SlideShare a Scribd company logo
1 of 8
CURRICULUM VITAE
Personal Details
Name : Hazmin Galim
I/C No. : 640724-04-5649
Address : 3774 Jalan Sin Ban Bee 1
Bt 19 Kampung Rim
77000 Jasin
Melaka
Malaysia.
E-mail : ibyocomm_hag@yahoo.com
Telephone no. : +6 - 019 - 6676599
Age : 50 years old
Date of birth : 24th
. July 1964
Sex : Male
Marital Status : Married with 5 children
Nationality : Malaysian
Height : 1.60 m
Weight : 69 kg
Education : Technical Certificate in Inspection –
1990 – INSTEP (Institut Teknologi
Petroleum PETRONAS)
SPM – 1981
Summary of Experience
I have more than 15 years working experience in oil, gas and petrochemical
industry. I’ve been involved in the plant construction project, static equipment,
tank and piping inspection, planning, preparation and execution of turnarounds. I
started my career as an Inspection Technician in Petronas Penapisan (Melaka)
Sdn. Bhd. ( Petronas Second Refinery) and over the years have worked in
various Oil and Gas Plant in the area of inspection activities, construction,
fabrication and installation work.
Technical Qualification
1. API 510 Pressure Vessel Inspector - API (2014~2017)
2. Welding Inspector 3.1 - CSWIP (1997)
3. Coating Inspector Level II - NACE (1995)
4. Magnetic / Penetrant Testing Level II - PCN (1999)
5. Ultrasonic Testing Level II - SIRIM (1993)
1
6. Radiography Level I - MINT (1997)
Courses Attended
1. Welding Inspector ( January 1997 ).
2. Welding Inspection and Certification ( January 1995 ).
3. Implication Of Weld Procedure ( November 1994 ).
4. Welding Technology Level 1 ( August 1994 ).
5. Basic Metallurgical Engineering Level I ( April 1994 ).
6. Welding Technology and Inspection ( November 1992 ).
7. Welding Inspection and Quality Control ( July 1991 ).
8. Approval Testing to BS EN 287/288 ( November 1994 ).
9. Radiography Interpretation ( May 1999 ).
10. Radiography Level I ( September 1997 ).
11. NACE International Session II Coating Inspector Training ( Sept. 1995 ).
12. NACE International Session I Coating Inspector Training ( Sept. 1995 ).
13. Basic Corrosion Engineering Level I ( May 1994 ).
14. Coating Seminar ( March 1993 ).
15. Ultrasonic Testing Level II ( October 1993 ).
16. Ultrasonic Testing Level I ( March 1991 ).
17. Magnetic Particle Inspection / Penetrant Testing Level II ( Sept.1999 )
18. Turnaround Inspection and Statutory Requirements In The Petrochemical
Industry ( May 1995 ).
19. Basic Sea Survival and Fire Fighting ( July 1990 ).
20. Technical Report Writing ( July 1996 ).
Major Work Scopes
1. Plant turnaround preparation, execution and Post TA documentation.
- Produce TA Generic Working Procedure
- Prepare equipment job packs
- Liaise with Inspection Dept. on quality, NDT and DOSH issues
- Coordinate QC activities
- Produce repair procedure related to welding and painting
- Compile turnaround dossier
2. Piping and static equipment inspection during fabrication, construction and
installation.
- Review and understanding project specification and ITP
- Materials receiving inspection i.e. pipes, fittings and valves
- Materials preservation audit
- Witness WPS qualification
- Witness WQT
- Shop and field weld inspection
- Review daily progress and NDT reports
- Review and monitor NDT plan vs. actual progress
- Line checking and issuing punch list
- Witness hydro-testing
- Perform line reinstatement and line walkdown
- Blasting and painting inspection
2
- Highlight any issues and obstacle in daily meeting
- Perform join inspection in safety audit
3. Coordinate inspection team in plant turnaround activities.
4. Plant Static Equipment Inspection – In-service and during shutdown (Piping,
Pressure Vessel, Boiler, Column, Heat Exchanger, Storage Tanks, Pressure
Safety Valves, etc).
5. Piping fabrication, modification and installation in live plant.
6. Coating and insulation inspection.
7. Corrosion monitoring.
8. Hydrostatic and Pneumatic Testing.
9. Prepare Technical Report.
10. Analytical Trouble Shooting.
Major Assigment
BASF-Petronas Chemical – Sr Inspection Supervisor (Dec 2014~Present)
1. OXO-Syngas – April 2015 Plant Turnaround
- Prepare Scheme of Examination (SOE), produce Inspection Work Flow,
coordinate inspection activities between owner and contractors, review
job-pack, liaise with mechanical and operation department regarding
inspection scope of works and DOSH (government authorities’)
requirement.
2. Plant Corrosion Monitoring – Static Equipment and Piping
- Organize corrosion monitoring activities as per inspection and RBI plan,
dealing with third party inspector and NDT company for the contract out
works, response to on call and emergent works in live plant.
PP(M)SB – Asset Integrity Management Department (2013~Nov 2014)
1. Risk Base Inspection – PSR2 Piping
- Review piping system, mark-up piping and Injection Points circuit on
P&ID based on corrosion loop study, list down piping tag and gather
piping data, develop composite piping survey for P-RBI selection and
upload to PRBI software V2.
2. Asset Life Study – Static Equipment
- As a support team to assist Material and Corrosion team to study and
analyzing inspection reports, determine and categorized equipment based
on the deterioration and remnant life, produce review outcome and
comments, and recommend for improvement in the next opportunity
shutdown.
SARAWAK SHELL BERHAD – Structure and Piping Fabrication and
Installation (2012~2013)
3
1. Wellhead Protector Structure (Labuan) – Monitor the fabrication works by
Serba Dinamik Sdn Bhd, witness QC activities, review NDT reports and
compile project dossier.
2. Exhaust Pipe and Air Intake Ducting for D12, Laila, F14A/B Field
Development Project (THHE Pulau Indah and MMHE Pasir Gudang) –
Prepare ITP, Quality Manual and QC forms. Monitor the fabrication
activities, review inspection reports and compile project dossier.
PP(M)SB – PSR2 Plant Revamp Project (2008~2010)
1. Monitor and perform inspection works on piping fabrication and
installation by Dialog /PFCE including tie-in, hot-tapping, piping
disinvestment, NDT, hydrotest, painting, punch list and reinstatement,
commissioning, work pack clearance and compiling document dossier.
2. Witness new static equipment fabrication, installation, inspection and
testing and ensure all the engineering works conform to project
specification and requirements.
PP(M)SB - MG3 Lube Oil Plant Construction (2007~2008)
1. Monitor and perform inspection works on piping fabrication and
installation by Lurgi /L &T /KQKS including welding, painting, NDT,
hydrotest, issue /clear punch list, line walkdown, commissioning, work
package clearance and compiling document dossier.
PP(M)SB - PSR 2 Plant Construction (1993~1994)
1. Monitor and perform inspection works on PSR 2 plant construction for
piping and static equipment fabrication and installation by Chiyoda
Corporation.
2. Inspection on heat exchanger fabrication at M.S.E Pasir Gudang, Johor.
3. Inspection on Single Buoy mooring fabrication and painting at Promet
Fabricators Teluk Rumania, Kota Tinggi
4. Inspection on fabrication of superheater tubes for PSR 1 and PSR 2 boiler
at Warga Nikmat workshop, Senawang, Negeri Sembilan.
PP(M)SB - PSR 1 Marine Facilities Project (1992 ~1993)
1. Supervise and monitor pipe rack fabrication / painting works by Hyundai
(HDEC) at PSR 1 jetty and KNM-DP fabrication yard.
Petronas Penapisan (Terengganu) Sdn Bhd (1989 – 1992)
1. Tank Cleaning and Painting of D916,D902, and D933
4
- Coordinate with Planning and Maintenance Department, Operation
department and Contractors to carry out modification, repair, blasting and
painting works.
2. Refurbishment of Tank D911
- Coordinate with Planning and Maintenance Department, Operation
Department and Contractors on refurbishment of tank shell plates.
3. Hot Trapping and Tie-in of Crude Line
- Monitor and perform inspection works on tie-in and hot tapping of 12” line
and 24” crude line.
4. LPG Spherical Tank Inspection
- Perform external and internal visual inspection and supervise the magnetic
particle inspection by third party NDT Company.
Career Resume
Period : October 2013 – Present
Company : S.E.M INSPECTION SDN BHD
Position : Senior Plant Inspector
Project : Petronas Penapisan (Melaka) Sdn Bhd) – Asset Life Study
and RBI
Period : August 2012 – September 2013
Company : SERBA DINAMIK SDN BHD
Position : QA/QC Executive
Project : SARAWAK SHELL BERHAD - Structure and Piping
Fabrication and Installation
Period : April 2011 – July 2012
Company : DIALOG PLANT SERVICES SDN BHD
Position : QA/QC Coordinator
Project : Petronas Penapisan (Melaka) Sdn Bhd) – PSR2 Revamp
and Turnaround
Period : August 2010 – April 2011
Company : S.E.M INSPECTION SDN BHD
Position : Piping Inspector
Project : Petronas Penapisan (Melaka) Sdn Bhd) – Corrosion
Monitoring
Period : April 2010 – July 2010
Company : S.E.M INSPECTION SDN BHD
Position : Piping Inspector
Project : Petronas Penapisan (Melaka) Sdn Bhd) - HPU1 Revamp
Project
5
Period : October 2008 – March 2010
Company : S.E.M INSPECTION SDN BHD
Position : Sr. Inspector
Project : Petronas Penapisan (Melaka) Sdn Bhd) – PSR2 Revamp
Project
Period : Dec. 2007 – Sep. 2008
Company : S.E.M INSPECTION SDN BHD
Position : Piping Inspector
Project : Petronas Penapisan (Melaka) Sdn Bhd) – MG3 Lube Base
Oil Project
Period : 2006 – 2007
Company : S.E.M INSPECTION SDN BHD
Position : Plant Inspector
Project : Petronas Penapisan (Melaka) Sdn Bhd) – Corrosion
Monitoring
Period : 2004 - 2005
Company : S.E.M INSPECTION SDN BHD
Position : Inspection Area Coordinator
Project : Plant Turnaound and Shutdown
Period : 2004
Company : S.E.M INSPECTION SDN BHD
Position : Plant Inspector
Project : Petronas Penapisan (Melaka) Sdn Bhd) – Corrosion
Monitoring
Period : 2003
Company : MUSHTARI MAINTENANCE & ENG. SDN BHD.
Position : QA/QC Engineer
Project : Gas Processing Plant (GPP5) - Turnaround
Period : 2002
Company : S.E.M INSPECTION SDN BHD.
Position : Plant Inspector
Project : PSR1 Turnaround Preparation
Period : 2001
Company : TEKNISPEK SDN BHD
Position : Plant Inspector
Project : Petronas Carigali Sdn Bhd - Corrosion Monitoring
Period : 2000
Company : INTRA TECH ENGINEERING & TRADING SDN BHD
6
Position : Mechanical Supervisor
Project : PP(M)SB - PSR2 Washing Bay Construction
Period : 1994 - 2000
Company : PETRONAS PENAPISAN (MELAKA) SDN BHD
Position : Senior Inspection Technician
Project : PP(M)SB – Inspection Staff
Period : 1993 -1994
Company : PETRONAS PENAPISAN (MELAKA) SDN BHD
Position : Inspection Technician
Project : PP(M)SB - PSR2 Project Team
Period : 1992~1993
Company : PETRONAS PENAPISAN (MELAKA) SDN BHD
Position : Inspection Technician
Project : PP(M)SB - Jetty, Pipe-Rack And Piping Construction
Period : 1990~1992
Company : PETRONAS PENAPISAN (MELAKA) SDN BHD
Position : Inspection Technician
Project : PP(M)SB - Corrosion Monitoring
Reference :
1) Mr. Suresh Raghavan
Inspection Manager
BASF-Petronas Chemical Sdn Bhd
H/P : +6016-9233217
2) Mr. Ariffin Mohamad
Operation Manager
S.E.M Inspection Sdn Bhd
H/P : +6019-6832835
3) Mr. Zainol Abidin Mohamaed
Senior Engineer (Inspection)
Asset Integrity Management Dept
Technical Services Division
Petronas Penapisan (Melaka) Sdn Bhd
H/P : +6019-6564610
7
4) Tn. Hj Abd Rahim Mohamad
Head of Inspection
PSR2 Revamp Project, Sungai Udang
Petronas Penapisan (Melaka) Sdn Bhd
H/P : +6019-9151959
8

More Related Content

What's hot (20)

CV_Thangaraj Raja
CV_Thangaraj RajaCV_Thangaraj Raja
CV_Thangaraj Raja
 
Tin's CV
Tin's CVTin's CV
Tin's CV
 
Cv ardiansyah t.a cswip 3.1
Cv ardiansyah t.a cswip 3.1Cv ardiansyah t.a cswip 3.1
Cv ardiansyah t.a cswip 3.1
 
CV Farid
CV FaridCV Farid
CV Farid
 
Faizal CV Rev 1
Faizal CV Rev 1Faizal CV Rev 1
Faizal CV Rev 1
 
QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)
 
CV Abd. Hadi Ahmad
CV Abd. Hadi AhmadCV Abd. Hadi Ahmad
CV Abd. Hadi Ahmad
 
THINAKARAN.R
THINAKARAN.RTHINAKARAN.R
THINAKARAN.R
 
Mohammed Nafea CV.DOC
Mohammed Nafea CV.DOCMohammed Nafea CV.DOC
Mohammed Nafea CV.DOC
 
Kumar.R Multi Inspector cv -5 - Copy
Kumar.R   Multi Inspector cv   -5 - CopyKumar.R   Multi Inspector cv   -5 - Copy
Kumar.R Multi Inspector cv -5 - Copy
 
(QA_QC Welding,piping engineer
(QA_QC  Welding,piping engineer(QA_QC  Welding,piping engineer
(QA_QC Welding,piping engineer
 
resume new
resume newresume new
resume new
 
Updated cv
Updated cvUpdated cv
Updated cv
 
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume -   Sr.QC Inspector-Mech.welding-painting-piping-pipelineResume -   Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
 
Qa qc mech enggs or sr.qc inspector welding.piping.pipeline
Qa qc mech enggs or sr.qc inspector welding.piping.pipelineQa qc mech enggs or sr.qc inspector welding.piping.pipeline
Qa qc mech enggs or sr.qc inspector welding.piping.pipeline
 
Lester_Coleman_Resume
Lester_Coleman_ResumeLester_Coleman_Resume
Lester_Coleman_Resume
 
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-Welding
 
Welding Inspector - QC Inspector
Welding Inspector - QC InspectorWelding Inspector - QC Inspector
Welding Inspector - QC Inspector
 
RESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTORRESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTOR
 
RAJU CV
RAJU  CVRAJU  CV
RAJU CV
 

Viewers also liked

Machine Learning Code in Wolfram Mathematica
Machine Learning Code in Wolfram MathematicaMachine Learning Code in Wolfram Mathematica
Machine Learning Code in Wolfram MathematicaRubens Zimbres, PhD
 
Normes de busseig Victoria Andrea
Normes de busseig Victoria AndreaNormes de busseig Victoria Andrea
Normes de busseig Victoria Andreaandrea_666
 
Arithmetic sequence
Arithmetic sequenceArithmetic sequence
Arithmetic sequencemaricel mas
 
Nikola Tesla Magnifying transmitter Patent
Nikola Tesla Magnifying transmitter PatentNikola Tesla Magnifying transmitter Patent
Nikola Tesla Magnifying transmitter PatentRubens Zimbres, PhD
 
HOW TO GET 41% MORE DIRECT BOOKINGS ON YOUR HOTEL WEBSITE
HOW TO GET 41% MORE DIRECT BOOKINGS ON YOUR HOTEL WEBSITEHOW TO GET 41% MORE DIRECT BOOKINGS ON YOUR HOTEL WEBSITE
HOW TO GET 41% MORE DIRECT BOOKINGS ON YOUR HOTEL WEBSITEDominik Suter
 
Sterling Financial Brokers
Sterling Financial BrokersSterling Financial Brokers
Sterling Financial BrokersSuhail F.
 
Support Vector Machines - Wolfram Mathematica
Support Vector Machines - Wolfram MathematicaSupport Vector Machines - Wolfram Mathematica
Support Vector Machines - Wolfram MathematicaRubens Zimbres, PhD
 
The_Forrester_Wave_DDoS_S 2015Q3.PDF
The_Forrester_Wave_DDoS_S 2015Q3.PDFThe_Forrester_Wave_DDoS_S 2015Q3.PDF
The_Forrester_Wave_DDoS_S 2015Q3.PDFDominik Suter
 
Marketing Automation - more than an email sending app
Marketing Automation - more than an email sending appMarketing Automation - more than an email sending app
Marketing Automation - more than an email sending appDominik Suter
 
Untitled Presentation
Untitled PresentationUntitled Presentation
Untitled Presentationmahdi tizabi
 

Viewers also liked (20)

My Portfolio 7.7 - Dec 2016
My Portfolio 7.7 - Dec 2016My Portfolio 7.7 - Dec 2016
My Portfolio 7.7 - Dec 2016
 
Machine Learning Code in Wolfram Mathematica
Machine Learning Code in Wolfram MathematicaMachine Learning Code in Wolfram Mathematica
Machine Learning Code in Wolfram Mathematica
 
Normes de busseig Victoria Andrea
Normes de busseig Victoria AndreaNormes de busseig Victoria Andrea
Normes de busseig Victoria Andrea
 
Arithmetic sequence
Arithmetic sequenceArithmetic sequence
Arithmetic sequence
 
Presentation ICEIS
Presentation ICEISPresentation ICEIS
Presentation ICEIS
 
Nikola Tesla Magnifying transmitter Patent
Nikola Tesla Magnifying transmitter PatentNikola Tesla Magnifying transmitter Patent
Nikola Tesla Magnifying transmitter Patent
 
Scientific Market Research
Scientific Market ResearchScientific Market Research
Scientific Market Research
 
Catering service
Catering service Catering service
Catering service
 
DRIMM project1997
DRIMM project1997DRIMM project1997
DRIMM project1997
 
FallNewsletter2012
FallNewsletter2012FallNewsletter2012
FallNewsletter2012
 
MNIST_HOT.5.FULL.OK
MNIST_HOT.5.FULL.OKMNIST_HOT.5.FULL.OK
MNIST_HOT.5.FULL.OK
 
HOW TO GET 41% MORE DIRECT BOOKINGS ON YOUR HOTEL WEBSITE
HOW TO GET 41% MORE DIRECT BOOKINGS ON YOUR HOTEL WEBSITEHOW TO GET 41% MORE DIRECT BOOKINGS ON YOUR HOTEL WEBSITE
HOW TO GET 41% MORE DIRECT BOOKINGS ON YOUR HOTEL WEBSITE
 
Sterling Financial Brokers
Sterling Financial BrokersSterling Financial Brokers
Sterling Financial Brokers
 
Support Vector Machines - Wolfram Mathematica
Support Vector Machines - Wolfram MathematicaSupport Vector Machines - Wolfram Mathematica
Support Vector Machines - Wolfram Mathematica
 
Iris Dataset Mathematica
Iris Dataset MathematicaIris Dataset Mathematica
Iris Dataset Mathematica
 
The_Forrester_Wave_DDoS_S 2015Q3.PDF
The_Forrester_Wave_DDoS_S 2015Q3.PDFThe_Forrester_Wave_DDoS_S 2015Q3.PDF
The_Forrester_Wave_DDoS_S 2015Q3.PDF
 
Marketing Automation - more than an email sending app
Marketing Automation - more than an email sending appMarketing Automation - more than an email sending app
Marketing Automation - more than an email sending app
 
CEO WORLD_29-04-2015_IESF
CEO WORLD_29-04-2015_IESFCEO WORLD_29-04-2015_IESF
CEO WORLD_29-04-2015_IESF
 
Untitled Presentation
Untitled PresentationUntitled Presentation
Untitled Presentation
 
Doutorado.Slides v5 - Rubens
Doutorado.Slides v5 - RubensDoutorado.Slides v5 - Rubens
Doutorado.Slides v5 - Rubens
 

Similar to CV Hazmin Galim

Similar to CV Hazmin Galim (20)

CV Hasrul Maswandy
CV Hasrul MaswandyCV Hasrul Maswandy
CV Hasrul Maswandy
 
Tin's cv
Tin's cvTin's cv
Tin's cv
 
Resume_ Arunkumar
Resume_ Arunkumar  Resume_ Arunkumar
Resume_ Arunkumar
 
Zuraidi Resume update 2016
Zuraidi Resume update 2016Zuraidi Resume update 2016
Zuraidi Resume update 2016
 
Resume othman sulaiman
Resume othman sulaimanResume othman sulaiman
Resume othman sulaiman
 
My Resume 2016 July
My Resume 2016 JulyMy Resume 2016 July
My Resume 2016 July
 
MIDEL C resume013[1] (1)
MIDEL C resume013[1] (1)MIDEL C resume013[1] (1)
MIDEL C resume013[1] (1)
 
MOHD NAZRI NGAH CV'S 040217
MOHD NAZRI NGAH CV'S 040217MOHD NAZRI NGAH CV'S 040217
MOHD NAZRI NGAH CV'S 040217
 
Adeel Shaikh CV
Adeel Shaikh CVAdeel Shaikh CV
Adeel Shaikh CV
 
navjay
navjaynavjay
navjay
 
CV - Prasath.V.R
CV - Prasath.V.RCV - Prasath.V.R
CV - Prasath.V.R
 
Resume 02
Resume 02Resume 02
Resume 02
 
Resume - MOHD YUNUS BIN MOHD NAFI
Resume - MOHD YUNUS BIN MOHD NAFIResume - MOHD YUNUS BIN MOHD NAFI
Resume - MOHD YUNUS BIN MOHD NAFI
 
CV Latest Rosdi PL381
CV Latest Rosdi PL381CV Latest Rosdi PL381
CV Latest Rosdi PL381
 
CV_sharaa
CV_sharaaCV_sharaa
CV_sharaa
 
CV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdfCV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdf
 
CV( Affendy Ali )040515new
CV( Affendy Ali )040515newCV( Affendy Ali )040515new
CV( Affendy Ali )040515new
 
Abdul Halim Sadikun - Resume 2016 (1)
Abdul Halim Sadikun - Resume 2016 (1)Abdul Halim Sadikun - Resume 2016 (1)
Abdul Halim Sadikun - Resume 2016 (1)
 
nixon cv-Jan2016 _2_
nixon cv-Jan2016 _2_nixon cv-Jan2016 _2_
nixon cv-Jan2016 _2_
 
CV Muhammad Afi Hassan 2015
CV Muhammad Afi Hassan 2015CV Muhammad Afi Hassan 2015
CV Muhammad Afi Hassan 2015
 

CV Hazmin Galim

  • 1. CURRICULUM VITAE Personal Details Name : Hazmin Galim I/C No. : 640724-04-5649 Address : 3774 Jalan Sin Ban Bee 1 Bt 19 Kampung Rim 77000 Jasin Melaka Malaysia. E-mail : ibyocomm_hag@yahoo.com Telephone no. : +6 - 019 - 6676599 Age : 50 years old Date of birth : 24th . July 1964 Sex : Male Marital Status : Married with 5 children Nationality : Malaysian Height : 1.60 m Weight : 69 kg Education : Technical Certificate in Inspection – 1990 – INSTEP (Institut Teknologi Petroleum PETRONAS) SPM – 1981 Summary of Experience I have more than 15 years working experience in oil, gas and petrochemical industry. I’ve been involved in the plant construction project, static equipment, tank and piping inspection, planning, preparation and execution of turnarounds. I started my career as an Inspection Technician in Petronas Penapisan (Melaka) Sdn. Bhd. ( Petronas Second Refinery) and over the years have worked in various Oil and Gas Plant in the area of inspection activities, construction, fabrication and installation work. Technical Qualification 1. API 510 Pressure Vessel Inspector - API (2014~2017) 2. Welding Inspector 3.1 - CSWIP (1997) 3. Coating Inspector Level II - NACE (1995) 4. Magnetic / Penetrant Testing Level II - PCN (1999) 5. Ultrasonic Testing Level II - SIRIM (1993) 1
  • 2. 6. Radiography Level I - MINT (1997) Courses Attended 1. Welding Inspector ( January 1997 ). 2. Welding Inspection and Certification ( January 1995 ). 3. Implication Of Weld Procedure ( November 1994 ). 4. Welding Technology Level 1 ( August 1994 ). 5. Basic Metallurgical Engineering Level I ( April 1994 ). 6. Welding Technology and Inspection ( November 1992 ). 7. Welding Inspection and Quality Control ( July 1991 ). 8. Approval Testing to BS EN 287/288 ( November 1994 ). 9. Radiography Interpretation ( May 1999 ). 10. Radiography Level I ( September 1997 ). 11. NACE International Session II Coating Inspector Training ( Sept. 1995 ). 12. NACE International Session I Coating Inspector Training ( Sept. 1995 ). 13. Basic Corrosion Engineering Level I ( May 1994 ). 14. Coating Seminar ( March 1993 ). 15. Ultrasonic Testing Level II ( October 1993 ). 16. Ultrasonic Testing Level I ( March 1991 ). 17. Magnetic Particle Inspection / Penetrant Testing Level II ( Sept.1999 ) 18. Turnaround Inspection and Statutory Requirements In The Petrochemical Industry ( May 1995 ). 19. Basic Sea Survival and Fire Fighting ( July 1990 ). 20. Technical Report Writing ( July 1996 ). Major Work Scopes 1. Plant turnaround preparation, execution and Post TA documentation. - Produce TA Generic Working Procedure - Prepare equipment job packs - Liaise with Inspection Dept. on quality, NDT and DOSH issues - Coordinate QC activities - Produce repair procedure related to welding and painting - Compile turnaround dossier 2. Piping and static equipment inspection during fabrication, construction and installation. - Review and understanding project specification and ITP - Materials receiving inspection i.e. pipes, fittings and valves - Materials preservation audit - Witness WPS qualification - Witness WQT - Shop and field weld inspection - Review daily progress and NDT reports - Review and monitor NDT plan vs. actual progress - Line checking and issuing punch list - Witness hydro-testing - Perform line reinstatement and line walkdown - Blasting and painting inspection 2
  • 3. - Highlight any issues and obstacle in daily meeting - Perform join inspection in safety audit 3. Coordinate inspection team in plant turnaround activities. 4. Plant Static Equipment Inspection – In-service and during shutdown (Piping, Pressure Vessel, Boiler, Column, Heat Exchanger, Storage Tanks, Pressure Safety Valves, etc). 5. Piping fabrication, modification and installation in live plant. 6. Coating and insulation inspection. 7. Corrosion monitoring. 8. Hydrostatic and Pneumatic Testing. 9. Prepare Technical Report. 10. Analytical Trouble Shooting. Major Assigment BASF-Petronas Chemical – Sr Inspection Supervisor (Dec 2014~Present) 1. OXO-Syngas – April 2015 Plant Turnaround - Prepare Scheme of Examination (SOE), produce Inspection Work Flow, coordinate inspection activities between owner and contractors, review job-pack, liaise with mechanical and operation department regarding inspection scope of works and DOSH (government authorities’) requirement. 2. Plant Corrosion Monitoring – Static Equipment and Piping - Organize corrosion monitoring activities as per inspection and RBI plan, dealing with third party inspector and NDT company for the contract out works, response to on call and emergent works in live plant. PP(M)SB – Asset Integrity Management Department (2013~Nov 2014) 1. Risk Base Inspection – PSR2 Piping - Review piping system, mark-up piping and Injection Points circuit on P&ID based on corrosion loop study, list down piping tag and gather piping data, develop composite piping survey for P-RBI selection and upload to PRBI software V2. 2. Asset Life Study – Static Equipment - As a support team to assist Material and Corrosion team to study and analyzing inspection reports, determine and categorized equipment based on the deterioration and remnant life, produce review outcome and comments, and recommend for improvement in the next opportunity shutdown. SARAWAK SHELL BERHAD – Structure and Piping Fabrication and Installation (2012~2013) 3
  • 4. 1. Wellhead Protector Structure (Labuan) – Monitor the fabrication works by Serba Dinamik Sdn Bhd, witness QC activities, review NDT reports and compile project dossier. 2. Exhaust Pipe and Air Intake Ducting for D12, Laila, F14A/B Field Development Project (THHE Pulau Indah and MMHE Pasir Gudang) – Prepare ITP, Quality Manual and QC forms. Monitor the fabrication activities, review inspection reports and compile project dossier. PP(M)SB – PSR2 Plant Revamp Project (2008~2010) 1. Monitor and perform inspection works on piping fabrication and installation by Dialog /PFCE including tie-in, hot-tapping, piping disinvestment, NDT, hydrotest, painting, punch list and reinstatement, commissioning, work pack clearance and compiling document dossier. 2. Witness new static equipment fabrication, installation, inspection and testing and ensure all the engineering works conform to project specification and requirements. PP(M)SB - MG3 Lube Oil Plant Construction (2007~2008) 1. Monitor and perform inspection works on piping fabrication and installation by Lurgi /L &T /KQKS including welding, painting, NDT, hydrotest, issue /clear punch list, line walkdown, commissioning, work package clearance and compiling document dossier. PP(M)SB - PSR 2 Plant Construction (1993~1994) 1. Monitor and perform inspection works on PSR 2 plant construction for piping and static equipment fabrication and installation by Chiyoda Corporation. 2. Inspection on heat exchanger fabrication at M.S.E Pasir Gudang, Johor. 3. Inspection on Single Buoy mooring fabrication and painting at Promet Fabricators Teluk Rumania, Kota Tinggi 4. Inspection on fabrication of superheater tubes for PSR 1 and PSR 2 boiler at Warga Nikmat workshop, Senawang, Negeri Sembilan. PP(M)SB - PSR 1 Marine Facilities Project (1992 ~1993) 1. Supervise and monitor pipe rack fabrication / painting works by Hyundai (HDEC) at PSR 1 jetty and KNM-DP fabrication yard. Petronas Penapisan (Terengganu) Sdn Bhd (1989 – 1992) 1. Tank Cleaning and Painting of D916,D902, and D933 4
  • 5. - Coordinate with Planning and Maintenance Department, Operation department and Contractors to carry out modification, repair, blasting and painting works. 2. Refurbishment of Tank D911 - Coordinate with Planning and Maintenance Department, Operation Department and Contractors on refurbishment of tank shell plates. 3. Hot Trapping and Tie-in of Crude Line - Monitor and perform inspection works on tie-in and hot tapping of 12” line and 24” crude line. 4. LPG Spherical Tank Inspection - Perform external and internal visual inspection and supervise the magnetic particle inspection by third party NDT Company. Career Resume Period : October 2013 – Present Company : S.E.M INSPECTION SDN BHD Position : Senior Plant Inspector Project : Petronas Penapisan (Melaka) Sdn Bhd) – Asset Life Study and RBI Period : August 2012 – September 2013 Company : SERBA DINAMIK SDN BHD Position : QA/QC Executive Project : SARAWAK SHELL BERHAD - Structure and Piping Fabrication and Installation Period : April 2011 – July 2012 Company : DIALOG PLANT SERVICES SDN BHD Position : QA/QC Coordinator Project : Petronas Penapisan (Melaka) Sdn Bhd) – PSR2 Revamp and Turnaround Period : August 2010 – April 2011 Company : S.E.M INSPECTION SDN BHD Position : Piping Inspector Project : Petronas Penapisan (Melaka) Sdn Bhd) – Corrosion Monitoring Period : April 2010 – July 2010 Company : S.E.M INSPECTION SDN BHD Position : Piping Inspector Project : Petronas Penapisan (Melaka) Sdn Bhd) - HPU1 Revamp Project 5
  • 6. Period : October 2008 – March 2010 Company : S.E.M INSPECTION SDN BHD Position : Sr. Inspector Project : Petronas Penapisan (Melaka) Sdn Bhd) – PSR2 Revamp Project Period : Dec. 2007 – Sep. 2008 Company : S.E.M INSPECTION SDN BHD Position : Piping Inspector Project : Petronas Penapisan (Melaka) Sdn Bhd) – MG3 Lube Base Oil Project Period : 2006 – 2007 Company : S.E.M INSPECTION SDN BHD Position : Plant Inspector Project : Petronas Penapisan (Melaka) Sdn Bhd) – Corrosion Monitoring Period : 2004 - 2005 Company : S.E.M INSPECTION SDN BHD Position : Inspection Area Coordinator Project : Plant Turnaound and Shutdown Period : 2004 Company : S.E.M INSPECTION SDN BHD Position : Plant Inspector Project : Petronas Penapisan (Melaka) Sdn Bhd) – Corrosion Monitoring Period : 2003 Company : MUSHTARI MAINTENANCE & ENG. SDN BHD. Position : QA/QC Engineer Project : Gas Processing Plant (GPP5) - Turnaround Period : 2002 Company : S.E.M INSPECTION SDN BHD. Position : Plant Inspector Project : PSR1 Turnaround Preparation Period : 2001 Company : TEKNISPEK SDN BHD Position : Plant Inspector Project : Petronas Carigali Sdn Bhd - Corrosion Monitoring Period : 2000 Company : INTRA TECH ENGINEERING & TRADING SDN BHD 6
  • 7. Position : Mechanical Supervisor Project : PP(M)SB - PSR2 Washing Bay Construction Period : 1994 - 2000 Company : PETRONAS PENAPISAN (MELAKA) SDN BHD Position : Senior Inspection Technician Project : PP(M)SB – Inspection Staff Period : 1993 -1994 Company : PETRONAS PENAPISAN (MELAKA) SDN BHD Position : Inspection Technician Project : PP(M)SB - PSR2 Project Team Period : 1992~1993 Company : PETRONAS PENAPISAN (MELAKA) SDN BHD Position : Inspection Technician Project : PP(M)SB - Jetty, Pipe-Rack And Piping Construction Period : 1990~1992 Company : PETRONAS PENAPISAN (MELAKA) SDN BHD Position : Inspection Technician Project : PP(M)SB - Corrosion Monitoring Reference : 1) Mr. Suresh Raghavan Inspection Manager BASF-Petronas Chemical Sdn Bhd H/P : +6016-9233217 2) Mr. Ariffin Mohamad Operation Manager S.E.M Inspection Sdn Bhd H/P : +6019-6832835 3) Mr. Zainol Abidin Mohamaed Senior Engineer (Inspection) Asset Integrity Management Dept Technical Services Division Petronas Penapisan (Melaka) Sdn Bhd H/P : +6019-6564610 7
  • 8. 4) Tn. Hj Abd Rahim Mohamad Head of Inspection PSR2 Revamp Project, Sungai Udang Petronas Penapisan (Melaka) Sdn Bhd H/P : +6019-9151959 8