SlideShare a Scribd company logo
1 of 5
GlenG.Rogers
15619 Four LeafDr
Houston, TX 77084
PH: 281-889-4207
Email: grogers@oqghou.com
BUSINESS SUMMARY
Quality AssuranceInspector with over 20 years’experience in QA/QC, ProjectManagement, weldinginspection,
audits,documentation review and NDT. I have a broad and thorough knowledge of numerous
National/International Codes/Standards/Specifications such as,ISO 9001:2008,ISO 17021:2005,ASME, ASTM
ASNT TC1A, TEMA, API, NACE, PFI,MSS, BSI and AWS and OSHA Regulations.
• High Energy Motivator
• Excellent planning and schedule development skills
• Passion for Success
• Change Manager Specialist
• Manager of Critical Process
• Achieves/continues project growth
• Excellent interpersonal, presentation, verbal and
written communication skills
• Professional Customer Focus
• Loss Analysis/Forecasting
• Independently Driven and Managed
• People and process Manager
• Extensive Experience in the Oil & Gas Industry
• Maximizes organizational productivity
• Strong negotiation and decision-making skills
• QA/QC Specialist within disciplines and areas
EmploymentHistory:
Transocean Inc. – Feb 2013 – Sep 2015
Offshore Quality Group – Jan 1996 - Jan 2013
Education:
US Army education programs – Oct 1989
Traverse City High School – May 1989
Certifications:
ASNT SNT-TC-1A
NDT Level II – LP, MP, UT Radiography
PMP Certified
CQA - Certified Quality Auditor
Feb 2013 to Sep 2015 Transocean Inc.
Marine Quality Assurance Specialist. 2 years experience in Quality Control and Quality Assurance of marine
drilling / production equipment. Performed vendor surveillance activities for the new builds and vendor
surveillancegroup for Transocean in the Houston area as well as Louisiana.Productgroup included 20K manifold
equipment various loose valves, blowout preventers, chokes and kill manifold, Manufacturing of the Manifold
skids, Control PODS at NOV, GE and Cameron, FAT, SIT. Worked with suppliers GE, NOV and Cameron along with
its sub-vendors to maintain industry and clientstandards.Worked closely within the groups to maintain constant
up to date and status on all areas of equipment manufacturing
 Created and Reviewed Inspection Test Plans (ITP’s).
 Perform visual inspections,plan,schedule,and evaluate non-destructive testing to maintain reliability
of equipment.
 Reviewed radiographic film/reports for proper documentation/ interpretation/technique.
 Reviewed specifications,and drawings to determine construction requirements or to plan
procedures.
 Reviewed and created test procedures for testing of various equipment.
 Development, maintainingand implementation of ProjectQuality AssuranceProgram.
 Review/Approval of vendor/supplier QC records.
 Liaison and communication of quality assurance effectiveness and activities.
 Inspection of all phases of construction (welding,NDE, Coatings,PWHT, PMI, PressureTest, etc.)
 Witnessed hydrostatic pressuretestingin accordancewith API and Clientspecifications.
 Coordinated NDE activities and monitored NDE activities for accuracy and adherenceto approved
procedures.
 Verified and approved welding and inspection procedures and the adherence to them.
 Conducted audits of vendors/suppliers beforeaward of contractto determine if QA/QC processes and
procedures were adequate and followed.
 Reviewed and developed QA documents such as ProjectQuality Plans,Supplier Quality Requirements,
Corrective Action Reports and Preventive Action Reports.
 Reviewed and monitored all levels of Non-conforming equipment and related NCR’s. Verified NCRs
were documented, communicated NCR to customer, and assured that all open NCRs were
dispositioned and closed out, prior to end of project
Jan 1996 To Jan 2013 Offshore Quality Group
Marine Quality Assurance Specialist. Five years experience in Quality Control and Quality Assurance of
marine drilling / production equipment for tieback, subsea single and multiple well completion’s, production
control panel,manifold pods,HPU units,ROV deployment skid,workover control system, electrical and hydraulic
umbilical’s and SCSSV valves.
18 years experience in Nondestructive Examination in Magnetic Particle Examination, Liquid Penetrant
Examination, Radiographic Examination, and Ultrasonic Examination. The type of equipment examined as
follows:onshoredrilling/ production and mechanical process equipment. High-pressurewellhead and Christmas
tree assemblies, blowout preventers, chokes and kill manifold, down hole equipment and oil country tubular
goods (mill/post mill), compressor, pressure vessels, separators, API tanks, ANSI and pipeline valves.
 Created and Reviewed Inspection Test Plans (ITP’s).
 Perform visual inspections,plan,schedule,and evaluate non-destructive testing to maintain reliability
of equipment and piping.
 Reviewed radiographic film/reports for proper documentation/ interpretation/technique.
 Reviewed specifications,and drawings to determine construction requirements or to plan
procedures.
 Reviewed and created test procedures for testing of various equipment.
 Development, maintainingand implementation of ProjectQuality AssuranceProgram.
 Review/Approval of vendor/supplier QC records.
 Liaison and communication of quality assuranceeffectiveness and activities.
 Inspection of all phases of construction (welding,NDE, Coatings,PWHT, PMI, Pressure
Test, etc)
 Witnessed hydrostatic pressureand gas testing for Exxon, Marathon, Petrobras,Mariner,Texaco,
Conoco and Shell Brunei
 Coordinated NDE activities and monitored NDE activities for accuracy and adherenceto approved
procedures.
 Verified and approved welding and inspection procedures and the adherence to them.
 Conducted audits of vendors/suppliers beforeaward of contractto determine if QA/QC processes and
procedures were adequate and followed.
 Reviewed and developed QA documents such as ProjectQuality Plans,Supplier Quality Requirements,
Corrective Action Reports and Preventive Action Reports.
 Reviewed and monitored all levels of Non-conformingequipment and related NCR’s. Verified NCRs
were documented, communicated NCR to customer, and assured thatall open NCRs were
dispositioned and closed out, prior to end of project.
 Performed 2nd party audits of vendors on a contractbasis for oil & gas end users
Responsiblefor the daily activities of individual and collectivework crews. Responsibilities included the direction
of manufacturing, construction, inspection and manufacturing of oil and gas products, using local, state and
national guidelines. Coordinated the activities of as many as 65 people, as well as Quality Management. Held
various offices such as, Quality Assurance Representative, Quality Coordinator, Auditor, Coating inspector and
NDE Technician.
Lead QA Advisor for the Thunder Horse IWOCS Riser System Managed the QA department for the Subsea Wells
Teams for the Riser components. Responsiblefor the managingof all areasof QA for Mike Byrd and Richard Arnt.
The Components from the Surface tree to the LRP (Lower Riser Package) and EDP (Emergency Disconnect
Package). The Various Riser tools, Subsea Lubricator valve to the 7800 ft of welded Riser Pipe and 7800 ft of
Machined Annulus pipe, Tapered Stress Joint, Tension sub mandrel and all other related parts. Oversaw the
logistics for Richard Arnt at the FMC and Port Fourchon facilities. Coordinated all inspection activities for the
IWOCS system as well as over sea’s coordination working with various inspection companies to provide
surveillance.
Responsible for the development and maintenance of Inspection Test Plans, Quality Plans and System Quality
Plans. Provide functions with support (Purchasing/Supplier Quality, Quality/Audit, Project Management/Data
book review and approval). Monitor all open NCRs and ensure they are effectively assigned and being
investigated and resolved in a timely manner for each customer’s specific needs or requirements. Screening
NCRs to ensure they are at the appropriate level of investigation and the specific level is applied. Identify and
implement appropriate corrective and preventative actions. Analyze all critical NCRs for product and process
trends and recommend improvements to avoid recurrence. Coordinateand facilitatea regular review board with
the project representatives from all relevant functions to review for quality,progress and for a satisfactory close-
out. Report NCR results on a regular basis in accordance with either customer and or supplier regulations of the
QMS.
Marine Projects
Company Name Tree Type Year
Marathon Oil Oyster 1 Horizontal Tree 1996
Marathon Oil Arnold 3 Horizontal Trees 1997
Mariner 3 Project 3 Horizontal Trees 1997 - 1999
Mariner 3 Project Umbilical,Hoses 1997 - 1999
Exxon Diana 6 Horizontal Trees 1998 - 1999
Amerada Hess Penn State 2 Horizontal Trees, U 1998 - 1999
Amerada Hess Penn State Umbilical,Duplex SS 1999
Pennzenergy Garden Bank 2 Horizontal Trees 1999
Amerada Hess Conger 3 Horizontal Trees 1999-2000
Amerada Hess Penn State #4 1 Horizontal Trees 2001
BP America Thunder Horse IWOCS Riser System BOP
System
2001- 2005
Chevron Agbami 24 Horizontal Trees 2005-2008
Petrobras Cascade/Chinook 6 Horizontal Trees 2008-2011
Wild Well Control 7 Series Well Controls
Package
7” and 3” well controls package 2011-present
EQUIPMENT INSPECTED:
Subsea Tree Packers Structural Steel
Wellheads B.O.P’s Pressure Vessels
Christmas Tree Surface Actuator Heat Exchanger
Manifold Systems Downhole Equipment Compressor
Chokes ANSI Valves Ball valves
Tieback Platforms Relief valves
Control valves Gate valves

More Related Content

What's hot

MADHAN RESUME - UPDATED
MADHAN RESUME - UPDATEDMADHAN RESUME - UPDATED
MADHAN RESUME - UPDATEDMadan Kumar
 
Martin fuentes .doc Jan 2017
Martin fuentes .doc Jan 2017Martin fuentes .doc Jan 2017
Martin fuentes .doc Jan 2017martin fuentes
 
Resume-Brandon Rhodes-May 2015
Resume-Brandon Rhodes-May 2015Resume-Brandon Rhodes-May 2015
Resume-Brandon Rhodes-May 2015Brandon Rhodes
 
RESUME - SANTANU GHOSH 2016
RESUME - SANTANU GHOSH 2016RESUME - SANTANU GHOSH 2016
RESUME - SANTANU GHOSH 2016Santanu Ghosh
 
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...Mark Mitchell
 
harveysarda-curriculum vitae
harveysarda-curriculum vitaeharveysarda-curriculum vitae
harveysarda-curriculum vitaeHarvey Sarda
 
Sushil Kumar Jain resume (International) mod 3
Sushil Kumar Jain resume (International) mod 3Sushil Kumar Jain resume (International) mod 3
Sushil Kumar Jain resume (International) mod 3Sushil Kumar Jain
 
Phil Hoggett-CV_24-Jun-15
Phil Hoggett-CV_24-Jun-15Phil Hoggett-CV_24-Jun-15
Phil Hoggett-CV_24-Jun-15Phil Hoggett
 
CV - Nehal Deputy - Nov2016
CV - Nehal Deputy - Nov2016CV - Nehal Deputy - Nov2016
CV - Nehal Deputy - Nov2016Nehal Deputy
 
Bwk resume 040116
Bwk resume 040116Bwk resume 040116
Bwk resume 040116Bruce Kain
 
RESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTORRESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTORMohsin Iqubal
 
DANIEL BLANTON RESUME 2016
DANIEL BLANTON RESUME 2016DANIEL BLANTON RESUME 2016
DANIEL BLANTON RESUME 2016Dan Blanton Sr.
 
2016 David R. Todd resume
2016 David R. Todd resume2016 David R. Todd resume
2016 David R. Todd resumeDavid Todd
 

What's hot (20)

MADHAN RESUME - UPDATED
MADHAN RESUME - UPDATEDMADHAN RESUME - UPDATED
MADHAN RESUME - UPDATED
 
Martin fuentes .doc Jan 2017
Martin fuentes .doc Jan 2017Martin fuentes .doc Jan 2017
Martin fuentes .doc Jan 2017
 
Resume-Brandon Rhodes-May 2015
Resume-Brandon Rhodes-May 2015Resume-Brandon Rhodes-May 2015
Resume-Brandon Rhodes-May 2015
 
Lester_Coleman_Resume
Lester_Coleman_ResumeLester_Coleman_Resume
Lester_Coleman_Resume
 
RESUME - SANTANU GHOSH 2016
RESUME - SANTANU GHOSH 2016RESUME - SANTANU GHOSH 2016
RESUME - SANTANU GHOSH 2016
 
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...
 
PRINCE CV -
PRINCE CV - PRINCE CV -
PRINCE CV -
 
Qc
QcQc
Qc
 
harveysarda-curriculum vitae
harveysarda-curriculum vitaeharveysarda-curriculum vitae
harveysarda-curriculum vitae
 
RESUME QA QC ENGG
RESUME  QA  QC ENGGRESUME  QA  QC ENGG
RESUME QA QC ENGG
 
Sushil Kumar Jain resume (International) mod 3
Sushil Kumar Jain resume (International) mod 3Sushil Kumar Jain resume (International) mod 3
Sushil Kumar Jain resume (International) mod 3
 
Phil Hoggett-CV_24-Jun-15
Phil Hoggett-CV_24-Jun-15Phil Hoggett-CV_24-Jun-15
Phil Hoggett-CV_24-Jun-15
 
CV - Nehal Deputy - Nov2016
CV - Nehal Deputy - Nov2016CV - Nehal Deputy - Nov2016
CV - Nehal Deputy - Nov2016
 
Bwk resume 040116
Bwk resume 040116Bwk resume 040116
Bwk resume 040116
 
RESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTORRESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTOR
 
DANIEL BLANTON RESUME 2016
DANIEL BLANTON RESUME 2016DANIEL BLANTON RESUME 2016
DANIEL BLANTON RESUME 2016
 
Resume Abdulbari
Resume   AbdulbariResume   Abdulbari
Resume Abdulbari
 
2016 David R. Todd resume
2016 David R. Todd resume2016 David R. Todd resume
2016 David R. Todd resume
 
Welding Inspector - QC Inspector
Welding Inspector - QC InspectorWelding Inspector - QC Inspector
Welding Inspector - QC Inspector
 
Chetan Sonani
Chetan SonaniChetan Sonani
Chetan Sonani
 

Similar to QA Specialist 20+ Years

Similar to QA Specialist 20+ Years (20)

Seeking Assignments in QA/QC , Project Site , Piping Welding/Fabrication , In...
Seeking Assignments in QA/QC , Project Site , Piping Welding/Fabrication , In...Seeking Assignments in QA/QC , Project Site , Piping Welding/Fabrication , In...
Seeking Assignments in QA/QC , Project Site , Piping Welding/Fabrication , In...
 
CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016
 
QA Weld
QA WeldQA Weld
QA Weld
 
QC WELDING INSPECTOR
QC WELDING INSPECTORQC WELDING INSPECTOR
QC WELDING INSPECTOR
 
Jayadevan_Pattali
Jayadevan_PattaliJayadevan_Pattali
Jayadevan_Pattali
 
Ganesan Plant Inspector_CV
Ganesan Plant Inspector_CVGanesan Plant Inspector_CV
Ganesan Plant Inspector_CV
 
ColinHunt.CV.May.16
ColinHunt.CV.May.16ColinHunt.CV.May.16
ColinHunt.CV.May.16
 
Resume - Perkins James.docx-2014
Resume - Perkins James.docx-2014Resume - Perkins James.docx-2014
Resume - Perkins James.docx-2014
 
mohamed eldeeb _ c.v
mohamed eldeeb _ c.vmohamed eldeeb _ c.v
mohamed eldeeb _ c.v
 
Michael Keeney--Resume2015-A
Michael Keeney--Resume2015-AMichael Keeney--Resume2015-A
Michael Keeney--Resume2015-A
 
Rengaraj n c vdone
Rengaraj  n c vdoneRengaraj  n c vdone
Rengaraj n c vdone
 
Prem's Resume
Prem's  ResumePrem's  Resume
Prem's Resume
 
Allen Schmitgen Resume' #12
Allen Schmitgen Resume' #12Allen Schmitgen Resume' #12
Allen Schmitgen Resume' #12
 
Jiju new cv
Jiju new cvJiju new cv
Jiju new cv
 
Bruce Kain Professional CV
Bruce Kain Professional CVBruce Kain Professional CV
Bruce Kain Professional CV
 
DEEPAK RESUME WITH 5 YEAR working EXP
DEEPAK RESUME WITH 5 YEAR working EXPDEEPAK RESUME WITH 5 YEAR working EXP
DEEPAK RESUME WITH 5 YEAR working EXP
 
BALAJI-2016
BALAJI-2016BALAJI-2016
BALAJI-2016
 
Ron Underwood. RESUME
Ron Underwood. RESUMERon Underwood. RESUME
Ron Underwood. RESUME
 
Updated Resume of Uthia BragasamChandran.
Updated Resume of Uthia BragasamChandran.Updated Resume of Uthia BragasamChandran.
Updated Resume of Uthia BragasamChandran.
 
Manohar CV QA-QC
Manohar CV QA-QCManohar CV QA-QC
Manohar CV QA-QC
 

QA Specialist 20+ Years

  • 1. GlenG.Rogers 15619 Four LeafDr Houston, TX 77084 PH: 281-889-4207 Email: grogers@oqghou.com BUSINESS SUMMARY Quality AssuranceInspector with over 20 years’experience in QA/QC, ProjectManagement, weldinginspection, audits,documentation review and NDT. I have a broad and thorough knowledge of numerous National/International Codes/Standards/Specifications such as,ISO 9001:2008,ISO 17021:2005,ASME, ASTM ASNT TC1A, TEMA, API, NACE, PFI,MSS, BSI and AWS and OSHA Regulations. • High Energy Motivator • Excellent planning and schedule development skills • Passion for Success • Change Manager Specialist • Manager of Critical Process • Achieves/continues project growth • Excellent interpersonal, presentation, verbal and written communication skills • Professional Customer Focus • Loss Analysis/Forecasting • Independently Driven and Managed • People and process Manager • Extensive Experience in the Oil & Gas Industry • Maximizes organizational productivity • Strong negotiation and decision-making skills • QA/QC Specialist within disciplines and areas EmploymentHistory: Transocean Inc. – Feb 2013 – Sep 2015 Offshore Quality Group – Jan 1996 - Jan 2013 Education: US Army education programs – Oct 1989 Traverse City High School – May 1989 Certifications: ASNT SNT-TC-1A NDT Level II – LP, MP, UT Radiography PMP Certified CQA - Certified Quality Auditor
  • 2. Feb 2013 to Sep 2015 Transocean Inc. Marine Quality Assurance Specialist. 2 years experience in Quality Control and Quality Assurance of marine drilling / production equipment. Performed vendor surveillance activities for the new builds and vendor surveillancegroup for Transocean in the Houston area as well as Louisiana.Productgroup included 20K manifold equipment various loose valves, blowout preventers, chokes and kill manifold, Manufacturing of the Manifold skids, Control PODS at NOV, GE and Cameron, FAT, SIT. Worked with suppliers GE, NOV and Cameron along with its sub-vendors to maintain industry and clientstandards.Worked closely within the groups to maintain constant up to date and status on all areas of equipment manufacturing  Created and Reviewed Inspection Test Plans (ITP’s).  Perform visual inspections,plan,schedule,and evaluate non-destructive testing to maintain reliability of equipment.  Reviewed radiographic film/reports for proper documentation/ interpretation/technique.  Reviewed specifications,and drawings to determine construction requirements or to plan procedures.  Reviewed and created test procedures for testing of various equipment.  Development, maintainingand implementation of ProjectQuality AssuranceProgram.  Review/Approval of vendor/supplier QC records.  Liaison and communication of quality assurance effectiveness and activities.  Inspection of all phases of construction (welding,NDE, Coatings,PWHT, PMI, PressureTest, etc.)  Witnessed hydrostatic pressuretestingin accordancewith API and Clientspecifications.  Coordinated NDE activities and monitored NDE activities for accuracy and adherenceto approved procedures.  Verified and approved welding and inspection procedures and the adherence to them.  Conducted audits of vendors/suppliers beforeaward of contractto determine if QA/QC processes and procedures were adequate and followed.  Reviewed and developed QA documents such as ProjectQuality Plans,Supplier Quality Requirements, Corrective Action Reports and Preventive Action Reports.  Reviewed and monitored all levels of Non-conforming equipment and related NCR’s. Verified NCRs were documented, communicated NCR to customer, and assured that all open NCRs were dispositioned and closed out, prior to end of project Jan 1996 To Jan 2013 Offshore Quality Group Marine Quality Assurance Specialist. Five years experience in Quality Control and Quality Assurance of marine drilling / production equipment for tieback, subsea single and multiple well completion’s, production control panel,manifold pods,HPU units,ROV deployment skid,workover control system, electrical and hydraulic umbilical’s and SCSSV valves. 18 years experience in Nondestructive Examination in Magnetic Particle Examination, Liquid Penetrant Examination, Radiographic Examination, and Ultrasonic Examination. The type of equipment examined as follows:onshoredrilling/ production and mechanical process equipment. High-pressurewellhead and Christmas tree assemblies, blowout preventers, chokes and kill manifold, down hole equipment and oil country tubular goods (mill/post mill), compressor, pressure vessels, separators, API tanks, ANSI and pipeline valves.  Created and Reviewed Inspection Test Plans (ITP’s).  Perform visual inspections,plan,schedule,and evaluate non-destructive testing to maintain reliability of equipment and piping.
  • 3.  Reviewed radiographic film/reports for proper documentation/ interpretation/technique.  Reviewed specifications,and drawings to determine construction requirements or to plan procedures.  Reviewed and created test procedures for testing of various equipment.  Development, maintainingand implementation of ProjectQuality AssuranceProgram.  Review/Approval of vendor/supplier QC records.  Liaison and communication of quality assuranceeffectiveness and activities.  Inspection of all phases of construction (welding,NDE, Coatings,PWHT, PMI, Pressure Test, etc)  Witnessed hydrostatic pressureand gas testing for Exxon, Marathon, Petrobras,Mariner,Texaco, Conoco and Shell Brunei  Coordinated NDE activities and monitored NDE activities for accuracy and adherenceto approved procedures.  Verified and approved welding and inspection procedures and the adherence to them.  Conducted audits of vendors/suppliers beforeaward of contractto determine if QA/QC processes and procedures were adequate and followed.  Reviewed and developed QA documents such as ProjectQuality Plans,Supplier Quality Requirements, Corrective Action Reports and Preventive Action Reports.  Reviewed and monitored all levels of Non-conformingequipment and related NCR’s. Verified NCRs were documented, communicated NCR to customer, and assured thatall open NCRs were dispositioned and closed out, prior to end of project.  Performed 2nd party audits of vendors on a contractbasis for oil & gas end users Responsiblefor the daily activities of individual and collectivework crews. Responsibilities included the direction of manufacturing, construction, inspection and manufacturing of oil and gas products, using local, state and national guidelines. Coordinated the activities of as many as 65 people, as well as Quality Management. Held various offices such as, Quality Assurance Representative, Quality Coordinator, Auditor, Coating inspector and NDE Technician. Lead QA Advisor for the Thunder Horse IWOCS Riser System Managed the QA department for the Subsea Wells Teams for the Riser components. Responsiblefor the managingof all areasof QA for Mike Byrd and Richard Arnt. The Components from the Surface tree to the LRP (Lower Riser Package) and EDP (Emergency Disconnect Package). The Various Riser tools, Subsea Lubricator valve to the 7800 ft of welded Riser Pipe and 7800 ft of Machined Annulus pipe, Tapered Stress Joint, Tension sub mandrel and all other related parts. Oversaw the logistics for Richard Arnt at the FMC and Port Fourchon facilities. Coordinated all inspection activities for the IWOCS system as well as over sea’s coordination working with various inspection companies to provide surveillance. Responsible for the development and maintenance of Inspection Test Plans, Quality Plans and System Quality Plans. Provide functions with support (Purchasing/Supplier Quality, Quality/Audit, Project Management/Data book review and approval). Monitor all open NCRs and ensure they are effectively assigned and being investigated and resolved in a timely manner for each customer’s specific needs or requirements. Screening NCRs to ensure they are at the appropriate level of investigation and the specific level is applied. Identify and implement appropriate corrective and preventative actions. Analyze all critical NCRs for product and process trends and recommend improvements to avoid recurrence. Coordinateand facilitatea regular review board with the project representatives from all relevant functions to review for quality,progress and for a satisfactory close- out. Report NCR results on a regular basis in accordance with either customer and or supplier regulations of the
  • 4. QMS. Marine Projects Company Name Tree Type Year Marathon Oil Oyster 1 Horizontal Tree 1996 Marathon Oil Arnold 3 Horizontal Trees 1997 Mariner 3 Project 3 Horizontal Trees 1997 - 1999 Mariner 3 Project Umbilical,Hoses 1997 - 1999 Exxon Diana 6 Horizontal Trees 1998 - 1999 Amerada Hess Penn State 2 Horizontal Trees, U 1998 - 1999 Amerada Hess Penn State Umbilical,Duplex SS 1999 Pennzenergy Garden Bank 2 Horizontal Trees 1999 Amerada Hess Conger 3 Horizontal Trees 1999-2000 Amerada Hess Penn State #4 1 Horizontal Trees 2001 BP America Thunder Horse IWOCS Riser System BOP System 2001- 2005 Chevron Agbami 24 Horizontal Trees 2005-2008 Petrobras Cascade/Chinook 6 Horizontal Trees 2008-2011 Wild Well Control 7 Series Well Controls Package 7” and 3” well controls package 2011-present EQUIPMENT INSPECTED: Subsea Tree Packers Structural Steel Wellheads B.O.P’s Pressure Vessels Christmas Tree Surface Actuator Heat Exchanger Manifold Systems Downhole Equipment Compressor Chokes ANSI Valves Ball valves Tieback Platforms Relief valves