Effect of Vegetative Filter Strips on
Sediment Deposition in Drainage Ditches
in Littoral Zone of Lake Sainte-Pierre in
Quebec, Canada
The 11th International
Drainage Symposium
Zhiming Qi, Birkhoff Li, Monique Poullin, Shiv Prasher
Zhiming Qi, Associate Professor (Presenter)
Birkhoff Li, MSc. Graduate Student
Shiv Prasher, James McGill Professor
Department of Bioresource Engineering, McGill University
Monique Poulin, Associate Professor
Département de Phytologie, Université Laval
Outlines
• Introduction
• Objectives
• Methods:
Sites, vegetative buffer treatment, sediment
measurement (ditch volume), grass
• Preliminary Results
Lakes in Canada
Lac Sainte Pierre
Lac Sainte-Pierre
Littoral Zone
353 km2 (136 sq mi)
About ¼ of Story County, Iowa
Agricultural drainage ditches (after flooding)
Lac Sainte-Pierre
spring flood
Sediment deposition in
drainage ditches
Ecological Impacts
Photo Eric Labonté -
MAPAQ
Objectives
• To investigate the effectiveness of vegetative filter
strips on reducing sediment deposition in drainage
ditches in the coastal area of Lac Saint Pierre.
Site St Cuthbert
Site Yamachiche
Site Baie-du-Febvre
Methods
Three sites
Three ditches at
each site
500-1000 m long
4-6 m wide
Cleaning: Nov 2019
Grass sowed: May 2020
Ditch monitored: 2020-
now
Site Yamachiche
• Ditch Trenching (Late Fall 2019)
• Vegetative Buffer Strip (0, 2, & 4m wide; sowed in May 2020)
DTM data of the control ditch at site St
Cuthbert, Aug 10th, 2020
• LiDAR Scan
Scanned 4 times:
October, 2019 (before trenching)
November, 2019 (after trenching, snowed)
August 2020
October 2021
YellowScan LiDAR
Surveyor mounted below
a DJI Matice 600 Pro UAV
though a contract with
MVT Geo-solutions Inc. in
Quebec City.
• Total station survey
• 20m interval along
the ditch
• 25cm between two
points at each cross
section
• Conducted after the
spring flooding and
before the snow in
Nov.
8
0
m
5.75 m
Ditch survey at site Saint-Cuthbert
• Total station survey
• 20m interval along each ditch
• 2 round per year
• 1st round from June to July
• 2nd round from September
to October
Total Station Survey at Yamachiche in Nov 2019
Total Station Survey at the Lac Sainte Pierre sites
-2
-1
0
Height
(m)
-2
-1
0
0 1 2 3 4 5 6
Height
(m)
-2
-1
0
0 1 2 3 4 5 6
Height
(m)
Distance from the reference point at the start of the ditch
cross-section (m)
Step 1. A horizontal auxiliary
line is made based on the
highest point of the ditch
cross-section (m)
Step 2. The area of the closed
polygon created by auxiliary line and
the ditch profile is calculated using
the GIS library
𝐷𝑖𝑡𝑐ℎ 𝑣𝑜𝑙𝑢𝑚𝑒
= 𝑐𝑟𝑜𝑠𝑠 𝑠𝑒𝑐𝑡𝑖𝑜𝑛𝑎𝑙 𝑎𝑟𝑒𝑎 ∗ 20 𝑚
Cross sectional area
= 𝑡ℎ𝑒 𝑎𝑟𝑒𝑎 𝑜𝑓 𝑐𝑙𝑜𝑠𝑒𝑑 𝑝𝑜𝑙𝑦𝑔𝑜𝑛
Ditch volume calculation (Total Station)
Robel height measurement
1.0 m
10
9
8
7
6
4
2
5
3
1
4 m
• To evaluate the vegetation
density close to the ditch
• Approximately 60m
interval along each VFS
• Conducted during fall in
2020 & 2021
Preliminary Results
Preliminary Results: 1) LiDAR Survey
Height decreased
between Dec 16, 2019
and August 10, 2020
Height increased
between Dec 16,
2019 and August
10, 2020
Distribution of sediment
accumulation and loss
DTM data comparison of the
control ditch at site St Cuthbert
between December 2019 and
August 2020
Sediment change calculation
Site
Baie du
Febvre
St Cuthbert Yamachiche
Buffer
strip
width
(m)
0 -1725 -1686 NA*
2 -701 -497 107
4 -663 -382 -353
Table 1 Sediment volume change (m3) over the
scanning area from winter 2019 to summer 2020
• Most ditches had sediment
accumulation during the
period between two LiDAR
scans (sediment volume
change < 0: decreasing)
Preliminary Results: 1) LiDAR Survey
*Note: the control ditch changed at site Yamachiche
* Control ditch changed to the one on the east side of the old
control in 2020 due to dense vegetation along the old control.
• Significant difference of ditch
volume between June and
November (Paired t test,
P=0.022)
Table 2. Ditch volume (m3) in 2019 and 2020
Site
Buffer
strip
width
(m)
Oct 2019
before
trenching
Nov 2019
right after
trenching
Jun
2020
Nov
2020
BDF
0 1414 1250 1165
2 856 1032 999
4 1354 1344 1375
STC
0 229 558 537
2 446 517 490
4 297 525 504
YMC
0* 729* 938* 628* 583*
2 486 522 590 532
4 837 987 549 536
* Control ditch changed to the one on the east side of the old
control in 2020 due to dense vegetation along the old control.
• Ditch volume after trenching in general decreased which
indicating a net sediment deposition
Preliminary Results: 2) Total Station Survey
2020
Total statoin survey
Percentage of ditch volume change from
June 2020 to November 2020
• Possible explanation
 Insufficient
observation time
 Inconsistent
vegetation
conditions (e.g.,
natural forage)
Preliminary Results: 2) Total Station Survey
• No significant difference among different width (0, 2,
and 4m) of buffer strips (P> 0.05)
Table 3 Robel height measurement in Fall 2020
Site
Buffer
strip
width
Mean
measurement
(cm)
Stdev (cm)
BDF
0 37.22 15.07
2 48.22 8.47
4 42.26 11.91
STC
0 38.84 15.89
2 61.50 11.66
4 44.67 12.74
YMC
0 33.81 11.85
2 53.38 13.00
4 48.68 17.06
Preliminary Results: 3) Robel height
Grass Robel height was significantly lower at 0-m ditches (p<0.05); no difference
between 2m and 4m vegetative filter strips.
Preliminary Results: Summary
• Both Total Station survey (manual) and LiDAR scan (UAV) in
2020 showed ditch volume decrease (sediment deposition), but
no significant difference among treatments (vegetative filter
strip width of 0, 2, and 4m) in the total station survey (though
lower % for wider buffer strip); LiDAR scan showed significantly
more deposition under 0-m strip than 2 and 4 m.
• 2021 data (completed in mid-Nov, under processing) showed a
reverse trend of ditch volume decrease (sediment loss, data no
shown). Needs further verification.
• Robel height followed our expectation (low at 0-m), and soil
and water quality data is under processing.
Treatment
/Site
2020 Ditch Sediment Deposition
2020 Robel Height (cm)
Total Station (m3) Total Station (%) LiDAR Scan (m3)
-------------------------------------------- Treatment (buffer width) --------------------------------------------
0M -50A -5.9%A -1560A 36.6B
2M -39A -6.1%A -364B 54.4A
4M -1A -1.4%A -466B 45.1AB
----------------------------------------------------- Sites -----------------------------------------------------
STC -23a -4.3%a -855a 48.3a
YMC -39a -6.5%a -505a 45.3a
BDF -29a -2.6%a -1030a 42.5a
Zhiming Qi, Ph.D.
James H. Brace Associate Professor​
Department of Bioresource Engineering​
McGill University
Email: zhiming.qi@mcgill.ca
Other information
Ditch volume calculation
-3
-2.5
-2
-1.5
0 1 2 3 4 5 6
-3
-2.5
-2
-1.5
0 1 2 3 4 5 6
-3
-2.5
-2
-1.5
0 1 2 3 4 5 6
Figure B.1 Ditch cross-section profile at Yamachiche 4m buffer strip ditch @ 340m in
2020 Oct and 2021 Jun
Figure B.2 Adjust them to achieve the equal ditch width
Figure B.3 Ditch volume illustration, resulting a volume difference of 24.305%
Other information
Field Survey
Cross sections measured in June and October in
4m vegetative buffer strip ditch at site Yamachiche
Table 2 Ditch Volume percentage change
from June 2020 to November 2021
• No significant difference among buffer strips (P> 0.05)
Total station survey
Site
Buffer
strip
width
(m)
Jun
2020 –
Nov
2020
Nov
2020 –
Jun
2021
Jun
2021 –
Oct
2021
Total(Jun
2020 –
Oct 2021)
BDF
0 -3.76% 3.40% 4.76% 4.247%
2 -5.22% 2.35% 0.99% -2.036%
4 -4.00% 4.87% 4.37% 5.079%
STC
0 -7.24% -1.32% -3.13% -11.336%
2 -9.83% 10.43% -3.83% -4.237%
4 -2.37% 26.73% 1.06% 25.050%
YMC
0* -6.80% 6.52% 11.41% 10.608%
2 -3.20% 6.41% 6.60% 9.804%
4 2.31% 3.12% -0.34% 5.136%
* Control ditch changed to the one on the east side of the old
control in 2020 due to dense vegetation along the old control.
Figure 2. Ditch volume percentage change comparison
between different buffer strip width over Jun 2020 to Nov 2021
• + sediment loss
• - sediment deposition
%𝐷𝑖𝑡𝑐ℎ 𝑣𝑜𝑙𝑢𝑚𝑒 𝑐ℎ𝑎𝑛𝑔𝑒 =
𝐷𝑖𝑡𝑐ℎ 𝑣𝑜𝑙𝑢𝑚𝑒 𝑎𝑡 𝑡ℎ𝑒 𝑒𝑛𝑑 𝑜𝑓 𝑡ℎ𝑒 𝑝𝑒𝑟𝑖𝑜𝑑 − 𝐷𝑖𝑡𝑐ℎ 𝑣𝑜𝑙𝑢𝑚𝑒 𝑎𝑡 𝑡ℎ𝑒 𝑠𝑡𝑎𝑟𝑡 𝑜𝑓 𝑡ℎ𝑒 𝑝𝑒𝑟𝑖𝑜𝑑
𝐷𝑖𝑡𝑐ℎ 𝑣𝑜𝑙𝑢𝑚𝑒 𝑖𝑛 𝑡ℎ𝑒 𝑠𝑡𝑎𝑟𝑡 𝑜𝑓 𝑡ℎ𝑒 𝑝𝑒𝑟𝑖𝑜𝑑
Site
Buffer
strip
width (m)
Growing*
Season
2020
Non-
growing*
Season
2020
Growing*
Season
2021
BDF
0 -3.76% 3.40% 4.76%
2 -5.22% 2.35% 0.99%
4 -4.00% 4.87% 4.37%
STC
0 -7.24% -1.32% -3.13%
2 -9.83% 10.43% -3.83%
4 -2.37% 26.73% 1.06%
YMC
0* -6.80% 6.52% 11.41%
2 -3.20% 6.41% 6.60%
4 2.31% 3.12% -0.34%
• Growing season has less
impact on ditch’s volume
than the fallow season.
(p=0.004, w=27, One -tailed
Mann-Whitney U test)
Figure 1. Ditch volume percentage change
comparison between growing and fallow
season
Total station survey
* Control ditch changed to the one on the east side of the old
control in 2020 due to vegetation along the old control.
* Growing season 2020: Jun 2020 – Nov 2020
* Non-growing season 2020: Nov 2020 – Jun 2021
* Growing season 2021: Jun 2021 – Oct 2021
Table 3 Ditch Volume percentage change
from June 2020 to November 2020
18 9
%𝐷𝑖𝑡𝑐ℎ 𝑣𝑜𝑙𝑢𝑚𝑒 𝑐ℎ𝑎𝑛𝑔𝑒 =
𝐷𝑖𝑡𝑐ℎ 𝑣𝑜𝑙𝑢𝑚𝑒 𝑎𝑡 𝑡ℎ𝑒 𝑒𝑛𝑑 𝑜𝑓 𝑡ℎ𝑒 𝑝𝑒𝑟𝑖𝑜𝑑 − 𝐷𝑖𝑡𝑐ℎ 𝑣𝑜𝑙𝑢𝑚𝑒 𝑎𝑡 𝑡ℎ𝑒 𝑠𝑡𝑎𝑟𝑡 𝑜𝑓 𝑡ℎ𝑒 𝑝𝑒𝑟𝑖𝑜𝑑
𝐷𝑖𝑡𝑐ℎ 𝑣𝑜𝑙𝑢𝑚𝑒 𝑖𝑛 𝑡ℎ𝑒 𝑠𝑡𝑎𝑟𝑡 𝑜𝑓 𝑡ℎ𝑒 𝑝𝑒𝑟𝑖𝑜𝑑
• + sediment loss
• - sediment deposition
NDVI of site
Yamachiche
NDVI of site
St Cuthbert
Vegetation measurement

More Related Content

Similar to September 1 - 1030 - Zhiming Qi

2010 tn green infrastructure
2010 tn green infrastructure2010 tn green infrastructure
2010 tn green infrastructure
curt_jawdy
 
ICLR Friday Forum: Climate change and extreme rainfall events (January 26, 20...
ICLR Friday Forum: Climate change and extreme rainfall events (January 26, 20...ICLR Friday Forum: Climate change and extreme rainfall events (January 26, 20...
ICLR Friday Forum: Climate change and extreme rainfall events (January 26, 20...
glennmcgillivray
 

Similar to September 1 - 1030 - Zhiming Qi (20)

2010 2012-groundwater-plume
2010 2012-groundwater-plume2010 2012-groundwater-plume
2010 2012-groundwater-plume
 
Retrofitting of road gutters with an infiltration-exfiltration system for sto...
Retrofitting of road gutters with an infiltration-exfiltration system for sto...Retrofitting of road gutters with an infiltration-exfiltration system for sto...
Retrofitting of road gutters with an infiltration-exfiltration system for sto...
 
2010 tn green infrastructure
2010 tn green infrastructure2010 tn green infrastructure
2010 tn green infrastructure
 
ICLR Friday Forum: Climate change and extreme rainfall events (January 26, 20...
ICLR Friday Forum: Climate change and extreme rainfall events (January 26, 20...ICLR Friday Forum: Climate change and extreme rainfall events (January 26, 20...
ICLR Friday Forum: Climate change and extreme rainfall events (January 26, 20...
 
Analysis Of Water Balance and Its Effect on Tube well Efficiency
Analysis Of Water Balance and Its Effect on Tube well EfficiencyAnalysis Of Water Balance and Its Effect on Tube well Efficiency
Analysis Of Water Balance and Its Effect on Tube well Efficiency
 
“Analysis Of Water Balance and Its Effect on Tube well Efficiency”
“Analysis Of Water Balance and Its Effect on Tube well Efficiency”“Analysis Of Water Balance and Its Effect on Tube well Efficiency”
“Analysis Of Water Balance and Its Effect on Tube well Efficiency”
 
Remote Sensing for Assessing Crop Residue Cover and Soil Tillage Intensity
Remote Sensing for Assessing Crop Residue Cover and Soil Tillage IntensityRemote Sensing for Assessing Crop Residue Cover and Soil Tillage Intensity
Remote Sensing for Assessing Crop Residue Cover and Soil Tillage Intensity
 
Understanding impacts of sustainable land management interventions using SWAT...
Understanding impacts of sustainable land management interventions using SWAT...Understanding impacts of sustainable land management interventions using SWAT...
Understanding impacts of sustainable land management interventions using SWAT...
 
My-Presentation.pptx
My-Presentation.pptxMy-Presentation.pptx
My-Presentation.pptx
 
Modelling Water & Salinity in the Kulin Catchment
Modelling Water & Salinity in the Kulin CatchmentModelling Water & Salinity in the Kulin Catchment
Modelling Water & Salinity in the Kulin Catchment
 
IPWEA Groundwater Separation Distances - Jun 17 - UrbAqua
IPWEA Groundwater Separation Distances - Jun 17 - UrbAquaIPWEA Groundwater Separation Distances - Jun 17 - UrbAqua
IPWEA Groundwater Separation Distances - Jun 17 - UrbAqua
 
DSD-INT 2022 Salt intrusion modelling in Aveiro Lagoon under morphological an...
DSD-INT 2022 Salt intrusion modelling in Aveiro Lagoon under morphological an...DSD-INT 2022 Salt intrusion modelling in Aveiro Lagoon under morphological an...
DSD-INT 2022 Salt intrusion modelling in Aveiro Lagoon under morphological an...
 
Master's course defense presentation in Water Resource Management and GIS
Master's course defense presentation in Water Resource Management and GIS  Master's course defense presentation in Water Resource Management and GIS
Master's course defense presentation in Water Resource Management and GIS
 
Downstream impacts of the melamchi inter basin water transfer plan (miwtp) un...
Downstream impacts of the melamchi inter basin water transfer plan (miwtp) un...Downstream impacts of the melamchi inter basin water transfer plan (miwtp) un...
Downstream impacts of the melamchi inter basin water transfer plan (miwtp) un...
 
Hermesquispecuadros
HermesquispecuadrosHermesquispecuadros
Hermesquispecuadros
 
Monitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Monitoring measuring and verification, Gonzalo Zambrano, University of AlbertaMonitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Monitoring measuring and verification, Gonzalo Zambrano, University of Alberta
 
Designing of Landfilling for Karad City: A Review
Designing of Landfilling for Karad City: A Review Designing of Landfilling for Karad City: A Review
Designing of Landfilling for Karad City: A Review
 
Lecture 3-Water Resources Monitoring.ppt
Lecture 3-Water Resources Monitoring.pptLecture 3-Water Resources Monitoring.ppt
Lecture 3-Water Resources Monitoring.ppt
 
Challenges to Adapt BMPs to Reduce Nitrate Leaching
Challenges to Adapt BMPs to Reduce Nitrate LeachingChallenges to Adapt BMPs to Reduce Nitrate Leaching
Challenges to Adapt BMPs to Reduce Nitrate Leaching
 
September 1 - 0916 - Ziwei Li and Zhiming Qi
September 1 - 0916 - Ziwei Li and Zhiming QiSeptember 1 - 0916 - Ziwei Li and Zhiming Qi
September 1 - 0916 - Ziwei Li and Zhiming Qi
 

More from Soil and Water Conservation Society

More from Soil and Water Conservation Society (20)

September 1 - 0939 - Catherine DeLong.pptx
September 1 - 0939 - Catherine DeLong.pptxSeptember 1 - 0939 - Catherine DeLong.pptx
September 1 - 0939 - Catherine DeLong.pptx
 
September 1 - 830 - Chris Hay
September 1 - 830 - Chris HaySeptember 1 - 830 - Chris Hay
September 1 - 830 - Chris Hay
 
August 31 - 0239 - Yuchuan Fan
August 31 - 0239 - Yuchuan FanAugust 31 - 0239 - Yuchuan Fan
August 31 - 0239 - Yuchuan Fan
 
August 31 - 0216 - Babak Dialameh
August 31 - 0216 - Babak DialamehAugust 31 - 0216 - Babak Dialameh
August 31 - 0216 - Babak Dialameh
 
August 31 - 0153 - San Simon
August 31 - 0153 - San SimonAugust 31 - 0153 - San Simon
August 31 - 0153 - San Simon
 
August 31 - 0130 - Chuck Brandel
August 31 - 0130 - Chuck BrandelAugust 31 - 0130 - Chuck Brandel
August 31 - 0130 - Chuck Brandel
 
September 1 - 1139 - Ainis Lagzdins
September 1 - 1139 - Ainis LagzdinsSeptember 1 - 1139 - Ainis Lagzdins
September 1 - 1139 - Ainis Lagzdins
 
September 1 - 1116 - David Whetter
September 1 - 1116 - David WhetterSeptember 1 - 1116 - David Whetter
September 1 - 1116 - David Whetter
 
September 1 - 1053 - Matt Helmers
September 1 - 1053 - Matt HelmersSeptember 1 - 1053 - Matt Helmers
September 1 - 1053 - Matt Helmers
 
September 1 - 1030 - Chandra Madramootoo
September 1 - 1030 - Chandra MadramootooSeptember 1 - 1030 - Chandra Madramootoo
September 1 - 1030 - Chandra Madramootoo
 
August 31 - 1139 - Mitchell Watkins
August 31 - 1139 - Mitchell WatkinsAugust 31 - 1139 - Mitchell Watkins
August 31 - 1139 - Mitchell Watkins
 
August 31 - 1116 - Shiv Prasher
August 31 - 1116 - Shiv PrasherAugust 31 - 1116 - Shiv Prasher
August 31 - 1116 - Shiv Prasher
 
August 31 - 1053 - Ehsan Ghane
August 31 - 1053 - Ehsan GhaneAugust 31 - 1053 - Ehsan Ghane
August 31 - 1053 - Ehsan Ghane
 
August 31 - 1030 - Joseph A. Bubcanec
August 31 - 1030 - Joseph A. BubcanecAugust 31 - 1030 - Joseph A. Bubcanec
August 31 - 1030 - Joseph A. Bubcanec
 
September 1 - 130 - McBride
September 1 - 130 - McBrideSeptember 1 - 130 - McBride
September 1 - 130 - McBride
 
September 1 - 0216 - Jessica D'Ambrosio
September 1 - 0216 - Jessica D'AmbrosioSeptember 1 - 0216 - Jessica D'Ambrosio
September 1 - 0216 - Jessica D'Ambrosio
 
September 1 - 0153 - Mike Pniewski
September 1 - 0153 - Mike PniewskiSeptember 1 - 0153 - Mike Pniewski
September 1 - 0153 - Mike Pniewski
 
September 1 - 0130 - Johnathan Witter
September 1 - 0130 - Johnathan WitterSeptember 1 - 0130 - Johnathan Witter
September 1 - 0130 - Johnathan Witter
 
August 31 - 1139 - Melisa Luymes
August 31 - 1139 - Melisa LuymesAugust 31 - 1139 - Melisa Luymes
August 31 - 1139 - Melisa Luymes
 
August 31 - 1116 - Hassam Moursi
August 31 - 1116 - Hassam MoursiAugust 31 - 1116 - Hassam Moursi
August 31 - 1116 - Hassam Moursi
 

Recently uploaded

Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
The Hebrew University of Jerusalem
 

Recently uploaded (20)

The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...
The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...
The Key to Sustainable Energy Optimization: A Data-Driven Approach for Manufa...
 
Lab Investigation.pptxjjjjjjjjjjjjjjjjjj
Lab Investigation.pptxjjjjjjjjjjjjjjjjjjLab Investigation.pptxjjjjjjjjjjjjjjjjjj
Lab Investigation.pptxjjjjjjjjjjjjjjjjjj
 
2024-05-16 Composting at Home 101 without link to voucher
2024-05-16 Composting at Home 101 without link to voucher2024-05-16 Composting at Home 101 without link to voucher
2024-05-16 Composting at Home 101 without link to voucher
 
Cooperative Mangrove Project: Introduction, Scope, and Perspectives
Cooperative Mangrove Project: Introduction, Scope, and PerspectivesCooperative Mangrove Project: Introduction, Scope, and Perspectives
Cooperative Mangrove Project: Introduction, Scope, and Perspectives
 
EFFLUENT TREATMENT PLANT For PHARMA INDUSTRY
EFFLUENT TREATMENT PLANT For PHARMA INDUSTRYEFFLUENT TREATMENT PLANT For PHARMA INDUSTRY
EFFLUENT TREATMENT PLANT For PHARMA INDUSTRY
 
Data analysis and findings
Data analysis and findingsData analysis and findings
Data analysis and findings
 
Palynology: History, branches, basic principles and application, collection o...
Palynology: History, branches, basic principles and application, collection o...Palynology: History, branches, basic principles and application, collection o...
Palynology: History, branches, basic principles and application, collection o...
 
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
 
Introducing Blue Carbon Deck seeking for actionable partnerships
Introducing Blue Carbon Deck seeking for actionable partnershipsIntroducing Blue Carbon Deck seeking for actionable partnerships
Introducing Blue Carbon Deck seeking for actionable partnerships
 
Christmas Palm Trees in Florida The Ultimate Guide to Festive Landscaping wit...
Christmas Palm Trees in Florida The Ultimate Guide to Festive Landscaping wit...Christmas Palm Trees in Florida The Ultimate Guide to Festive Landscaping wit...
Christmas Palm Trees in Florida The Ultimate Guide to Festive Landscaping wit...
 
National Tree Planting Day May 2024 Nairobi
National Tree Planting Day May 2024 NairobiNational Tree Planting Day May 2024 Nairobi
National Tree Planting Day May 2024 Nairobi
 
A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...
 
Laplace Transforms.pptxhhhhhhhhhhhhhhhhh
Laplace Transforms.pptxhhhhhhhhhhhhhhhhhLaplace Transforms.pptxhhhhhhhhhhhhhhhhh
Laplace Transforms.pptxhhhhhhhhhhhhhhhhh
 
Global warming, Types, Causes and Effects.
Global warming, Types, Causes and Effects.Global warming, Types, Causes and Effects.
Global warming, Types, Causes and Effects.
 
Coastal and mangrove vulnerability assessment In the Northern Coast of Java, ...
Coastal and mangrove vulnerability assessment In the Northern Coast of Java, ...Coastal and mangrove vulnerability assessment In the Northern Coast of Java, ...
Coastal and mangrove vulnerability assessment In the Northern Coast of Java, ...
 
Young & Hot ℂall Girls Hyderabad 8250077686 WhatsApp Number Best Rates of Hyd...
Young & Hot ℂall Girls Hyderabad 8250077686 WhatsApp Number Best Rates of Hyd...Young & Hot ℂall Girls Hyderabad 8250077686 WhatsApp Number Best Rates of Hyd...
Young & Hot ℂall Girls Hyderabad 8250077686 WhatsApp Number Best Rates of Hyd...
 
Carbon Stock Assessment in Banten Province and Demak, Central Java, Indonesia
Carbon Stock Assessment in Banten Province and Demak, Central Java, IndonesiaCarbon Stock Assessment in Banten Province and Demak, Central Java, Indonesia
Carbon Stock Assessment in Banten Province and Demak, Central Java, Indonesia
 
Up to 40% of food crops are lost to plant pests and diseases annually.
Up to 40% of food crops are lost to plant pests and diseases annually.Up to 40% of food crops are lost to plant pests and diseases annually.
Up to 40% of food crops are lost to plant pests and diseases annually.
 
Elemental Analysis of Plants using ICP-OES(2023)
Elemental Analysis of Plants using ICP-OES(2023)Elemental Analysis of Plants using ICP-OES(2023)
Elemental Analysis of Plants using ICP-OES(2023)
 
NO1 Best Amil Baba In Pakistan Authentic Amil In pakistan Best Amil In Pakist...
NO1 Best Amil Baba In Pakistan Authentic Amil In pakistan Best Amil In Pakist...NO1 Best Amil Baba In Pakistan Authentic Amil In pakistan Best Amil In Pakist...
NO1 Best Amil Baba In Pakistan Authentic Amil In pakistan Best Amil In Pakist...
 

September 1 - 1030 - Zhiming Qi

  • 1. Effect of Vegetative Filter Strips on Sediment Deposition in Drainage Ditches in Littoral Zone of Lake Sainte-Pierre in Quebec, Canada The 11th International Drainage Symposium Zhiming Qi, Birkhoff Li, Monique Poullin, Shiv Prasher Zhiming Qi, Associate Professor (Presenter) Birkhoff Li, MSc. Graduate Student Shiv Prasher, James McGill Professor Department of Bioresource Engineering, McGill University Monique Poulin, Associate Professor Département de Phytologie, Université Laval
  • 2. Outlines • Introduction • Objectives • Methods: Sites, vegetative buffer treatment, sediment measurement (ditch volume), grass • Preliminary Results
  • 3. Lakes in Canada Lac Sainte Pierre
  • 4. Lac Sainte-Pierre Littoral Zone 353 km2 (136 sq mi) About ¼ of Story County, Iowa
  • 5.
  • 6. Agricultural drainage ditches (after flooding)
  • 9. Ecological Impacts Photo Eric Labonté - MAPAQ
  • 10. Objectives • To investigate the effectiveness of vegetative filter strips on reducing sediment deposition in drainage ditches in the coastal area of Lac Saint Pierre.
  • 11. Site St Cuthbert Site Yamachiche Site Baie-du-Febvre Methods Three sites Three ditches at each site 500-1000 m long 4-6 m wide Cleaning: Nov 2019 Grass sowed: May 2020 Ditch monitored: 2020- now Site Yamachiche
  • 12. • Ditch Trenching (Late Fall 2019)
  • 13. • Vegetative Buffer Strip (0, 2, & 4m wide; sowed in May 2020)
  • 14. DTM data of the control ditch at site St Cuthbert, Aug 10th, 2020 • LiDAR Scan Scanned 4 times: October, 2019 (before trenching) November, 2019 (after trenching, snowed) August 2020 October 2021 YellowScan LiDAR Surveyor mounted below a DJI Matice 600 Pro UAV though a contract with MVT Geo-solutions Inc. in Quebec City.
  • 15.
  • 16.
  • 17. • Total station survey • 20m interval along the ditch • 25cm between two points at each cross section • Conducted after the spring flooding and before the snow in Nov. 8 0 m 5.75 m
  • 18. Ditch survey at site Saint-Cuthbert • Total station survey • 20m interval along each ditch • 2 round per year • 1st round from June to July • 2nd round from September to October
  • 19. Total Station Survey at Yamachiche in Nov 2019
  • 20. Total Station Survey at the Lac Sainte Pierre sites
  • 21.
  • 22. -2 -1 0 Height (m) -2 -1 0 0 1 2 3 4 5 6 Height (m) -2 -1 0 0 1 2 3 4 5 6 Height (m) Distance from the reference point at the start of the ditch cross-section (m) Step 1. A horizontal auxiliary line is made based on the highest point of the ditch cross-section (m) Step 2. The area of the closed polygon created by auxiliary line and the ditch profile is calculated using the GIS library 𝐷𝑖𝑡𝑐ℎ 𝑣𝑜𝑙𝑢𝑚𝑒 = 𝑐𝑟𝑜𝑠𝑠 𝑠𝑒𝑐𝑡𝑖𝑜𝑛𝑎𝑙 𝑎𝑟𝑒𝑎 ∗ 20 𝑚 Cross sectional area = 𝑡ℎ𝑒 𝑎𝑟𝑒𝑎 𝑜𝑓 𝑐𝑙𝑜𝑠𝑒𝑑 𝑝𝑜𝑙𝑦𝑔𝑜𝑛 Ditch volume calculation (Total Station)
  • 23. Robel height measurement 1.0 m 10 9 8 7 6 4 2 5 3 1 4 m • To evaluate the vegetation density close to the ditch • Approximately 60m interval along each VFS • Conducted during fall in 2020 & 2021
  • 25. Preliminary Results: 1) LiDAR Survey Height decreased between Dec 16, 2019 and August 10, 2020 Height increased between Dec 16, 2019 and August 10, 2020 Distribution of sediment accumulation and loss
  • 26. DTM data comparison of the control ditch at site St Cuthbert between December 2019 and August 2020 Sediment change calculation Site Baie du Febvre St Cuthbert Yamachiche Buffer strip width (m) 0 -1725 -1686 NA* 2 -701 -497 107 4 -663 -382 -353 Table 1 Sediment volume change (m3) over the scanning area from winter 2019 to summer 2020 • Most ditches had sediment accumulation during the period between two LiDAR scans (sediment volume change < 0: decreasing) Preliminary Results: 1) LiDAR Survey *Note: the control ditch changed at site Yamachiche
  • 27. * Control ditch changed to the one on the east side of the old control in 2020 due to dense vegetation along the old control. • Significant difference of ditch volume between June and November (Paired t test, P=0.022) Table 2. Ditch volume (m3) in 2019 and 2020 Site Buffer strip width (m) Oct 2019 before trenching Nov 2019 right after trenching Jun 2020 Nov 2020 BDF 0 1414 1250 1165 2 856 1032 999 4 1354 1344 1375 STC 0 229 558 537 2 446 517 490 4 297 525 504 YMC 0* 729* 938* 628* 583* 2 486 522 590 532 4 837 987 549 536 * Control ditch changed to the one on the east side of the old control in 2020 due to dense vegetation along the old control. • Ditch volume after trenching in general decreased which indicating a net sediment deposition Preliminary Results: 2) Total Station Survey 2020
  • 28. Total statoin survey Percentage of ditch volume change from June 2020 to November 2020 • Possible explanation  Insufficient observation time  Inconsistent vegetation conditions (e.g., natural forage) Preliminary Results: 2) Total Station Survey • No significant difference among different width (0, 2, and 4m) of buffer strips (P> 0.05)
  • 29. Table 3 Robel height measurement in Fall 2020 Site Buffer strip width Mean measurement (cm) Stdev (cm) BDF 0 37.22 15.07 2 48.22 8.47 4 42.26 11.91 STC 0 38.84 15.89 2 61.50 11.66 4 44.67 12.74 YMC 0 33.81 11.85 2 53.38 13.00 4 48.68 17.06 Preliminary Results: 3) Robel height Grass Robel height was significantly lower at 0-m ditches (p<0.05); no difference between 2m and 4m vegetative filter strips.
  • 30. Preliminary Results: Summary • Both Total Station survey (manual) and LiDAR scan (UAV) in 2020 showed ditch volume decrease (sediment deposition), but no significant difference among treatments (vegetative filter strip width of 0, 2, and 4m) in the total station survey (though lower % for wider buffer strip); LiDAR scan showed significantly more deposition under 0-m strip than 2 and 4 m. • 2021 data (completed in mid-Nov, under processing) showed a reverse trend of ditch volume decrease (sediment loss, data no shown). Needs further verification. • Robel height followed our expectation (low at 0-m), and soil and water quality data is under processing. Treatment /Site 2020 Ditch Sediment Deposition 2020 Robel Height (cm) Total Station (m3) Total Station (%) LiDAR Scan (m3) -------------------------------------------- Treatment (buffer width) -------------------------------------------- 0M -50A -5.9%A -1560A 36.6B 2M -39A -6.1%A -364B 54.4A 4M -1A -1.4%A -466B 45.1AB ----------------------------------------------------- Sites ----------------------------------------------------- STC -23a -4.3%a -855a 48.3a YMC -39a -6.5%a -505a 45.3a BDF -29a -2.6%a -1030a 42.5a
  • 31. Zhiming Qi, Ph.D. James H. Brace Associate Professor​ Department of Bioresource Engineering​ McGill University Email: zhiming.qi@mcgill.ca
  • 33. Ditch volume calculation -3 -2.5 -2 -1.5 0 1 2 3 4 5 6 -3 -2.5 -2 -1.5 0 1 2 3 4 5 6 -3 -2.5 -2 -1.5 0 1 2 3 4 5 6 Figure B.1 Ditch cross-section profile at Yamachiche 4m buffer strip ditch @ 340m in 2020 Oct and 2021 Jun Figure B.2 Adjust them to achieve the equal ditch width Figure B.3 Ditch volume illustration, resulting a volume difference of 24.305% Other information
  • 34. Field Survey Cross sections measured in June and October in 4m vegetative buffer strip ditch at site Yamachiche
  • 35. Table 2 Ditch Volume percentage change from June 2020 to November 2021 • No significant difference among buffer strips (P> 0.05) Total station survey Site Buffer strip width (m) Jun 2020 – Nov 2020 Nov 2020 – Jun 2021 Jun 2021 – Oct 2021 Total(Jun 2020 – Oct 2021) BDF 0 -3.76% 3.40% 4.76% 4.247% 2 -5.22% 2.35% 0.99% -2.036% 4 -4.00% 4.87% 4.37% 5.079% STC 0 -7.24% -1.32% -3.13% -11.336% 2 -9.83% 10.43% -3.83% -4.237% 4 -2.37% 26.73% 1.06% 25.050% YMC 0* -6.80% 6.52% 11.41% 10.608% 2 -3.20% 6.41% 6.60% 9.804% 4 2.31% 3.12% -0.34% 5.136% * Control ditch changed to the one on the east side of the old control in 2020 due to dense vegetation along the old control. Figure 2. Ditch volume percentage change comparison between different buffer strip width over Jun 2020 to Nov 2021 • + sediment loss • - sediment deposition %𝐷𝑖𝑡𝑐ℎ 𝑣𝑜𝑙𝑢𝑚𝑒 𝑐ℎ𝑎𝑛𝑔𝑒 = 𝐷𝑖𝑡𝑐ℎ 𝑣𝑜𝑙𝑢𝑚𝑒 𝑎𝑡 𝑡ℎ𝑒 𝑒𝑛𝑑 𝑜𝑓 𝑡ℎ𝑒 𝑝𝑒𝑟𝑖𝑜𝑑 − 𝐷𝑖𝑡𝑐ℎ 𝑣𝑜𝑙𝑢𝑚𝑒 𝑎𝑡 𝑡ℎ𝑒 𝑠𝑡𝑎𝑟𝑡 𝑜𝑓 𝑡ℎ𝑒 𝑝𝑒𝑟𝑖𝑜𝑑 𝐷𝑖𝑡𝑐ℎ 𝑣𝑜𝑙𝑢𝑚𝑒 𝑖𝑛 𝑡ℎ𝑒 𝑠𝑡𝑎𝑟𝑡 𝑜𝑓 𝑡ℎ𝑒 𝑝𝑒𝑟𝑖𝑜𝑑
  • 36. Site Buffer strip width (m) Growing* Season 2020 Non- growing* Season 2020 Growing* Season 2021 BDF 0 -3.76% 3.40% 4.76% 2 -5.22% 2.35% 0.99% 4 -4.00% 4.87% 4.37% STC 0 -7.24% -1.32% -3.13% 2 -9.83% 10.43% -3.83% 4 -2.37% 26.73% 1.06% YMC 0* -6.80% 6.52% 11.41% 2 -3.20% 6.41% 6.60% 4 2.31% 3.12% -0.34% • Growing season has less impact on ditch’s volume than the fallow season. (p=0.004, w=27, One -tailed Mann-Whitney U test) Figure 1. Ditch volume percentage change comparison between growing and fallow season Total station survey * Control ditch changed to the one on the east side of the old control in 2020 due to vegetation along the old control. * Growing season 2020: Jun 2020 – Nov 2020 * Non-growing season 2020: Nov 2020 – Jun 2021 * Growing season 2021: Jun 2021 – Oct 2021 Table 3 Ditch Volume percentage change from June 2020 to November 2020 18 9 %𝐷𝑖𝑡𝑐ℎ 𝑣𝑜𝑙𝑢𝑚𝑒 𝑐ℎ𝑎𝑛𝑔𝑒 = 𝐷𝑖𝑡𝑐ℎ 𝑣𝑜𝑙𝑢𝑚𝑒 𝑎𝑡 𝑡ℎ𝑒 𝑒𝑛𝑑 𝑜𝑓 𝑡ℎ𝑒 𝑝𝑒𝑟𝑖𝑜𝑑 − 𝐷𝑖𝑡𝑐ℎ 𝑣𝑜𝑙𝑢𝑚𝑒 𝑎𝑡 𝑡ℎ𝑒 𝑠𝑡𝑎𝑟𝑡 𝑜𝑓 𝑡ℎ𝑒 𝑝𝑒𝑟𝑖𝑜𝑑 𝐷𝑖𝑡𝑐ℎ 𝑣𝑜𝑙𝑢𝑚𝑒 𝑖𝑛 𝑡ℎ𝑒 𝑠𝑡𝑎𝑟𝑡 𝑜𝑓 𝑡ℎ𝑒 𝑝𝑒𝑟𝑖𝑜𝑑 • + sediment loss • - sediment deposition
  • 37. NDVI of site Yamachiche NDVI of site St Cuthbert Vegetation measurement

Editor's Notes

  1. What does the color represent? Red means increase in elevation and green means decrease in elevation? Red means high; might be grasses; but can be eliminated by MVT
  2. Can you separate “total station survey” and “soil sampling”? It is better to put all information about total station survey in one slides or two consecutive slides the followed by a slide for soil sampling. “befer” should be “before”.
  3. Add a picture of Robel height
  4. Along ditch on both sides? What is your plan for 2021?
  5. Average height increased ~ 0.168m Average height decreased ~ -0.056m Can you add digital legends? so that I can estimate approximately how many cm increase or decrease. What is the unit? Winter 2019: how to remove the effect of snow cover? Compute the average increase How was the grass and water look like while LiDAR survey in August 2020? Can you post a aerial picture taken by MVT?
  6. Failed in both one way ANOVA and Kruskal-Wallis rank sum test(a nonparametric statstics).
  7. A one-tailed T-test has also being runed, ended with p-value 0.2639 the data fail to the normality test(Shapiro-Wilk test). Serval normalize procedure(logarithmic, root, square) were tried, but all failed.
  8. Don’t know whether is useful or not, the NDVI data.