  1. 1. IMPLEMENTATION AND MAINTENANCE TWO –STAGE DITCHES LUCAS COUNTY ENGINEER’S OFFICE MIKE PNIEWSKI, P.E., P.S. LUCAS COUNTY ENGINEER
  2. 2. TWO-STAGE CHANNELS • TWO-STAGE CHANNELS PROVIDE FOR A MORE “NATURAL” CHANNEL SYSTEM • INCORPORATES FLOODPLAIN AREA • INCREASES OR MAINTAINS FLOW WHILE SLOWING VELOCITIES IN THE CHANNEL DURING HIGH FLOW CONDITIONS • MAINTAINS EXISTING FLOWS DURING NORMAL CONDITIONS • PERMITS AREA FOR CHANNEL VEGETATION ESTABLISHMENT • SLOWS CHANNEL VELOCITIES • LOWERS EROSIVE POTENTIAL • LOWERS “CARRYING CAPACITY” FOR PARTICULATES • RESULTS IN GREATER SEDIMENT SETTLEMENT IN BENCHES • ALLOWS GREATER POTENTIAL FOR PARTICULATE FILTERING BY BENCH VEGETATION • GREATER TAKE UP OF NITROGEN AND PHOSPHORUS BY BENCH VEGETATION
  3. 3. TWO-STAGE CHANNELS • BEST SUITED TO DITCHES WITH FOLLOWING CHARACTERISTICS • DITCH GRADE OF 2% OR LESS • DITCHES EXHIBIT BANK EROSION DUE TO UNDERSIZING • ADJACENT FIELDS ARE FLAT <0.5% SLOPE AND LARGELY UTILIZE SUBSURFACE DRAINAGE SYSTEMS • BENEFITS TO AGRICULTURE • REDUCES WETNESS IN FIELDS DUE TO LOWER FREQUENCY OF OUTLETS UNDER WATER OR CLOGGING • INCREASES AVERAGE FIELD YIELDS • VEGETATION STABILIZES BANKS RESULTING IN LOWER MAINTENANCE • LOWER STREAM SEDIMENTATION • LITTLE CLEANOUT • BENEFITS TO ENVIRONMENT • IMPROVES PLANT-SOIL-WATER INTERACTION • INCREASES NUTRIENT CYCLING • REDUCES DOWNSTREAM EXPORTS OF NUTRIMENTS AND SEDIMENT
  4. 4. CHALLENGES WITH IMPLEMENTATION • ACCESS • OHIO PETITION DITCH LAW • OHIO REVISED CODE 6131 • VIEW AND FIRST HEARING (~90 DAYS) • DESIGN/CALCULATION OF BENEFITS AND COSTS (12-18 MONTHS) AND DAMAGE ASSESSMENTS • FINAL HEARING • PROVIDES FOR AN PERMANENT ACCESS EASEMENT • 10-15 FOOT BUFFER STRIP REQUIRED
  5. 5. CHALLENGES WITH IMPLEMENTATION • COMMUNICATION • EARLY AND COMPREHENSIVE COMMUNICATION WITH LAND OWNERS • INVOLVE THEM IN THE DESIGN AND IMPLEMENTATION PROCESS • LEARN ISSUES WITH DRAINAGE/EROSION ON ADJACENT LAND • INCORPORATE LAND OWNERS NEEDS IN PROJECT • PRESERVE SUBSURFACE DRAINAGE • CONSTRUCTION TIMING AND PLANTING AREAS • SPOILS
  6. 6. CHALLENGES WITH IMPLEMENTATION • PERMITTING • NO 404 REQUIRED IF NO CONSTRUCTION IN WATER • SWPPP/NOI TYPICALLY REQUIRED BY CONTRACTOR FOR MOST PROJECTS • > 1 ACRE LAND DISTURBANCE • FLOODPLAIN USE PERMIT TYPICALLY REQUIRED • CLOMR/LOMR? • ENDANGERED SPECIES • OBTAIN SPECIES LIST FROM USFWS • TREE CLEARING BETWEEN NOVEMBER 1 TO APRIL 1
  7. 7. CHALLENGES WITH IMPLEMENTATION • PLANTING/EROSION CONTROL • SOME RIP RAP MAY BE REQUIRED AT SHARP CURVES • PLANT WITH NATIVE GRASSES • USED WILLOW STAKES AT SOME LOCATIONS IN PLACE OF RIP RAP • EROSION CONTROL MATTING USED PRIOR TO GRASS ESTABLISHMENT
  8. 8. TEN MILE CREEK
  9. 9. PROJECT OVERVIEW • INCORPORATION OF 8,000 FEET OF TWO-STAGE CHANNEL DESIGN • FROM CONFLUENCE OF PRAIRIE DITCH TO APPROXIMATELY 3,000 FEET SOUTH OF SYLVANIA ROAD • INVASIVE SPECIES REMOVAL AND INCORPORATION OF NATIVE VEGETATION • PROVIDE BENCH LOCATION OF FUTURE MULTI-USE TRAIL
  10. 10. SITE SPECIFIC ISSUES • AREA SUBJECT TO FREQUENT FLOODING • CONFLUENCE OF TWO AG WATERSHEDS • UPSTREAM TEN MILE CREEK (RICHFIELD TWP) • PRAIRIE DITCH (SPENCER AND HARDING TWP) • NEAR FUTURE PROJECT • REGIONAL RETENTION AT SECOR METROPARK • MODIFIED TRAPEZOIDAL CHANNEL WITH HARDENED BANKS • RIP-RAPPED BANKS ALONG ENTIRELY OF AREA TO REDUCE EROSION • TRAPEZIODAL CHANNEL CREATED BY PREVIOUS FILLING OF FLOODPLAINS DOWNSTREAM OF HERR ROAD
  11. 11. PRE – CONSTRUCTION CONDITIONS CENTENNIAL ROAD
  12. 12. PRE – CONSTRUCTION CONDITIONS HERR ROAD
  13. 13. POST – CONSTRUCTION CONDITIONS (2020) CENTENNIAL ROAD
  14. 14. POST – CONSTRUCTION CONDITIONS (2022) CENTENNIAL ROAD
  15. 15. POST – CONSTRUCTION CONDITIONS (2020) HERR ROAD
  16. 16. POST – CONSTRUCTION CONDITIONS (2022) HERR ROAD
  17. 17. SMITH DITCH
  18. 18. PROJECT OVERVIEW • INCORPORATION OF 2,300 FEET OF TWO-STAGE CHANNEL DESIGN • FROM MCCORD ROAD TO I-475 EXPRESSWAY • INVASIVE SPECIES REMOVAL AND INCORPORATION OF NATIVE VEGETATION
  19. 19. SITE SPECIFIC ISSUES • AREA SUBJECT TO FREQUENT FLOODING • SUBURBAN WATERSHED WITH WATER SOLUBLE PHOSPHORUS AND NITROFICATION • URBAN FERTILIZATION • MODIFIED TRAPEZOIDAL CHANNEL WITH HARDENED BANKS
  20. 20. PRE – CONSTRUCTION CONDITIONS
  21. 21. POST – CONSTRUCTION CONDITIONS (2020)
  22. 22. POST – CONSTRUCTION CONDITIONS (2020)
  23. 23. CURRENT PROJECTS IN IMPLEMETATION
  24. 24. ZINK-HELDMAN DITCH
  25. 25. PROJECT OVERVIEW • INCORPORATION OF 1,600 FEET OF TWO-STAGE CHANNEL DESIGN • REPLACEMENT OF CULVERTS TO ALLOW FLOW • OAK PARK TO PLUM GROVE • INVASIVE SPECIES REMOVAL AND INCORPORATION OF NATIVE VEGETATION • USING PETITION DITCH PROCESS TO OBTAIN LAND ACCESS • FIRST HEARING – OCTOBER 8, 2020 • FINAL HEARING – JUNE 15, 2021
  26. 26. PRE – CONSTRUCTION CONDITIONS
  27. 27. POST – CONSTRUCTION CONDITIONS (2022)
  28. 28. VAN FLEET DITCH
  29. 29. PROJECT OVERVIEW • INCORPORATION OF 12,600 FEET OF TWO-STAGE CHANNEL DESIGN • WECKERLY TO WABASH CANNONBALL TRAIL • INVASIVE SPECIES REMOVAL AND INCORPORATION OF NATIVE VEGETATION • USING PETITION DITCH PROCESS TO OBTAIN LAND ACCESS • FIRST HEARING – MARCH 2, 2021 • FINAL HEARING – SEPTEMBER 14, 2021
  30. 30. PRE – CONSTRUCTION CONDITIONS
  31. 31. POST – CONSTRUCTION CONDITIONS
  32. 32. MAINTENANCE/RESULTS • CHANNELS ARE PERFORMING • NO SEDIMENT ACCUMULATION/”CLEAN” BOTTOMS • CHANNELS BEGINNING TO MEANDER IN BENCHES • NO FLOODING IN AREAS WHERE INSTALLED • HIGHER YIELDS (10-20%) DUE TO NO OR SHORT TILE BACK-UP TIMES • FASTER DRAINAGE OF FIELDS
  33. 33. MAINTENANCE/RESULTS • NATIVE GRASSES PERFORM BETTER • LESS MAINTENANCE • LESS BROADLEAF ESTABLISHMENT/ LESS SPRAYING • LESS INVASIVE SPECIES ISSUES • MOW ONCE A YEAR

×