SlideShare a Scribd company logo
 handling of material in warehouse
 solving the problems involving the movement
 control and protection of materials, goods and products
 applied in both manufacturing and distributional operations
does not add
value to the
product but it
usually adds a
significant value
to the product
These early methods treated the three basic stages of handling—
a. materials collection
b. Manufacturing
c. product distribution
Modern materials-handling
systems, by contrast, emphasize
the integrated flow of goods from
the source of raw materials to final
user
This can be achieved by transporting
goods in large quantities and in
standardized units; by handling
procedures using cranes, conveyor belts,
and other machines; and by the careful
coordination of the movement of goods
with production, processing, and
distribution schedules
a. Designing the system for continues flow of material, i.e. idle time should be
zero.
b. Going in for standard equipment, which ensures low investment and flexibility
in case of changes in material handling requirements in the future.
c. Incorporating gravity flow in material flow system
d. Ensuring that the ratio of the dead weight to the payload of material handling
equipment is minimum.
Various material handling systems are in use, right from those
that are fully manual to the ones that are fully automatic.
However, the selection of a particular system depends in factors
such as:
i. Volumes to be handled
ii. Speed in handling
iii. Productivity
iv. Product characteristics
(weight, size, shape)
v. Nature of the product
(hazardous, perishable,
crushable)
1. Planning Principle: where the needs, performance objectives,
functional specifications of the methods
2. Standardization Principle: should be standardized within the
limits of achieving overall performance objectives
3. Work Principle: should be minimized without sacrificing
productivity
The Key to Greater Productivity,
Customer Service and Profitability
4. Ergonomic Principle: Human must be recognized and respected in the design of
material-handling tasks
5. Unit Load Principle: can be stored or moved as a single
6. Space Utilization Principle: All available space must be used effectively and
efficiently.
7. System Principle: Material movement and storage activities should be fully
integrated to form a coordinated, operational system that spans receiving, inspection,
storage, production, assembly, packaging, unitizing, order selection, shipping,
transportation, and the handling of returns.
8. Automation Principle: operations should be mechanized and/or automated where
feasible to improve operational efficiency
9. Environmental Principle: total energy consumption should be an evaluation
criterion
10. Life Cycle Cost Principle: A complete economic analysis should account for the
entire life cycle of all material-handling equipment and the resulting systems.
Lifting and Transport Equipment
Equipment that falls into this category is fork lift trucks, order picking trucks, overhead
cranes, tower cranes and belt, chain and overhead conveyors.
fork lift trucks overhead conveyors
Storage Equipment
within this category are pallet racks, mobile shelf units, and plastic, wood and steel containers
Automated Handling Equipment
automated guide vehicles, storage and retrieval equipment, conveying systems and product sorting
equipment
Material Handling Equipment Selection
Properly Match:
 The Material Characteristics
 The Move Requirements
 The Equipment Capabilities/Requirements
Other factors to be considered
include:
 Labor skills available
 Capital available
 Return on investment
 Expected life of installation
STUDY ON THE APPROACHES OF THE SELECTION OF
EQUIPMENT AND DESIGN OF THE MHS
Problems to overcome : minimizes cost and maximizes reliability.
Layout Design
MHS Design
Modifications
of Layout
MHS Design
Layout Design
Review of the
MHS Design
The Solution Sequence and Preferable Relations Between MHS and Facility
Layout Design
[ Sequence A ] [ Sequence B ]
The selection of equipment and design of the MHS
can be done using four ways:
 by means of a traditional selection method,
 using an analytical model,
 by knowledge-based approaches,
 Hybrid approaches (analytical and knowledge based approaches).
 Traditional Selection Method
1. the designer relies principally on handbooks and experience
2. approach may not be cost-effective
 Analytical Model
1. generally consider only quantifiable factors such as cost and utilization
2. often difficult to implement
 Knowledge-based Approaches
1. involves the use of expert guidelines.
2. allows extensive matching of equipment characteristics to application
requirements
PRODUCT AND PROCESS SPECIFICATIONS AND MHS
EQUIPMENT SELECTION FOR EACH PRODUCT
Main Features of the MHS Equipment Selection
1. Product Type (bar stock, package,
pallet load, unit)
2. Product Weight
3. Product Size (Cubic Volume)
4. Product nature (Sturdy, Fragile)
5. Product Volume
1. 1.Speed Requirements
2. Accumulation Requirements (Yes or
No)
3. Distance for Transfer
4. Frequency of Movement
5. Flexibility of Process Route
6. Loading and Unloading Requirements
7. Safety Aspects
The choice of MHS equipment depends on the product and process requirements.
For this reason, MHS equipment can be selected according to the product and
process specifications.
MHS Equipment
Selection
Rationalastion of the
Selected MH
Equipments
Utilisation and Detail
Design of Material
Handling System
MHS Design Stages Finding appropriate equipment for
a handling problem involves
extensive matching of product and
process features and material
handling equipment specifications.
The Rationalization of the MHS between
departments (nodes)
Why Rationalization required ?
 Different product types are likely to require different details.
 reducing the total investment and operating cost of the MHS.
Rail Guided Vehicle (RGV) Automated Guided Vehicle (AGV)
If there are material transfers between two departments and they require these two
types of equipment at the same time, the equipment types and their alternatives have
been considered and alternative choices must be established and arranged in a form.
If the requirement of MHS types is more than one and these types of equipment can
replace each other then select the dominant one.
Implementation Of The Approaches
The approach comprises three stages which are represented by two
different knowledge-bases and one external program.
• The knowledge-base contains all the rules and the objects which
describe a particular topic.
• function of the external program is to reorganize the data for the
MHS selection phase and has been developed using FORTRAN.
Product
Process
Routes
Product Database
MHS.EXE
MHS-DEP.DAT
Specifies MHS equipment
types for each product
Flow Chart of the Arrangement Procedure
Obtain Product and Process features for MHS
Equipment Selection
Program of Rule Set for Material Handling
Equipment Selection
MHS Equipments for Each Product
Organization of Selected Equipment (External
Program)
Rationalisation
Pre-Designed MHS
Utilisation and DETAIL DESIGN
The Main
Flow Chart
of the
Approach
MHS EQUIPMENT SELECTION FOR PRODUCTS
In a MHS equipment selection, the selection procedure can be carried out as
follows:
If the distances, the event intervals between arrival times and the components
are relatively large, an AGV system is likely to prove appropriate. For
generalization, each MHS equipment has been taken as a member of a class,
which has a certain number of features and which can be represented by slots in
a program.
example, an AGV may be represented using a class object and the details are
given [Leonardo Expert System Shell (Creative Logic, 1989)]
1: Name: AGV
2: Long Name:
3: Type:
4: Value:
5: Certainty:
6: Derived From:
7: IsA: mhs
8: Member Slots:
8: load_type: discrete
9: we_ran: high
10: load_size: mdm
11: req_speed: high
13: req_acc: very high
14: req_diss: high
15: frequ_req: often
16: path_flexi: high
17: load_un_ab: high
MHS
Equipment
Type
Load Type
Load
Capacity
Size Nature
Speed Of
System
Accumulation
Required
Distance
Frequency
Of Move
Flexibility
Of Path
Loading &
Unloading
Ability
Robots Discrete
Low-
Medium
Medium
Solid-
Fragaile
Low-
Medium
No short often low high
AGV Discrete Medium Medium
Solid-
Fragaile
Medium No medium often high high
RGV (Rail
Guided
Vehicle )
Discrete High
Medium-
Large
Solid High No long low low medium
Fork Lift Discrete High Large Solid Medium No long high high high
Conveyors Continuous
Low-
Medium
Small -
Medium
Solid
High-
Medium
Yes
short-
medium
low low medium
Manual Discrete Low Medium Solid Low No short high high high
These suggested alternatives will clearly need development with experience of
operating the design system.
Probem : An MHS is going to be pre-designed for a plant. The plant is designed for 6
processes and 4 different parts. The parts and process routes and their specifications
are presented in Table . When the part and process routes and their MHS equipment
information have been gathered, the first stage can be carried out for MHS equipment
selection. In this selection, for example, heavy loads, Far trips, and very big in size for
Part 3, suggests the use of a Rail Guided Vehicle (RGV). Another example can be
given for Part 1. This part is of medium weight, medium in size and has a fragile
nature; these requirements can be satisfied using an AGV.
1 2
3
4 5 6
Network Analysis and
Part Root Process of the
case study
Product and Process Feature for MHS Equipment Selection
Part
Number
Part
Volume
Part Route
Process
Load
Type
Load
Capacity
Size Nature
Speed Of
System
Accumulatio
n Required
Distanc
e
Frequency
Of Move
Loading &
Unloading
Ability
1 50 1-2-4-5-6 Discrete medium medium Fragile Low No
Mediu
m
High Rare
2 40 1-5-6-0 Discrete high small Solid Medium No Short Low No
3 70 1-3-4-5-6 Discrete very high very big Solid High No Far Low Frequently
4 20 1-2-3-5-6 Discrete low medium Fragile Medium Yes
Mediu
m
Medium Frequently
MHS Equipment for Parts
Product Number Part 1 Part 2 Part 3 Part 4
MHS Equipment RGV Man Fork-Lift AGV
1 2
3
4 5 6
From
Department
To
Department
Required MHS
Equipment
Rationalized
MHS
Equipment
1 2 RGV, Fork Lift, AGV RGV
1 3 RGV, Man, AGV, RGV
1 5 AGV AGV
2 4 Man Man
2 3 Fork Lift, AGV Fork Lift
3 2 AGV AGV
3 4 Man Man
3 5 AGV, Man AGV
4 2 AGV, Man AGV
4 5 RGV, Man, AGV, RGV
5 6 Fork Lift Fork Lift
MHS Equipment Requirements Between Departments
Product Number Part 1 Part 2 Part 3 Part 4
MHS Equipment RGV Man Fork-Lift AGV
 Responsive
 Flexible
 Autonomous
 Highly automatic
 Multi-functional
 Modularized
 Multi-level
 Compatible
The most possible objectives to do in future are:
•• High-speed, high-value material handling and logistics processes for
challenging environments
•• Low-cost, low-impact material handling and logistics capabilities to
maintain high service levels
•• The workforce of tomorrow and what is needed to develop it.
The field of materials handling remains still to be fully to
be fully explored.
Material handling techniques are not only industry’s
biggest opportunity — they are industry’s biggest
necessity.
Competition is beginning to force this new technology
upon industry.
Conclusions
 This study describes a decision aid which may be used by a designer who is
not very familiar with selection of material handling systems.
 The case study exemplifies the selection of MHS equipment using the
approach and a recommended rationalization procedure.
 A knowledge based approach can overcome the limitations of analytical
approaches which are generally limited with only quantifiable factors.
 Rationalizations of MHS equipment will reduce total investment and
operation costs.
 It highlights the importance of the material handling system design and
facility layout problem, requiring an integrated solution strategy.
 It'll help to work a system with full automation and there it'll create a scope
for future work on knowledge based programmed Material Handling System
Design.
An approach for selection of material handling equipment and material handling system pre design

More Related Content

What's hot

Materials handling
Materials handlingMaterials handling
Materials handling
Rohit Verma
 
Material handling
Material handlingMaterial handling
Material handling
Chandrasekaran M
 
Material handling
Material handlingMaterial handling
Material handling
Aditya Shah
 
Material handling
Material handlingMaterial handling
Material handling
DEBOLINAMUKHERJEE7
 
Material handling industry
Material handling industryMaterial handling industry
Material handling industry
mehulomgupta
 
Agv and asrs
Agv and asrsAgv and asrs
Agv and asrs
Akash Maurya
 
Automated Material Handling System
Automated Material Handling SystemAutomated Material Handling System
Automated Material Handling System
Rakesh Raki
 
Plant layouts(presentation)
Plant layouts(presentation)Plant layouts(presentation)
Plant layouts(presentation)
Chaudhry Zaghum Chahal
 
Maintenance and material handling methods (1)
Maintenance and material handling methods (1)Maintenance and material handling methods (1)
Maintenance and material handling methods (1)
Harpreet Singh Grover
 
material handling system
material handling systemmaterial handling system
material handling system
Dinesh Nikam
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
awantika diwan
 
Material Handling System in Industries
Material Handling System in IndustriesMaterial Handling System in Industries
Material Handling System in Industries
Rahul Bhardwaj
 
Material handling
Material handling Material handling
Material handling
Nishant Agrawal
 
Material Handling Equipments
Material Handling EquipmentsMaterial Handling Equipments
Material Handling Equipments
Puneeth Kamath
 
material-handling
material-handlingmaterial-handling
material-handling
Anirudh Chaiworaporn
 
Facility layout ppt
Facility layout pptFacility layout ppt
Facility layout ppt
Anju Rana
 
Material handling leturer
Material handling leturerMaterial handling leturer
Material handling leturer
rkjain90
 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planning
Naushii Khan
 
Work Study
Work StudyWork Study
Work Study
vishakeb
 
Automated storage and retrieval system
Automated storage and retrieval systemAutomated storage and retrieval system
Automated storage and retrieval system
Prasanna3804
 

What's hot (20)

Materials handling
Materials handlingMaterials handling
Materials handling
 
Material handling
Material handlingMaterial handling
Material handling
 
Material handling
Material handlingMaterial handling
Material handling
 
Material handling
Material handlingMaterial handling
Material handling
 
Material handling industry
Material handling industryMaterial handling industry
Material handling industry
 
Agv and asrs
Agv and asrsAgv and asrs
Agv and asrs
 
Automated Material Handling System
Automated Material Handling SystemAutomated Material Handling System
Automated Material Handling System
 
Plant layouts(presentation)
Plant layouts(presentation)Plant layouts(presentation)
Plant layouts(presentation)
 
Maintenance and material handling methods (1)
Maintenance and material handling methods (1)Maintenance and material handling methods (1)
Maintenance and material handling methods (1)
 
material handling system
material handling systemmaterial handling system
material handling system
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Material Handling System in Industries
Material Handling System in IndustriesMaterial Handling System in Industries
Material Handling System in Industries
 
Material handling
Material handling Material handling
Material handling
 
Material Handling Equipments
Material Handling EquipmentsMaterial Handling Equipments
Material Handling Equipments
 
material-handling
material-handlingmaterial-handling
material-handling
 
Facility layout ppt
Facility layout pptFacility layout ppt
Facility layout ppt
 
Material handling leturer
Material handling leturerMaterial handling leturer
Material handling leturer
 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planning
 
Work Study
Work StudyWork Study
Work Study
 
Automated storage and retrieval system
Automated storage and retrieval systemAutomated storage and retrieval system
Automated storage and retrieval system
 

Viewers also liked

SELECTION OF MATERIAL HANDLING SYSTEM USING MULTI CRITERIA DECISION TECHNIQUE...
SELECTION OF MATERIAL HANDLING SYSTEM USING MULTI CRITERIA DECISION TECHNIQUE...SELECTION OF MATERIAL HANDLING SYSTEM USING MULTI CRITERIA DECISION TECHNIQUE...
SELECTION OF MATERIAL HANDLING SYSTEM USING MULTI CRITERIA DECISION TECHNIQUE...
Ankur Mahajan
 
material handling equipment
material handling equipmentmaterial handling equipment
material handling equipment
Thushan Dharmawardana
 
Material handling principles
Material handling principlesMaterial handling principles
Material handling principles
Kaushik Raja
 
Design of material handeling equipment
Design of material handeling equipmentDesign of material handeling equipment
Design of material handeling equipment
Sagar Chokshi
 
Materials Handling Ppt
Materials Handling PptMaterials Handling Ppt
Materials Handling Ppt
Colleen True
 
Material Selection and Design Standards
Material Selection and Design Standards Material Selection and Design Standards
Material Selection and Design Standards
Naseel Ibnu Azeez
 
Composite materials
Composite materialsComposite materials
Composite materials
Student
 
Mtrl handling
Mtrl handlingMtrl handling
Mtrl handling
E P John
 
Principle’s of material handling
Principle’s of material handlingPrinciple’s of material handling
Principle’s of material handling
k_potter
 
Concurrent engineering
Concurrent engineeringConcurrent engineering
Concurrent engineering
paragmahajan01
 
Design for Manufacturing and Assembly
Design for Manufacturing and AssemblyDesign for Manufacturing and Assembly
Design for Manufacturing and Assembly
elai1001
 
Design for Assembly (DFA)
Design for Assembly (DFA)Design for Assembly (DFA)
Design for Assembly (DFA)
Richard Farr
 
Basics of AGVs (Automated guided vehicles)
Basics of AGVs (Automated guided vehicles)Basics of AGVs (Automated guided vehicles)
Basics of AGVs (Automated guided vehicles)
smit1994
 
Application of Composite Materials for different mechanical components
Application of Composite Materials for different mechanical componentsApplication of Composite Materials for different mechanical components
Application of Composite Materials for different mechanical components
Piyush Mishra
 
13 CHAPTER 4 Design and material selection
13 CHAPTER 4 Design and material selection13 CHAPTER 4 Design and material selection
13 CHAPTER 4 Design and material selection
CHIN KOK LI
 
Balinese Water Temples: A Case Study in Water Management
Balinese Water Temples: A Case Study in Water ManagementBalinese Water Temples: A Case Study in Water Management
Balinese Water Temples: A Case Study in Water Management
James King
 
Trishul Presentation 2012
Trishul Presentation 2012Trishul Presentation 2012
Trishul Presentation 2012
yogeshtrishul
 
Materials handling, storage مناولة المواد والتخزين
Materials handling, storage  مناولة المواد والتخزينMaterials handling, storage  مناولة المواد والتخزين
Materials handling, storage مناولة المواد والتخزين
دكتور تامر عبدالله شراكى
 
Design of Manual Material Handling System through Computer Aided Ergonomics
Design of Manual Material Handling System through Computer Aided ErgonomicsDesign of Manual Material Handling System through Computer Aided Ergonomics
Design of Manual Material Handling System through Computer Aided Ergonomics
Birhanu Dagnew Sendek
 

Viewers also liked (19)

SELECTION OF MATERIAL HANDLING SYSTEM USING MULTI CRITERIA DECISION TECHNIQUE...
SELECTION OF MATERIAL HANDLING SYSTEM USING MULTI CRITERIA DECISION TECHNIQUE...SELECTION OF MATERIAL HANDLING SYSTEM USING MULTI CRITERIA DECISION TECHNIQUE...
SELECTION OF MATERIAL HANDLING SYSTEM USING MULTI CRITERIA DECISION TECHNIQUE...
 
material handling equipment
material handling equipmentmaterial handling equipment
material handling equipment
 
Material handling principles
Material handling principlesMaterial handling principles
Material handling principles
 
Design of material handeling equipment
Design of material handeling equipmentDesign of material handeling equipment
Design of material handeling equipment
 
Materials Handling Ppt
Materials Handling PptMaterials Handling Ppt
Materials Handling Ppt
 
Material Selection and Design Standards
Material Selection and Design Standards Material Selection and Design Standards
Material Selection and Design Standards
 
Composite materials
Composite materialsComposite materials
Composite materials
 
Mtrl handling
Mtrl handlingMtrl handling
Mtrl handling
 
Principle’s of material handling
Principle’s of material handlingPrinciple’s of material handling
Principle’s of material handling
 
Concurrent engineering
Concurrent engineeringConcurrent engineering
Concurrent engineering
 
Design for Manufacturing and Assembly
Design for Manufacturing and AssemblyDesign for Manufacturing and Assembly
Design for Manufacturing and Assembly
 
Design for Assembly (DFA)
Design for Assembly (DFA)Design for Assembly (DFA)
Design for Assembly (DFA)
 
Basics of AGVs (Automated guided vehicles)
Basics of AGVs (Automated guided vehicles)Basics of AGVs (Automated guided vehicles)
Basics of AGVs (Automated guided vehicles)
 
Application of Composite Materials for different mechanical components
Application of Composite Materials for different mechanical componentsApplication of Composite Materials for different mechanical components
Application of Composite Materials for different mechanical components
 
13 CHAPTER 4 Design and material selection
13 CHAPTER 4 Design and material selection13 CHAPTER 4 Design and material selection
13 CHAPTER 4 Design and material selection
 
Balinese Water Temples: A Case Study in Water Management
Balinese Water Temples: A Case Study in Water ManagementBalinese Water Temples: A Case Study in Water Management
Balinese Water Temples: A Case Study in Water Management
 
Trishul Presentation 2012
Trishul Presentation 2012Trishul Presentation 2012
Trishul Presentation 2012
 
Materials handling, storage مناولة المواد والتخزين
Materials handling, storage  مناولة المواد والتخزينMaterials handling, storage  مناولة المواد والتخزين
Materials handling, storage مناولة المواد والتخزين
 
Design of Manual Material Handling System through Computer Aided Ergonomics
Design of Manual Material Handling System through Computer Aided ErgonomicsDesign of Manual Material Handling System through Computer Aided Ergonomics
Design of Manual Material Handling System through Computer Aided Ergonomics
 

Similar to An approach for selection of material handling equipment and material handling system pre design

3_Material Handling_Plan, set up , and control
3_Material Handling_Plan, set up , and control3_Material Handling_Plan, set up , and control
3_Material Handling_Plan, set up , and control
slowmr180
 
Selection of Material Handling Equipment
Selection of Material Handling EquipmentSelection of Material Handling Equipment
Selection of Material Handling Equipment
Susheel Dhale
 
INDUSTRIAL ENGINEERING 2 nd module
INDUSTRIAL ENGINEERING 2 nd moduleINDUSTRIAL ENGINEERING 2 nd module
INDUSTRIAL ENGINEERING 2 nd module
Jim Alex
 
Automated material handling
Automated material handlingAutomated material handling
Automated material handling
DINBANDHU SINGH
 
unitiiimtrlhandlingmodif-181029120211.pptx
unitiiimtrlhandlingmodif-181029120211.pptxunitiiimtrlhandlingmodif-181029120211.pptx
unitiiimtrlhandlingmodif-181029120211.pptx
Chandrasen Sharma
 
material handling and its classifications with principles.
material handling and its classifications with principles.material handling and its classifications with principles.
material handling and its classifications with principles.
Vaibhav Pathak
 
handling equipment
handling equipmenthandling equipment
handling equipment
Muhamad Fauzi Anuar
 
mhfp-5.pptx
mhfp-5.pptxmhfp-5.pptx
mhfp-5.pptx
AnoopCadlord1
 
Simulation Applications In Warehouse Operations
Simulation Applications In Warehouse OperationsSimulation Applications In Warehouse Operations
Simulation Applications In Warehouse Operations
rahulnaveenaggarwal
 
UNIT 1 - Introduction to Material Handling Equipments.pdf
UNIT 1 - Introduction to Material Handling Equipments.pdfUNIT 1 - Introduction to Material Handling Equipments.pdf
UNIT 1 - Introduction to Material Handling Equipments.pdf
AdugnaGosa1
 
material handling systems
material handling systemsmaterial handling systems
material handling systems
VADLAJAGADEESHWARAAC
 
IRJET- Design and Development of Conveyor System for Scrap Collection of Tab ...
IRJET- Design and Development of Conveyor System for Scrap Collection of Tab ...IRJET- Design and Development of Conveyor System for Scrap Collection of Tab ...
IRJET- Design and Development of Conveyor System for Scrap Collection of Tab ...
IRJET Journal
 
Notes material handling
Notes material handlingNotes material handling
Notes material handling
VIKKYsing
 
Plant layout
Plant layout Plant layout
Plant layout
Gaurang Joshi
 
Microsoft word chapter10 f-automated material handling and storage systems
Microsoft word   chapter10 f-automated material handling and storage systemsMicrosoft word   chapter10 f-automated material handling and storage systems
Microsoft word chapter10 f-automated material handling and storage systems
PadmalathaTSRV1
 
Ch11Material handling.pdf
Ch11Material handling.pdfCh11Material handling.pdf
Ch11Material handling.pdf
ssuser486a8b
 
Material Handling
Material Handling Material Handling
Material Handling
Techy Indian
 
Material handling piyush 12mt07ind006
Material handling piyush 12mt07ind006Material handling piyush 12mt07ind006
Material handling piyush 12mt07ind006
samjune
 
IV. System Design and Optimization .pptx
IV. System Design and Optimization .pptxIV. System Design and Optimization .pptx
IV. System Design and Optimization .pptx
CaptainPats
 
An Investigation Into Design And Manufacturing Of Mechanical Conveyors System...
An Investigation Into Design And Manufacturing Of Mechanical Conveyors System...An Investigation Into Design And Manufacturing Of Mechanical Conveyors System...
An Investigation Into Design And Manufacturing Of Mechanical Conveyors System...
Cheryl Brown
 

Similar to An approach for selection of material handling equipment and material handling system pre design (20)

3_Material Handling_Plan, set up , and control
3_Material Handling_Plan, set up , and control3_Material Handling_Plan, set up , and control
3_Material Handling_Plan, set up , and control
 
Selection of Material Handling Equipment
Selection of Material Handling EquipmentSelection of Material Handling Equipment
Selection of Material Handling Equipment
 
INDUSTRIAL ENGINEERING 2 nd module
INDUSTRIAL ENGINEERING 2 nd moduleINDUSTRIAL ENGINEERING 2 nd module
INDUSTRIAL ENGINEERING 2 nd module
 
Automated material handling
Automated material handlingAutomated material handling
Automated material handling
 
unitiiimtrlhandlingmodif-181029120211.pptx
unitiiimtrlhandlingmodif-181029120211.pptxunitiiimtrlhandlingmodif-181029120211.pptx
unitiiimtrlhandlingmodif-181029120211.pptx
 
material handling and its classifications with principles.
material handling and its classifications with principles.material handling and its classifications with principles.
material handling and its classifications with principles.
 
handling equipment
handling equipmenthandling equipment
handling equipment
 
mhfp-5.pptx
mhfp-5.pptxmhfp-5.pptx
mhfp-5.pptx
 
Simulation Applications In Warehouse Operations
Simulation Applications In Warehouse OperationsSimulation Applications In Warehouse Operations
Simulation Applications In Warehouse Operations
 
UNIT 1 - Introduction to Material Handling Equipments.pdf
UNIT 1 - Introduction to Material Handling Equipments.pdfUNIT 1 - Introduction to Material Handling Equipments.pdf
UNIT 1 - Introduction to Material Handling Equipments.pdf
 
material handling systems
material handling systemsmaterial handling systems
material handling systems
 
IRJET- Design and Development of Conveyor System for Scrap Collection of Tab ...
IRJET- Design and Development of Conveyor System for Scrap Collection of Tab ...IRJET- Design and Development of Conveyor System for Scrap Collection of Tab ...
IRJET- Design and Development of Conveyor System for Scrap Collection of Tab ...
 
Notes material handling
Notes material handlingNotes material handling
Notes material handling
 
Plant layout
Plant layout Plant layout
Plant layout
 
Microsoft word chapter10 f-automated material handling and storage systems
Microsoft word   chapter10 f-automated material handling and storage systemsMicrosoft word   chapter10 f-automated material handling and storage systems
Microsoft word chapter10 f-automated material handling and storage systems
 
Ch11Material handling.pdf
Ch11Material handling.pdfCh11Material handling.pdf
Ch11Material handling.pdf
 
Material Handling
Material Handling Material Handling
Material Handling
 
Material handling piyush 12mt07ind006
Material handling piyush 12mt07ind006Material handling piyush 12mt07ind006
Material handling piyush 12mt07ind006
 
IV. System Design and Optimization .pptx
IV. System Design and Optimization .pptxIV. System Design and Optimization .pptx
IV. System Design and Optimization .pptx
 
An Investigation Into Design And Manufacturing Of Mechanical Conveyors System...
An Investigation Into Design And Manufacturing Of Mechanical Conveyors System...An Investigation Into Design And Manufacturing Of Mechanical Conveyors System...
An Investigation Into Design And Manufacturing Of Mechanical Conveyors System...
 

More from Soumyodeep Mukherjee

Fork Lift Truck
Fork Lift TruckFork Lift Truck
Fork Lift Truck
Soumyodeep Mukherjee
 
Product design and development
Product design and developmentProduct design and development
Product design and development
Soumyodeep Mukherjee
 
A case study on improvement of an air conditioning system
A case study on improvement of an air conditioning systemA case study on improvement of an air conditioning system
A case study on improvement of an air conditioning system
Soumyodeep Mukherjee
 
Emt megatherm a site visit report
Emt megatherm a site visit reportEmt megatherm a site visit report
Emt megatherm a site visit report
Soumyodeep Mukherjee
 
Total Quality Management - An Overview
Total Quality Management - An OverviewTotal Quality Management - An Overview
Total Quality Management - An Overview
Soumyodeep Mukherjee
 
Pneumatic conveying system of fly ash in a thermal power plant
Pneumatic conveying system of fly ash in a thermal power plantPneumatic conveying system of fly ash in a thermal power plant
Pneumatic conveying system of fly ash in a thermal power plant
Soumyodeep Mukherjee
 
Project on HVACR
Project on HVACRProject on HVACR
Project on HVACR
Soumyodeep Mukherjee
 

More from Soumyodeep Mukherjee (7)

Fork Lift Truck
Fork Lift TruckFork Lift Truck
Fork Lift Truck
 
Product design and development
Product design and developmentProduct design and development
Product design and development
 
A case study on improvement of an air conditioning system
A case study on improvement of an air conditioning systemA case study on improvement of an air conditioning system
A case study on improvement of an air conditioning system
 
Emt megatherm a site visit report
Emt megatherm a site visit reportEmt megatherm a site visit report
Emt megatherm a site visit report
 
Total Quality Management - An Overview
Total Quality Management - An OverviewTotal Quality Management - An Overview
Total Quality Management - An Overview
 
Pneumatic conveying system of fly ash in a thermal power plant
Pneumatic conveying system of fly ash in a thermal power plantPneumatic conveying system of fly ash in a thermal power plant
Pneumatic conveying system of fly ash in a thermal power plant
 
Project on HVACR
Project on HVACRProject on HVACR
Project on HVACR
 

Recently uploaded

Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
Nada Hikmah
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...
bijceesjournal
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
architagupta876
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
gowrishankartb2005
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
People as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimalaPeople as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimala
riddhimaagrawal986
 
cnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classicationcnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classication
SakkaravarthiShanmug
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
ElakkiaU
 
artificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptxartificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptx
GauravCar
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
Mahmoud Morsy
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 

Recently uploaded (20)

Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
People as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimalaPeople as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimala
 
cnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classicationcnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classication
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
 
artificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptxartificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptx
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 

An approach for selection of material handling equipment and material handling system pre design

  • 1.
  • 2.  handling of material in warehouse  solving the problems involving the movement  control and protection of materials, goods and products  applied in both manufacturing and distributional operations does not add value to the product but it usually adds a significant value to the product
  • 3. These early methods treated the three basic stages of handling— a. materials collection b. Manufacturing c. product distribution Modern materials-handling systems, by contrast, emphasize the integrated flow of goods from the source of raw materials to final user This can be achieved by transporting goods in large quantities and in standardized units; by handling procedures using cranes, conveyor belts, and other machines; and by the careful coordination of the movement of goods with production, processing, and distribution schedules
  • 4. a. Designing the system for continues flow of material, i.e. idle time should be zero. b. Going in for standard equipment, which ensures low investment and flexibility in case of changes in material handling requirements in the future. c. Incorporating gravity flow in material flow system d. Ensuring that the ratio of the dead weight to the payload of material handling equipment is minimum.
  • 5. Various material handling systems are in use, right from those that are fully manual to the ones that are fully automatic. However, the selection of a particular system depends in factors such as: i. Volumes to be handled ii. Speed in handling iii. Productivity iv. Product characteristics (weight, size, shape) v. Nature of the product (hazardous, perishable, crushable)
  • 6. 1. Planning Principle: where the needs, performance objectives, functional specifications of the methods 2. Standardization Principle: should be standardized within the limits of achieving overall performance objectives 3. Work Principle: should be minimized without sacrificing productivity The Key to Greater Productivity, Customer Service and Profitability
  • 7. 4. Ergonomic Principle: Human must be recognized and respected in the design of material-handling tasks 5. Unit Load Principle: can be stored or moved as a single 6. Space Utilization Principle: All available space must be used effectively and efficiently. 7. System Principle: Material movement and storage activities should be fully integrated to form a coordinated, operational system that spans receiving, inspection, storage, production, assembly, packaging, unitizing, order selection, shipping, transportation, and the handling of returns. 8. Automation Principle: operations should be mechanized and/or automated where feasible to improve operational efficiency 9. Environmental Principle: total energy consumption should be an evaluation criterion 10. Life Cycle Cost Principle: A complete economic analysis should account for the entire life cycle of all material-handling equipment and the resulting systems.
  • 8. Lifting and Transport Equipment Equipment that falls into this category is fork lift trucks, order picking trucks, overhead cranes, tower cranes and belt, chain and overhead conveyors. fork lift trucks overhead conveyors
  • 9. Storage Equipment within this category are pallet racks, mobile shelf units, and plastic, wood and steel containers Automated Handling Equipment automated guide vehicles, storage and retrieval equipment, conveying systems and product sorting equipment
  • 10. Material Handling Equipment Selection Properly Match:  The Material Characteristics  The Move Requirements  The Equipment Capabilities/Requirements Other factors to be considered include:  Labor skills available  Capital available  Return on investment  Expected life of installation
  • 11. STUDY ON THE APPROACHES OF THE SELECTION OF EQUIPMENT AND DESIGN OF THE MHS Problems to overcome : minimizes cost and maximizes reliability. Layout Design MHS Design Modifications of Layout MHS Design Layout Design Review of the MHS Design The Solution Sequence and Preferable Relations Between MHS and Facility Layout Design [ Sequence A ] [ Sequence B ]
  • 12. The selection of equipment and design of the MHS can be done using four ways:  by means of a traditional selection method,  using an analytical model,  by knowledge-based approaches,  Hybrid approaches (analytical and knowledge based approaches).  Traditional Selection Method 1. the designer relies principally on handbooks and experience 2. approach may not be cost-effective  Analytical Model 1. generally consider only quantifiable factors such as cost and utilization 2. often difficult to implement  Knowledge-based Approaches 1. involves the use of expert guidelines. 2. allows extensive matching of equipment characteristics to application requirements
  • 13. PRODUCT AND PROCESS SPECIFICATIONS AND MHS EQUIPMENT SELECTION FOR EACH PRODUCT Main Features of the MHS Equipment Selection 1. Product Type (bar stock, package, pallet load, unit) 2. Product Weight 3. Product Size (Cubic Volume) 4. Product nature (Sturdy, Fragile) 5. Product Volume 1. 1.Speed Requirements 2. Accumulation Requirements (Yes or No) 3. Distance for Transfer 4. Frequency of Movement 5. Flexibility of Process Route 6. Loading and Unloading Requirements 7. Safety Aspects The choice of MHS equipment depends on the product and process requirements. For this reason, MHS equipment can be selected according to the product and process specifications.
  • 14. MHS Equipment Selection Rationalastion of the Selected MH Equipments Utilisation and Detail Design of Material Handling System MHS Design Stages Finding appropriate equipment for a handling problem involves extensive matching of product and process features and material handling equipment specifications.
  • 15. The Rationalization of the MHS between departments (nodes) Why Rationalization required ?  Different product types are likely to require different details.  reducing the total investment and operating cost of the MHS. Rail Guided Vehicle (RGV) Automated Guided Vehicle (AGV) If there are material transfers between two departments and they require these two types of equipment at the same time, the equipment types and their alternatives have been considered and alternative choices must be established and arranged in a form. If the requirement of MHS types is more than one and these types of equipment can replace each other then select the dominant one.
  • 16. Implementation Of The Approaches The approach comprises three stages which are represented by two different knowledge-bases and one external program. • The knowledge-base contains all the rules and the objects which describe a particular topic. • function of the external program is to reorganize the data for the MHS selection phase and has been developed using FORTRAN. Product Process Routes Product Database MHS.EXE MHS-DEP.DAT Specifies MHS equipment types for each product Flow Chart of the Arrangement Procedure
  • 17. Obtain Product and Process features for MHS Equipment Selection Program of Rule Set for Material Handling Equipment Selection MHS Equipments for Each Product Organization of Selected Equipment (External Program) Rationalisation Pre-Designed MHS Utilisation and DETAIL DESIGN The Main Flow Chart of the Approach
  • 18. MHS EQUIPMENT SELECTION FOR PRODUCTS In a MHS equipment selection, the selection procedure can be carried out as follows: If the distances, the event intervals between arrival times and the components are relatively large, an AGV system is likely to prove appropriate. For generalization, each MHS equipment has been taken as a member of a class, which has a certain number of features and which can be represented by slots in a program. example, an AGV may be represented using a class object and the details are given [Leonardo Expert System Shell (Creative Logic, 1989)] 1: Name: AGV 2: Long Name: 3: Type: 4: Value: 5: Certainty: 6: Derived From: 7: IsA: mhs 8: Member Slots: 8: load_type: discrete 9: we_ran: high 10: load_size: mdm 11: req_speed: high 13: req_acc: very high 14: req_diss: high 15: frequ_req: often 16: path_flexi: high 17: load_un_ab: high
  • 19. MHS Equipment Type Load Type Load Capacity Size Nature Speed Of System Accumulation Required Distance Frequency Of Move Flexibility Of Path Loading & Unloading Ability Robots Discrete Low- Medium Medium Solid- Fragaile Low- Medium No short often low high AGV Discrete Medium Medium Solid- Fragaile Medium No medium often high high RGV (Rail Guided Vehicle ) Discrete High Medium- Large Solid High No long low low medium Fork Lift Discrete High Large Solid Medium No long high high high Conveyors Continuous Low- Medium Small - Medium Solid High- Medium Yes short- medium low low medium Manual Discrete Low Medium Solid Low No short high high high These suggested alternatives will clearly need development with experience of operating the design system.
  • 20. Probem : An MHS is going to be pre-designed for a plant. The plant is designed for 6 processes and 4 different parts. The parts and process routes and their specifications are presented in Table . When the part and process routes and their MHS equipment information have been gathered, the first stage can be carried out for MHS equipment selection. In this selection, for example, heavy loads, Far trips, and very big in size for Part 3, suggests the use of a Rail Guided Vehicle (RGV). Another example can be given for Part 1. This part is of medium weight, medium in size and has a fragile nature; these requirements can be satisfied using an AGV. 1 2 3 4 5 6 Network Analysis and Part Root Process of the case study
  • 21. Product and Process Feature for MHS Equipment Selection Part Number Part Volume Part Route Process Load Type Load Capacity Size Nature Speed Of System Accumulatio n Required Distanc e Frequency Of Move Loading & Unloading Ability 1 50 1-2-4-5-6 Discrete medium medium Fragile Low No Mediu m High Rare 2 40 1-5-6-0 Discrete high small Solid Medium No Short Low No 3 70 1-3-4-5-6 Discrete very high very big Solid High No Far Low Frequently 4 20 1-2-3-5-6 Discrete low medium Fragile Medium Yes Mediu m Medium Frequently MHS Equipment for Parts Product Number Part 1 Part 2 Part 3 Part 4 MHS Equipment RGV Man Fork-Lift AGV 1 2 3 4 5 6
  • 22. From Department To Department Required MHS Equipment Rationalized MHS Equipment 1 2 RGV, Fork Lift, AGV RGV 1 3 RGV, Man, AGV, RGV 1 5 AGV AGV 2 4 Man Man 2 3 Fork Lift, AGV Fork Lift 3 2 AGV AGV 3 4 Man Man 3 5 AGV, Man AGV 4 2 AGV, Man AGV 4 5 RGV, Man, AGV, RGV 5 6 Fork Lift Fork Lift MHS Equipment Requirements Between Departments Product Number Part 1 Part 2 Part 3 Part 4 MHS Equipment RGV Man Fork-Lift AGV
  • 23.  Responsive  Flexible  Autonomous  Highly automatic  Multi-functional  Modularized  Multi-level  Compatible
  • 24. The most possible objectives to do in future are: •• High-speed, high-value material handling and logistics processes for challenging environments •• Low-cost, low-impact material handling and logistics capabilities to maintain high service levels •• The workforce of tomorrow and what is needed to develop it.
  • 25. The field of materials handling remains still to be fully to be fully explored. Material handling techniques are not only industry’s biggest opportunity — they are industry’s biggest necessity. Competition is beginning to force this new technology upon industry.
  • 26. Conclusions  This study describes a decision aid which may be used by a designer who is not very familiar with selection of material handling systems.  The case study exemplifies the selection of MHS equipment using the approach and a recommended rationalization procedure.  A knowledge based approach can overcome the limitations of analytical approaches which are generally limited with only quantifiable factors.  Rationalizations of MHS equipment will reduce total investment and operation costs.  It highlights the importance of the material handling system design and facility layout problem, requiring an integrated solution strategy.  It'll help to work a system with full automation and there it'll create a scope for future work on knowledge based programmed Material Handling System Design.