SlideShare a Scribd company logo
1 of 2
Ronan J. Maxwell
Knocknamana, Clarecastle, Co. Clare.
T: (065) 6892737 M: (086) 8149814 E: ronan@ronanmaxwell.com
Profile
 Action oriented and dedicated engineering professional with over 20 years’ experience in
process improvement and product design roles in a Six-Sigma / Lean design environment
 Excellent communication skills, works highly effectively within cross functional teams
 Analytical and methodical approach to problem solving with a proven ability to generate
inventive and effective solutions. Numerous patent disclosures have been filed
 Energetic and versatile, with the ability to effectively manage multiple tasks
 Bringing experience from Electrical products and medical devices field of engineering
Key Skills and Knowledge Areas
- Design for Six Sigma (Black Belt) - Project Management - Process Development / Transfer
- New Product Development - Leadership & Management - Technology Development
- Medical Devices - Problem Solving Techniques - Core Polymer processing
Work Experience:
TE Connectivity, Limerick. Positions held as follows Oct ’95 – Present
R&D Project Manager (Advanced Development Group) Jan ’09 – Present
 Directed large scale Silicone(HTV) injection moulding technology project in Kunshan, China
(budget ~$10M) for the manufacture of hollow core insulators upto 12 metres in length
 Simulation using Moldflow analysis, supporting mould design and process development
 Innovation development with a number of innovations developed and filed as trade secrets
 Liaised with and supported a wide range of local project teams (~5-10 indirect reports),
based in China, Germany, Switzerland and the UK
 Developed supplier selection models, worked with selected suppliers to improve quality
systems, coordinating the commissioning of equipment , material selection and evaluation
 Provided consulting global process support across 7 manufacturing sites with polymer
process related issues, also supporting global expansion technology for polymer products
 Established 3 layer moulding process technology for German/Slovenian manufacturing
facility. Used 4 station vertical rotating injection moulding process to manufacture product
 Led and Coordinated a product recall program with major Irish customer, providing an
immediate response which saved the company a potential liability
Project Manager (R&D Materials & Process Group) Jan ’03 – Jan ‘09
 Managed a team of local engineers and technicians and virtual project teams, supporting a
wide range of cost reduction and sustaining projects globally.
 Conducted performance reviews for a numbers of direct reports
 Managed and ran polymer characterisation laboratory at our Shannon facility
 Transferred manufacturing technology lines to Czech Republic, Mexico, India, & China
 Sourced new insulator, surge arrester and cable accessories moulds in China
 Directed a host of lean Six Sigma cost reduction projects throughout our global
manufacturing sites, providing savings in excess of $1M.
 Risk assessment and contingency planning for each project(D-FMEA, P-FMEA)
 Supported HTV silicone injection moulding and product expansion cells in France
Development & Projects Engineer (R&D Technical Development) Oct ’95 – Jan ‘03
 Formulation of polyethylene compound for injection moulded and cobalt-60 irradiated
(Isotron) cross-linked heat shrink caps automation process (>$1M budget)
 Reduced scrap by 20% on high volume moulds by switching to using hot runner systems
 Working knowledge of hot melt adhesive extruder as part of automated assembly line
 Supported the development and setup of a 4 station polyethylene blow moulding cell
 Commissioned materials handling system for polyethylene injection moulding process
 Designed and commissioned a central high speed explosion proof Henschel Peroxide
mixing system for cross-linked compounds, reducing labour hours from 24 to 4
 Planned projects involved in the design and development of moulds for high voltage
products and cross-linked type products for Electrical utility market in USA and Europe
 Sourced moulds in China for 5KA and 10KA Surge arrester products for global sites
 Developed 2 layer LSR moulding process for cold applied Push-On Termination product
 Design of Experiments (Taguchi, fractional factorial) used for setting up processes
 Carried out polymer material testing such as tensile, cure rate and hardness testing
 Practiced Phase review process (stage gate approval) for running each new project.
 Working knowledge of capital expenditure financial control during project execution.
Medtronic, Massachusetts, USA Process Technician/Supervisor Aug ’93 – Sept ‘95
 Manufacture of medical devices such as Angioplasty Guide catheters and guide wires
 Supported process validation and risk assessments for new product introductions
 Strict compliance to all quality and GMP documentation and procedures
 Setup first luer hub insert injection moulding cell for this manufacturing site
 Carried out Capillary Rheology testing on Pebax material for support of extrusion cell
 Supported insert moulding of Pebax soft segments onto guide catheter shaft
 Production Supervision, process trouble shooting and maintenance
Other positions held:
C.R. BARD, Galway Co-op engineer (Medical devices) Oct ’92 – June ‘93
SAAB-SCANIA AB, Sweden Co-op Placement Summer 92
Oy ENSTO AB, Finland Co-op Placement Summer 91
Education & Training
NUIG Post-graduate Diploma in Quality Assurance (hons.) 1993
AIT B. Sc. in Polymer Technology (hons.) 1992
Innovation for results 2012
Diploma in Operations Management (Grade A) 2010
Diploma in Project Management (Grade A) 2010
Certified Black Belt in Design for Six Sigma 2009
Advanced Injection Moulding Technology 2006
Dale Carnegie Course (effective communications and human relations) 2005
Additional Information:
Efficient in a range of software including MS Project, Minitab 15, Word, Excel, PowerPoint
Efficient in CAD package such as Solidworks 15, Autocad Mechanical and Moldflow Analysis
References: Available on request

More Related Content

What's hot

FCS Resume 2016 English ENG
FCS Resume 2016 English ENGFCS Resume 2016 English ENG
FCS Resume 2016 English ENGFelipe Calleros
 
150610 Exploring the supply chain opportunities of additive manufacturing in ...
150610 Exploring the supply chain opportunities of additive manufacturing in ...150610 Exploring the supply chain opportunities of additive manufacturing in ...
150610 Exploring the supply chain opportunities of additive manufacturing in ...SINTAS
 
Alcione_Colecha_EN_NOVEMBER_2016
Alcione_Colecha_EN_NOVEMBER_2016Alcione_Colecha_EN_NOVEMBER_2016
Alcione_Colecha_EN_NOVEMBER_2016Alcione Colecha
 
J. P Berry Design Engineer Resume
J. P Berry Design Engineer ResumeJ. P Berry Design Engineer Resume
J. P Berry Design Engineer ResumeJason Berry
 
Brent_Strahan_resume
Brent_Strahan_resumeBrent_Strahan_resume
Brent_Strahan_resumeBrent Strahan
 
Resume of Russell Stevens 2013
Resume of Russell Stevens 2013Resume of Russell Stevens 2013
Resume of Russell Stevens 2013Russell Stevens
 
Mei Fung Curriculum Vitae_2016
Mei Fung Curriculum Vitae_2016Mei Fung Curriculum Vitae_2016
Mei Fung Curriculum Vitae_2016Mei Fung Chong
 
Matthew Grindstaff resume 8-25-16
Matthew Grindstaff resume 8-25-16Matthew Grindstaff resume 8-25-16
Matthew Grindstaff resume 8-25-16Matthew Grindstaff
 
Leschak Resume
Leschak ResumeLeschak Resume
Leschak Resumedleschak
 
Leschak Resume
Leschak ResumeLeschak Resume
Leschak Resumedleschak
 

What's hot (20)

MNikpour_2016
MNikpour_2016MNikpour_2016
MNikpour_2016
 
Enics tasks
Enics tasksEnics tasks
Enics tasks
 
Jonathan C. Zuk
Jonathan C. ZukJonathan C. Zuk
Jonathan C. Zuk
 
FCS Resume 2016 English ENG
FCS Resume 2016 English ENGFCS Resume 2016 English ENG
FCS Resume 2016 English ENG
 
150610 Exploring the supply chain opportunities of additive manufacturing in ...
150610 Exploring the supply chain opportunities of additive manufacturing in ...150610 Exploring the supply chain opportunities of additive manufacturing in ...
150610 Exploring the supply chain opportunities of additive manufacturing in ...
 
Kraig Kottenstette 102016.doc
Kraig Kottenstette 102016.docKraig Kottenstette 102016.doc
Kraig Kottenstette 102016.doc
 
Haitham Sayed C.V
Haitham Sayed C.VHaitham Sayed C.V
Haitham Sayed C.V
 
Mal_CV
Mal_CVMal_CV
Mal_CV
 
Alcione_Colecha_EN_NOVEMBER_2016
Alcione_Colecha_EN_NOVEMBER_2016Alcione_Colecha_EN_NOVEMBER_2016
Alcione_Colecha_EN_NOVEMBER_2016
 
R. Venkatraman-Resume
R. Venkatraman-ResumeR. Venkatraman-Resume
R. Venkatraman-Resume
 
Anastasios Spontis Resume
Anastasios Spontis ResumeAnastasios Spontis Resume
Anastasios Spontis Resume
 
J. P Berry Design Engineer Resume
J. P Berry Design Engineer ResumeJ. P Berry Design Engineer Resume
J. P Berry Design Engineer Resume
 
CV J Singh 2016
CV J Singh 2016CV J Singh 2016
CV J Singh 2016
 
Brent_Strahan_resume
Brent_Strahan_resumeBrent_Strahan_resume
Brent_Strahan_resume
 
Vg (2)
Vg (2)Vg (2)
Vg (2)
 
Resume of Russell Stevens 2013
Resume of Russell Stevens 2013Resume of Russell Stevens 2013
Resume of Russell Stevens 2013
 
Mei Fung Curriculum Vitae_2016
Mei Fung Curriculum Vitae_2016Mei Fung Curriculum Vitae_2016
Mei Fung Curriculum Vitae_2016
 
Matthew Grindstaff resume 8-25-16
Matthew Grindstaff resume 8-25-16Matthew Grindstaff resume 8-25-16
Matthew Grindstaff resume 8-25-16
 
Leschak Resume
Leschak ResumeLeschak Resume
Leschak Resume
 
Leschak Resume
Leschak ResumeLeschak Resume
Leschak Resume
 

Similar to Experienced Engineering Professional Seeking New Opportunities

Similar to Experienced Engineering Professional Seeking New Opportunities (20)

resume_montminy
resume_montminyresume_montminy
resume_montminy
 
MohantyRita-16-7
MohantyRita-16-7MohantyRita-16-7
MohantyRita-16-7
 
Daniel T. Persaud Resume
Daniel T. Persaud ResumeDaniel T. Persaud Resume
Daniel T. Persaud Resume
 
Shaktikumar_Potdar
Shaktikumar_PotdarShaktikumar_Potdar
Shaktikumar_Potdar
 
Bruce Gittleman resume
Bruce Gittleman resumeBruce Gittleman resume
Bruce Gittleman resume
 
Res 10-30-15
Res 10-30-15Res 10-30-15
Res 10-30-15
 
ANIRUDDHA DEV_CV
ANIRUDDHA DEV_CVANIRUDDHA DEV_CV
ANIRUDDHA DEV_CV
 
Roger Spencer Resume revised 9_20_16
Roger Spencer Resume revised 9_20_16Roger Spencer Resume revised 9_20_16
Roger Spencer Resume revised 9_20_16
 
John Setty Resume Rev2
John Setty Resume Rev2John Setty Resume Rev2
John Setty Resume Rev2
 
Mark resume
Mark resumeMark resume
Mark resume
 
Mohamed thalha senior mes consultant Resume
Mohamed thalha  senior mes consultant ResumeMohamed thalha  senior mes consultant Resume
Mohamed thalha senior mes consultant Resume
 
9 May 2022 Tito Camps Resume (1) (4) (1).doc
9 May 2022 Tito Camps Resume (1) (4) (1).doc9 May 2022 Tito Camps Resume (1) (4) (1).doc
9 May 2022 Tito Camps Resume (1) (4) (1).doc
 
2016_11_6_Revised Resume _R0
2016_11_6_Revised Resume _R02016_11_6_Revised Resume _R0
2016_11_6_Revised Resume _R0
 
Amy Freeman Resume June2009
Amy Freeman Resume June2009Amy Freeman Resume June2009
Amy Freeman Resume June2009
 
RESUME98[1]. (1)
RESUME98[1]. (1)RESUME98[1]. (1)
RESUME98[1]. (1)
 
Lane Oltmanns Resume 102416
Lane Oltmanns Resume 102416Lane Oltmanns Resume 102416
Lane Oltmanns Resume 102416
 
Resume 2016_
Resume 2016_Resume 2016_
Resume 2016_
 
PMM CV Jan 2016 - Copy
PMM CV Jan 2016 - CopyPMM CV Jan 2016 - Copy
PMM CV Jan 2016 - Copy
 
MichaelEmblincv
MichaelEmblincvMichaelEmblincv
MichaelEmblincv
 
Jonathan Harman CV 2016
Jonathan Harman CV 2016Jonathan Harman CV 2016
Jonathan Harman CV 2016
 

Experienced Engineering Professional Seeking New Opportunities

  • 1. Ronan J. Maxwell Knocknamana, Clarecastle, Co. Clare. T: (065) 6892737 M: (086) 8149814 E: ronan@ronanmaxwell.com Profile  Action oriented and dedicated engineering professional with over 20 years’ experience in process improvement and product design roles in a Six-Sigma / Lean design environment  Excellent communication skills, works highly effectively within cross functional teams  Analytical and methodical approach to problem solving with a proven ability to generate inventive and effective solutions. Numerous patent disclosures have been filed  Energetic and versatile, with the ability to effectively manage multiple tasks  Bringing experience from Electrical products and medical devices field of engineering Key Skills and Knowledge Areas - Design for Six Sigma (Black Belt) - Project Management - Process Development / Transfer - New Product Development - Leadership & Management - Technology Development - Medical Devices - Problem Solving Techniques - Core Polymer processing Work Experience: TE Connectivity, Limerick. Positions held as follows Oct ’95 – Present R&D Project Manager (Advanced Development Group) Jan ’09 – Present  Directed large scale Silicone(HTV) injection moulding technology project in Kunshan, China (budget ~$10M) for the manufacture of hollow core insulators upto 12 metres in length  Simulation using Moldflow analysis, supporting mould design and process development  Innovation development with a number of innovations developed and filed as trade secrets  Liaised with and supported a wide range of local project teams (~5-10 indirect reports), based in China, Germany, Switzerland and the UK  Developed supplier selection models, worked with selected suppliers to improve quality systems, coordinating the commissioning of equipment , material selection and evaluation  Provided consulting global process support across 7 manufacturing sites with polymer process related issues, also supporting global expansion technology for polymer products  Established 3 layer moulding process technology for German/Slovenian manufacturing facility. Used 4 station vertical rotating injection moulding process to manufacture product  Led and Coordinated a product recall program with major Irish customer, providing an immediate response which saved the company a potential liability Project Manager (R&D Materials & Process Group) Jan ’03 – Jan ‘09  Managed a team of local engineers and technicians and virtual project teams, supporting a wide range of cost reduction and sustaining projects globally.  Conducted performance reviews for a numbers of direct reports  Managed and ran polymer characterisation laboratory at our Shannon facility  Transferred manufacturing technology lines to Czech Republic, Mexico, India, & China  Sourced new insulator, surge arrester and cable accessories moulds in China  Directed a host of lean Six Sigma cost reduction projects throughout our global manufacturing sites, providing savings in excess of $1M.  Risk assessment and contingency planning for each project(D-FMEA, P-FMEA)  Supported HTV silicone injection moulding and product expansion cells in France
  • 2. Development & Projects Engineer (R&D Technical Development) Oct ’95 – Jan ‘03  Formulation of polyethylene compound for injection moulded and cobalt-60 irradiated (Isotron) cross-linked heat shrink caps automation process (>$1M budget)  Reduced scrap by 20% on high volume moulds by switching to using hot runner systems  Working knowledge of hot melt adhesive extruder as part of automated assembly line  Supported the development and setup of a 4 station polyethylene blow moulding cell  Commissioned materials handling system for polyethylene injection moulding process  Designed and commissioned a central high speed explosion proof Henschel Peroxide mixing system for cross-linked compounds, reducing labour hours from 24 to 4  Planned projects involved in the design and development of moulds for high voltage products and cross-linked type products for Electrical utility market in USA and Europe  Sourced moulds in China for 5KA and 10KA Surge arrester products for global sites  Developed 2 layer LSR moulding process for cold applied Push-On Termination product  Design of Experiments (Taguchi, fractional factorial) used for setting up processes  Carried out polymer material testing such as tensile, cure rate and hardness testing  Practiced Phase review process (stage gate approval) for running each new project.  Working knowledge of capital expenditure financial control during project execution. Medtronic, Massachusetts, USA Process Technician/Supervisor Aug ’93 – Sept ‘95  Manufacture of medical devices such as Angioplasty Guide catheters and guide wires  Supported process validation and risk assessments for new product introductions  Strict compliance to all quality and GMP documentation and procedures  Setup first luer hub insert injection moulding cell for this manufacturing site  Carried out Capillary Rheology testing on Pebax material for support of extrusion cell  Supported insert moulding of Pebax soft segments onto guide catheter shaft  Production Supervision, process trouble shooting and maintenance Other positions held: C.R. BARD, Galway Co-op engineer (Medical devices) Oct ’92 – June ‘93 SAAB-SCANIA AB, Sweden Co-op Placement Summer 92 Oy ENSTO AB, Finland Co-op Placement Summer 91 Education & Training NUIG Post-graduate Diploma in Quality Assurance (hons.) 1993 AIT B. Sc. in Polymer Technology (hons.) 1992 Innovation for results 2012 Diploma in Operations Management (Grade A) 2010 Diploma in Project Management (Grade A) 2010 Certified Black Belt in Design for Six Sigma 2009 Advanced Injection Moulding Technology 2006 Dale Carnegie Course (effective communications and human relations) 2005 Additional Information: Efficient in a range of software including MS Project, Minitab 15, Word, Excel, PowerPoint Efficient in CAD package such as Solidworks 15, Autocad Mechanical and Moldflow Analysis References: Available on request