive actions are taken to provide continuous improvement
towards the achievement of organization excellence.
• Problem Solving with customers and in-house personnel regarding product quality issues and initiate work
improvement activities for continuous improvement.
• Coordinate, audit and optimize interdepartmental work flow with standardization and continuous improvement for
the organization long term development.
• Attend weekly Progress Meeting or Unplan meeting with Client in regards to the Project Progress, Manpower,
Materials, Quality Matters and Project issues
• Responsible for Quality work at site, administrative matters at site office, including of maintenance of Quality
Records and Welders performance records. Coordinate and Conduct toolbox talk meeting together with the
construction superintendent.
Updated: 3 November 2016 Page 4 of 22
EC/file
CurriCulum ViTAE
• In- charge in coordination with third party testing and inspection works. In-charge of documentation such as
preparation of loop folders QC reports test result laboratory and third party test results, handover related and required
QAQC documentation to client.
Experience No.: 13 –
Previous Employer : MASER (M) SDN. BHD.
Job Title : QA/QC MANAGER FOR MLNG
Duration : 1ST
December 2012 to 31st
January 2015
Work scope
• Responsible for fabrication, construction, installation, Inspection/testing of Civil works, Structures, Piping’s and
Instrumentation, Mechanical Installation NDT’S, blasting/painting, Hydrostatic pressure testing. Identify & prepare
welding procedures specification required for fabrication of MLNG SDN. BHD, Project PC 12409 – CONTINUOUS
CONDENSATE POLISHER OPERATION. CONTRACT NO.: MLNG/PLM/14/2012/0041
• Prepared Project Quality Procedures, Hydrostatic Pressure Testing Procedure, Civil Work Procedures, Inspection &
Testing plan (ITP) for Civil Work, Mechanical Installation, Piping’s, Steel Structure, Instrumentation, Job Method
Statements (JMS), PQP Procedures and other procedures related to the project. Prepare quality control report for the
attention of Client, Contractor and the Company. Prepare Welding Procedures Specification (for API 5L GR B/A106,
A312-TP316L, A333 GR 6. Repair procedure for filter, pressure vessel, duplex spools and other procedures related to
the project.
• Establish and implement necessary communication strategy for the improvement and awareness of quality issues
across all departments by given priority on the in process quality control management to establish & maintain a full
proof control system to ensure that production processes is carry out strictly as per predetermine standard work
instruction/drawing with the concept of “Do Right Thing at the First Time toward “Zero Defect” goal.
• Liaise with customers and in-house personnel regarding product quality issues and initiate work improvement
activities for continuous improvement.
• Problem Solving with customers and in-house personnel regarding product quality issues and initiate work
improvement activities for continuous improvement.
• Prepare Quality Control documentations for Malaysia LNG SDN. BHD, Project PC 12409 – CONTINUOUS
CONDENSATE POLISHER OPERATION. CONTRACT NO.: MLNG/PLM/14/2012/0041
• Conduct Dimensional Check on the completed Piping’s, Steel Structures, Civil Works as per AFC drawings prior to
handover to Contractor/Client for project close out document.
• Final check on piping, steel structures connection, Mechanical Installation, removal of positive isolation blinds, leak
testing and live connection of control systems and plant instrument air and firewater systems.
• Problem Solving with customers and in-house personnel regarding product quality issues and initiate work
improvement activities for continuous improvement.
• Review and approved Subcontractors NDT (MT, PT, UT & RT) Reports, QAQC Documents such as Quality Plan,
ITP’s, Quality related procedures, personnel Qualification, Inspection reports, material certificates, Civil Works
Procedures, WPS, Job Method Statements (JMS), and other documents for as-built Dossier.
• Verified and prepare Quality deliverables in accordance with the contract requirements (i.e. Inspection Test Plans and
project specification procedures. Coordinate with Quality Lead/Inspectors to ensure that all QAQC activities will be
executed as specified on approved Inspection Test Plan and project procedures.
• Lead Team of QA/QC Inspectors to carried out Fit-Up/Visual inspection/testing on piping’s, steel structures, Civil
works, Mechanical Installation, prepare as built drawings & Punchlist for the project and conduct Internal
Quality Audit to ensure that corrective and preventive actions are taken to provide continuous improvement towards
the achievement of organization excellence.
• Prepare Welding Inspection Control Summary (WICS) for the Project PC 12409 – CONTINUOUS CONDENSATE
POLISHER OPERATION. CONTRACT NO.: MLNG/PLM/14/2012/0041
• Implement, communicate and maintain a Quality plan throughout the entire organization to bring the Company
Quality Systems sustainable and compliance with ISO9001 Quality System requirement.
• Conduct Inspection on the incoming/outgoing materials and liaise with purchasing personnel on supplier Quality
issue, prior to accept and issue the material for construction/fabrication.
• Attend coordination & weekly progress meeting with client in regards to the work progress, work schedule,
materials, manpower, equipment, etc and also conduct morning briefing to the construction crew in regards to HSE &
QA/QC activities.
Updated: 3 November 2016 Page 5 of 22
EC/file
CurriCulum ViTAE
Experience No.: 12 –
Previous Employer : SARKU ENGINEERING SERVICES SDN. BHD.
Job Title : Operation Engineer SSB MIRI OFFSHORE
Duration : 18th
August 2009 – 26th
November 2012
Work Scope
• Responsible for the daily Operation of Ajang Hikmah Work Boat at B11K-A Topside
Major Maintenance for SSB Contract No.: 600611.
• Supervising onshore and offshore fabrication of facilities for SSB contract No.
600611 for Oil & Gas platform.
• Coordinate with Design on shop drawings and other engineering related issues.
• Planned and monitor the requirement for Manpower, Construction Procedures, Tools,
Equipment, Consumables Materials and Construction Materials for the Operation
Work at B11K-A.
• Attended the Daily Progress Meeting with Client and other Contractors to update
the Daily Work Progress, Manpower, Tools and Equipments requirement for the
ongoing SSB project.
• Coordinate and Monitor the Modification of Gangway and Repair of the KDNP-A
Crane damaged, arrange all the necessary requirement (e.g. arrange for third party
Inspection, Prepare Service Oder for purchasing of materials/spare parts and
mobilization of the crew, Tools/Equipment and Materials/Spare parts to the
location of Maintenance or Modification/Repair).
• To ensure the availability of the Crew performs the work and the availability of the
Equipment are adequate. Ensure the completions of the Project are meeting the
schedule/requirement of the Contract No. 600611.
Updated: 3 November 2016 Page 6 of 22
EC/file
CurriCulum ViTAE
Updated: 3 November 2016 Page 7 of 22
EC/file
CurriCulum ViTAE
Experience No.: 11 –
Previous Employer : SARKU ENGINEERING SERVICES SDN. BHD.
Job Title : QA/QC Engineer for EMEPMI PROJECT
Duration : 27th
June 2005 to 18th
August 2009
Work scope
• Responsible for welding Inspection of piping’s/structures, construction of Civil Works, installation of
Instrumentation, Mechanical Installation, piping and structures, NDT’S, blasting/painting, Post Weld heat treatment,
Hydrostatic pressure testing, identify & prepare welding procedures specification require for fabrication and Quality
Control documentations for EMEPMI Projects, contract no.FCB037 at KSB Phase 2, Kemaman, Terengganu.
• Liaise with customers and in-house personnel regarding product quality issues and initiate work improvement
activities for continuous improvement.
• Prepared Project Quality Procedures, Welding Procedures Specification (for API 5L GR B/A106, A312-TP316L,
A333 GR 6, CuNi and DUPLEX (A790 UNS S31803), Hydrostatic Pressure Testing Procedure, Repair procedure for
filter, pressure vessel, duplex spools, Inspection & Testing plan and other procedures related to the project.
• Problem Solving with customers and in-house personnel regarding product quality issues and initiate work
improvement activities for continuous improvement.
• Lead Team of QA/QC Inspectors to carried out Dimensional check, Fit-Up/Visual inspection/testing on piping’s,
steel structures, Mechanical Installation, Civil works and conduct Internal Quality Audit to ensure that corrective and
preventive actions are taken to provide continuous improvement towards the achievement of organization excellence.
• Responsible for the planning, implementation and management of the project Quality program.
• Review and approved Subcontractors NDT (MT, PT, UT & RT) Reports, QAQC Documents such as Quality Plan,
ITP’s, Quality related procedures, personnel Qualification, Inspection reports, material certificates, Civil Works
Procedures, Job Method Statements (JMS), and other documents for as-built Dossier.
• Final check on piping/structures connection, removal of positive isolation blinds, leak testing and live connection of
control systems and plant instrument air and firewater systems.
• Conduct Dimensional Check on the completed Piping’s, Steel Structures, Civil Works as per AFC drawings prior to
handover to Contractor/Client for project close out document.
• Implements verification of disposition and corrective action for non-conformance.
• Controls to keep quality related documents and AS-Built preparation before project complete.
• Schedule and conduct Quality audits for the company and subcontractors.
• Responsible to monitor the incoming materials and liaise with purchasing personnel on supplier Quality issue, prior
to accept and issue the material for construction/fabrication.
• Attend coordination & weekly progress meeting with client in regards to the work progress, work schedule,
materials, manpower, equipment, etc and also conduct morning briefing to the construction crew in regards to HSE &
QA/QC activities.
• Conduct visual inspection on repair roof, shell and bottom plate of crude oil storage tanks at TCOT, Terengganu for
EMEPMI contract No.FCB037. Prepared and submit all the QC report, NDT and Repair Procedures to EMEPMI for
review and approval.
• Monitor ferrite and temperature of Duplex stainless steel during welding and arrange for PMI upon completion of
welding.
• Perform dimensional check on completed pipe spools and structures based on ISO/AFC drawings and prepared
welding summary for completed pipe spools and structures.
• Conduct Welder Qualification Test (WQT) and Welding Procedure Qualification Record (WPQR) for the above
project.
• Final check on piping connection, removal of positive isolation blinds, leak testing and live connection of control
systems and plant instrument air and firewater systems.
• Prepared As Built drawings by marking on the existing AFC drawing with red ink on the modification, alteration
and rectification, submit the completed As Built drawing to the Company for approval. Compile As Built
drawings with QA/QC report.
Updated: 3 November 2016 Page 8 of 22
EC/file
CurriCulum ViTAE
Experience No.: 10 –
Previous Employer : SARKU ENGINEERING SERVICES SDN. BHD.
Job Title : QA/QC Engineer FOR PCSB SARAWAK
Duration : 05th
June 2001 to 01 June 2005
Work Scope
• Responsible for welding Inspection, NDT’S, blasting/painting, Hydrotesting, Post weld heat treatment, Quality
Control documentation, Fabrication/Installation of pipe work, Mechanical Installation & structural steel, Hook-up,
Construction and commissioning for Duyong – A/B Platform in Terengganu, KAKAP KG Gas Platform in Indonesia,
M1 Platform Sarawak, Baram B Platform Sarawak and E11 Rejuvenation project in Sarawak
• Liaise with customers and in-house personnel regarding product quality issues and initiate work improvement
activities for continuous improvement.
• Prepared Project Quality Plan, Quality Assurance Manual, Welding Procedures Specification for API 5L GR
B/A106, Hydrostatic Pressure Testing Procedure, Repair procedure for filter, pressure vessel, duplex spools,
Inspection & Testing plan and other procedures related to the project.
• Lead Team of QA/QC Inspectors to carried out Dimensional check, Fit-Up/Visual inspection/testing on piping’s,
steel structures, Mechanical Installation, Civil works and conduct Internal Quality Audit to ensure that corrective and
preventive actions are taken to provide continuous improvement towards the achievement of organization excellence.
• Review and approved Subcontractors NDT (MT, PT, UT & RT) Reports, QAQC Documents such as Quality Plan,
ITP’s, Quality related procedures, personnel Qualification, Inspection reports, material certificates, Civil Works
Procedures, Job Method Statements (JMS), and other documents for as-built Dossier.
• Problem Solving with customers and in-house personnel regarding product quality issues and initiate work
improvement activities for continuous improvement.
• Plans and implements Quality assurance audit, and approved inspection agencies and inspectors’.
• Contacts and communicates with the Employer/Engineer’s QA/QC managers on Quality matters.
• Controls to keep quality related documents and AS-Built preparation before project complete.
• Attend daily and weekly progress meeting with client in regards to the work progress, work schedule, materials,
manpower, equipment, etc and also conduct morning briefing to the construction crew in regards to HSE & QA/QC
activities.
• Conduct visual check on butt & socket weld of completed pipe spools and structures and perform dimensional check
based on ISO/AFC drawings prior to proceed for NDT’S. and other test requirement by Company.
• Final check on piping, steel structures connection, Mechanical Installation, removal of positive isolation blinds, leak
testing and live connection of control systems and plant instrument air and firewater systems.
• Prepared As Built drawing by marking on the existing AFC drawing with red ink on the modification, alteration and
rectification, submit the completed As Built drawing to the Company for approval. Compile As Built drawing with
QA/QC report.
• Conduct Welder Qualification Test (WQT) and Welding Procedure Qualification Record (WPQR) for the above
project.
• Material receiving inspection and verification against the manufactures Mill Certificates and purchase order, prior to
accept and issue the material for construction/fabrication.
• Maintained audible and demonstrable inspection records of all repairs, modification, rectification, fabrication and
maintenance to facilities in order to maintain adequacy and accuracy in the historical information.
Updated: 3 November 2016 Page 9 of 22
EC/file
CurriCulum ViTAE
Experience No.: 9 –
Previous Employer : DAYANG ENTERPRISE SDN. BHD. (7721/80)
Job Title : QA/QC ENGINEER FOR SSB OFFSHORE
Duration : 05th
June 2000 to 28th
May 2001
Work Scope
• Responsible for welding Inspection, Hydrotesting, blasting/painting, Quality Control documentation,
Coordination/monitoring Topside Major Maintenance (TMM) for PCSB contract No.: S99/J/062 and SSB/SSPC
contract No.: 589858.
• Prepared Project Quality Plan, Welding Procedures Specification, Hydrostatic Pressure Testing Procedure, Buttering
Repair Procedures, Inspection & Testing plan for the above project.
• Lead Team of QA/QC Inspectors to carried out Dimensional check, Fit-Up/Visual inspection/testing on piping’s,
steel structures, Civil works and conduct Internal Quality Audit to ensure that corrective and preventive actions are
taken to provide continuous improvement towards the achievement of organization excellence.
• Problem Solving with customers and in-house personnel regarding product quality issues and initiate work
improvement activities for continuous improvement.
• Plans and implements Quality assurance audit, and approved inspection agencies and inspectors’.
• Controls to keep quality related documents and AS-Built preparation before project complete.
• Schedule and conduct Quality audits for the company and subcontractors.
• Organized and conduct presentation on Quality Management System, Quality Assurance, Quality Control,
Inspection and Testing Plan. The presentation gives awareness and understanding to the Staff on the implementation
of Quality Management System, Quality Assurance, Quality Control, Inspection and Testing Plan.
• Coordinate and monitor Welding, Blasting/Painting and other activities related to Quality Control and Inspection at
offshore platform Topside Major Maintenance for PCSB and SSB/SSPC. This is to ensure that the works being
carried out are in accordance with the contract requirement and approved Procedures.
• Material receiving inspection and verification against the manufactures Mill Certificates and purchase order, prior to
accept and issue the material for construction and fabrication of offshore Platform Topside facilities for PCSB and
SSB/SSPC.
• Maintained audible and demonstrable inspection records of all repairs, modification, rectification, fabrication and
maintenance to facilities in order to maintain adequacy in the historical information.
• Final/Dimensional check on piping connection, removal of positive isolation blinds, leak testing and live connection
of control systems and plant instrument air and firewater systems.
• Prepared As Built drawing by marking on the existing AFC drawing with red ink on the modification, alteration and
rectification, submit the completed As Built drawing to the Company for approval. Compile As Built drawing with
QA/QC report.
Updated: 3 November 2016 Page 10 of 22
EC/file
CurriCulum ViTAE
Experience No.: 8 -
Previous Employer : SYARIKAT BERSAUDARA LUTONG SDN. BHD. (SBL)
Job Title : QA/QC ENGINEER for TANKS MAINTENANCE
Duration : 2nd May 1997 to 31st
May 2000
Work Scope
• Responsible for maintenance repair inspection, NDT’S, blasting/painting, Quality Control
documentation, Leak test of storage tank and identify welding procedure for repair of Crude Oil
Storage Tank based on API 650 for PCSB, Contracts No. 1000500.
• Prepared Welding Procedures Specification for carbon steel/stainless steels pipe/plate, Hydrostatic
Pressure Testing, Quality Assurance Manuals, Quality Control Procedures, Blasting/Painting
Procedures, Buttering Repair Procedures, Inspection and Testing Plan for the above Projects.
• Lead Team of QA/QC personnel to carried out inspection/testing and Perform Internal Quality Audit to ensure that
corrective and preventive actions are taken to provide continuous improvement towards the achievement of
organization excellence.
• Responsible for the planning, implementation and management of the project Quality program.
Review and approved Subcontractors NDT (MT, PT, UT & RT) Reports, QAQC Documents such as Quality Plan,
ITP’s, Quality related procedures, personnel Qualification, Inspection reports, material certificates, Civil Works
Procedures, Job Method Statements (JMS), and other documents for as-built Dossier.
• Implements verification of disposition and corrective action for non-conformance.
• Problem Solving with customers and in-house personnel regarding product quality issues and initiate work
improvement activities for continuous improvement.
• Controls to keep quality related documents and AS-Built preparation before project complete.
• Schedule and conduct Quality audits for the company and subcontractors.
• Established the work schedule/plan and organized the manpower for the Maintenance of Crude Oil Storage Tanks,
fabrication/installation of Pipeworks and other activities involved in the above contract.
• Lead Team of QA/QC Inspectors to carried out Dimensional check, Fit-Up/Visual inspection/testing on piping’s,
steel structures, Civil works and conduct Internal Quality Audit to ensure that corrective and preventive actions are
taken to provide continuous improvement towards the achievement of organization excellence.
• Organized and Conduct Welder Qualification Tests and Welding Procedure Qualification Records for carbon
steel/stainless steel pipe/plate in accordance with API 653 standard and Section IX of ASME Code.
• Materials receiving Inspection and Verification against manufacturers mill Certificates and purchase order, prior to
accept and issue the material for fabrication/construction.
Updated: 3 November 2016 Page 11 of 22
EC/file
CurriCulum ViTAE
• Coordinate and monitored site construction and fabrication /installation of Pipeworks and repair of Crude oil
storage tanks. This is to ensure that all the works being carried out is in accordance with PCSB requirement and
approved Procedures.
• Coordinate inspection, NDT’s, Blasting/Painting inspection and other activities related to Quality Control involved
in the Tanks Maintenance and Fabrication/Installation of Pipeworks for PCSB at MCOT, Miri, Sarawak.
• Performed pipelines survey after installation at the site, this survey to ensure that the installation is in accordance
with Design and also to ensure all the fittings are installed accordingly, prior to carrying out reinstatement (leak) test
of the system.
Experience No.: 7-
Previous Employer : MUHIBBAH PETROCHEMICAL ENGINEERING SDN BHD
Job Title : QA/QC COORDINATOR FOR TANKS
CONSTRUCTION
Duration : 07 January to 23 April 1997
Work Scope
• Responsible for welding inspection for piping’s/structures, construction of Civil Works for Tank foundation, NDT’S,
blasting/painting Quality Control documentations, Blasting/Painting, Vacuum testing and Hydrostatic pressure testing for
the construction/erection of Chemical Storage Tanks, based on API 650 and fabrication/installation of Pipeworks in Pulau
Indah, Selangor Darul Ehsan.
• Prepared Quality Control procedures, Quality Assurance Manuals, Welding Procedure Specification for carbon steel &
stainless steel pipe/plate, Hydrostatic Testing Procedures, Blasting/Painting Procedures, Inspection & Testing Plan and
Welding Repair Procedures for the construction/erection of Chemical Storage tanks in Pulau Indah, Kelang, Selangor
Darul Ehsan.
• Lead Team of QA/QC personnel to carried out inspection/testing and Perform Internal Quality Audit to ensure that
corrective and preventive actions are taken to provide continuous improvement towards the achievement of organization
excellence.
• Review and approves the Quality assurance program and other Quality related documents submitted by subcontractors
and vendors.
• Plans and implements Quality assurance audit, and approved inspection agencies and inspectors’.
• Implements verification of disposition and corrective action for non-conformance.
• Contacts and communicates with the Employer/Engineer’s QA/QC managers on Quality matters.
• Controls to keep quality related documents and AS-Built preparation before project complete.
• Problem Solving with customers and in-house personnel regarding product quality issues and initiate work improvement
activities for continuous improvement.
• Conducted Welder Qualification Tests and Welding Procedures Qualification Records in accordance with API 650
standard and section IX of the ASME code.
• Established inspection works schedule and organized the manpower for the Construction of Chemical Storage Tanks and
fabrication /installation of Pipeworks.
Updated: 3 November 2016 Page 12 of 22
EC/file
CurriCulum ViTAE
• Coordinate welding/fabrication inspection, construction/erection inspection, NDT’s, blasting/painting inspection and
other activities involved in the Construction of Chemical Storage Tanks and fabrication/installation of Pipeworks in Pulau
Indah, Klang, Selangor.
• Material receiving inspection and verification against the manufactures Mill Certificates and purchase order, prior to
accept and issue the material for construction of chemical storage tanks and fabrication/installation of Pipeworks.
• Monitored site Construction and Fabrication activities for the above projects. This is to ensure that the works being
carried out in accordance with client requirement and also, to ensure the safety of site personnel.
Experience No.: 6 -
Previous Employer : SARAWAK SHELL BERHAD, LUTONG, MIRI
Job Title : SENIOR PLANT INSPECTOR
Duration : 1st September 1991 to 23rd September 1996
Work Scope
• Prepared general inspection procedures for Pressure Vessels, Cranes and Welding Procedures Specification for
carbon steel & stainless steel pipe/plate, Quality Assurance Manuals, Hydrostatic Pressure Testing and Slings/Other
Lifting Tackles for SSB/SSPC.
• Carried out On-stream and Thorough visual inspection of Pressure Vessels, Boilers, Heat exchangers, Crude oil
storage Tanks, Sling/other Lifting Tackles, oil/gas Pipelines (included risers) and Steel Structure for Offshore
Platform Topside and Onshore Crude oil terminal and Refinery.
• Liaise with Jabatan Keselamatan Dan Kesihatan Pekerjaan (JKKP), Kuching and Kota Kinabalu for the Application
of Authorization to Operate the Statutory Equipment, Renewal Certificate of Fitness, Modification and Repair of the
Statutory Equipment, such as Pressure Vessels, Boilers and Hoisting machines for SSB/SSPC.
• Organized and performed Quality audit on Contractors and Company quality performance, such as records,
procedures, plans, organization and validity of the NDT’s equipment, safety equipment, fire equipment and
slings/other lifting tackles.
• Evaluated the inspection (visual, NDT, etc.) results in accordance with standards and codes requirement on the
equipment inspected for any corrective action to be carried out prior to putting back the equipment in service
• QA/QC Coordinator for fabrication of Pipe works and structural steel for mini-platform (M1 & M3), MLNG 2 and
Bintulu stabilization plant – (BSTAB 3 & 4) projects. The work involved in general maintenance inspection,
welding inspection, blasting /painting inspection and hydrotesting.
• Performed pipelines survey to ensure the installation is in accordance with design drawings and also to ensure all
the fittings are installed accordingly, prior to carrying out reinstatement (leak) test of the system.
Updated: 3 November 2016 Page 13 of 22
EC/file
CurriCulum ViTAE
• Prepared the inspection Interval for On-stream and Thorough visual inspection of pressure vessels, boilers,
furnaces, heat exchangers, columns, piping system and lifting equipment/machine for SSB/SSPC offshore and
onshore location.
• Maintained audible and demonstrable inspection records of all repairs, modification, rectification, fabrication and
maintenance to facilities in order to maintain adequacy in the historical information.
Updated: 3 November 2016 Page 14 of 22
EC/file
CurriCulum ViTAE
Experience No.: 5 –
Previous Employer : SARAWAK SHELL BERHAD, BINTULU (BCOT)
Job Title : SENIOR PLANT INSPECTOR FOR
BCOT
Duration : 17th October 1988 to 31st August 1991
Work Scope
• QA/QC Coordinator Responsible for welding/fabrication inspection, NDT’s, erection inspection, vacuum testing,
hydrostatic pressure testing and blasting/painting inspection for the Construction of Crude Oil Storage Tanks and
fabrication/installation of Pipeworks at BCOT.
• Prepared Quality Control Procedures, Quality Assurance Manual, Inspection & Testing Plan, Welding Procedures
Specification for carbon steel & stainless steel pipe/plate for the construction of Crude Oil Storage Tanks based on
API 650 and Fabrications of Pipeworks at BCOT.
• Carried out inspection on blasting/painting of the Crude Oil Storage Tanks, Pipeworks, Structural Steel and
Pressure Vessels in accordance with SSB/SSPC Procedures Specification No. SES 47.1.
• Carried out On-stream and Thorough visual inspection on Pressure Vessels, Oil & Gas Pipelines, Crude Oil
Storage Tanks, Heat exchangers, Heaters and other associate facilities in Bintulu Crude Oil Terminal for SSB/SSPC.
• Performed Materials receiving inspection and verification against the manufacturer’s mill certificates and purchase
order, prior to accept and issue the materials for the projects.
• Coordinate and Supervised hot tapping on the incoming crude oil line from offshore (Bayan Field) to BCOT.
This was involved in preparation of Welding Procedures Specification, conduct Welders Qualification Test, NDT’s
and pipeline inspection prior to commence hot tapping.
• Prepared inspection Interval (including NDT’s) for On-stream and Thorough visual inspection of pressure vessels,
heaters, heat exchangers, cranes, crude oil storage tanks, piping system, Slings / Other Lifting Tackles and other
Related Activities.
• Maintained audible and demonstrable inspection records of all repairs, modification, rectification, fabrication and
maintenance or changes in operating design to facilities in order to maintain adequacy in the historical information.
• Performed pipelines survey after installation at the site, this survey to ensure the installation is in accordance with
AFC drawings and also to ensure all the fittings are installed accordingly, prior to carrying out reinstatement (leak)
test of the system.
Updated: 3 November 2016 Page 15 of 22
EC/file
CurriCulum ViTAE
Experience No.: 4 -
Previous Employer : SARAWAK SHELL BERHAD, LUTONG, MIRI
Job Title : PLANT INSPECTOR FOR
OFFSHORE
Duration : 1st January 1987 to 16th October 1988
Work Scope
• Performed maintenance work scoping for Offshore Platform Topside Facilities and Structural Steel prior to
commence Topside Facilities maintenance (shutdown) works for SSB/SSPC.
• Carried out maintenance inspection on offshore platform Topside facilities. The work involved preparation of
Blasting/Painting inspection Procedure, Hydrostatic Pressure Testing Procedure, conducts Welder Qualification Test
and Welding Procedure Qualification Record in accordance with section IX of the ASME code.
• Performed NDT’s (MT & PT) on the maintenance repair work at offshore Topside facilities and Structural Steel in
accordance with SSB/SSPC standards and codes.
• Evaluated Visual inspection and NDT’s (RT, MT & PT) results in accordance with SSB/ SSPC standard and codes,
(e.g.ASME, BS & AWS) requirement.
• Planned and performed On-stream and Thorough visual inspection on offshore Pressure Vessels, Cranes, Heat
exchangers, Oil/Gas Pipelines, Jacket Legs, Structural Steel, Sling/other lifting tackles and other associate facilities.
• Monitored and carried out inspection on fabrication and installation of Pipeworks, Structural Steel and Repair of
Pressure Vessels at Offshore Platform Topside facilities.
• Blasting/painting inspection on offshore Platform Topside Facilities, such as Jacket legs, Pipelines, Pressure
Vessels, Structural steel and other associate Topside Facilities for SSB/SSPC in accordance with SES 47.2
• Produced weekly work summary and other written reports of specific and general inspection work activities. Where
necessary, written explanation will be provided with regards to the involvement of the inspection works.
• Maintained audible and demonstrable inspection records of all repairs, modification, rectification, fabrication and
maintenance or changes in operating design to facilities in order to maintain adequacy in the historical information.
Updated: 3 November 2016 Page 16 of 22
EC/file
CurriCulum ViTAE
Updated: 3 November 2016 Page 17 of 22
EC/file
CurriCulum ViTAE
Experience No.: 3 -
Previous Employer : SARAWAK SHELL BERHAD, LUTONG, MIRI
Job Title : PLANT INSPECTOR FOR
REFINERY
Duration : 1st January 1985 to 31st December 1986
Work Scope
• Carried out On-stream and Thorough visual inspection on Heat Exchangers, Coolers, Condensers, Furnaces,
Columns, Crude Oil Storage Tanks, Pressure Vessels, Boilers and other associate activities in accordance with
Guide for Inspection of Refinery Equipment for SSB/SSPC Refinery Lutong.
• Prepared inspection works Programme for Refinery equipment shutdown. The work involved in the preparation of
Inspection schedule, Hydrostatic Testing Procedure and Welding Procedure Specification for the maintenance repair
of Refinery Equipment.
• Performed inspection on the Construction and Erection of furnaces and fabrication of Pipeworks for Lutong
Refinery plant. The work involved in preparation of the Welding Procedures Specification, inspection schedule,
conduct Welder Qualification Test, Welding/fabrication inspection, carried out NDT’s (MT & PT) and
Blasting/Painting inspection.
• Prepared general Inspection Procedures and Inspection Interval for Refinery equipment, such as Heat exchangers,
Coolers, Condensers, Furnaces, columns, Crude oil storage Tanks, Pressure vessels and Piping system
• Performed inspection of the MLNG Plant Equipment Shutdown. The inspection involved, thorough visual
inspection and NDT’s (MT & PT) of Pressure vessel, Boilers, Columns, Condensers and other associate plant
facilities in Bintulu, Sarawak.
• Planned and performed thorough visual inspection of the Refinery Equipment Shutdown at Pulau Bukom,
Singapore. The inspection involved thorough visual inspection of Boilers, Pressure vessels, Columns, Witnessed of
relief valves pop test and prepared update inspection reports.
Updated: 3 November 2016 Page 18 of 22
EC/file
CurriCulum ViTAE
Experience No.: 2 -
Previous Employer : SARAWAK SHELL BERHAD, LUTONG, MIRI
Job Title : PLANT INSPECTOR FOR MCOT
LUTONG
Duration : 1st November 1982 to 31st December 1984
Work Scope
• Carried out On-stream and Thorough visual inspection and non-destructive testing on the Crude Oil Storage tanks,
Pressure Vessels, Pipelines and other associated facilities for SSB/SSPC Onshore location.
• Evaluated Visual Inspection and Non-destructive testing results in accordance with section V of the ASME and
ANSI B31.3 code for Pipeworks fabrication and installation.
• Established Inspection Schedule for the inspection of Crude Oil Storage tanks, Pressure Vessels, Pipelines and
other associate facilities for SSB/SSPC Onshore.
• Performed Inspection (Visual and NDT’s) on Relief valves, Pressure vessels, Boilers and other Pressure Relieving
Devices for SSB/SSPC onshore and offshore location.
• Performed inspection and verification of stock and surplus materials against the manufacturer’s mill certificate
from suppliers, prior to issue the material for construction/fabrication.
• Performed Blasting/painting inspection on the Crude Oil Storage Tank, Water Tanks, Pressure Vessels and
Structural Steel in accordance with SSB/SSPC Standard Engineering Specification No. SES 47.2 for offshore and
SES 47.1 for onshore.
• Witnessed vacuum testing on the bottom and roof plates of Crude Oil Storage Tanks and hydrostatic testing by
filling the fresh water to the tank to be tested.
• Maintained audible and demonstrable inspection records of all repairs, modification, rectification, fabrication and
maintenance or changes in operating design to facilities in order to maintain adequacy in the historical information.
Updated: 3 November 2016 Page 19 of 22
EC/file
CurriCulum ViTAE
Updated: 3 November 2016 Page 20 of 22
EC/file
CurriCulum ViTAE
Experience No.: 1 -
Previous Employer : BRUNEI SHELL PETROLEUM CO. SERIA
Job Title : MAINTENANCE SUPERVISOR
Duration : 1st January 1980 to 30th October 1982
Work Scope
• Planned and supervised the Maintenance, Service and Testing of the Well Head/Christmases Tree and other
related drilling equipment for Brunei Shell Petroleum Co. Seria.
• Evaluated inspection and testing result on the drilling equipment for any necessary corrective action for Brunei
Shell Petroleum Co., Seria.
• Liaise with the asset holder department for the Maintenance, Service and Testing of the Drilling Equipment for BSP
Seria, Negara Bunei Darussalam.
• Supervised and monitor blasting/painting of the Drilling Equipment. The work involved in preparation of the
Blasting/Painting Procedures, Surface Preparation Inspection and compiled inspection reports.
• Coordinated with the Asset Holder department/section in regards to the purchasing and ordering of the
materials/spare part for drilling equipment.
• Supervised the maintenance of Brunei LNG Plant (Equipment) shutdown. The work involved Maintenance,
Repairs, Service and Testing of the Pressure vessels, Boilers, Furnaces, Relieving devices and slings/other lifting
tackles.
• Maintained audible and demonstrable inspection records of all repairs, modification, rectification, fabrication and
maintenance or changes in operating design to facilities in order to maintain adequacy in the historical information.
Updated: 3 November 2016 Page 21 of 22
EC/file
CurriCulum ViTAE
7 REFERENCES
Codes & standards always use for reference
(a) GUIDE FOR INSPECTION OF REFINERY EQUIPMENT
(b) AMERICAN PETROLIUM INSTITUTE (API)
(c) AMERICAN WELDING SOCIETY (AWS)
(d) AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
(e) BRITISH STANDARD INSTITUTE (BSI)
(f) DESIGN ENGINEERING PRACTICE (DEP)
(g) AMERICAN STANDARD OF NON-DESTRUCTIVE TESTING (ASNT)
(h) AMERICAN STANDARD TESTING OF MATERIALS (ASTM)
(i) NATIONAL BOARD INSPECTION CODE
(j) INTERNATIONAL STANDARD ORGANIZATION (ISO 9000 SERIES)
(k) STANDARD ENGINEERING SPECIFICATION (SES).
8. DECLARATION
I, Edmund Changngi IC NO. 561212-13-5397, the under signed below confirmed that the information
given above is TRUE, CORRECT and COMPLETE.
SIGNATURE :
NAME : Edmund Changngi
DATE : 17th
August 2016
Updated: 3 November 2016 Page 22 of 22
EC/file

More Related Content

What's hot

RAMASAMY (NACE CERTIFIED CP LEVEL II ENGINEER)
RAMASAMY  (NACE CERTIFIED   CP LEVEL II ENGINEER)RAMASAMY  (NACE CERTIFIED   CP LEVEL II ENGINEER)
RAMASAMY (NACE CERTIFIED CP LEVEL II ENGINEER)RAMA SAMY
 
JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)jeyaraj selvaraj
 
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume -   Sr.QC Inspector-Mech.welding-painting-piping-pipelineResume -   Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipelineUDAYAKUMAR P C PANICKER
 
Updated CV Lead QAQC Engineer Acting QaQc Manager
Updated CV Lead QAQC Engineer Acting QaQc ManagerUpdated CV Lead QAQC Engineer Acting QaQc Manager
Updated CV Lead QAQC Engineer Acting QaQc ManagerMuhammad Rehman
 
(QA_QC Welding,piping engineer
(QA_QC  Welding,piping engineer(QA_QC  Welding,piping engineer
(QA_QC Welding,piping engineerAhmed Hamdy
 
SHER ZAMAN CV (2)
SHER ZAMAN CV (2)SHER ZAMAN CV (2)
SHER ZAMAN CV (2)Sher Zaman
 
QA- QC INSPECTOR AJITH CV - Copy
QA- QC INSPECTOR AJITH CV - CopyQA- QC INSPECTOR AJITH CV - Copy
QA- QC INSPECTOR AJITH CV - CopyAjith Puthoor
 
Structural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFStructural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFChandra Battu
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Sangilimuthu Samiayyah
 

What's hot (20)

RAMASAMY (NACE CERTIFIED CP LEVEL II ENGINEER)
RAMASAMY  (NACE CERTIFIED   CP LEVEL II ENGINEER)RAMASAMY  (NACE CERTIFIED   CP LEVEL II ENGINEER)
RAMASAMY (NACE CERTIFIED CP LEVEL II ENGINEER)
 
Bannichan Savier CV
Bannichan Savier CVBannichan Savier CV
Bannichan Savier CV
 
CV Johannes Sidabutar1(2)
CV Johannes Sidabutar1(2)CV Johannes Sidabutar1(2)
CV Johannes Sidabutar1(2)
 
JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)
 
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume -   Sr.QC Inspector-Mech.welding-painting-piping-pipelineResume -   Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
 
Updated CV Lead QAQC Engineer Acting QaQc Manager
Updated CV Lead QAQC Engineer Acting QaQc ManagerUpdated CV Lead QAQC Engineer Acting QaQc Manager
Updated CV Lead QAQC Engineer Acting QaQc Manager
 
CB CV 2015
CB CV 2015CB CV 2015
CB CV 2015
 
Adeel Shaikh CV
Adeel Shaikh CVAdeel Shaikh CV
Adeel Shaikh CV
 
(QA_QC Welding,piping engineer
(QA_QC  Welding,piping engineer(QA_QC  Welding,piping engineer
(QA_QC Welding,piping engineer
 
mohamed daowod cv
mohamed daowod cvmohamed daowod cv
mohamed daowod cv
 
SHER ZAMAN CV (2)
SHER ZAMAN CV (2)SHER ZAMAN CV (2)
SHER ZAMAN CV (2)
 
QA- QC INSPECTOR AJITH CV - Copy
QA- QC INSPECTOR AJITH CV - CopyQA- QC INSPECTOR AJITH CV - Copy
QA- QC INSPECTOR AJITH CV - Copy
 
CV_Thangaraj Raja
CV_Thangaraj RajaCV_Thangaraj Raja
CV_Thangaraj Raja
 
TARIQUE ALSTOM
TARIQUE ALSTOMTARIQUE ALSTOM
TARIQUE ALSTOM
 
Ganesan Plant Inspector_CV
Ganesan Plant Inspector_CVGanesan Plant Inspector_CV
Ganesan Plant Inspector_CV
 
Structural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFStructural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDF
 
Ghullam murtaza cv (1)
Ghullam murtaza cv (1)Ghullam murtaza cv (1)
Ghullam murtaza cv (1)
 
CV Denstar Ricardo Silalahi
CV Denstar Ricardo SilalahiCV Denstar Ricardo Silalahi
CV Denstar Ricardo Silalahi
 
Instrumentation Inspector
Instrumentation InspectorInstrumentation Inspector
Instrumentation Inspector
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
 

Similar to Edmund Changngi (Current CV's Rev. 1 )

Similar to Edmund Changngi (Current CV's Rev. 1 ) (20)

Resume othman sulaiman
Resume othman sulaimanResume othman sulaiman
Resume othman sulaiman
 
CV_Sa-nga Last Revision
CV_Sa-nga Last RevisionCV_Sa-nga Last Revision
CV_Sa-nga Last Revision
 
Cv ardiansyah t.a cswip 3.1
Cv ardiansyah t.a cswip 3.1Cv ardiansyah t.a cswip 3.1
Cv ardiansyah t.a cswip 3.1
 
Tin's CV
Tin's CVTin's CV
Tin's CV
 
RAMASAMY NACE CP LEVEL II ENGINEER
RAMASAMY NACE CP LEVEL II ENGINEERRAMASAMY NACE CP LEVEL II ENGINEER
RAMASAMY NACE CP LEVEL II ENGINEER
 
Welding Inspector Mohammad Taher .docx
Welding Inspector Mohammad Taher .docxWelding Inspector Mohammad Taher .docx
Welding Inspector Mohammad Taher .docx
 
CV Hasrul Maswandy
CV Hasrul MaswandyCV Hasrul Maswandy
CV Hasrul Maswandy
 
Latest CV Engr. Zubair
Latest CV Engr. ZubairLatest CV Engr. Zubair
Latest CV Engr. Zubair
 
Latest cv engr. zubair
Latest cv engr. zubairLatest cv engr. zubair
Latest cv engr. zubair
 
MURUG NEW
MURUG NEWMURUG NEW
MURUG NEW
 
Resume_ Arunkumar
Resume_ Arunkumar  Resume_ Arunkumar
Resume_ Arunkumar
 
Curriculum Vitae Anbika, ST (Update)
Curriculum Vitae Anbika, ST (Update)Curriculum Vitae Anbika, ST (Update)
Curriculum Vitae Anbika, ST (Update)
 
01. cv qc civil structur & wi
01. cv qc civil structur & wi01. cv qc civil structur & wi
01. cv qc civil structur & wi
 
Arun_Resume
Arun_ResumeArun_Resume
Arun_Resume
 
1.CV Phung Duc Phuong Nam
1.CV Phung Duc Phuong Nam1.CV Phung Duc Phuong Nam
1.CV Phung Duc Phuong Nam
 
QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)
 
MOHD NAZRI NGAH CV'S 040217
MOHD NAZRI NGAH CV'S 040217MOHD NAZRI NGAH CV'S 040217
MOHD NAZRI NGAH CV'S 040217
 
Tin's cv
Tin's cvTin's cv
Tin's cv
 
Anuj resume 21 - copy
Anuj resume 21 - copyAnuj resume 21 - copy
Anuj resume 21 - copy
 
LINGAM
LINGAMLINGAM
LINGAM
 

Edmund Changngi (Current CV's Rev. 1 )

  • 1. CurriCulum ViTAE 1. PERSONAL PARTICULARS Name : EDMUND CHANGNGI (IC NO.561212 – 13 - 5397) Date of Birth : 12th December 1956 Sex : Male Race : Iban (Bumiputra) Marital Status : Married With Two (2) Children Nationality : Malaysian (Sarawakian) Residence/Correspondent Addressed : Lot 2028, RPR Batu 6, Lorong Palma 11, 98000 Miri, Sarawak. 0169441708 (H/P) E-mail Address : echangngi@yahoo.com echangngi@gmail.com 2. ACADEMIC QUALIFICATION A) Qualification : DIPLOMA IN MOTOR TECHNICIAN Date Completed : November, 1979 Institution : Federal Institute of Technology Country : Kuala Lumpur B) Qualification : MCE Date Completed : December, 1974 Institution : Saint Luke’s Secondary School Country : Sri Aman, Sarawak 3. TRAINING ATTENDED A) Place / Location : SHELL REFINERY PULAU BUKUM Date of Training : 5th May to 5th June 1986 Duty : Refinery Equipment Inspection Country : Singapore B) Place / Location : MALAYSIAN SHIPYARD ENGINEERING Date of Training : 6th June to 7th July 1986 Duty : Fabrication Inspection of SSB Platform Country : Pasir Gudang - Johor Bahru 4. MEMBER OF SOCIETY Society : AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) From (Since) : 1st October 1991 Membership Number : 2978328 5. COURSES ATTENDED, PRESENT AND PREVIOUS WORKING EXPERIENCE - Please refers to the Working Experience, Courses attended and copies of Certificate (Copies of Certificates will be attached upon request) Updated: 3 November 2016 Page 1 of 22 EC/file
  • 2. CurriCulum ViTAE 6. PROFESSIONAL QUALIFICATION/COURSES ATTENDED NO. COURSES INSTITUTION DATE PLACE CONDUCTEDFROM TO 1 SUPERVISORY DEVELOPMENT 1 SSB, LUTONG, MIRI 09/02/83 10/02/83 SSB, TC, LUTONG 2 WELDING SUPERVISORY SSB, LUTONG, MIRI 11/02/84 15/02/84 SSB, TC, LUTONG 3 LATEINER SAFETY CONTROL SSB, LUTONG, MIRI 27/02/84 28/02/84 SSB, TC, LUTONG 4 ULTRASONIC TESTING (ASNT – LEVEL 1) SISIR, SINGAPORE 09/04/84 14/04/84 B.S.P, SERIA, BRUNEI 5 EFFECTIVE WRITING SSB, LUTONG, MIRI 17/07/84 19/07/84 SSB, TC, LUTONG 6 WELDING INSPECTION AND QUALITY CONTOL MEI – AWS 03/09/84 13/09/84 B.S.P, SERIA, BRUNIE 7 TECHNICAL REPORT WRITING SSB, LUTONG, MIRI 26/02/85 27/02/85 SSB, TC, LUTONG 8 MPI & LPI (SNT – TC – 1A LEVEL – II) SISIR, SINGAPORE 22/07/85 26/07/85 B.S.P, SERIA, BRUNEI 9 COMMUNICATION COURSE SSB, LUTONG, MIRI 01/07/86 03/07/86 SSB, TC, LUTONG 10 OFFSHORE INDUCTION SSB, LUTONG, MIRI 24/08/87 25/08/87 SSB, TC, LUTONG 11 BASIC OFFSHORE SAFETY & SURVIVAL SSB, LUTONG, MIRI 17/09/87 18/09/87 SSB, TC, LUTONG 12 UNSAFE ACT AUDITING SSB, LUTONG, MIRI 28/06/88 29/06/88 SSB, LUTONG, MIRI 13 WELDING INSPECTION PART 1 STEEL E DUOBUS UNUM 03/10/88 07/10/88 B.S.P, SERIA, BRUNEI 14 DEFENSIVE DRIVING SMTC, MIRI 14/08/89 15/08/89 BINTULU, SARAWAK 15 LIFTING GEARS INSPECTION / EXAMINATION SPARROWS OFFSHORE 24/08/89 26/08/89 SSB, TC, LUTONG 16 BASIC RADIATION PROTECTION MINT, BANGI 30/07/90 01/08/90 SSB, TC, LUTONG 17 RADIOGRAPHY FILM INTERPRETATION LEVEL 2 MINT, BANGI 04/03/91 09/03/91 BANGI, SELANGOR 18 CP FOR SCAFFOLDING INSPECTION TRIDENT, TC, MIRI 13/05/91 24/05/91 PIASAU, MIRI 19 HELICOPTER UNDERWATER ESCAPE SMTC, MIRI 25/02/93 26/02/93 K.BARAM TC, MIRI 20 FIRST AID FIRE FIGHTING SSB, LUTONG, MIRI 14/08/89 15/08/89 BINTULU, SARAWAK 21 SEA SURVIVAL & OFFSHORE SAFETY PROCEDURE SMTC, MIRI 04/01/96 05/01/96 K.BARAM, TC, MIRI 22 AMMONIA / CHEMICAL SAFETY SEMINAR ABF, BINTULU 20/05/98 20/05/98 TG. KIDURONG, BINT. 23 MS WORD, EXCEL & POWER POINT VIGIL COMPUTER 05/05/98 22/06/98 VIGIL TC, LUTONG 24 COMBINE SEA SURVIVAL & OFFSHORE SAFETY. SMTC, MIRI 10/08/00 11/08/00 K. BARAM, TC, MIRI 25 INTERNAL QUALITY AUDIT (ISO 9000: 2000) The INSEMA Group 18/04/01 20/04/01 Holiday Inn, Kuching 26 CONSTRUCTION WORKER SAFETY TRAINING CIDB, MALAYSIA 10/05/06 10/05/06 TSTC, TERENGGANU 27 CONFINED SPACE SAFETY AKADEMI OSH S/B 02/03/07 03/03/07 EMEPMI TC, PAKA. 28 WELDING INSPECTOR (CSWIP 3.1) TWI SUNGAI BULOH 14/9/09 18/9/09 TWI SUNGAI BULOH. Updated: 3 November 2016 Page 2 of 22 EC/file
  • 3. CurriCulum ViTAE Experience No.: 15 – Current Employer : USAHAWAN BERSAMA TEKNIK SDN. BHD. Job Title : QA/QC MANAGER FOR MLNG REJUVENATION Duration : 8TH October 2015 to 30TH November 2016. Work scope • Responsible for fabrication, construction, installation, Inspection/testing of Civil works, Structures, Piping’s, Mechanical Installation and Instrumentation. NDT’S, blasting/painting, Hydrostatic pressure testing. Identify & prepare welding procedures specification required for fabrication of MLNG UTILITY STEAM TURBINE GENERATOR RESTORATION (MUSTGEN) PROJECT. CONTRACT NO: SMSO/MLNG/2014/0185 • Prepared Project Quality Procedures, Hydrostatic Pressure Testing Procedure, Civil Work Procedures, Inspection & Testing plan (ITP) for Civil Work, Piping’s, Steel Structure, Mechanical Installation, Instrumentation, Job Method Statements (JMS), PQP Procedures and other procedures related to the project. Prepare Project Close Out Document and quality control report for the attention of Client, Contractor and the Company. Prepare Welding Procedures Specification (for API 5L GR B/A106, A312-TP316L and A333 GR 6. • Verified and prepare Quality deliverables in accordance with the contract requirements (i.e. Inspection Test Plans and project quality procedures). Coordinate with Quality Lead Inspectors to ensure that all QAQC activities will be executed as specified on approved Inspection Test Plan and project procedures. • Implement, communicate and maintain a Quality plan throughout the entire organization to bring the Company Quality Systems sustainable and compliance with ISO9001 Quality System requirement. • Responsible for relevant QA and QC training for all site Personnel and overseeing all Personnel understanding and effectively deliver their QA/QC responsibility as per Quality Plan Procedures. • Review and approved Subcontractors NDT (MT, PT, UT & RT) Reports, WIS, QAQC Documents such as Quality Plan, ITP’s, Quality related procedures, personnel Qualification, Inspection reports, material certificates, Civil Works Procedures, Job Method Statements (JMS), and other documents for as-built Dossier. • Carry out Contract Administration and Construction Supervision to ensure that the Construction works are in accordance to drawings and specification. • Problem Solving with customers and in-house personnel regarding product quality issues and initiate work improvement activities for continuous improvement. • Lead Team of QA/QC Inspectors to carried out Dimensional check, prepare as Built Drawings, Fit-Up, Visual inspection/testing on piping’s, steel structures, Civil works, Mechanical Installation, prepare Punchlist for the project and conduct Internal Quality Audit to ensure that corrective and preventive actions are taken to provide continuous improvement towards the achievement of organization excellence. • Conduct Inspection/testing on the incoming/outgoing materials and liaise with purchasing personnel on supplier Quality issue, prior to accept and issue the material for construction/fabrication site. • Carried out Final check on piping’s system, as Built Drawings, steel structures connection, Civil works, Mechanical Installation, removal of positive isolation blinds for leak testing and live connection of control systems and plant instrument air and firewater systems. • Conduct Dimensional Check on the completed Piping’s, Steel Structures, Civil Works, instrumentation and Mechanical Installation as per AFC drawings prior to handover to Contractor/Client for project close out document. • Attend weekly Progress Meeting or Unplan meeting with Client in regards to the Project Progress, Manpower, Materials, Quality Matters and Project issues • Monitor Quality work at site, administrative matters at site/office, including of maintenance of Quality Records and Welders performance records. Coordinate and Conduct toolbox talk meeting together with the construction superintendent. • Coordinate, audit and optimize interdepartmental work flow with standardization and continuous improvement for the organization long term development. • Ensure testing works are in compliance with the project standard and plant safety requirements. Responsible for various inspection jobs such as cable continuity, inspection resistance check, Lifting Tackles Inspection and other related Quality verifying inspection. • Prepare and resolve project Equipment’s, Manpower, Raw materials use by the project site and ensure their availability is adequate. Ensure project Procedures are adequate prior to commence of the Project. Updated: 3 November 2016 Page 3 of 22 EC/file
  • 4. CurriCulum ViTAE Experience No.: 14 – Previous Employer : EVERSENDAI OIL & GAS (M) SDN. BHD . Job Title : QA/QC MANAGER FOR PCSB RAPID PROJECT Duration : 2ND February 2015 to 30th September 2015 Work scope • Responsible for fabrication, construction, installation, Inspection/testing of Civil Works, Piping’s, Steel Structures, Mechanical Installation and Instrumentation. NDT’S, blasting/painting, Hydrostatic pressure testing. Identify Prepare and Conduct Welding Procedures Specification (WPS) required for fabrication of GRE/GRVE, CS and SS Pipes as per ASME IX/AWS D1.1 for Project activities Contract No.: TGAST 2676 PCSB (RAPID PROJECT), Paka, Dungun, Terengganu. • Prepared Project Quality Procedures, Hydrostatic Pressure Testing Procedure, Civil Work Procedures, Inspection & Testing plan (ITP) for Civil Work, Mechanical Installation, Piping’s, Steel Structure, Instrumentation, Job Method Statements (JMS), PQP Procedures and other procedures related to the project. Prepare Project Close Out Document and Quality Control Report for the attention of Client, Contractor and the Company. Prepare Welding Procedures Specification (for API 5L GR B/A106, A312-TP316L, A333 GR 6, CuNi and DUPLEX (A790 UNS S31803), Repair procedure for filter, pressure vessel, duplex spools and other procedures related to the project. • Responsible for relevant QA and QC training for all site Personnel and overseeing all Personnel understanding and effectively deliver their QA/QC responsibility as per Quality Plan Procedures. • Advising, guiding and motivating site line management on all QAQC activities and related technical matters. • Review and approved Subcontractors NDT (MT, PT, UT & RT) Reports, WIS, QAQC Documents such as Quality Plan, ITP’s, Quality related procedures, personnel Qualification, Inspection reports, material certificates, Civil Works Procedures, Job Method Statements (JMS), and other documents for as-built Dossier. • Verified and prepare Quality deliverables in accordance with the contract requirements (i.e. Inspection Test Plans and project specification procedures. Coordinate with Quality Lead/Inspectors to ensure that all QAQC activities will be executed as specified on approved Inspection Test Plan and project procedures. • Prepare, Implement necessary communication strategy for the improvement and awareness of quality issues across all departments by given priority on the in process quality control management to establish & maintain a full proof control system to ensure that production processes is carry out strictly as per predetermine standard work instruction/drawing with the concept of “Do Right Thing at the First Time toward “Zero Defect” goal. • Conduct Inspection/testing of the incoming/outgoing materials and liaise with purchasing personnel on supplier Quality issue, prior to accept and issue the material for construction/fabrication site. • Carried out Final check on piping’s, steel structures connection, Civil Works, Mechanical Installation, removal of positive isolation blinds, leak testing and live connection of control systems and plant instrument air and firewater systems. • Conduct Dimensional Check on the completed Piping’s, Steel Structures, Civil Works as per AFC drawings prior to handover to Contractor/Client for project close out document. • Attend weekly Progress Meeting or Unplan meeting with Client in regards to the Project Progress, Manpower, Materials, Quality Matters and Project issues • Lead Team of QA/QC Inspectors to carried out Fit-Up/Visual inspection/testing on piping’s, steel structures, Civil works, Mechanical Installation, prepare as Built Drawings, prepare Punchlist for project activities and conduct Internal Quality Audit to ensure that corrective and preventive actions are taken to provide continuous improvement towards the achievement of organization excellence. • Problem Solving with customers and in-house personnel regarding product quality issues and initiate work improvement activities for continuous improvement. • Coordinate, audit and optimize interdepartmental work flow with standardization and continuous improvement for the organization long term development. • Attend weekly Progress Meeting or Unplan meeting with Client in regards to the Project Progress, Manpower, Materials, Quality Matters and Project issues • Responsible for Quality work at site, administrative matters at site office, including of maintenance of Quality Records and Welders performance records. Coordinate and Conduct toolbox talk meeting together with the construction superintendent. Updated: 3 November 2016 Page 4 of 22 EC/file
  • 5. CurriCulum ViTAE • In- charge in coordination with third party testing and inspection works. In-charge of documentation such as preparation of loop folders QC reports test result laboratory and third party test results, handover related and required QAQC documentation to client. Experience No.: 13 – Previous Employer : MASER (M) SDN. BHD. Job Title : QA/QC MANAGER FOR MLNG Duration : 1ST December 2012 to 31st January 2015 Work scope • Responsible for fabrication, construction, installation, Inspection/testing of Civil works, Structures, Piping’s and Instrumentation, Mechanical Installation NDT’S, blasting/painting, Hydrostatic pressure testing. Identify & prepare welding procedures specification required for fabrication of MLNG SDN. BHD, Project PC 12409 – CONTINUOUS CONDENSATE POLISHER OPERATION. CONTRACT NO.: MLNG/PLM/14/2012/0041 • Prepared Project Quality Procedures, Hydrostatic Pressure Testing Procedure, Civil Work Procedures, Inspection & Testing plan (ITP) for Civil Work, Mechanical Installation, Piping’s, Steel Structure, Instrumentation, Job Method Statements (JMS), PQP Procedures and other procedures related to the project. Prepare quality control report for the attention of Client, Contractor and the Company. Prepare Welding Procedures Specification (for API 5L GR B/A106, A312-TP316L, A333 GR 6. Repair procedure for filter, pressure vessel, duplex spools and other procedures related to the project. • Establish and implement necessary communication strategy for the improvement and awareness of quality issues across all departments by given priority on the in process quality control management to establish & maintain a full proof control system to ensure that production processes is carry out strictly as per predetermine standard work instruction/drawing with the concept of “Do Right Thing at the First Time toward “Zero Defect” goal. • Liaise with customers and in-house personnel regarding product quality issues and initiate work improvement activities for continuous improvement. • Problem Solving with customers and in-house personnel regarding product quality issues and initiate work improvement activities for continuous improvement. • Prepare Quality Control documentations for Malaysia LNG SDN. BHD, Project PC 12409 – CONTINUOUS CONDENSATE POLISHER OPERATION. CONTRACT NO.: MLNG/PLM/14/2012/0041 • Conduct Dimensional Check on the completed Piping’s, Steel Structures, Civil Works as per AFC drawings prior to handover to Contractor/Client for project close out document. • Final check on piping, steel structures connection, Mechanical Installation, removal of positive isolation blinds, leak testing and live connection of control systems and plant instrument air and firewater systems. • Problem Solving with customers and in-house personnel regarding product quality issues and initiate work improvement activities for continuous improvement. • Review and approved Subcontractors NDT (MT, PT, UT & RT) Reports, QAQC Documents such as Quality Plan, ITP’s, Quality related procedures, personnel Qualification, Inspection reports, material certificates, Civil Works Procedures, WPS, Job Method Statements (JMS), and other documents for as-built Dossier. • Verified and prepare Quality deliverables in accordance with the contract requirements (i.e. Inspection Test Plans and project specification procedures. Coordinate with Quality Lead/Inspectors to ensure that all QAQC activities will be executed as specified on approved Inspection Test Plan and project procedures. • Lead Team of QA/QC Inspectors to carried out Fit-Up/Visual inspection/testing on piping’s, steel structures, Civil works, Mechanical Installation, prepare as built drawings & Punchlist for the project and conduct Internal Quality Audit to ensure that corrective and preventive actions are taken to provide continuous improvement towards the achievement of organization excellence. • Prepare Welding Inspection Control Summary (WICS) for the Project PC 12409 – CONTINUOUS CONDENSATE POLISHER OPERATION. CONTRACT NO.: MLNG/PLM/14/2012/0041 • Implement, communicate and maintain a Quality plan throughout the entire organization to bring the Company Quality Systems sustainable and compliance with ISO9001 Quality System requirement. • Conduct Inspection on the incoming/outgoing materials and liaise with purchasing personnel on supplier Quality issue, prior to accept and issue the material for construction/fabrication. • Attend coordination & weekly progress meeting with client in regards to the work progress, work schedule, materials, manpower, equipment, etc and also conduct morning briefing to the construction crew in regards to HSE & QA/QC activities. Updated: 3 November 2016 Page 5 of 22 EC/file
  • 6. CurriCulum ViTAE Experience No.: 12 – Previous Employer : SARKU ENGINEERING SERVICES SDN. BHD. Job Title : Operation Engineer SSB MIRI OFFSHORE Duration : 18th August 2009 – 26th November 2012 Work Scope • Responsible for the daily Operation of Ajang Hikmah Work Boat at B11K-A Topside Major Maintenance for SSB Contract No.: 600611. • Supervising onshore and offshore fabrication of facilities for SSB contract No. 600611 for Oil & Gas platform. • Coordinate with Design on shop drawings and other engineering related issues. • Planned and monitor the requirement for Manpower, Construction Procedures, Tools, Equipment, Consumables Materials and Construction Materials for the Operation Work at B11K-A. • Attended the Daily Progress Meeting with Client and other Contractors to update the Daily Work Progress, Manpower, Tools and Equipments requirement for the ongoing SSB project. • Coordinate and Monitor the Modification of Gangway and Repair of the KDNP-A Crane damaged, arrange all the necessary requirement (e.g. arrange for third party Inspection, Prepare Service Oder for purchasing of materials/spare parts and mobilization of the crew, Tools/Equipment and Materials/Spare parts to the location of Maintenance or Modification/Repair). • To ensure the availability of the Crew performs the work and the availability of the Equipment are adequate. Ensure the completions of the Project are meeting the schedule/requirement of the Contract No. 600611. Updated: 3 November 2016 Page 6 of 22 EC/file
  • 7. CurriCulum ViTAE Updated: 3 November 2016 Page 7 of 22 EC/file
  • 8. CurriCulum ViTAE Experience No.: 11 – Previous Employer : SARKU ENGINEERING SERVICES SDN. BHD. Job Title : QA/QC Engineer for EMEPMI PROJECT Duration : 27th June 2005 to 18th August 2009 Work scope • Responsible for welding Inspection of piping’s/structures, construction of Civil Works, installation of Instrumentation, Mechanical Installation, piping and structures, NDT’S, blasting/painting, Post Weld heat treatment, Hydrostatic pressure testing, identify & prepare welding procedures specification require for fabrication and Quality Control documentations for EMEPMI Projects, contract no.FCB037 at KSB Phase 2, Kemaman, Terengganu. • Liaise with customers and in-house personnel regarding product quality issues and initiate work improvement activities for continuous improvement. • Prepared Project Quality Procedures, Welding Procedures Specification (for API 5L GR B/A106, A312-TP316L, A333 GR 6, CuNi and DUPLEX (A790 UNS S31803), Hydrostatic Pressure Testing Procedure, Repair procedure for filter, pressure vessel, duplex spools, Inspection & Testing plan and other procedures related to the project. • Problem Solving with customers and in-house personnel regarding product quality issues and initiate work improvement activities for continuous improvement. • Lead Team of QA/QC Inspectors to carried out Dimensional check, Fit-Up/Visual inspection/testing on piping’s, steel structures, Mechanical Installation, Civil works and conduct Internal Quality Audit to ensure that corrective and preventive actions are taken to provide continuous improvement towards the achievement of organization excellence. • Responsible for the planning, implementation and management of the project Quality program. • Review and approved Subcontractors NDT (MT, PT, UT & RT) Reports, QAQC Documents such as Quality Plan, ITP’s, Quality related procedures, personnel Qualification, Inspection reports, material certificates, Civil Works Procedures, Job Method Statements (JMS), and other documents for as-built Dossier. • Final check on piping/structures connection, removal of positive isolation blinds, leak testing and live connection of control systems and plant instrument air and firewater systems. • Conduct Dimensional Check on the completed Piping’s, Steel Structures, Civil Works as per AFC drawings prior to handover to Contractor/Client for project close out document. • Implements verification of disposition and corrective action for non-conformance. • Controls to keep quality related documents and AS-Built preparation before project complete. • Schedule and conduct Quality audits for the company and subcontractors. • Responsible to monitor the incoming materials and liaise with purchasing personnel on supplier Quality issue, prior to accept and issue the material for construction/fabrication. • Attend coordination & weekly progress meeting with client in regards to the work progress, work schedule, materials, manpower, equipment, etc and also conduct morning briefing to the construction crew in regards to HSE & QA/QC activities. • Conduct visual inspection on repair roof, shell and bottom plate of crude oil storage tanks at TCOT, Terengganu for EMEPMI contract No.FCB037. Prepared and submit all the QC report, NDT and Repair Procedures to EMEPMI for review and approval. • Monitor ferrite and temperature of Duplex stainless steel during welding and arrange for PMI upon completion of welding. • Perform dimensional check on completed pipe spools and structures based on ISO/AFC drawings and prepared welding summary for completed pipe spools and structures. • Conduct Welder Qualification Test (WQT) and Welding Procedure Qualification Record (WPQR) for the above project. • Final check on piping connection, removal of positive isolation blinds, leak testing and live connection of control systems and plant instrument air and firewater systems. • Prepared As Built drawings by marking on the existing AFC drawing with red ink on the modification, alteration and rectification, submit the completed As Built drawing to the Company for approval. Compile As Built drawings with QA/QC report. Updated: 3 November 2016 Page 8 of 22 EC/file
  • 9. CurriCulum ViTAE Experience No.: 10 – Previous Employer : SARKU ENGINEERING SERVICES SDN. BHD. Job Title : QA/QC Engineer FOR PCSB SARAWAK Duration : 05th June 2001 to 01 June 2005 Work Scope • Responsible for welding Inspection, NDT’S, blasting/painting, Hydrotesting, Post weld heat treatment, Quality Control documentation, Fabrication/Installation of pipe work, Mechanical Installation & structural steel, Hook-up, Construction and commissioning for Duyong – A/B Platform in Terengganu, KAKAP KG Gas Platform in Indonesia, M1 Platform Sarawak, Baram B Platform Sarawak and E11 Rejuvenation project in Sarawak • Liaise with customers and in-house personnel regarding product quality issues and initiate work improvement activities for continuous improvement. • Prepared Project Quality Plan, Quality Assurance Manual, Welding Procedures Specification for API 5L GR B/A106, Hydrostatic Pressure Testing Procedure, Repair procedure for filter, pressure vessel, duplex spools, Inspection & Testing plan and other procedures related to the project. • Lead Team of QA/QC Inspectors to carried out Dimensional check, Fit-Up/Visual inspection/testing on piping’s, steel structures, Mechanical Installation, Civil works and conduct Internal Quality Audit to ensure that corrective and preventive actions are taken to provide continuous improvement towards the achievement of organization excellence. • Review and approved Subcontractors NDT (MT, PT, UT & RT) Reports, QAQC Documents such as Quality Plan, ITP’s, Quality related procedures, personnel Qualification, Inspection reports, material certificates, Civil Works Procedures, Job Method Statements (JMS), and other documents for as-built Dossier. • Problem Solving with customers and in-house personnel regarding product quality issues and initiate work improvement activities for continuous improvement. • Plans and implements Quality assurance audit, and approved inspection agencies and inspectors’. • Contacts and communicates with the Employer/Engineer’s QA/QC managers on Quality matters. • Controls to keep quality related documents and AS-Built preparation before project complete. • Attend daily and weekly progress meeting with client in regards to the work progress, work schedule, materials, manpower, equipment, etc and also conduct morning briefing to the construction crew in regards to HSE & QA/QC activities. • Conduct visual check on butt & socket weld of completed pipe spools and structures and perform dimensional check based on ISO/AFC drawings prior to proceed for NDT’S. and other test requirement by Company. • Final check on piping, steel structures connection, Mechanical Installation, removal of positive isolation blinds, leak testing and live connection of control systems and plant instrument air and firewater systems. • Prepared As Built drawing by marking on the existing AFC drawing with red ink on the modification, alteration and rectification, submit the completed As Built drawing to the Company for approval. Compile As Built drawing with QA/QC report. • Conduct Welder Qualification Test (WQT) and Welding Procedure Qualification Record (WPQR) for the above project. • Material receiving inspection and verification against the manufactures Mill Certificates and purchase order, prior to accept and issue the material for construction/fabrication. • Maintained audible and demonstrable inspection records of all repairs, modification, rectification, fabrication and maintenance to facilities in order to maintain adequacy and accuracy in the historical information. Updated: 3 November 2016 Page 9 of 22 EC/file
  • 10. CurriCulum ViTAE Experience No.: 9 – Previous Employer : DAYANG ENTERPRISE SDN. BHD. (7721/80) Job Title : QA/QC ENGINEER FOR SSB OFFSHORE Duration : 05th June 2000 to 28th May 2001 Work Scope • Responsible for welding Inspection, Hydrotesting, blasting/painting, Quality Control documentation, Coordination/monitoring Topside Major Maintenance (TMM) for PCSB contract No.: S99/J/062 and SSB/SSPC contract No.: 589858. • Prepared Project Quality Plan, Welding Procedures Specification, Hydrostatic Pressure Testing Procedure, Buttering Repair Procedures, Inspection & Testing plan for the above project. • Lead Team of QA/QC Inspectors to carried out Dimensional check, Fit-Up/Visual inspection/testing on piping’s, steel structures, Civil works and conduct Internal Quality Audit to ensure that corrective and preventive actions are taken to provide continuous improvement towards the achievement of organization excellence. • Problem Solving with customers and in-house personnel regarding product quality issues and initiate work improvement activities for continuous improvement. • Plans and implements Quality assurance audit, and approved inspection agencies and inspectors’. • Controls to keep quality related documents and AS-Built preparation before project complete. • Schedule and conduct Quality audits for the company and subcontractors. • Organized and conduct presentation on Quality Management System, Quality Assurance, Quality Control, Inspection and Testing Plan. The presentation gives awareness and understanding to the Staff on the implementation of Quality Management System, Quality Assurance, Quality Control, Inspection and Testing Plan. • Coordinate and monitor Welding, Blasting/Painting and other activities related to Quality Control and Inspection at offshore platform Topside Major Maintenance for PCSB and SSB/SSPC. This is to ensure that the works being carried out are in accordance with the contract requirement and approved Procedures. • Material receiving inspection and verification against the manufactures Mill Certificates and purchase order, prior to accept and issue the material for construction and fabrication of offshore Platform Topside facilities for PCSB and SSB/SSPC. • Maintained audible and demonstrable inspection records of all repairs, modification, rectification, fabrication and maintenance to facilities in order to maintain adequacy in the historical information. • Final/Dimensional check on piping connection, removal of positive isolation blinds, leak testing and live connection of control systems and plant instrument air and firewater systems. • Prepared As Built drawing by marking on the existing AFC drawing with red ink on the modification, alteration and rectification, submit the completed As Built drawing to the Company for approval. Compile As Built drawing with QA/QC report. Updated: 3 November 2016 Page 10 of 22 EC/file
  • 11. CurriCulum ViTAE Experience No.: 8 - Previous Employer : SYARIKAT BERSAUDARA LUTONG SDN. BHD. (SBL) Job Title : QA/QC ENGINEER for TANKS MAINTENANCE Duration : 2nd May 1997 to 31st May 2000 Work Scope • Responsible for maintenance repair inspection, NDT’S, blasting/painting, Quality Control documentation, Leak test of storage tank and identify welding procedure for repair of Crude Oil Storage Tank based on API 650 for PCSB, Contracts No. 1000500. • Prepared Welding Procedures Specification for carbon steel/stainless steels pipe/plate, Hydrostatic Pressure Testing, Quality Assurance Manuals, Quality Control Procedures, Blasting/Painting Procedures, Buttering Repair Procedures, Inspection and Testing Plan for the above Projects. • Lead Team of QA/QC personnel to carried out inspection/testing and Perform Internal Quality Audit to ensure that corrective and preventive actions are taken to provide continuous improvement towards the achievement of organization excellence. • Responsible for the planning, implementation and management of the project Quality program. Review and approved Subcontractors NDT (MT, PT, UT & RT) Reports, QAQC Documents such as Quality Plan, ITP’s, Quality related procedures, personnel Qualification, Inspection reports, material certificates, Civil Works Procedures, Job Method Statements (JMS), and other documents for as-built Dossier. • Implements verification of disposition and corrective action for non-conformance. • Problem Solving with customers and in-house personnel regarding product quality issues and initiate work improvement activities for continuous improvement. • Controls to keep quality related documents and AS-Built preparation before project complete. • Schedule and conduct Quality audits for the company and subcontractors. • Established the work schedule/plan and organized the manpower for the Maintenance of Crude Oil Storage Tanks, fabrication/installation of Pipeworks and other activities involved in the above contract. • Lead Team of QA/QC Inspectors to carried out Dimensional check, Fit-Up/Visual inspection/testing on piping’s, steel structures, Civil works and conduct Internal Quality Audit to ensure that corrective and preventive actions are taken to provide continuous improvement towards the achievement of organization excellence. • Organized and Conduct Welder Qualification Tests and Welding Procedure Qualification Records for carbon steel/stainless steel pipe/plate in accordance with API 653 standard and Section IX of ASME Code. • Materials receiving Inspection and Verification against manufacturers mill Certificates and purchase order, prior to accept and issue the material for fabrication/construction. Updated: 3 November 2016 Page 11 of 22 EC/file
  • 12. CurriCulum ViTAE • Coordinate and monitored site construction and fabrication /installation of Pipeworks and repair of Crude oil storage tanks. This is to ensure that all the works being carried out is in accordance with PCSB requirement and approved Procedures. • Coordinate inspection, NDT’s, Blasting/Painting inspection and other activities related to Quality Control involved in the Tanks Maintenance and Fabrication/Installation of Pipeworks for PCSB at MCOT, Miri, Sarawak. • Performed pipelines survey after installation at the site, this survey to ensure that the installation is in accordance with Design and also to ensure all the fittings are installed accordingly, prior to carrying out reinstatement (leak) test of the system. Experience No.: 7- Previous Employer : MUHIBBAH PETROCHEMICAL ENGINEERING SDN BHD Job Title : QA/QC COORDINATOR FOR TANKS CONSTRUCTION Duration : 07 January to 23 April 1997 Work Scope • Responsible for welding inspection for piping’s/structures, construction of Civil Works for Tank foundation, NDT’S, blasting/painting Quality Control documentations, Blasting/Painting, Vacuum testing and Hydrostatic pressure testing for the construction/erection of Chemical Storage Tanks, based on API 650 and fabrication/installation of Pipeworks in Pulau Indah, Selangor Darul Ehsan. • Prepared Quality Control procedures, Quality Assurance Manuals, Welding Procedure Specification for carbon steel & stainless steel pipe/plate, Hydrostatic Testing Procedures, Blasting/Painting Procedures, Inspection & Testing Plan and Welding Repair Procedures for the construction/erection of Chemical Storage tanks in Pulau Indah, Kelang, Selangor Darul Ehsan. • Lead Team of QA/QC personnel to carried out inspection/testing and Perform Internal Quality Audit to ensure that corrective and preventive actions are taken to provide continuous improvement towards the achievement of organization excellence. • Review and approves the Quality assurance program and other Quality related documents submitted by subcontractors and vendors. • Plans and implements Quality assurance audit, and approved inspection agencies and inspectors’. • Implements verification of disposition and corrective action for non-conformance. • Contacts and communicates with the Employer/Engineer’s QA/QC managers on Quality matters. • Controls to keep quality related documents and AS-Built preparation before project complete. • Problem Solving with customers and in-house personnel regarding product quality issues and initiate work improvement activities for continuous improvement. • Conducted Welder Qualification Tests and Welding Procedures Qualification Records in accordance with API 650 standard and section IX of the ASME code. • Established inspection works schedule and organized the manpower for the Construction of Chemical Storage Tanks and fabrication /installation of Pipeworks. Updated: 3 November 2016 Page 12 of 22 EC/file
  • 13. CurriCulum ViTAE • Coordinate welding/fabrication inspection, construction/erection inspection, NDT’s, blasting/painting inspection and other activities involved in the Construction of Chemical Storage Tanks and fabrication/installation of Pipeworks in Pulau Indah, Klang, Selangor. • Material receiving inspection and verification against the manufactures Mill Certificates and purchase order, prior to accept and issue the material for construction of chemical storage tanks and fabrication/installation of Pipeworks. • Monitored site Construction and Fabrication activities for the above projects. This is to ensure that the works being carried out in accordance with client requirement and also, to ensure the safety of site personnel. Experience No.: 6 - Previous Employer : SARAWAK SHELL BERHAD, LUTONG, MIRI Job Title : SENIOR PLANT INSPECTOR Duration : 1st September 1991 to 23rd September 1996 Work Scope • Prepared general inspection procedures for Pressure Vessels, Cranes and Welding Procedures Specification for carbon steel & stainless steel pipe/plate, Quality Assurance Manuals, Hydrostatic Pressure Testing and Slings/Other Lifting Tackles for SSB/SSPC. • Carried out On-stream and Thorough visual inspection of Pressure Vessels, Boilers, Heat exchangers, Crude oil storage Tanks, Sling/other Lifting Tackles, oil/gas Pipelines (included risers) and Steel Structure for Offshore Platform Topside and Onshore Crude oil terminal and Refinery. • Liaise with Jabatan Keselamatan Dan Kesihatan Pekerjaan (JKKP), Kuching and Kota Kinabalu for the Application of Authorization to Operate the Statutory Equipment, Renewal Certificate of Fitness, Modification and Repair of the Statutory Equipment, such as Pressure Vessels, Boilers and Hoisting machines for SSB/SSPC. • Organized and performed Quality audit on Contractors and Company quality performance, such as records, procedures, plans, organization and validity of the NDT’s equipment, safety equipment, fire equipment and slings/other lifting tackles. • Evaluated the inspection (visual, NDT, etc.) results in accordance with standards and codes requirement on the equipment inspected for any corrective action to be carried out prior to putting back the equipment in service • QA/QC Coordinator for fabrication of Pipe works and structural steel for mini-platform (M1 & M3), MLNG 2 and Bintulu stabilization plant – (BSTAB 3 & 4) projects. The work involved in general maintenance inspection, welding inspection, blasting /painting inspection and hydrotesting. • Performed pipelines survey to ensure the installation is in accordance with design drawings and also to ensure all the fittings are installed accordingly, prior to carrying out reinstatement (leak) test of the system. Updated: 3 November 2016 Page 13 of 22 EC/file
  • 14. CurriCulum ViTAE • Prepared the inspection Interval for On-stream and Thorough visual inspection of pressure vessels, boilers, furnaces, heat exchangers, columns, piping system and lifting equipment/machine for SSB/SSPC offshore and onshore location. • Maintained audible and demonstrable inspection records of all repairs, modification, rectification, fabrication and maintenance to facilities in order to maintain adequacy in the historical information. Updated: 3 November 2016 Page 14 of 22 EC/file
  • 15. CurriCulum ViTAE Experience No.: 5 – Previous Employer : SARAWAK SHELL BERHAD, BINTULU (BCOT) Job Title : SENIOR PLANT INSPECTOR FOR BCOT Duration : 17th October 1988 to 31st August 1991 Work Scope • QA/QC Coordinator Responsible for welding/fabrication inspection, NDT’s, erection inspection, vacuum testing, hydrostatic pressure testing and blasting/painting inspection for the Construction of Crude Oil Storage Tanks and fabrication/installation of Pipeworks at BCOT. • Prepared Quality Control Procedures, Quality Assurance Manual, Inspection & Testing Plan, Welding Procedures Specification for carbon steel & stainless steel pipe/plate for the construction of Crude Oil Storage Tanks based on API 650 and Fabrications of Pipeworks at BCOT. • Carried out inspection on blasting/painting of the Crude Oil Storage Tanks, Pipeworks, Structural Steel and Pressure Vessels in accordance with SSB/SSPC Procedures Specification No. SES 47.1. • Carried out On-stream and Thorough visual inspection on Pressure Vessels, Oil & Gas Pipelines, Crude Oil Storage Tanks, Heat exchangers, Heaters and other associate facilities in Bintulu Crude Oil Terminal for SSB/SSPC. • Performed Materials receiving inspection and verification against the manufacturer’s mill certificates and purchase order, prior to accept and issue the materials for the projects. • Coordinate and Supervised hot tapping on the incoming crude oil line from offshore (Bayan Field) to BCOT. This was involved in preparation of Welding Procedures Specification, conduct Welders Qualification Test, NDT’s and pipeline inspection prior to commence hot tapping. • Prepared inspection Interval (including NDT’s) for On-stream and Thorough visual inspection of pressure vessels, heaters, heat exchangers, cranes, crude oil storage tanks, piping system, Slings / Other Lifting Tackles and other Related Activities. • Maintained audible and demonstrable inspection records of all repairs, modification, rectification, fabrication and maintenance or changes in operating design to facilities in order to maintain adequacy in the historical information. • Performed pipelines survey after installation at the site, this survey to ensure the installation is in accordance with AFC drawings and also to ensure all the fittings are installed accordingly, prior to carrying out reinstatement (leak) test of the system. Updated: 3 November 2016 Page 15 of 22 EC/file
  • 16. CurriCulum ViTAE Experience No.: 4 - Previous Employer : SARAWAK SHELL BERHAD, LUTONG, MIRI Job Title : PLANT INSPECTOR FOR OFFSHORE Duration : 1st January 1987 to 16th October 1988 Work Scope • Performed maintenance work scoping for Offshore Platform Topside Facilities and Structural Steel prior to commence Topside Facilities maintenance (shutdown) works for SSB/SSPC. • Carried out maintenance inspection on offshore platform Topside facilities. The work involved preparation of Blasting/Painting inspection Procedure, Hydrostatic Pressure Testing Procedure, conducts Welder Qualification Test and Welding Procedure Qualification Record in accordance with section IX of the ASME code. • Performed NDT’s (MT & PT) on the maintenance repair work at offshore Topside facilities and Structural Steel in accordance with SSB/SSPC standards and codes. • Evaluated Visual inspection and NDT’s (RT, MT & PT) results in accordance with SSB/ SSPC standard and codes, (e.g.ASME, BS & AWS) requirement. • Planned and performed On-stream and Thorough visual inspection on offshore Pressure Vessels, Cranes, Heat exchangers, Oil/Gas Pipelines, Jacket Legs, Structural Steel, Sling/other lifting tackles and other associate facilities. • Monitored and carried out inspection on fabrication and installation of Pipeworks, Structural Steel and Repair of Pressure Vessels at Offshore Platform Topside facilities. • Blasting/painting inspection on offshore Platform Topside Facilities, such as Jacket legs, Pipelines, Pressure Vessels, Structural steel and other associate Topside Facilities for SSB/SSPC in accordance with SES 47.2 • Produced weekly work summary and other written reports of specific and general inspection work activities. Where necessary, written explanation will be provided with regards to the involvement of the inspection works. • Maintained audible and demonstrable inspection records of all repairs, modification, rectification, fabrication and maintenance or changes in operating design to facilities in order to maintain adequacy in the historical information. Updated: 3 November 2016 Page 16 of 22 EC/file
  • 17. CurriCulum ViTAE Updated: 3 November 2016 Page 17 of 22 EC/file
  • 18. CurriCulum ViTAE Experience No.: 3 - Previous Employer : SARAWAK SHELL BERHAD, LUTONG, MIRI Job Title : PLANT INSPECTOR FOR REFINERY Duration : 1st January 1985 to 31st December 1986 Work Scope • Carried out On-stream and Thorough visual inspection on Heat Exchangers, Coolers, Condensers, Furnaces, Columns, Crude Oil Storage Tanks, Pressure Vessels, Boilers and other associate activities in accordance with Guide for Inspection of Refinery Equipment for SSB/SSPC Refinery Lutong. • Prepared inspection works Programme for Refinery equipment shutdown. The work involved in the preparation of Inspection schedule, Hydrostatic Testing Procedure and Welding Procedure Specification for the maintenance repair of Refinery Equipment. • Performed inspection on the Construction and Erection of furnaces and fabrication of Pipeworks for Lutong Refinery plant. The work involved in preparation of the Welding Procedures Specification, inspection schedule, conduct Welder Qualification Test, Welding/fabrication inspection, carried out NDT’s (MT & PT) and Blasting/Painting inspection. • Prepared general Inspection Procedures and Inspection Interval for Refinery equipment, such as Heat exchangers, Coolers, Condensers, Furnaces, columns, Crude oil storage Tanks, Pressure vessels and Piping system • Performed inspection of the MLNG Plant Equipment Shutdown. The inspection involved, thorough visual inspection and NDT’s (MT & PT) of Pressure vessel, Boilers, Columns, Condensers and other associate plant facilities in Bintulu, Sarawak. • Planned and performed thorough visual inspection of the Refinery Equipment Shutdown at Pulau Bukom, Singapore. The inspection involved thorough visual inspection of Boilers, Pressure vessels, Columns, Witnessed of relief valves pop test and prepared update inspection reports. Updated: 3 November 2016 Page 18 of 22 EC/file
  • 19. CurriCulum ViTAE Experience No.: 2 - Previous Employer : SARAWAK SHELL BERHAD, LUTONG, MIRI Job Title : PLANT INSPECTOR FOR MCOT LUTONG Duration : 1st November 1982 to 31st December 1984 Work Scope • Carried out On-stream and Thorough visual inspection and non-destructive testing on the Crude Oil Storage tanks, Pressure Vessels, Pipelines and other associated facilities for SSB/SSPC Onshore location. • Evaluated Visual Inspection and Non-destructive testing results in accordance with section V of the ASME and ANSI B31.3 code for Pipeworks fabrication and installation. • Established Inspection Schedule for the inspection of Crude Oil Storage tanks, Pressure Vessels, Pipelines and other associate facilities for SSB/SSPC Onshore. • Performed Inspection (Visual and NDT’s) on Relief valves, Pressure vessels, Boilers and other Pressure Relieving Devices for SSB/SSPC onshore and offshore location. • Performed inspection and verification of stock and surplus materials against the manufacturer’s mill certificate from suppliers, prior to issue the material for construction/fabrication. • Performed Blasting/painting inspection on the Crude Oil Storage Tank, Water Tanks, Pressure Vessels and Structural Steel in accordance with SSB/SSPC Standard Engineering Specification No. SES 47.2 for offshore and SES 47.1 for onshore. • Witnessed vacuum testing on the bottom and roof plates of Crude Oil Storage Tanks and hydrostatic testing by filling the fresh water to the tank to be tested. • Maintained audible and demonstrable inspection records of all repairs, modification, rectification, fabrication and maintenance or changes in operating design to facilities in order to maintain adequacy in the historical information. Updated: 3 November 2016 Page 19 of 22 EC/file
  • 20. CurriCulum ViTAE Updated: 3 November 2016 Page 20 of 22 EC/file
  • 21. CurriCulum ViTAE Experience No.: 1 - Previous Employer : BRUNEI SHELL PETROLEUM CO. SERIA Job Title : MAINTENANCE SUPERVISOR Duration : 1st January 1980 to 30th October 1982 Work Scope • Planned and supervised the Maintenance, Service and Testing of the Well Head/Christmases Tree and other related drilling equipment for Brunei Shell Petroleum Co. Seria. • Evaluated inspection and testing result on the drilling equipment for any necessary corrective action for Brunei Shell Petroleum Co., Seria. • Liaise with the asset holder department for the Maintenance, Service and Testing of the Drilling Equipment for BSP Seria, Negara Bunei Darussalam. • Supervised and monitor blasting/painting of the Drilling Equipment. The work involved in preparation of the Blasting/Painting Procedures, Surface Preparation Inspection and compiled inspection reports. • Coordinated with the Asset Holder department/section in regards to the purchasing and ordering of the materials/spare part for drilling equipment. • Supervised the maintenance of Brunei LNG Plant (Equipment) shutdown. The work involved Maintenance, Repairs, Service and Testing of the Pressure vessels, Boilers, Furnaces, Relieving devices and slings/other lifting tackles. • Maintained audible and demonstrable inspection records of all repairs, modification, rectification, fabrication and maintenance or changes in operating design to facilities in order to maintain adequacy in the historical information. Updated: 3 November 2016 Page 21 of 22 EC/file
  • 22. CurriCulum ViTAE 7 REFERENCES Codes & standards always use for reference (a) GUIDE FOR INSPECTION OF REFINERY EQUIPMENT (b) AMERICAN PETROLIUM INSTITUTE (API) (c) AMERICAN WELDING SOCIETY (AWS) (d) AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) (e) BRITISH STANDARD INSTITUTE (BSI) (f) DESIGN ENGINEERING PRACTICE (DEP) (g) AMERICAN STANDARD OF NON-DESTRUCTIVE TESTING (ASNT) (h) AMERICAN STANDARD TESTING OF MATERIALS (ASTM) (i) NATIONAL BOARD INSPECTION CODE (j) INTERNATIONAL STANDARD ORGANIZATION (ISO 9000 SERIES) (k) STANDARD ENGINEERING SPECIFICATION (SES). 8. DECLARATION I, Edmund Changngi IC NO. 561212-13-5397, the under signed below confirmed that the information given above is TRUE, CORRECT and COMPLETE. SIGNATURE : NAME : Edmund Changngi DATE : 17th August 2016 Updated: 3 November 2016 Page 22 of 22 EC/file