  1. 1. Conservation Channel Design
  2. 2. The Conservation Toolbox
  3. 3. Self-Forming Two-Stage Ditch Sites Photo Albums: https://www.flickr.com/photos/101539667@N06/albums
  4. 4. Beem Ditch
  5. 5. Beem Ditch Evolution - As Built October-2005
  6. 6. Beem Ditch Evolution - Anticipated Some Date in the Future
  7. 7. Beem Ditch Evolution - 5.8-Years June-2011
  8. 8. Beem Ditch Evolution - 7.0-Years October-2012
  9. 9. Beem Ditch Evolution - 10.4-Years February-2016
  10. 10. Site Characteristics Reach Length Catchment Area Reach Reach:Catchment Slope Age Site (m) (ha) (ha) Area (%) (%) (yrs) BEE 152 116.6 0.165 0.14% 0.27% 16.2 COL 147 88.1 0.301 0.34% 0.33% 15.9 CLO 511 671.1 0.869 0.13% 0.06% 16.1 FIS 49 658.1 0.089 0.01% 0.89% 13.2 GRA 422 342.0 0.607 0.18% 0.60% 14.3 HOG 323 95.9 0.319 0.33% 0.46% 15.0 HOL 155 248.7 0.092 0.04% 0.30% 12.5 SCI 152 33.7 0.156 0.46% 1.10% 13.2
  11. 11. Accumulated material Bulk density Accumulation rate Site (kg/yr) (g/cm3) (kg·m-2·yr-1) FIS 23,541 0.77 41.6 GRA 53,036 0.99 16.4 HOL 9,956 0.79 18.5 BEE 15,384 0.81 9.9 SCI 5,693 0.80 5.5 HOG 19,037 0.75 5.7 COL 49,662 0.85 20.2
  12. 12. BEE COL CLO FIS GRA HOG HOL SCI Total P (ppm) 200 400 600 800 1000 1200 1400 1600 TP Concentrations
  13. 13. Organic Matter BEE COL CLO FIS GRA HOG HOL SCI OM (%) 2 4 6 8 10 12 14 16
  14. 14. Total Carbon (%) BEE COL CLO FIS GRA HOG HOL SCI Total C (%) 3 4 5 6 7 8 9 10
  15. 15. Total Nitrogen (%) BEE COL CLO FIS GRA HOG HOL SCI Total N(%) 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8
  16. 16. Accumulation Rates Total C Total N Total P Site (g · m-2 · yr-1 ) (g · m-2 · yr-1 ) (g · m-2 · yr-1 ) BEE 804 34.9 6.2 COL 1411 65.0 24.7 CLO 186 15.9 3.2 FIS 2453 150.7 24.9 GRA 873 39.1 10.2 HOG 256 18.7 5.1 HOL 1362 64.1 17.6 SCI 360 15.9 3.2 Average 963 50.5 11.9 Mean Accumulation rates
  17. 17. Indicator System Type Range Soil organic matter (g/kg) This study Self-forming channels 28-142 Rokosch et al. 2009† Forested wetlands 15-35 Mitsch et al. 2012‡ Constructed wetlands 50 - 90 Total Carbon (g/kg) This study Self-forming channels 35 – 90 Anderson and Mitsch 2006 Constructed wetlands 38±2 Rokosch et al. 2009† Forested wetlands 6 - 18 Hossler et al. 2011 Constructed wetlands 29.3±2 Hossler et al. 2011 Natural wetlands 129±50 Total carbon (g/m2/yr) This study Self-forming channels 186-2453 Anderson and Mitsch 2006 Riverine wetlands 181 – 193 Total nitrogen (mg/kg) This study Self-forming channels 2193 – 7090 Anderson and Mitsch 2006 Constructed wetlands 320±20 Rokosch et al., 2009† Forested wetlands 500 – 1200 Hossler et al. 2011 Constructed wetlands 2540±160 Hossler et al. 2011 Natural wetlands 11300±4700 Total nitrogen (g/m2/yr) This study Self-forming channels 15.9-151 Anderson and Mitsch 2006 Riverine wetland 16.2 – 16.6 Total phosphorus (mg/kg) This study Self-forming channels 377 - 1494 Anderson and Mitsch 2006 Constructed wetlands 701±35 Rokosch et al. 2009† Forested wetlands 700 - 1200 Total phosphorus (g/m2/yr) This study Self-forming channels 3.2 – 24.9 Mitsch and Gosselink 1993 Treatment wetlands 0.4 – 3.5 Anderson and Mitsch 2006 Riverine wetlands 3.3 – 3.5 Comparison to Other Ecosystems
  18. 18. Deposited Sediment/Soil Subsoil P and N Mineralization – Kurt Site
  19. 19. OWC - Upstream
  20. 20. OWC - Downstream
  21. 21. Subsoil Topsoil Deposited Soil Bench in Trapezoidal Channel Deposited Soil Core Subsoil Core Original Trapezoidal Ditch Constructed Two-Stage Ditch Excavated Floodplain in Subsoil Subsoil Core Deposited Soil Core Subsoil Core Deposited Soil Core In Situ Resin Core Method (Noe)
  22. 22. Proportion by Resin Bead Bag Position Threshold in Check Bags (B+E) <10-20%
  23. 23. Mineralization Rates (g/m2/yr) PO4-P NO3-N NH4-N Watershed Data Period (g · m-2 · yr-1) (g · m-2 · yr-1) (g · m-2 · yr-1) Notes OWC All 11/21 – 5/22 0.35 -0.42 11.17 This study; two-stage ditch OWC All 11/21 – 5/22 0.49 -0.60 10.85 This study; self-forming channel OWC Below Threshold 11/21 – 5/22 0.79 -0.52 9.47 This study; self-forming channel OWC Worst Case 11/21 – 5/22 0.64 0.46 11.80 This study; two-stage ditch OWC Worst Case 11/21 – 5/22 0.79 -0.34 12.37 This study; self-forming channel Kurt Below Threshold 10/20 – 10/21 0.56 1.06 0.47 This study; two-stage ditch deposition Kurt Below Threshold 10/20 – 10/21 0.26 0.59 0.67 This study; two-stage ditch subsoil Urban WS (NC ) 0.27 9.11 McMillan et al., 2017; Urban Stream Restoration Smith Creek (VA) 0.15 - 4.53 (-24.0) - 25.1 0.77 - 25.5 Gillespie et al., 2018; 3rd/4th Order Difficult Run (VA) 0.11 2.69 1.78 Noe et al., 2013; streams/swamp Piedmont (VA) 0.15 1.13 5.8 Wolf et al., 2014; Natural and constructed wetlands Pocomoke (MD) 0.21 - 5.5 2.3 - 28 Noe et al., 2019; Restored/channelized/natural
  24. 24. Agronomic Impacts of Sediment and Nutrient Capture, Harvest and Reuse Matt Simmons Advisor: Dr. Jon Witter
  25. 25. FERTILIZER TREATMENTS Preplant (Valmar 1255) 29-lb/ac N (163-lb/ac 18-46-0) 75-lb/ac P2O5 (163-lb/ac 18-46-0) 57-lbs/ac K2O (95-lb/ac 0-0-60) At Plant (Vapply Surface Bands) 20-lbs/ac 28% N Sidedress (Hand Spread; 8/17/20) 150-lbs/ac N @V8-V10 (0-46-0)
  26. 26. In Season Sampling Observations (Year 1 – Corn) • Stand counts lower in several sediment amended plots • Timing of amendment and seed corn maggot • Sediment amended plants ahead 1 growth stage • Taller plants in sediment amended soils (V5-V7) • Stalk diameters where significantly higher in sediment amended plots • Plant tissue analysis of macronutrients all within acceptable ranges for growth stage • Weeds not an issue with typical crop protection program • Little disease pressure observed during the growing season • Insects (Japanese beetles (Year 2 – Soybeans))
  27. 27. Corn Yield T1 T2 T3 T4 T5 T6 T7 T8 Yield (bu/ac) 120 140 160 180 200 220 240 260 280 300 a de bc abc cde bcd e ab
  28. 28. CONTACT INFORMATION Jon Witter Email: witter.7@osu.edu Office Phone: (330)287-1377 Dan Mecklenburg Email: mecklenburg.2@osu.edu
  29. 29. Site:Watershed Area vs. P Accumulation P Accumulation (g·m-2·yr) Site:Watershed Area (%)
  30. 30. Site:Watershed Area vs. P Accumulation P Accumulation (g·m-2·yr) Site:Watershed Area (%)
  31. 31. Context – Sediment Capture, Harvest, and Reuse – OWC Site • Deposition in 900-ft reach of self-forming channel • Cost - $13,200 ($14/ft) • Time since construction – 9.44-yrs • ~1250-cubic yards (900-ft*25-ft*1.5-ft) • Bulk density - ~0.5g/cm3 • 542-kg P (1195-lbs P; 127-lbs/yr; 743-lbs/mile/yr) • 27.5-g P/m2/yr • ~$8 NPK per yd3 • $6-$12 per yd3 to dredge and spread • Coverage ~9.3-acres (1-inch spread depth)