2nd UCTE project
Training
Phase 1
Item 2
Power Plant Unit Control Structures
and Operating Modes related to
Frequency Control Issues
Oguz YILMAZ
Tubitak-UZAY
oguz.yilmaz@uzay.tubitak.gov.tr
• Gas Turbine and Comined Cycle Power Plants
• Operating Modes
• Variable maximum power, ambient conditions
dependency
• Requirement for continuous reserve control
• Example simulations with dynamic models
• Hydro Power Plants
• Operating Modes
• Example simulations with dynamic models
• Lignite/Coal Fired Thermal Units (steam turbines)
• Operating Modes
• Example simulations with dynamic models
• Operational directives to power plants
SUMMARY
8 Unit Control Structures and Operating Modes
Combined Cycle Power Plants
•Constant Load Control (MW Setpoint Control)
(Plant or Gas Turbine)
•Maintain constant MW setpoint whatever the frequency is
•Transient or no response to frequency deviations
•Unpreferred operating mode for system requirements related to primary
frequency control
•Primary Control (Droop Mode, Governor Free Operation)
•Dynamic response to frequency deviations
•Requirement for Reserve (Very Important !!!)
•Base Load (Temperature Control)
•Best operating mode for efficiency. BUT !!!
•Worst operating mode for frequency control!!!!!!!!
•Secondary Control
•Remote determination of Steady State operating point of a Power Block (1/2
GT + ST)
•Primary Control ACTIVE !!!
•Plant Load Controller Details are very very important
Gas Turbine
Combustor
Compressor
&
IGVs
Turbine
P2
T1 T2,
P1
Air, P1=Patm
Exhaust
Flow to
HRSG
Fuel
•Why maximum power is dependent on ambient conditions
and even frequency ???
oguz.yilmaz@uzay.tubitak.gov.tr
Governor
Temp.
Control
M
i
n
S
e
l
e
c
t
Gas
Control
Valve
Turbine
Frequency
Droop
Speed/Load
Reference
(Raise/Lower)
Power
Gas turbine principal control block diagram
Dead
Band
oguz.yilmaz@uzay.tubitak.gov.tr
Reserve Control
Governor
Temp
Control
M
i
n
S
e
l
e
c
t
Gaz
Kontrl
Vanası
Turbin
Frequency
Droop
Speed/Load
Reference
(Raise/Lower)
Power
t(24 saat)
6:00 15:00 24:00
6:00
Max power (observation,
calculation, correction)
Steady state operating
point at 50 Hz
•For the short term state of the compressor, temperature dependency of
maximum power can be foreseen.
•For the long term state of the compresor observation is necessary
% Power
reserve
100
97.5
98
95.5
Continuous control for %2.5 reserve
IGV< IGV max should be satisfied (Reserve Air !!!)
oguz.yilmaz@uzay.tubitak.gov.tr
%P
f(Hz)
50
Speed Droop
% ∆f / %∆P @ steady state
200 mHz= 0.2/50 x100 =%0.4
If Droop=%5
%∆P= %∆f / %droop x100
%∆P=0.4 / 5 x100 =%8
Then,
200 mHz => %8 (if reserve exists !)
100 mHz => %4 (if reserve exists !)
50 mHz => %2 (if reserve exists !)
90 95 97.5 100
Temperature
Control
Limit
oguz.yilmaz@uzay.tubitak.gov.tr
•Same reserve
•Different droop
9
Example Simulations
Scenario 1
Combined Cycle=0.90;0.95 Gas Turbini=0.90;0.95
Dynamic response to +/- 200 mHz frequency deviation
Plant Load Controller details (limiters)
oguz.yilmaz@uzay.tubitak.gov.tr
8 Unit Control Structures and Operating Modes
Hydro Units
•Constant Wicket Gate Opening Control
(Opening Limiters) (Constant Load Control)
•Constant output power whatever the frequency is
•No primary response to frequency deviations.
•Primary Control (Droop Mode, Governor Free
Operation)
•Dynamic responses to frequency deviations
•Requirement for reserve
•Governor settings are important !!! (island mode stability)
•Secondary Control
•Primary Control Active (Governor free, active)
•Steady state operating point is remotely
determined.
oguz.yilmaz@uzay.tubitak.gov.tr
8 Unit Control Structures and Operating Modes
Hydro Units –Speed Regulator Block Diagram
oguz.yilmaz@uzay.tubitak.gov.tr
12
Example Simulations
Scenario 2
Hydro=0.90; 0.95
Dynamic Response to +/- 200 mHz frequency deviations
Opening Limiter
Island Mode Stability
oguz.yilmaz@uzay.tubitak.gov.tr
8 Unit Control Structures and Operating Modes
Lignite/Coal Fired Units (steamers)
•Pressure Control
•Turbine => Pressure Control
•Boiler => Load Controlu (or manual under operator control)
•No or transient response to frequency deviations.
•Change of output depending on caol input quality
•Constant Load Control (constant MW setpoint control,
Load Limit Control)
•Turbine => MW setpoint control
•Boiler => Pressure Regulation (Eğer otomasyon yeterli ise)
•No or transient response to frequency deviations.
•Primary Control (Droop Mode, Governor Free Operation)
•Turbine => Speed Control /Frequency influenced power control
Dynamic response to frequency deviations
•Boiler => Pressure Control (if automation is enough)
•Boiler Following the Turbine and catches up with the pressure
•Coordinated Control
•Secondary Control
•Primary Control Active (Governor free, active)
•Steady state operating point is remotely determined.
8
22/09/09D4121/TRA/2009-00512-1-A15
Example Simulations
Scenario 3
CoalFired=0.90; 0.95
Dynamic response to +/- 200 mHz frequency deviations
Successful/Unsuccessful Pressure Regulation
Load Controller Details (Limiters)
oguz.yilmaz@uzay.tubitak.gov.tr
8 Directives to the Power Plants
•Requirement to set up a common language
•System Details =>meaningful for system operators (TSOs)
•Power Plant details =>meaningful for plant operators
•Common language for common operating modes
•Constant load control, primary control, remote control via AGC
with active primary control etc...
•Requirement to have the fundamental information
related to generating units.
•For generating units,
•speed droop or MW/Hz (or MW/0.2 Hz),
•minimum reserve amount,
•whether limiters are applied or not (primary reserve changes
with operating point unless limiters are applied)
•Maximum and minimum values for secondary control range
Should be known and validated by after incident records.
•Contactual details related to Private generation companies must be
very well known.
oguz.yilmaz@uzay.tubitak.gov.tr

More Related Content

What's hot

Industrial process control
Industrial process controlIndustrial process control
Industrial process controlMohamed A Hakim
 
Cascade control system
Cascade control systemCascade control system
Cascade control systemVedant Patel
 
Control configuration in digital control
Control configuration in digital controlControl configuration in digital control
Control configuration in digital controlAshvani Shukla
 
Pneumatic controllers
Pneumatic controllersPneumatic controllers
Pneumatic controllersbestinkallely
 
Types of Controllers PID PD I PD
Types of Controllers PID PD I PDTypes of Controllers PID PD I PD
Types of Controllers PID PD I PDAnaseem Hanini
 
Proportional-Derivative-Integral (PID) Control
Proportional-Derivative-Integral (PID) ControlProportional-Derivative-Integral (PID) Control
Proportional-Derivative-Integral (PID) Controlguest9006ab
 
Split range control system
Split range  control systemSplit range  control system
Split range control systemAshvani Shukla
 
Automated process control systems
Automated process control systemsAutomated process control systems
Automated process control systemsShine Thenu
 
Introduction of process control
Introduction of process controlIntroduction of process control
Introduction of process controlchemical ppt
 
Btl control system-lab-manual-10 eel68
Btl control system-lab-manual-10 eel68Btl control system-lab-manual-10 eel68
Btl control system-lab-manual-10 eel68Gopinath.B.L Naidu
 
Instrumentation and process control fundamentals
Instrumentation and  process control fundamentalsInstrumentation and  process control fundamentals
Instrumentation and process control fundamentalshossam hassanein
 
Pid controllers
Pid controllersPid controllers
Pid controllersmilind1076
 
Ch8 pid controller
Ch8 pid controllerCh8 pid controller
Ch8 pid controllerElaf A.Saeed
 

What's hot (19)

Industrial process control
Industrial process controlIndustrial process control
Industrial process control
 
Cascade control system
Cascade control systemCascade control system
Cascade control system
 
Control configuration in digital control
Control configuration in digital controlControl configuration in digital control
Control configuration in digital control
 
Basicontrol
BasicontrolBasicontrol
Basicontrol
 
Pneumatic controllers
Pneumatic controllersPneumatic controllers
Pneumatic controllers
 
08 pid.controller
08 pid.controller08 pid.controller
08 pid.controller
 
Types of Controllers PID PD I PD
Types of Controllers PID PD I PDTypes of Controllers PID PD I PD
Types of Controllers PID PD I PD
 
PID Control
PID ControlPID Control
PID Control
 
Proportional-Derivative-Integral (PID) Control
Proportional-Derivative-Integral (PID) ControlProportional-Derivative-Integral (PID) Control
Proportional-Derivative-Integral (PID) Control
 
Split range control system
Split range  control systemSplit range  control system
Split range control system
 
Automated process control systems
Automated process control systemsAutomated process control systems
Automated process control systems
 
Controller Tuning Method for Non-Linear Conical Tank System
Controller Tuning Method for Non-Linear Conical Tank SystemController Tuning Method for Non-Linear Conical Tank System
Controller Tuning Method for Non-Linear Conical Tank System
 
Introduction of process control
Introduction of process controlIntroduction of process control
Introduction of process control
 
Btl control system-lab-manual-10 eel68
Btl control system-lab-manual-10 eel68Btl control system-lab-manual-10 eel68
Btl control system-lab-manual-10 eel68
 
Instrumentation and process control fundamentals
Instrumentation and  process control fundamentalsInstrumentation and  process control fundamentals
Instrumentation and process control fundamentals
 
Pid controllers
Pid controllersPid controllers
Pid controllers
 
Lab02 lead in
Lab02 lead inLab02 lead in
Lab02 lead in
 
06 control.systems
06 control.systems06 control.systems
06 control.systems
 
Ch8 pid controller
Ch8 pid controllerCh8 pid controller
Ch8 pid controller
 

Viewers also liked

Frequency Of Hyponatraemia And Its Influence On Liver Cirrhosis Related Compl...
Frequency Of Hyponatraemia And Its Influence On Liver Cirrhosis Related Compl...Frequency Of Hyponatraemia And Its Influence On Liver Cirrhosis Related Compl...
Frequency Of Hyponatraemia And Its Influence On Liver Cirrhosis Related Compl...Samiullah Shaikh
 
WWW2014: Long Time No See: The Probability of Reusing Tags as a Function of F...
WWW2014: Long Time No See: The Probability of Reusing Tags as a Function of F...WWW2014: Long Time No See: The Probability of Reusing Tags as a Function of F...
WWW2014: Long Time No See: The Probability of Reusing Tags as a Function of F...Dominik Kowald
 
Grid frequency control using step response in free governor mode of operation
Grid frequency control using step response in free governor mode of operationGrid frequency control using step response in free governor mode of operation
Grid frequency control using step response in free governor mode of operationeSAT Publishing House
 
Ступені причетності до партії,Світлак Б.,ФФІм-51с
Ступені причетності до партії,Світлак Б.,ФФІм-51сСтупені причетності до партії,Світлак Б.,ФФІм-51с
Ступені причетності до партії,Світлак Б.,ФФІм-51сBohdanaSvitlak
 
Entrapreneur Parakhramsinh jadeja
Entrapreneur Parakhramsinh jadejaEntrapreneur Parakhramsinh jadeja
Entrapreneur Parakhramsinh jadejaRavi_rao
 
Sebeke Yonetmeligi ek18 Degisiklik Onerilerinin Yan Hizmetler Acisinden Deger...
Sebeke Yonetmeligi ek18 Degisiklik Onerilerinin Yan Hizmetler Acisinden Deger...Sebeke Yonetmeligi ek18 Degisiklik Onerilerinin Yan Hizmetler Acisinden Deger...
Sebeke Yonetmeligi ek18 Degisiklik Onerilerinin Yan Hizmetler Acisinden Deger...PowerSystems2k
 
cung cấp dịch vụ giúp việc gia đình cao cấp tphcm
cung cấp dịch vụ giúp việc gia đình cao cấp tphcmcung cấp dịch vụ giúp việc gia đình cao cấp tphcm
cung cấp dịch vụ giúp việc gia đình cao cấp tphcmqiana882
 
RRCC HUC Case Study Final Draft 1.3
RRCC HUC Case Study Final Draft 1.3RRCC HUC Case Study Final Draft 1.3
RRCC HUC Case Study Final Draft 1.3Joan W. Smith
 
Tax Incentives for Start ups - Toowoomba Start-ups
Tax Incentives for Start ups - Toowoomba Start-upsTax Incentives for Start ups - Toowoomba Start-ups
Tax Incentives for Start ups - Toowoomba Start-upsMichael Garrone
 
Диференційні виборчі технології, Світлак Б., ФФІм -51с
Диференційні виборчі технології, Світлак Б., ФФІм -51сДиференційні виборчі технології, Світлак Б., ФФІм -51с
Диференційні виборчі технології, Світлак Б., ФФІм -51сBohdanaSvitlak
 
Tersiyer Frekans Kontrolu ve Denetimi TEIAS'a oneri
Tersiyer Frekans Kontrolu ve Denetimi TEIAS'a oneriTersiyer Frekans Kontrolu ve Denetimi TEIAS'a oneri
Tersiyer Frekans Kontrolu ve Denetimi TEIAS'a oneriPowerSystems2k
 
Casablanca’s Corniche - An African Riviera
Casablanca’s Corniche - An African Riviera Casablanca’s Corniche - An African Riviera
Casablanca’s Corniche - An African Riviera Jeffery Fraser
 

Viewers also liked (14)

Frequency Of Hyponatraemia And Its Influence On Liver Cirrhosis Related Compl...
Frequency Of Hyponatraemia And Its Influence On Liver Cirrhosis Related Compl...Frequency Of Hyponatraemia And Its Influence On Liver Cirrhosis Related Compl...
Frequency Of Hyponatraemia And Its Influence On Liver Cirrhosis Related Compl...
 
WWW2014: Long Time No See: The Probability of Reusing Tags as a Function of F...
WWW2014: Long Time No See: The Probability of Reusing Tags as a Function of F...WWW2014: Long Time No See: The Probability of Reusing Tags as a Function of F...
WWW2014: Long Time No See: The Probability of Reusing Tags as a Function of F...
 
Grid frequency control using step response in free governor mode of operation
Grid frequency control using step response in free governor mode of operationGrid frequency control using step response in free governor mode of operation
Grid frequency control using step response in free governor mode of operation
 
Ступені причетності до партії,Світлак Б.,ФФІм-51с
Ступені причетності до партії,Світлак Б.,ФФІм-51сСтупені причетності до партії,Світлак Б.,ФФІм-51с
Ступені причетності до партії,Світлак Б.,ФФІм-51с
 
Entrapreneur Parakhramsinh jadeja
Entrapreneur Parakhramsinh jadejaEntrapreneur Parakhramsinh jadeja
Entrapreneur Parakhramsinh jadeja
 
Sebeke Yonetmeligi ek18 Degisiklik Onerilerinin Yan Hizmetler Acisinden Deger...
Sebeke Yonetmeligi ek18 Degisiklik Onerilerinin Yan Hizmetler Acisinden Deger...Sebeke Yonetmeligi ek18 Degisiklik Onerilerinin Yan Hizmetler Acisinden Deger...
Sebeke Yonetmeligi ek18 Degisiklik Onerilerinin Yan Hizmetler Acisinden Deger...
 
cung cấp dịch vụ giúp việc gia đình cao cấp tphcm
cung cấp dịch vụ giúp việc gia đình cao cấp tphcmcung cấp dịch vụ giúp việc gia đình cao cấp tphcm
cung cấp dịch vụ giúp việc gia đình cao cấp tphcm
 
RRCC HUC Case Study Final Draft 1.3
RRCC HUC Case Study Final Draft 1.3RRCC HUC Case Study Final Draft 1.3
RRCC HUC Case Study Final Draft 1.3
 
Tax Incentives for Start ups - Toowoomba Start-ups
Tax Incentives for Start ups - Toowoomba Start-upsTax Incentives for Start ups - Toowoomba Start-ups
Tax Incentives for Start ups - Toowoomba Start-ups
 
Диференційні виборчі технології, Світлак Б., ФФІм -51с
Диференційні виборчі технології, Світлак Б., ФФІм -51сДиференційні виборчі технології, Світлак Б., ФФІм -51с
Диференційні виборчі технології, Світлак Б., ФФІм -51с
 
Tersiyer Frekans Kontrolu ve Denetimi TEIAS'a oneri
Tersiyer Frekans Kontrolu ve Denetimi TEIAS'a oneriTersiyer Frekans Kontrolu ve Denetimi TEIAS'a oneri
Tersiyer Frekans Kontrolu ve Denetimi TEIAS'a oneri
 
Casablanca’s Corniche - An African Riviera
Casablanca’s Corniche - An African Riviera Casablanca’s Corniche - An African Riviera
Casablanca’s Corniche - An African Riviera
 
Oguz yilmaz
Oguz yilmazOguz yilmaz
Oguz yilmaz
 
Nauru
NauruNauru
Nauru
 

Similar to Tubitak ucte training 1_2final_eng

FREQUENCY POWER CHARACTERISTICS OF SYNCHRONOUS GENERATOR
FREQUENCY POWER CHARACTERISTICS OF SYNCHRONOUS GENERATORFREQUENCY POWER CHARACTERISTICS OF SYNCHRONOUS GENERATOR
FREQUENCY POWER CHARACTERISTICS OF SYNCHRONOUS GENERATORPower System Operation
 
ON-OFF CONTROL (2).ppt
ON-OFF CONTROL (2).pptON-OFF CONTROL (2).ppt
ON-OFF CONTROL (2).pptMUST
 
Fire Pump System Pressure Control
Fire Pump System Pressure ControlFire Pump System Pressure Control
Fire Pump System Pressure ControlJames S Nasby
 
LOAD FREQUENCY AND VOLTAGE GENERATION CONTROL
LOAD FREQUENCY AND VOLTAGE GENERATION CONTROLLOAD FREQUENCY AND VOLTAGE GENERATION CONTROL
LOAD FREQUENCY AND VOLTAGE GENERATION CONTROLPreet_patel
 
Lecture control 1.pptx
Lecture control 1.pptxLecture control 1.pptx
Lecture control 1.pptxAsmaCh17
 
SMC SMC-12 MCB circuit breaker testing system
SMC SMC-12 MCB circuit breaker testing systemSMC SMC-12 MCB circuit breaker testing system
SMC SMC-12 MCB circuit breaker testing systemErika Herbozo
 
Mitsubishi inverter freqrol-a700 series dienhathe.vn
Mitsubishi inverter freqrol-a700 series dienhathe.vnMitsubishi inverter freqrol-a700 series dienhathe.vn
Mitsubishi inverter freqrol-a700 series dienhathe.vnDien Ha The
 
Mitsubishi inverter freqrol-a700 series
Mitsubishi inverter freqrol-a700 seriesMitsubishi inverter freqrol-a700 series
Mitsubishi inverter freqrol-a700 seriesDien Ha The
 
Mitsubishi inverter freqrol-a700 series
Mitsubishi inverter freqrol-a700 seriesMitsubishi inverter freqrol-a700 series
Mitsubishi inverter freqrol-a700 seriesDien Ha The
 
Maximizing the return on your control investment meet the experts sessions part2
Maximizing the return on your control investment meet the experts sessions part2Maximizing the return on your control investment meet the experts sessions part2
Maximizing the return on your control investment meet the experts sessions part2Emerson Exchange
 
Process control examples and applications
Process control examples and applications Process control examples and applications
Process control examples and applications Amr Seif
 
LV Compact Soft starter Familiarisation Presentation - SSUK
LV Compact Soft starter Familiarisation Presentation - SSUKLV Compact Soft starter Familiarisation Presentation - SSUK
LV Compact Soft starter Familiarisation Presentation - SSUKStuart Harvey
 
Over current Relays
Over current RelaysOver current Relays
Over current RelaysASWANTH6270
 

Similar to Tubitak ucte training 1_2final_eng (20)

FREQUENCY POWER CHARACTERISTICS OF SYNCHRONOUS GENERATOR
FREQUENCY POWER CHARACTERISTICS OF SYNCHRONOUS GENERATORFREQUENCY POWER CHARACTERISTICS OF SYNCHRONOUS GENERATOR
FREQUENCY POWER CHARACTERISTICS OF SYNCHRONOUS GENERATOR
 
3.CONTROL ACTIONS.pptx
3.CONTROL ACTIONS.pptx3.CONTROL ACTIONS.pptx
3.CONTROL ACTIONS.pptx
 
ON-OFF CONTROL (2).ppt
ON-OFF CONTROL (2).pptON-OFF CONTROL (2).ppt
ON-OFF CONTROL (2).ppt
 
Fire Pump System Pressure Control
Fire Pump System Pressure ControlFire Pump System Pressure Control
Fire Pump System Pressure Control
 
LOAD FREQUENCY AND VOLTAGE GENERATION CONTROL
LOAD FREQUENCY AND VOLTAGE GENERATION CONTROLLOAD FREQUENCY AND VOLTAGE GENERATION CONTROL
LOAD FREQUENCY AND VOLTAGE GENERATION CONTROL
 
Lecture control 1.pptx
Lecture control 1.pptxLecture control 1.pptx
Lecture control 1.pptx
 
SMC SMC-12 MCB circuit breaker testing system
SMC SMC-12 MCB circuit breaker testing systemSMC SMC-12 MCB circuit breaker testing system
SMC SMC-12 MCB circuit breaker testing system
 
Hamza Kazmi (GTE)
Hamza Kazmi (GTE)Hamza Kazmi (GTE)
Hamza Kazmi (GTE)
 
ssd_unit_1.ppt
ssd_unit_1.pptssd_unit_1.ppt
ssd_unit_1.ppt
 
ssd_unit_1.ppt
ssd_unit_1.pptssd_unit_1.ppt
ssd_unit_1.ppt
 
10.3_Practical Implementation of Microgrid Control, Protection, and Communica...
10.3_Practical Implementation of Microgrid Control, Protection, and Communica...10.3_Practical Implementation of Microgrid Control, Protection, and Communica...
10.3_Practical Implementation of Microgrid Control, Protection, and Communica...
 
Mitsubishi inverter freqrol-a700 series dienhathe.vn
Mitsubishi inverter freqrol-a700 series dienhathe.vnMitsubishi inverter freqrol-a700 series dienhathe.vn
Mitsubishi inverter freqrol-a700 series dienhathe.vn
 
Mitsubishi inverter freqrol-a700 series
Mitsubishi inverter freqrol-a700 seriesMitsubishi inverter freqrol-a700 series
Mitsubishi inverter freqrol-a700 series
 
Mitsubishi inverter freqrol-a700 series
Mitsubishi inverter freqrol-a700 seriesMitsubishi inverter freqrol-a700 series
Mitsubishi inverter freqrol-a700 series
 
Maximizing the return on your control investment meet the experts sessions part2
Maximizing the return on your control investment meet the experts sessions part2Maximizing the return on your control investment meet the experts sessions part2
Maximizing the return on your control investment meet the experts sessions part2
 
Wind Forum 2016
Wind Forum 2016Wind Forum 2016
Wind Forum 2016
 
Process control examples and applications
Process control examples and applications Process control examples and applications
Process control examples and applications
 
محاضرة 5
محاضرة 5محاضرة 5
محاضرة 5
 
LV Compact Soft starter Familiarisation Presentation - SSUK
LV Compact Soft starter Familiarisation Presentation - SSUKLV Compact Soft starter Familiarisation Presentation - SSUK
LV Compact Soft starter Familiarisation Presentation - SSUK
 
Over current Relays
Over current RelaysOver current Relays
Over current Relays
 

More from PowerSystems2k

Elma yilmaz guneydogu_gerilim_cokme
Elma yilmaz guneydogu_gerilim_cokmeElma yilmaz guneydogu_gerilim_cokme
Elma yilmaz guneydogu_gerilim_cokmePowerSystems2k
 
Elektrik uretimiletimdagitimindaenerjiverimliligi final_oguzyilmaz
Elektrik uretimiletimdagitimindaenerjiverimliligi final_oguzyilmazElektrik uretimiletimdagitimindaenerjiverimliligi final_oguzyilmaz
Elektrik uretimiletimdagitimindaenerjiverimliligi final_oguzyilmazPowerSystems2k
 
Tubitak ucte training 1_2final_tr
Tubitak ucte training 1_2final_trTubitak ucte training 1_2final_tr
Tubitak ucte training 1_2final_trPowerSystems2k
 
Tubitak ucte training 1_1final_tr
Tubitak ucte training 1_1final_trTubitak ucte training 1_1final_tr
Tubitak ucte training 1_1final_trPowerSystems2k
 
Tubitak ucte training 1_1final_eng
Tubitak ucte training 1_1final_engTubitak ucte training 1_1final_eng
Tubitak ucte training 1_1final_engPowerSystems2k
 
Ruzgar Enerjisine Dayali Uretim Tesislerinden Reaktif Guc Desteği Saglanmasi ...
Ruzgar Enerjisine Dayali Uretim Tesislerinden Reaktif Guc Desteği Saglanmasi ...Ruzgar Enerjisine Dayali Uretim Tesislerinden Reaktif Guc Desteği Saglanmasi ...
Ruzgar Enerjisine Dayali Uretim Tesislerinden Reaktif Guc Desteği Saglanmasi ...PowerSystems2k
 
Sebeke Yonetmeligi Denge Durumu Reaktif Guc Destegi Test Proseduru
Sebeke Yonetmeligi Denge Durumu Reaktif Guc Destegi Test ProseduruSebeke Yonetmeligi Denge Durumu Reaktif Guc Destegi Test Proseduru
Sebeke Yonetmeligi Denge Durumu Reaktif Guc Destegi Test ProseduruPowerSystems2k
 
Sebeke Yonetmeligi Primer Frekans Kontrolune Katilima Dair Performans Test Pr...
Sebeke Yonetmeligi Primer Frekans Kontrolune Katilima Dair Performans Test Pr...Sebeke Yonetmeligi Primer Frekans Kontrolune Katilima Dair Performans Test Pr...
Sebeke Yonetmeligi Primer Frekans Kontrolune Katilima Dair Performans Test Pr...PowerSystems2k
 
Turkiye Elektrik Sisteminde Frekans Kontrolu makale 2012
Turkiye Elektrik Sisteminde Frekans Kontrolu makale 2012Turkiye Elektrik Sisteminde Frekans Kontrolu makale 2012
Turkiye Elektrik Sisteminde Frekans Kontrolu makale 2012PowerSystems2k
 
Turkiye elektriksistemindegerilimkontrolu 2012
Turkiye elektriksistemindegerilimkontrolu 2012Turkiye elektriksistemindegerilimkontrolu 2012
Turkiye elektriksistemindegerilimkontrolu 2012PowerSystems2k
 
Oturan Sistemin Toparlanmasi Performans Testleri (System Restoration)
Oturan Sistemin Toparlanmasi Performans Testleri (System Restoration)Oturan Sistemin Toparlanmasi Performans Testleri (System Restoration)
Oturan Sistemin Toparlanmasi Performans Testleri (System Restoration)PowerSystems2k
 
Sekonder Frekans Kontrolu
Sekonder Frekans KontroluSekonder Frekans Kontrolu
Sekonder Frekans KontroluPowerSystems2k
 

More from PowerSystems2k (12)

Elma yilmaz guneydogu_gerilim_cokme
Elma yilmaz guneydogu_gerilim_cokmeElma yilmaz guneydogu_gerilim_cokme
Elma yilmaz guneydogu_gerilim_cokme
 
Elektrik uretimiletimdagitimindaenerjiverimliligi final_oguzyilmaz
Elektrik uretimiletimdagitimindaenerjiverimliligi final_oguzyilmazElektrik uretimiletimdagitimindaenerjiverimliligi final_oguzyilmaz
Elektrik uretimiletimdagitimindaenerjiverimliligi final_oguzyilmaz
 
Tubitak ucte training 1_2final_tr
Tubitak ucte training 1_2final_trTubitak ucte training 1_2final_tr
Tubitak ucte training 1_2final_tr
 
Tubitak ucte training 1_1final_tr
Tubitak ucte training 1_1final_trTubitak ucte training 1_1final_tr
Tubitak ucte training 1_1final_tr
 
Tubitak ucte training 1_1final_eng
Tubitak ucte training 1_1final_engTubitak ucte training 1_1final_eng
Tubitak ucte training 1_1final_eng
 
Ruzgar Enerjisine Dayali Uretim Tesislerinden Reaktif Guc Desteği Saglanmasi ...
Ruzgar Enerjisine Dayali Uretim Tesislerinden Reaktif Guc Desteği Saglanmasi ...Ruzgar Enerjisine Dayali Uretim Tesislerinden Reaktif Guc Desteği Saglanmasi ...
Ruzgar Enerjisine Dayali Uretim Tesislerinden Reaktif Guc Desteği Saglanmasi ...
 
Sebeke Yonetmeligi Denge Durumu Reaktif Guc Destegi Test Proseduru
Sebeke Yonetmeligi Denge Durumu Reaktif Guc Destegi Test ProseduruSebeke Yonetmeligi Denge Durumu Reaktif Guc Destegi Test Proseduru
Sebeke Yonetmeligi Denge Durumu Reaktif Guc Destegi Test Proseduru
 
Sebeke Yonetmeligi Primer Frekans Kontrolune Katilima Dair Performans Test Pr...
Sebeke Yonetmeligi Primer Frekans Kontrolune Katilima Dair Performans Test Pr...Sebeke Yonetmeligi Primer Frekans Kontrolune Katilima Dair Performans Test Pr...
Sebeke Yonetmeligi Primer Frekans Kontrolune Katilima Dair Performans Test Pr...
 
Turkiye Elektrik Sisteminde Frekans Kontrolu makale 2012
Turkiye Elektrik Sisteminde Frekans Kontrolu makale 2012Turkiye Elektrik Sisteminde Frekans Kontrolu makale 2012
Turkiye Elektrik Sisteminde Frekans Kontrolu makale 2012
 
Turkiye elektriksistemindegerilimkontrolu 2012
Turkiye elektriksistemindegerilimkontrolu 2012Turkiye elektriksistemindegerilimkontrolu 2012
Turkiye elektriksistemindegerilimkontrolu 2012
 
Oturan Sistemin Toparlanmasi Performans Testleri (System Restoration)
Oturan Sistemin Toparlanmasi Performans Testleri (System Restoration)Oturan Sistemin Toparlanmasi Performans Testleri (System Restoration)
Oturan Sistemin Toparlanmasi Performans Testleri (System Restoration)
 
Sekonder Frekans Kontrolu
Sekonder Frekans KontroluSekonder Frekans Kontrolu
Sekonder Frekans Kontrolu
 

Recently uploaded

SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 

Recently uploaded (20)

SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 

Tubitak ucte training 1_2final_eng

  • 1. 2nd UCTE project Training Phase 1 Item 2 Power Plant Unit Control Structures and Operating Modes related to Frequency Control Issues Oguz YILMAZ Tubitak-UZAY oguz.yilmaz@uzay.tubitak.gov.tr
  • 2. • Gas Turbine and Comined Cycle Power Plants • Operating Modes • Variable maximum power, ambient conditions dependency • Requirement for continuous reserve control • Example simulations with dynamic models • Hydro Power Plants • Operating Modes • Example simulations with dynamic models • Lignite/Coal Fired Thermal Units (steam turbines) • Operating Modes • Example simulations with dynamic models • Operational directives to power plants SUMMARY
  • 3. 8 Unit Control Structures and Operating Modes Combined Cycle Power Plants •Constant Load Control (MW Setpoint Control) (Plant or Gas Turbine) •Maintain constant MW setpoint whatever the frequency is •Transient or no response to frequency deviations •Unpreferred operating mode for system requirements related to primary frequency control •Primary Control (Droop Mode, Governor Free Operation) •Dynamic response to frequency deviations •Requirement for Reserve (Very Important !!!) •Base Load (Temperature Control) •Best operating mode for efficiency. BUT !!! •Worst operating mode for frequency control!!!!!!!! •Secondary Control •Remote determination of Steady State operating point of a Power Block (1/2 GT + ST) •Primary Control ACTIVE !!! •Plant Load Controller Details are very very important
  • 4. Gas Turbine Combustor Compressor & IGVs Turbine P2 T1 T2, P1 Air, P1=Patm Exhaust Flow to HRSG Fuel •Why maximum power is dependent on ambient conditions and even frequency ??? oguz.yilmaz@uzay.tubitak.gov.tr
  • 6. Reserve Control Governor Temp Control M i n S e l e c t Gaz Kontrl Vanası Turbin Frequency Droop Speed/Load Reference (Raise/Lower) Power t(24 saat) 6:00 15:00 24:00 6:00 Max power (observation, calculation, correction) Steady state operating point at 50 Hz •For the short term state of the compressor, temperature dependency of maximum power can be foreseen. •For the long term state of the compresor observation is necessary % Power reserve 100 97.5 98 95.5 Continuous control for %2.5 reserve IGV< IGV max should be satisfied (Reserve Air !!!) oguz.yilmaz@uzay.tubitak.gov.tr
  • 7. %P f(Hz) 50 Speed Droop % ∆f / %∆P @ steady state 200 mHz= 0.2/50 x100 =%0.4 If Droop=%5 %∆P= %∆f / %droop x100 %∆P=0.4 / 5 x100 =%8 Then, 200 mHz => %8 (if reserve exists !) 100 mHz => %4 (if reserve exists !) 50 mHz => %2 (if reserve exists !) 90 95 97.5 100 Temperature Control Limit oguz.yilmaz@uzay.tubitak.gov.tr
  • 9. 9 Example Simulations Scenario 1 Combined Cycle=0.90;0.95 Gas Turbini=0.90;0.95 Dynamic response to +/- 200 mHz frequency deviation Plant Load Controller details (limiters) oguz.yilmaz@uzay.tubitak.gov.tr
  • 10. 8 Unit Control Structures and Operating Modes Hydro Units •Constant Wicket Gate Opening Control (Opening Limiters) (Constant Load Control) •Constant output power whatever the frequency is •No primary response to frequency deviations. •Primary Control (Droop Mode, Governor Free Operation) •Dynamic responses to frequency deviations •Requirement for reserve •Governor settings are important !!! (island mode stability) •Secondary Control •Primary Control Active (Governor free, active) •Steady state operating point is remotely determined. oguz.yilmaz@uzay.tubitak.gov.tr
  • 11. 8 Unit Control Structures and Operating Modes Hydro Units –Speed Regulator Block Diagram oguz.yilmaz@uzay.tubitak.gov.tr
  • 12. 12 Example Simulations Scenario 2 Hydro=0.90; 0.95 Dynamic Response to +/- 200 mHz frequency deviations Opening Limiter Island Mode Stability oguz.yilmaz@uzay.tubitak.gov.tr
  • 13. 8 Unit Control Structures and Operating Modes Lignite/Coal Fired Units (steamers) •Pressure Control •Turbine => Pressure Control •Boiler => Load Controlu (or manual under operator control) •No or transient response to frequency deviations. •Change of output depending on caol input quality •Constant Load Control (constant MW setpoint control, Load Limit Control) •Turbine => MW setpoint control •Boiler => Pressure Regulation (Eğer otomasyon yeterli ise) •No or transient response to frequency deviations. •Primary Control (Droop Mode, Governor Free Operation) •Turbine => Speed Control /Frequency influenced power control Dynamic response to frequency deviations •Boiler => Pressure Control (if automation is enough) •Boiler Following the Turbine and catches up with the pressure •Coordinated Control •Secondary Control •Primary Control Active (Governor free, active) •Steady state operating point is remotely determined.
  • 14. 8
  • 15. 22/09/09D4121/TRA/2009-00512-1-A15 Example Simulations Scenario 3 CoalFired=0.90; 0.95 Dynamic response to +/- 200 mHz frequency deviations Successful/Unsuccessful Pressure Regulation Load Controller Details (Limiters) oguz.yilmaz@uzay.tubitak.gov.tr
  • 16. 8 Directives to the Power Plants •Requirement to set up a common language •System Details =>meaningful for system operators (TSOs) •Power Plant details =>meaningful for plant operators •Common language for common operating modes •Constant load control, primary control, remote control via AGC with active primary control etc... •Requirement to have the fundamental information related to generating units. •For generating units, •speed droop or MW/Hz (or MW/0.2 Hz), •minimum reserve amount, •whether limiters are applied or not (primary reserve changes with operating point unless limiters are applied) •Maximum and minimum values for secondary control range Should be known and validated by after incident records. •Contactual details related to Private generation companies must be very well known. oguz.yilmaz@uzay.tubitak.gov.tr