SlideShare a Scribd company logo
1 of 4
SREEVATSA CHAKRAVARTHY (US Citizen)
Houston, TX 77059 • C: (832) 754-0093 • sreevatsa@att.net
Summary of Qualifications
Lean Six-Sigma Systems (Minitab 17.0)
Manufacturing & Supplier Quality
Continuous Improvement (CIP)
ASME B&PVC Sections VIII, IX, V
ASME B31.3, B31.9 and ASTM
Lean Manufacturing; RCA (5WHYs, Fish Bone diagram)
Corrective action (Six Sigma/8D)
QMS (CAPA); CAR; PAR; NCR
APQP; Lean& Six Sigma Tools
Customer Complaints & NCR Resolution
ISO14001-2004, OSHAS18001
ISO 17025-2005 (Calibration)
API Q1: RCFA; FMEA, FA; QA/QC lab
Metallurgy & Design Engineering
Major Critical Equipment Inspections
AWS D.1.1; AWS D17.1; WPS; PQR
Fabrication (welding methods, procedures)
Corrosion & Mitigation Engineering
Reliability & Preventive Maintenance
Project Management & Project Quality
ISO 9001-2008, ISO/ TS 16949 PED, ATEX, ASTM
NDE (hardness, hydrostatic, liquid penetrant, magnetic particle, PMI, radiography, ultrasound)
Professional Work Experience
Quality Manager December 2015 - Current
TAS Energy Inc., Houston, TX
• Achieved a 50% cost reduction in NDE contractor inspection costs.
• Manage customer audits including 3rd
party welding audit, 3rd
party Quality Management System (QMS)
audits and corporate quality audits achieving customer satisfaction at completion.
• Manage 3rd
Party ISO 9001-2008 certification audit.
• Manage welding program including rework of Welding Procedure Specifications (WPS), PQRs and welder
certifications while meeting stringent, project specific customer welding code requirements.
• Maintain effective supplier management system through communication, issue resolution, supplier audits
and conducting inspections and factory acceptance testing (FAT) at supplier facilities for major equipment
providers (both domestic and internationally).
• Conduct internal factory acceptance testing (FAT).
• Work closely with Engineering, Project Management, Supply Chain, Sales and other functional teams to
ensure overall project quality and customer satisfaction.
• Developed and implemented NCR (Nonconformance Report); CAR (Corrective Action Report); SCAR
(Supplier Corrective Action System) programs and ensure root cause solutions are identified and
implemented.
• Driving the organization toward data based decision making, by developing and implementing appropriate
data collection methods to provide relevant and actionable data for suppliers and operational departments,
both in house and at project sites.
Senior Quality Engineer November 2011 - November 2014
Mitsubishi Caterpillar Forklift America Inc. (MCFA), Houston, TX
• ISO 9001-2008 (Quality Management), ISO 14001-2004 (Environmental Management) & OSHAS 18001
Certified Internal Auditor. Liaison between registration body (DNV) (3rd
Party Audits) and MCFA
Management for ISO 9001 & ISO14001 certifications.
• Maintained ISO Program, internal quality audits, document and data control. Created/revised procedures as
needed and provided training. Conducted Quality Audits of Suppliers and Potential Suppliers.
• Possess strong working knowledge of ISO 9001(2008), ISO/ TS 16949& API SPEC Q1.
• Implemented and maintained advanced quality concepts Total Quality Management (TQM), Continuous
Quality Improvement, Statistical Process Control, and Quality Function Deployment.
• Worked as a lead for Root Cause Analysis (RCA); root cause corrective action methodology (Six
Sigma/8D); CAPA; NCR; Corrective Action Plans (CAR) Preventive Action(PAR).
• Implemented and enforced the QMS System CAPA (Corrective Action Preventive Action process), RCA
(Root Cause Analysis); and NCR reports and reduced the Cost of Poor Quality from 10% to 1%.
• Developed and trained company employees on CAPA (Corrective Action Preventive Action process), RCA
(Root Cause Analysis) and NCR processes.
• Maintained Customer Complaints & NCR data base.
• Resolved customer complaints resulting in a $3 M per year cost savings by implementing design
changes to several manufacturing quality Issues. Performed Lean Six Sigma Projects to improve Quality.
• Implemented Lean manufacturing tools (5S, Kaizen, Continuous Flow), improved process speed and
achieved waste or scrap reduction from 6% to 1% ($1M savings).
• Identified and eliminated process variations resulting in internal and external failures and lead
improvements to reduce Cost of Quality, improve yield or customer satisfaction through 8-D corrective
action, Six Sigma, LEAN tools and other QMS (Quality Management System) tools and processes.
• Established controls and inspection points to facilitate detection, correction, and prevention of
nonconforming materials, parts, assemblies, and products. Presented charts regarding product, process
quality, Cost of Poor Quality (COPQ) and key Performance Indicators (KPI) on weekly basis.
• Developed, initiated, and maintained standards and procedures for the performance of quality
assurance, inspection, and test functions.
• Coordinated and provided required project quality related deliverables including FAT (Factory Acceptance
Testing), PFMEA, capability studies, statistical analysis, inspection plans, quality records and
workmanship standards.
• Possess strong work experience in LEAN Tools (5s,Continuous Process Improvement Kaizen, Continuous
Flow, KANBAN;KPI,OEE, Value Stream mapping TAKT Time, PDCA); Six Sigma Tools(FMEA, MSA,
Control Charts, Pareto Charts, SPC, DOE, Process mapping, Process Capability Cpk, Ppk; Gaga R&R); 8D;
DMAIC; GD&T, PFMEA; RPPM Reports; MRB (Waste Reduction & Control Techniques), Calibrating
Instrument /Equipment per ISO17025-2005 Standards; measuring and testing equipment Faro Arm,
CMM.
• Performed customer plant visits to analyze customer issues with product quality. Worked investigations
of field failures and liaison with Design Engineering, Manufacturing, Sales, Service and Customer.
• Worked closely with Manufacturing, Engineering, Suppliers, Factory Operations, Sales and Supply Chain to
facilitate resolution of technical problems.
• Conducted internal audits (Process Quality, Procedures, Customer Focus Audits; Product QA), external
(supplier) audits and served as Quality representative for customer on-site visits/audits.
• Managed Quality Receiving Inspection group, generated Initial Inspection Reports (IIRs) and PPAPs
(HQMS System) on received parts from vendors.
Deputy Manager June 1997 – August 2011
United Space Alliance (USA)/NASA, Houston, TX
• Provided Project Quality Assurance/Quality Control support to Engineering and Design teams during project
execution. Performed specification reviews, development of the Project Quality Plan and Inspection & Test
Plan (ITP).
• Possess strong working knowledge in pressure vessel performance and inspection concepts (hydrostatic
pressure tests, data books, engineering drawings and ASME U Stamp.
• Possess strong work experience in 3rd
Party Standards (ASME B&PVC Sections VIII and IX, ASME
B31.3,B31.9; and ASTM).
• Possess strong work experience in Fabrication Techniques (welding methods and procedures).
• Possess strong working knowledge in NDE Methods (hardness, hydrostatic, liquid penetrant, magnetic
particle, PMI, radiography, and ultrasonic examinations); and Documents (data sheets, engineering
drawings, Inspection Reports, Inspection and Test Plans).
• Confirmed compliance with the customer’s purchase order regarding the project and process requirements.
• Supported specification and requisition development of major buy-out equipment items such as heat
exchangers, pumps and compressors.
• Developed Project Quality Plan, Inspection & Test Plan. Performed review of Project Job Manuals.
• Performed Project Engineering support and participated in the upfront project proposal, planning,
development, engineering and manufacturing processes, meeting operational objectives in Safety, Quality,
Delivery and Cost.
• Performed drawing/document review checklist to ensure engineering drawings and other design deliverables
& datasheets were in compliance with project specifications. Performed shop visits of sub-vendors and
traveled to the jobsite as needed.
• Assisted in cost estimation by performing specification reviews, preparing summary list of requirements and
acceptance criteria, identifying material, WPS/PQR, NDE requirements and requirements for coating and
insulation.
• Assisted in development of Design Input Checklist, review of engineering and drawing deliverables and
preparation of Design Review Checklist and Drawing Review Checklist.
• Worked as a lead for Root Cause Analysis(RCA); root cause corrective action methodology (Six
Sigma/8D); CAPA; NCR; Corrective Action Plans (CAR) Preventive Action(PAR). Possess strong knowledge
in Quality principles including NCRs, CARs, PARs, sampling techniques, and process control.
• Reviewed customer material & manufacturing specifications and ensured that equipment design matched
specifications.
• Provided technical assistance to customers during project execution and field operations as required.
• Developed and maintained Materials and Process Engineering (M&P) specifications of metallic materials,
non- metallic materials, corrosion protective coatings, insulations, heat treating and Non-Destructive
Evaluation (NDE) processes.
• Performed several metallurgical analysis (materials selections, evaluations, testing of metals, non-metals
insulations, and coatings), plastics, elastomers; welding inspections and repair (Per Welding Standards
AWS D17.1), WPS, PQR's, Weld Logs; Failure Analysis; NDE inspections.
• Possess working knowledge of assembly and welding processes and testing methods used to construct and
certify pressure vessels and associated piping systems.
• Possess strong working knowledge of material properties (chemical, mechanical properties) and
certifications (NACE, PED) associated with steel plate, pipe, flanges, and fittings.
• Liaison between the customer (NASA) and the contractors and suppliers; worked as the suppliers primary
contact and performed several quality surveillance activities.
Quality Engineer June 1993 - June 1997
University of Texas Health Science Center, Houston
• Responsibilities included performing research, developing protocols for drug companies, product
development.
Manufacturing and Quality Engineer (Process& Quality Control) April 1986 - June 1993
Chemicals Incorporated Baytown, TX
• Primary responsibilities included focusing on maximizing production by reducing equipment failure and
downtime, lowering maintenance costs, and minimizing safety/environmental concerns.
EDUCATION
MS (Chemistry-Metals & Polymers); BS (Mathematics, Physics & Chemistry) from Accredited Universities
CERTIFICATIONS AND PROFESSIONAL DEVELOPMENT ASSOCIATIONS
• NMA-Project Management Professional (PMP) Preparation Series (16 hours)-May 2010
• Advise for Successful Projects (Project Management Course) (8 hours)-April 2010
• University of Houston, Leadership & Management Certification Program (36 hours) – July 2008
• United Space Alliance, Integrated Project Management Program Certificate (24 hours) – June 2009
• Completed the Leadership Training Programs at Boeing in St. Louis and United Space Alliance in Houston
• United Space Alliance/Cadence Mgmt Corp, Project Management Certificate (16 hours) – November 2000
• Metallurgy and Failure Analysis course offered by ASM International (40 hours)- April 2007
• Fracture Mechanics, life assessment, and fracture control course (40 hours)- April 2007
• NASA/Apollo Services, Root Cause Mapping Certificate – May 2010
• San Jacinto College/Think Reliability, Cause Mapping: Effective Root Cause Analysis - August 2010
COMPUTER PROGRAMS AND SYSTEMS EXPERIENCE
Working knowledge of Microsoft Excel, Visio, Project, Word and Power Point; Linux; Unix Operating Systems;
Minitab; Auto Cad (Creo); Finite Element Analysis Tool; Matlab; HQMS; SAP; BPCS (ERP system)

More Related Content

What's hot

Quality Assurance Information Guide
Quality Assurance Information GuideQuality Assurance Information Guide
Quality Assurance Information GuideWilliam Harbin
 
Dana Weber Resume 04-15
Dana Weber Resume 04-15Dana Weber Resume 04-15
Dana Weber Resume 04-15Dana Weber
 
MAHANTESH-Resume -LSSGB,LSSBB
MAHANTESH-Resume -LSSGB,LSSBBMAHANTESH-Resume -LSSGB,LSSBB
MAHANTESH-Resume -LSSGB,LSSBBMahantesh sh
 
Dana C. Weber Resume
Dana C. Weber ResumeDana C. Weber Resume
Dana C. Weber ResumeDana Weber
 
Rajeev_R_CV Updated
Rajeev_R_CV UpdatedRajeev_R_CV Updated
Rajeev_R_CV UpdatedRAJEEV R
 
Resume_Chintan_Gohil_
Resume_Chintan_Gohil_Resume_Chintan_Gohil_
Resume_Chintan_Gohil_Chintan Gohil
 
Quality management review template
Quality management review templateQuality management review template
Quality management review templateselinasimpson2801
 
Glen Rogers Resume 2015
Glen Rogers Resume 2015Glen Rogers Resume 2015
Glen Rogers Resume 2015Glen Rogers
 
Quality harjeet gill 11 19_16
Quality harjeet gill 11 19_16Quality harjeet gill 11 19_16
Quality harjeet gill 11 19_16Harjeet Gill
 
L9 quality assurance and documentation
L9 quality assurance and documentationL9 quality assurance and documentation
L9 quality assurance and documentationOMWOMA JACKSON
 
Sushil Kumar Jain resume (International) mod 3
Sushil Kumar Jain resume (International) mod 3Sushil Kumar Jain resume (International) mod 3
Sushil Kumar Jain resume (International) mod 3Sushil Kumar Jain
 
Bruce Pfeffer Resume May 2015
Bruce Pfeffer Resume May 2015Bruce Pfeffer Resume May 2015
Bruce Pfeffer Resume May 2015Bruce Pfeffer
 
Iso9001 2008 Transition Asq Govind
Iso9001 2008 Transition Asq GovindIso9001 2008 Transition Asq Govind
Iso9001 2008 Transition Asq GovindGovind Ramu
 
1 documents & Requirements
1 documents & Requirements1 documents & Requirements
1 documents & RequirementsICHAPPS
 

What's hot (20)

Cv
CvCv
Cv
 
Quality Assurance Information Guide
Quality Assurance Information GuideQuality Assurance Information Guide
Quality Assurance Information Guide
 
Dana Weber Resume 04-15
Dana Weber Resume 04-15Dana Weber Resume 04-15
Dana Weber Resume 04-15
 
MAHANTESH-Resume -LSSGB,LSSBB
MAHANTESH-Resume -LSSGB,LSSBBMAHANTESH-Resume -LSSGB,LSSBB
MAHANTESH-Resume -LSSGB,LSSBB
 
Contractor Best Practices in Construction Quality Assurance
Contractor Best Practices in Construction Quality AssuranceContractor Best Practices in Construction Quality Assurance
Contractor Best Practices in Construction Quality Assurance
 
Sanjeev - cv
Sanjeev - cvSanjeev - cv
Sanjeev - cv
 
Dana C. Weber Resume
Dana C. Weber ResumeDana C. Weber Resume
Dana C. Weber Resume
 
Ramon Banaga's Resume
Ramon Banaga's ResumeRamon Banaga's Resume
Ramon Banaga's Resume
 
Rajeev_R_CV Updated
Rajeev_R_CV UpdatedRajeev_R_CV Updated
Rajeev_R_CV Updated
 
Sanjeev - cv
Sanjeev - cvSanjeev - cv
Sanjeev - cv
 
Apqp to print
Apqp to printApqp to print
Apqp to print
 
Resume_Chintan_Gohil_
Resume_Chintan_Gohil_Resume_Chintan_Gohil_
Resume_Chintan_Gohil_
 
Quality management review template
Quality management review templateQuality management review template
Quality management review template
 
Glen Rogers Resume 2015
Glen Rogers Resume 2015Glen Rogers Resume 2015
Glen Rogers Resume 2015
 
Quality harjeet gill 11 19_16
Quality harjeet gill 11 19_16Quality harjeet gill 11 19_16
Quality harjeet gill 11 19_16
 
L9 quality assurance and documentation
L9 quality assurance and documentationL9 quality assurance and documentation
L9 quality assurance and documentation
 
Sushil Kumar Jain resume (International) mod 3
Sushil Kumar Jain resume (International) mod 3Sushil Kumar Jain resume (International) mod 3
Sushil Kumar Jain resume (International) mod 3
 
Bruce Pfeffer Resume May 2015
Bruce Pfeffer Resume May 2015Bruce Pfeffer Resume May 2015
Bruce Pfeffer Resume May 2015
 
Iso9001 2008 Transition Asq Govind
Iso9001 2008 Transition Asq GovindIso9001 2008 Transition Asq Govind
Iso9001 2008 Transition Asq Govind
 
1 documents & Requirements
1 documents & Requirements1 documents & Requirements
1 documents & Requirements
 

Viewers also liked

Viewers also liked (15)

Laura Nealon Resume Nursing
Laura Nealon Resume NursingLaura Nealon Resume Nursing
Laura Nealon Resume Nursing
 
Better Resume
Better ResumeBetter Resume
Better Resume
 
Resume
Resume Resume
Resume
 
Resume - Carl Harris
Resume - Carl HarrisResume - Carl Harris
Resume - Carl Harris
 
Resume - Chatuphon Yangyuen
Resume - Chatuphon YangyuenResume - Chatuphon Yangyuen
Resume - Chatuphon Yangyuen
 
Katherine Somer Resume
Katherine Somer ResumeKatherine Somer Resume
Katherine Somer Resume
 
Conscientious Administrative Professional Resume_M Thompson
Conscientious Administrative Professional Resume_M ThompsonConscientious Administrative Professional Resume_M Thompson
Conscientious Administrative Professional Resume_M Thompson
 
Detailed Resume
Detailed ResumeDetailed Resume
Detailed Resume
 
Chris Lott Resume 2016.1_V_3
Chris Lott Resume 2016.1_V_3Chris Lott Resume 2016.1_V_3
Chris Lott Resume 2016.1_V_3
 
Michelle Kennedy Resume complete
Michelle Kennedy Resume completeMichelle Kennedy Resume complete
Michelle Kennedy Resume complete
 
Terry Robinson Resume
Terry Robinson ResumeTerry Robinson Resume
Terry Robinson Resume
 
Resume of Jamie Roupe
Resume of Jamie RoupeResume of Jamie Roupe
Resume of Jamie Roupe
 
Jose M. Castaneda Resume 2016
Jose M. Castaneda Resume 2016Jose M. Castaneda Resume 2016
Jose M. Castaneda Resume 2016
 
Resume 1-12-2017
Resume 1-12-2017Resume 1-12-2017
Resume 1-12-2017
 
Resume-
Resume-Resume-
Resume-
 

Similar to Sreevatsa Chakravarthy Resume (revised)

Similar to Sreevatsa Chakravarthy Resume (revised) (20)

Faruk_Syed_Engineer
Faruk_Syed_EngineerFaruk_Syed_Engineer
Faruk_Syed_Engineer
 
Dulan_Resume_QE
Dulan_Resume_QEDulan_Resume_QE
Dulan_Resume_QE
 
Jake Essig FDA QA Engineer - 3May2016
Jake Essig FDA QA Engineer - 3May2016Jake Essig FDA QA Engineer - 3May2016
Jake Essig FDA QA Engineer - 3May2016
 
TylerSi_CV
TylerSi_CVTylerSi_CV
TylerSi_CV
 
Harjeet Gill 110516
Harjeet Gill  110516Harjeet Gill  110516
Harjeet Gill 110516
 
Faruk syed ee mba_asq-cssgb
Faruk syed ee mba_asq-cssgbFaruk syed ee mba_asq-cssgb
Faruk syed ee mba_asq-cssgb
 
Rod Cornell ResumeA2
Rod Cornell ResumeA2Rod Cornell ResumeA2
Rod Cornell ResumeA2
 
Kristine kowalski resume
Kristine kowalski resume Kristine kowalski resume
Kristine kowalski resume
 
Pradeep CV
Pradeep CV Pradeep CV
Pradeep CV
 
MJonesMFG Quality Resume
MJonesMFG Quality ResumeMJonesMFG Quality Resume
MJonesMFG Quality Resume
 
VIJAYA PILLY.condensed_resume
VIJAYA PILLY.condensed_resumeVIJAYA PILLY.condensed_resume
VIJAYA PILLY.condensed_resume
 
resume
resumeresume
resume
 
Nital Resume - QA Batch record review 2014
Nital Resume - QA Batch record review 2014Nital Resume - QA Batch record review 2014
Nital Resume - QA Batch record review 2014
 
CV_Arvind Pandey
CV_Arvind PandeyCV_Arvind Pandey
CV_Arvind Pandey
 
roberto llagas resume-1
roberto llagas resume-1roberto llagas resume-1
roberto llagas resume-1
 
jayam
jayamjayam
jayam
 
Enri resume
Enri    resumeEnri    resume
Enri resume
 
Vinoth.s qa qc-ims (qms&ehs)
Vinoth.s   qa qc-ims (qms&ehs)Vinoth.s   qa qc-ims (qms&ehs)
Vinoth.s qa qc-ims (qms&ehs)
 
Rick Inserra_Resume
Rick Inserra_ResumeRick Inserra_Resume
Rick Inserra_Resume
 
Hawkersmith Dec 2015 Resume
Hawkersmith Dec 2015 ResumeHawkersmith Dec 2015 Resume
Hawkersmith Dec 2015 Resume
 

Sreevatsa Chakravarthy Resume (revised)

  • 1. SREEVATSA CHAKRAVARTHY (US Citizen) Houston, TX 77059 • C: (832) 754-0093 • sreevatsa@att.net Summary of Qualifications Lean Six-Sigma Systems (Minitab 17.0) Manufacturing & Supplier Quality Continuous Improvement (CIP) ASME B&PVC Sections VIII, IX, V ASME B31.3, B31.9 and ASTM Lean Manufacturing; RCA (5WHYs, Fish Bone diagram) Corrective action (Six Sigma/8D) QMS (CAPA); CAR; PAR; NCR APQP; Lean& Six Sigma Tools Customer Complaints & NCR Resolution ISO14001-2004, OSHAS18001 ISO 17025-2005 (Calibration) API Q1: RCFA; FMEA, FA; QA/QC lab Metallurgy & Design Engineering Major Critical Equipment Inspections AWS D.1.1; AWS D17.1; WPS; PQR Fabrication (welding methods, procedures) Corrosion & Mitigation Engineering Reliability & Preventive Maintenance Project Management & Project Quality ISO 9001-2008, ISO/ TS 16949 PED, ATEX, ASTM NDE (hardness, hydrostatic, liquid penetrant, magnetic particle, PMI, radiography, ultrasound) Professional Work Experience Quality Manager December 2015 - Current TAS Energy Inc., Houston, TX • Achieved a 50% cost reduction in NDE contractor inspection costs. • Manage customer audits including 3rd party welding audit, 3rd party Quality Management System (QMS) audits and corporate quality audits achieving customer satisfaction at completion. • Manage 3rd Party ISO 9001-2008 certification audit. • Manage welding program including rework of Welding Procedure Specifications (WPS), PQRs and welder certifications while meeting stringent, project specific customer welding code requirements. • Maintain effective supplier management system through communication, issue resolution, supplier audits and conducting inspections and factory acceptance testing (FAT) at supplier facilities for major equipment providers (both domestic and internationally). • Conduct internal factory acceptance testing (FAT). • Work closely with Engineering, Project Management, Supply Chain, Sales and other functional teams to ensure overall project quality and customer satisfaction. • Developed and implemented NCR (Nonconformance Report); CAR (Corrective Action Report); SCAR (Supplier Corrective Action System) programs and ensure root cause solutions are identified and implemented. • Driving the organization toward data based decision making, by developing and implementing appropriate data collection methods to provide relevant and actionable data for suppliers and operational departments, both in house and at project sites. Senior Quality Engineer November 2011 - November 2014 Mitsubishi Caterpillar Forklift America Inc. (MCFA), Houston, TX • ISO 9001-2008 (Quality Management), ISO 14001-2004 (Environmental Management) & OSHAS 18001 Certified Internal Auditor. Liaison between registration body (DNV) (3rd Party Audits) and MCFA Management for ISO 9001 & ISO14001 certifications. • Maintained ISO Program, internal quality audits, document and data control. Created/revised procedures as needed and provided training. Conducted Quality Audits of Suppliers and Potential Suppliers. • Possess strong working knowledge of ISO 9001(2008), ISO/ TS 16949& API SPEC Q1. • Implemented and maintained advanced quality concepts Total Quality Management (TQM), Continuous Quality Improvement, Statistical Process Control, and Quality Function Deployment. • Worked as a lead for Root Cause Analysis (RCA); root cause corrective action methodology (Six Sigma/8D); CAPA; NCR; Corrective Action Plans (CAR) Preventive Action(PAR). • Implemented and enforced the QMS System CAPA (Corrective Action Preventive Action process), RCA (Root Cause Analysis); and NCR reports and reduced the Cost of Poor Quality from 10% to 1%. • Developed and trained company employees on CAPA (Corrective Action Preventive Action process), RCA (Root Cause Analysis) and NCR processes. • Maintained Customer Complaints & NCR data base.
  • 2. • Resolved customer complaints resulting in a $3 M per year cost savings by implementing design changes to several manufacturing quality Issues. Performed Lean Six Sigma Projects to improve Quality. • Implemented Lean manufacturing tools (5S, Kaizen, Continuous Flow), improved process speed and achieved waste or scrap reduction from 6% to 1% ($1M savings). • Identified and eliminated process variations resulting in internal and external failures and lead improvements to reduce Cost of Quality, improve yield or customer satisfaction through 8-D corrective action, Six Sigma, LEAN tools and other QMS (Quality Management System) tools and processes. • Established controls and inspection points to facilitate detection, correction, and prevention of nonconforming materials, parts, assemblies, and products. Presented charts regarding product, process quality, Cost of Poor Quality (COPQ) and key Performance Indicators (KPI) on weekly basis. • Developed, initiated, and maintained standards and procedures for the performance of quality assurance, inspection, and test functions. • Coordinated and provided required project quality related deliverables including FAT (Factory Acceptance Testing), PFMEA, capability studies, statistical analysis, inspection plans, quality records and workmanship standards. • Possess strong work experience in LEAN Tools (5s,Continuous Process Improvement Kaizen, Continuous Flow, KANBAN;KPI,OEE, Value Stream mapping TAKT Time, PDCA); Six Sigma Tools(FMEA, MSA, Control Charts, Pareto Charts, SPC, DOE, Process mapping, Process Capability Cpk, Ppk; Gaga R&R); 8D; DMAIC; GD&T, PFMEA; RPPM Reports; MRB (Waste Reduction & Control Techniques), Calibrating Instrument /Equipment per ISO17025-2005 Standards; measuring and testing equipment Faro Arm, CMM. • Performed customer plant visits to analyze customer issues with product quality. Worked investigations of field failures and liaison with Design Engineering, Manufacturing, Sales, Service and Customer. • Worked closely with Manufacturing, Engineering, Suppliers, Factory Operations, Sales and Supply Chain to facilitate resolution of technical problems. • Conducted internal audits (Process Quality, Procedures, Customer Focus Audits; Product QA), external (supplier) audits and served as Quality representative for customer on-site visits/audits. • Managed Quality Receiving Inspection group, generated Initial Inspection Reports (IIRs) and PPAPs (HQMS System) on received parts from vendors. Deputy Manager June 1997 – August 2011 United Space Alliance (USA)/NASA, Houston, TX • Provided Project Quality Assurance/Quality Control support to Engineering and Design teams during project execution. Performed specification reviews, development of the Project Quality Plan and Inspection & Test Plan (ITP). • Possess strong working knowledge in pressure vessel performance and inspection concepts (hydrostatic pressure tests, data books, engineering drawings and ASME U Stamp. • Possess strong work experience in 3rd Party Standards (ASME B&PVC Sections VIII and IX, ASME B31.3,B31.9; and ASTM). • Possess strong work experience in Fabrication Techniques (welding methods and procedures). • Possess strong working knowledge in NDE Methods (hardness, hydrostatic, liquid penetrant, magnetic particle, PMI, radiography, and ultrasonic examinations); and Documents (data sheets, engineering drawings, Inspection Reports, Inspection and Test Plans). • Confirmed compliance with the customer’s purchase order regarding the project and process requirements. • Supported specification and requisition development of major buy-out equipment items such as heat exchangers, pumps and compressors. • Developed Project Quality Plan, Inspection & Test Plan. Performed review of Project Job Manuals. • Performed Project Engineering support and participated in the upfront project proposal, planning, development, engineering and manufacturing processes, meeting operational objectives in Safety, Quality, Delivery and Cost.
  • 3. • Performed drawing/document review checklist to ensure engineering drawings and other design deliverables & datasheets were in compliance with project specifications. Performed shop visits of sub-vendors and traveled to the jobsite as needed. • Assisted in cost estimation by performing specification reviews, preparing summary list of requirements and acceptance criteria, identifying material, WPS/PQR, NDE requirements and requirements for coating and insulation. • Assisted in development of Design Input Checklist, review of engineering and drawing deliverables and preparation of Design Review Checklist and Drawing Review Checklist. • Worked as a lead for Root Cause Analysis(RCA); root cause corrective action methodology (Six Sigma/8D); CAPA; NCR; Corrective Action Plans (CAR) Preventive Action(PAR). Possess strong knowledge in Quality principles including NCRs, CARs, PARs, sampling techniques, and process control. • Reviewed customer material & manufacturing specifications and ensured that equipment design matched specifications. • Provided technical assistance to customers during project execution and field operations as required. • Developed and maintained Materials and Process Engineering (M&P) specifications of metallic materials, non- metallic materials, corrosion protective coatings, insulations, heat treating and Non-Destructive Evaluation (NDE) processes. • Performed several metallurgical analysis (materials selections, evaluations, testing of metals, non-metals insulations, and coatings), plastics, elastomers; welding inspections and repair (Per Welding Standards AWS D17.1), WPS, PQR's, Weld Logs; Failure Analysis; NDE inspections. • Possess working knowledge of assembly and welding processes and testing methods used to construct and certify pressure vessels and associated piping systems. • Possess strong working knowledge of material properties (chemical, mechanical properties) and certifications (NACE, PED) associated with steel plate, pipe, flanges, and fittings. • Liaison between the customer (NASA) and the contractors and suppliers; worked as the suppliers primary contact and performed several quality surveillance activities. Quality Engineer June 1993 - June 1997 University of Texas Health Science Center, Houston • Responsibilities included performing research, developing protocols for drug companies, product development. Manufacturing and Quality Engineer (Process& Quality Control) April 1986 - June 1993 Chemicals Incorporated Baytown, TX • Primary responsibilities included focusing on maximizing production by reducing equipment failure and downtime, lowering maintenance costs, and minimizing safety/environmental concerns. EDUCATION MS (Chemistry-Metals & Polymers); BS (Mathematics, Physics & Chemistry) from Accredited Universities CERTIFICATIONS AND PROFESSIONAL DEVELOPMENT ASSOCIATIONS • NMA-Project Management Professional (PMP) Preparation Series (16 hours)-May 2010 • Advise for Successful Projects (Project Management Course) (8 hours)-April 2010 • University of Houston, Leadership & Management Certification Program (36 hours) – July 2008 • United Space Alliance, Integrated Project Management Program Certificate (24 hours) – June 2009 • Completed the Leadership Training Programs at Boeing in St. Louis and United Space Alliance in Houston • United Space Alliance/Cadence Mgmt Corp, Project Management Certificate (16 hours) – November 2000 • Metallurgy and Failure Analysis course offered by ASM International (40 hours)- April 2007 • Fracture Mechanics, life assessment, and fracture control course (40 hours)- April 2007 • NASA/Apollo Services, Root Cause Mapping Certificate – May 2010 • San Jacinto College/Think Reliability, Cause Mapping: Effective Root Cause Analysis - August 2010 COMPUTER PROGRAMS AND SYSTEMS EXPERIENCE
  • 4. Working knowledge of Microsoft Excel, Visio, Project, Word and Power Point; Linux; Unix Operating Systems; Minitab; Auto Cad (Creo); Finite Element Analysis Tool; Matlab; HQMS; SAP; BPCS (ERP system)