PROCESS PLANT START UP &
COMMISSIONING
Your Expert Course Director:
MAX ZORNADA B.E. (MECH), HONS. M.B.A.
Max was a Commissioning Engineer on the largest onshore petrochemical project, which included
commissioning of Power House, Crude Stabilisation Plant, Gas Sweetening, NGL and LNG plan. He has
also had experience in construction and commissioning of plant in the Fertiliser and Cement Industries.
He has been running his “flagship” program on Process Plant Start-Up and Commissioning in the
Middle East for some 15 years both as a public program and on an in-house basis.
www.petroEDGEasia.net
PROCESS PLANT START UP AND COMMISSIONING
Conduct this training course in-house for more effective savings!
Call us at +65 6579 1293 or email to yong@asiaedge.net. For more information, visit us at
www.petroedgeasia.net
Course Objectives
This program addresses in an integrated manner the key activities involved in the safe, effective and timely
commissioning and start-up of a new plant or facility. Start Up and Commissioning of new plant and equipment
presents both a major technical and management challenge. An organisation’s personnel must familiarise
themselves with new equipment, processes and technologies, develop the relevant operating and safety
procedures.
At the same time there is the requirement to execute an exceptionally large scope of work – much of it complex
when compared to routine operations - over a short period of time, with equipment and plant which is as yet
unproven and that may pose significant risks to personnel, environment and profitability.
This 5 day training course addresses the technical issues of commissioning and starting up various equipment
and asset types commonly found in processing plant environments, the development of specific commissioning
procedures, process and facility wide commissioning strategies. The course will also address the broader
managerial issues of commissioning and start up planning, resourcing, budgeting and cost control, risk
management – safety, environmental, financial and operational, problem solving and trouble shooting.
Learning Objectives
The objectives of this program are to provide participants with an awareness of the unique challenges
associated with plant start-up and commissioning situations.
 Gain an understanding of the key concepts, tools and techniques that can be used to facilitate the effective
planning, execution, control and management of these situations, including performance testing and
acceptance into operation.
 Contribute confidently to the planning and execution of effective strategies for plant commissioning and
start-up in their own specific work and process plant situations.
Who Should Attend?
This program addresses the needs of a diverse audience with an interest in Plant Start-up and Commission,
including:
 General Managers who have oversight responsibility for Plant Start-up and Commissioning;
 Operations and Maintenance Managers with direct line responsibility as well as staff support responsibility
for delivering on effective Plant Start-up and Commissioning;
 Plant Start-up and Commissioning Managers and Engineers;
 Technical personnel involved in supporting Plant Start-up and Commissioning activities;
 Supervisors and Engineers, both operations and maintenance who are involved or likely to be involved in
Plant Start-up and Commissioning situations.
Training Methodology
Process Plant Start-up and Commissioning is a hands-on, stimulating learning experience. The program will be
highly interactive, with opportunities to advance your opinions and ideas. Participation is encouraged in a
supportive environment. To ensure the concepts introduced during the program are understood, they will be
reinforced through a mix of learning methods, including lecture style presentation, open discussion, case
studies, simulations and group work.
PROCESS PLANT START UP AND COMMISSIONING
Conduct this training course in-house for more effective savings!
Call us at +65 6579 1293 or email to yong@asiaedge.net. For more information, visit us at
www.petroedgeasia.net
Organisational Impact
The need for Plant Start Up and Commissioning is ongoing in any business that is growing, as new plant is added
to expand capacity and to replace obsolete technology.
This program aims to develop employees through exposure to the training and development experience
provided by this program, to build a “cadre” of knowledgeable and skilled staff who will be able to add value
through their contributions to any situations involving plant start-up and commissioning.
They will be able to contribute in leadership or operational roles, both with knowledge and skills to ensure such
projects are effectively and efficiently managed in a manner consistent with recognised best practices. A spin
off benefit will be their ability to coach and impart learning to their peers and subordinates to the mutual
benefit of individuals and organisation.
About your Expert Trainer: Max Zornada B.E. (Mech), Hons. M.B.A.
Max spent several years with the London based international management and technology
consultancy PA Consulting Group, after holding various managerial and professional engineering
positions in the chemicals processing and petrochemicals industry with Adelaide and Wallaroo
Fertilisers, ICI and Santos.
During his time working in the Petrochemical Industry, Max developed specific expertise in
Operational Excellence, Maintenance Management, Shutdown and Turnaround Management,
Process Plant Start-up and Commissioning through hands-on involvement in commissioning of new plant, as a
Shutdown/Turnaround Manager and implementing computerised maintenance management systems.
Max was a Commissioning Engineer on the largest onshore petrochemical project, which included commissioning of
Power House, Crude Stabilisation Plant, Gas Sweetening, NGL and LNG plan. He has also had experience in
construction and commissioning of plant in the Fertiliser and Cement Industries.
He has been running his “flagship” program on Process Plant Start-Up and Commissioning in the Middle East for some
15 years both as a public program and on an inhouse basis.
Max maintains an active international consulting and education practice, with a focus on the management of capital
intensive (petrochemical, energy and chemicals) businesses in the Middle East, Europe and Asia. Max Zornada is also
an Adjunct Lecturer at the University of Adelaide Business School where he currently teaches the Operations
Management and Business Improvement in the MBA Program. He delivers various Executive Education Programs
including Yellow Belt, Green Belt and Black Belt level Lean Six Sigma programs. He has presented programs for the
University of New South Wales, Southern Cross and was a Visiting Professor at the Consorzio MIP at the Politecnico di
Milano.
PROCESS PLANT START UP AND COMMISSIONING
Conduct this training course in-house for more effective savings!
Call us at +65 6579 1293 or email to yong@asiaedge.net. For more information, visit us at
www.petroedgeasia.net
5-DAY COURSE AGENDA
DAY ONE
INTRODUCTION AND PREPARATION
 Introduction to Process Plant Start Up and Commissioning
o The Commissioning Process
o The Operating Instruction Manual
o The Role of Simulators
 Commissioning Team Organisation and Roles
o Commissioning Team Structure
o Roles and Responsibilities
 Support Function
o Maintenance Department Involvement
o Documentation and Information Management
o Laboratory Involvement
 Cost Estimation and Budgeting
 Commissioning and Start Up Logistics Issues
o Determining Spare Parts and Consumables
Requirements for Commissioning
o Determining Spare Parts Stocks Requirements for
ongoing support
DAY TWO
COMMISSIONING STRATEGY
 Overall Commissioning Strategy Development
 The Six Key Stages of Process Plant Start Up and
Commissioning
 Preparation, Planning and Commissioning strategy
Mechanical completion, integrity checking, P&ID checking
and verification
o Piping and Spring Supports
o Pressure Testing
o Cleaning and Flushing
 Pre-commissioning and operational testing
o Commissioning Utilities
o Electrical Sytems
o Operational Testing
o Dynamic Testing
 Start-up and Initial operation;
o Start-Up and Initial Operation
o Troubleshooting
 Performance testing and acceptance;
 Post-commissioning
DAY THREE
PROCESS PLANT AND MACHINERY SPECIFIC ISSUES
 Process Plant and Machinery Commissioning
o General Machinery Commissioning Principles
o Pumps
o Compressors
o Turbines
o Distillation Columns
 Instrumentation and Control Systems
o Distributed Control System Commissioning
o Field Instrumentation Commissioning
 Preparing and Isolating Process Plant
o Preparation and Isolation of Plant
o Electrical Isolation
o Removal of Hazardous Substances
o Testing and Access
DAY FOUR
MANAGEMENT, PLANNING AND CONTROL
 The Start Up and Commissioning Planning and Control
 Developing Commissioning Scope of Work
 The Critical Path Method of Planning and Control
 A Short-cut Approaches to Planning
 Progress Monitoring and Control
o Budget Development and Cost Control
o Earned Value Analysis
o Earned Hours Analysis
DAY FIVE
MANAGING RISKS DURING COMMISSIONING
 OH&S and Risk Management
o Safety Management
o Safety Audits and Inspections
o Permit to work system
o Formal Safety Analysis Techniques
- Take 5 Analysis
- Job Safety Analysis
- Qualitative Risk Assessment
o Accident Prevention and Investigation
 Trouble shooting and problem solving
o Trouble shooting and problem solving
o Trouble shooting instrumentation systems
 Trouble Shooting and Problem Solving
 Managing Quality
 Conclusion
PROCESS PLANT START UP AND COMMISSIONING
Conduct this training course in-house for more effective savings!
Call us at +65 6579 1293 or email to yong@asiaedge.net. For more information, visit us at
www.petroedgeasia.net
DELEGATE DETAILS
Delegate 1 Please note
- Indicate if you have already registered by Phone +Fax +Email +Web
- If you have not received an acknowledgement before the training
course, please call us to confirm your booking.
- Photocopy this form to register multiple delegates.
PAYMENT METHODS
By Cheque/ Bank Draft
Make Payable to Asia Edge Pte. Ltd.
By Direct Transfer
Please quote your invoice number with the remittance advise
Account Name: Asia Edge Pte. Ltd.
Bank Number: 508 Account Number: 762903-001
Swift Code: OCBCSGSG
All bank charges to be borne by payer. Please ensure that Asia Edge
Pte Ltd receives the full invoiced amount.
PAYMENT POLICY
Payment is due in full at the time of registration. Full payment is
mandatory for event attendance. By submitting this registration form,
you have agreed to Asia Edge Pte Ltd’s payment terms
CANCELLATIONS & SUBSTITUTIONS
You may substitute delegates at any time. ASIA EDGE PTE LTD does not
provide refunds for cancellations. For cancellations received in writing
more than seven (7) days prior to the training course you will receive a
100% credit to be used at another ASIA EDGE PTE LTD training course
for up to one year from the date of issuance. For cancellations
received seven (7) days or less prior to an event (including day 7), no
credits will be issued. In the event that ASIA EDGE PTE LTD cancels an
event, delegate payments at the date of cancellation will be credited
to a future ASIA EDGE PTE LTD event. This credit will be available for
up to one year from the date of issuance. In the event that ASIA EDGE
PTE LTD postpones an event, delegate payments at the postponement
date will be credited towards the rescheduled date. If the delegate is
unable to attend the rescheduled event, the delegate will receive a
100% credit representing payments made towards a future ASIA EDGE
PTE LTD event. This credit will be available for up to one year from the
date of issuance. No refunds will be available for cancellations or
postponements.
ASIA EDGE PTE LTD is not responsible for any loss or damage as a
result of a substitution, alteration or cancellation/postponement of an
event. ASIA EDGE PTE LTD shall assume no liability whatsoever in the
event this training course is cancelled, rescheduled or postponed due
to a fortuitous event, Act of God, unforeseen occurrence or any other
event that renders performance of this training course impracticable
or impossible. For purposes of this clause, a fortuitous event shall
include, but not be limited to: war, fire, labor strike, extreme weather
or other emergency.
PROGRAM CHANGE POLICY
Please note that speakers and topics were confirmed at the time of
publishing; however, circumstances beyond the control of the
organizers may necessitate substitutions, alterations or cancellations
of the speakers and/or topics. As such, ASIA EDGE PTE LTD reserves
the right to alter or modify the advertised speakers and/or topics if
necessary. Any substitutions or alterations will be updated on our web
page as soon as possible.
ASIA EDGE PTE. LTD.
Company Registration No: No. 200710561C
Copyright@ 2005 ASIA EDGE PTE LTD. All rights reserved.
 Mr  Ms  Mrs  Dr  Others:
Name :
Job Title :
Department :
Telephone No. :
Email :
Delegate 2
 Mr  Ms  Mrs  Dr  Others:
Name :
Job Title :
Department :
Telephone No. :
Email :
Company :
Address :
Country : Postcode:
Attention
Invoice to :
Telephone No. :
Fax No. :
4 EASY WAYS TO REGISTER
 Online: www.petroedgeasia.net
 Email: yong@asiaedge.net
 Phone: +65 579 1293
 Fax: +65 6747 8737
This brochure may not be copied, photocopied, reproduced, translated, or converted to any electronic or machine-readable form in whole or in part
without prior written approval of ASIA EDGE PTE LTD
PROCESS PLANT START UP AND COMMISSIONING
R E G I S T R A T I O N F O R M

More Related Content

What's hot

Commissioning & Interface With Engineering
Commissioning & Interface With EngineeringCommissioning & Interface With Engineering
Commissioning & Interface With Engineeringasim569
 
Piping Installation and Erection Procedure.pdf
Piping Installation and Erection Procedure.pdfPiping Installation and Erection Procedure.pdf
Piping Installation and Erection Procedure.pdfMDAbdullah621330
 
Storage tanks basic training (rev 2)
Storage tanks basic training (rev 2)Storage tanks basic training (rev 2)
Storage tanks basic training (rev 2)ledzung
 
Storage Tank Farms Layout and Piping
Storage Tank Farms Layout and PipingStorage Tank Farms Layout and Piping
Storage Tank Farms Layout and PipingAmir Razmi
 
Presentation API 570 -510-653.pptx
Presentation API 570 -510-653.pptxPresentation API 570 -510-653.pptx
Presentation API 570 -510-653.pptxhesham ismail
 
Detail engineering of piping systems
Detail engineering of piping systemsDetail engineering of piping systems
Detail engineering of piping systemsjudithmorrison01
 
Oil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution PlanOil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution PlanDavid H Moloney
 
Piping and Vessels Flushing and Cleaning Procedure
Piping and Vessels Flushing and Cleaning ProcedurePiping and Vessels Flushing and Cleaning Procedure
Piping and Vessels Flushing and Cleaning ProcedureGerard B. Hawkins
 
PROCESS STORAGE TANK LAH & LAHH LEVEL CALCULATION
PROCESS STORAGE TANK LAH & LAHH LEVEL CALCULATIONPROCESS STORAGE TANK LAH & LAHH LEVEL CALCULATION
PROCESS STORAGE TANK LAH & LAHH LEVEL CALCULATIONVijay Sarathy
 
495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docxSharad Naik
 
Aramco inspection handbook
Aramco inspection handbookAramco inspection handbook
Aramco inspection handbookram111eg
 
Piping training-course
Piping training-coursePiping training-course
Piping training-coursepdmsguy
 
Inspection manual for piping
Inspection manual for pipingInspection manual for piping
Inspection manual for pipingKhiem Vo Duy
 
38785106 api-tank-design
38785106 api-tank-design38785106 api-tank-design
38785106 api-tank-design141jdf
 
Tank design - powerpoint slides
Tank design - powerpoint slidesTank design - powerpoint slides
Tank design - powerpoint slidesmoamen mohamed
 
Static equipment in oil and gas industry
Static equipment in oil and gas industryStatic equipment in oil and gas industry
Static equipment in oil and gas industryBaher El-Shaikh, CRE
 

What's hot (20)

Commissioning & Interface With Engineering
Commissioning & Interface With EngineeringCommissioning & Interface With Engineering
Commissioning & Interface With Engineering
 
Piping Installation and Erection Procedure.pdf
Piping Installation and Erection Procedure.pdfPiping Installation and Erection Procedure.pdf
Piping Installation and Erection Procedure.pdf
 
Storage tanks basic training (rev 2)
Storage tanks basic training (rev 2)Storage tanks basic training (rev 2)
Storage tanks basic training (rev 2)
 
Storage Tank Farms Layout and Piping
Storage Tank Farms Layout and PipingStorage Tank Farms Layout and Piping
Storage Tank Farms Layout and Piping
 
Presentation API 570 -510-653.pptx
Presentation API 570 -510-653.pptxPresentation API 570 -510-653.pptx
Presentation API 570 -510-653.pptx
 
Detail engineering of piping systems
Detail engineering of piping systemsDetail engineering of piping systems
Detail engineering of piping systems
 
Oil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution PlanOil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution Plan
 
Piping and Vessels Flushing and Cleaning Procedure
Piping and Vessels Flushing and Cleaning ProcedurePiping and Vessels Flushing and Cleaning Procedure
Piping and Vessels Flushing and Cleaning Procedure
 
Ppt
PptPpt
Ppt
 
PROCESS STORAGE TANK LAH & LAHH LEVEL CALCULATION
PROCESS STORAGE TANK LAH & LAHH LEVEL CALCULATIONPROCESS STORAGE TANK LAH & LAHH LEVEL CALCULATION
PROCESS STORAGE TANK LAH & LAHH LEVEL CALCULATION
 
495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx
 
Basic engineering_Checklist
Basic engineering_ChecklistBasic engineering_Checklist
Basic engineering_Checklist
 
Aramco inspection handbook
Aramco inspection handbookAramco inspection handbook
Aramco inspection handbook
 
Storage Tank Safety
Storage Tank SafetyStorage Tank Safety
Storage Tank Safety
 
Piping training-course
Piping training-coursePiping training-course
Piping training-course
 
Inspection manual for piping
Inspection manual for pipingInspection manual for piping
Inspection manual for piping
 
38785106 api-tank-design
38785106 api-tank-design38785106 api-tank-design
38785106 api-tank-design
 
API 653 TANK INSPECTION.pdf
API 653 TANK INSPECTION.pdfAPI 653 TANK INSPECTION.pdf
API 653 TANK INSPECTION.pdf
 
Tank design - powerpoint slides
Tank design - powerpoint slidesTank design - powerpoint slides
Tank design - powerpoint slides
 
Static equipment in oil and gas industry
Static equipment in oil and gas industryStatic equipment in oil and gas industry
Static equipment in oil and gas industry
 

Viewers also liked

Modules of Leadership And Management Skills E-Learning Suite For Up Coming Ma...
Modules of Leadership And Management Skills E-Learning Suite For Up Coming Ma...Modules of Leadership And Management Skills E-Learning Suite For Up Coming Ma...
Modules of Leadership And Management Skills E-Learning Suite For Up Coming Ma...petroEDGE
 
LIVE WEBINAR: Depositional Systems Tracts and Reservoir Distribution
LIVE WEBINAR: Depositional Systems Tracts and Reservoir DistributionLIVE WEBINAR: Depositional Systems Tracts and Reservoir Distribution
LIVE WEBINAR: Depositional Systems Tracts and Reservoir DistributionpetroEDGE
 
Introduction to Floating Storage & Regasification Unit (FSRU)
Introduction to Floating Storage & Regasification Unit (FSRU)Introduction to Floating Storage & Regasification Unit (FSRU)
Introduction to Floating Storage & Regasification Unit (FSRU)petroEDGE
 
Advanced Petroleum Economics & Risk Analysis
Advanced Petroleum Economics & Risk AnalysisAdvanced Petroleum Economics & Risk Analysis
Advanced Petroleum Economics & Risk AnalysispetroEDGE
 
PETROLEUM RISK ANALYSIS & PORTFOLIO MANAGEMENT
PETROLEUM RISK ANALYSIS & PORTFOLIO MANAGEMENT PETROLEUM RISK ANALYSIS & PORTFOLIO MANAGEMENT
PETROLEUM RISK ANALYSIS & PORTFOLIO MANAGEMENT petroEDGE
 
Subsea Production Engineering
Subsea Production EngineeringSubsea Production Engineering
Subsea Production EngineeringpetroEDGE
 
LearnersEDGE - Virtual Reality Based Simulated Learning For Oil & Gas
LearnersEDGE - Virtual Reality Based Simulated Learning For Oil & GasLearnersEDGE - Virtual Reality Based Simulated Learning For Oil & Gas
LearnersEDGE - Virtual Reality Based Simulated Learning For Oil & GaspetroEDGE
 
Wheeler Diagram and interpretation of wheeler diagram
Wheeler Diagram and interpretation of wheeler diagram Wheeler Diagram and interpretation of wheeler diagram
Wheeler Diagram and interpretation of wheeler diagram Muhammad Umar
 
Advanced Reservoir Engineering
Advanced Reservoir EngineeringAdvanced Reservoir Engineering
Advanced Reservoir EngineeringpetroEDGE
 
Research & Reviews Journal of Food Science & Technology vol 5 issue 3
Research & Reviews Journal of Food Science & Technology vol 5 issue 3Research & Reviews Journal of Food Science & Technology vol 5 issue 3
Research & Reviews Journal of Food Science & Technology vol 5 issue 3STM Journals
 
OmniScience: A Multi-disciplinary Journal vol 6 issue-3
OmniScience: A Multi-disciplinary Journal vol 6 issue-3OmniScience: A Multi-disciplinary Journal vol 6 issue-3
OmniScience: A Multi-disciplinary Journal vol 6 issue-3STM Journals
 
Tournée Générale 29 mei 2013 | Vlaamse Erfgoedbibliotheek
Tournée Générale 29 mei 2013 | Vlaamse ErfgoedbibliotheekTournée Générale 29 mei 2013 | Vlaamse Erfgoedbibliotheek
Tournée Générale 29 mei 2013 | Vlaamse ErfgoedbibliotheekFARO
 
SAMR Keynote VSTE 2015
SAMR Keynote VSTE 2015SAMR Keynote VSTE 2015
SAMR Keynote VSTE 2015Pamela Mabry
 
Research & Reviews: Journal of Statistics vol 5 issue 3
Research & Reviews: Journal of Statistics vol 5 issue 3Research & Reviews: Journal of Statistics vol 5 issue 3
Research & Reviews: Journal of Statistics vol 5 issue 3STM Journals
 

Viewers also liked (16)

Modules of Leadership And Management Skills E-Learning Suite For Up Coming Ma...
Modules of Leadership And Management Skills E-Learning Suite For Up Coming Ma...Modules of Leadership And Management Skills E-Learning Suite For Up Coming Ma...
Modules of Leadership And Management Skills E-Learning Suite For Up Coming Ma...
 
LIVE WEBINAR: Depositional Systems Tracts and Reservoir Distribution
LIVE WEBINAR: Depositional Systems Tracts and Reservoir DistributionLIVE WEBINAR: Depositional Systems Tracts and Reservoir Distribution
LIVE WEBINAR: Depositional Systems Tracts and Reservoir Distribution
 
Wellsite VR
Wellsite VRWellsite VR
Wellsite VR
 
Introduction to Floating Storage & Regasification Unit (FSRU)
Introduction to Floating Storage & Regasification Unit (FSRU)Introduction to Floating Storage & Regasification Unit (FSRU)
Introduction to Floating Storage & Regasification Unit (FSRU)
 
Advanced Petroleum Economics & Risk Analysis
Advanced Petroleum Economics & Risk AnalysisAdvanced Petroleum Economics & Risk Analysis
Advanced Petroleum Economics & Risk Analysis
 
PETROLEUM RISK ANALYSIS & PORTFOLIO MANAGEMENT
PETROLEUM RISK ANALYSIS & PORTFOLIO MANAGEMENT PETROLEUM RISK ANALYSIS & PORTFOLIO MANAGEMENT
PETROLEUM RISK ANALYSIS & PORTFOLIO MANAGEMENT
 
Subsea Production Engineering
Subsea Production EngineeringSubsea Production Engineering
Subsea Production Engineering
 
LearnersEDGE - Virtual Reality Based Simulated Learning For Oil & Gas
LearnersEDGE - Virtual Reality Based Simulated Learning For Oil & GasLearnersEDGE - Virtual Reality Based Simulated Learning For Oil & Gas
LearnersEDGE - Virtual Reality Based Simulated Learning For Oil & Gas
 
Wheeler Diagram and interpretation of wheeler diagram
Wheeler Diagram and interpretation of wheeler diagram Wheeler Diagram and interpretation of wheeler diagram
Wheeler Diagram and interpretation of wheeler diagram
 
Advanced Reservoir Engineering
Advanced Reservoir EngineeringAdvanced Reservoir Engineering
Advanced Reservoir Engineering
 
Research & Reviews Journal of Food Science & Technology vol 5 issue 3
Research & Reviews Journal of Food Science & Technology vol 5 issue 3Research & Reviews Journal of Food Science & Technology vol 5 issue 3
Research & Reviews Journal of Food Science & Technology vol 5 issue 3
 
OmniScience: A Multi-disciplinary Journal vol 6 issue-3
OmniScience: A Multi-disciplinary Journal vol 6 issue-3OmniScience: A Multi-disciplinary Journal vol 6 issue-3
OmniScience: A Multi-disciplinary Journal vol 6 issue-3
 
Tournée Générale 29 mei 2013 | Vlaamse Erfgoedbibliotheek
Tournée Générale 29 mei 2013 | Vlaamse ErfgoedbibliotheekTournée Générale 29 mei 2013 | Vlaamse Erfgoedbibliotheek
Tournée Générale 29 mei 2013 | Vlaamse Erfgoedbibliotheek
 
SAMR Keynote VSTE 2015
SAMR Keynote VSTE 2015SAMR Keynote VSTE 2015
SAMR Keynote VSTE 2015
 
Research & Reviews: Journal of Statistics vol 5 issue 3
Research & Reviews: Journal of Statistics vol 5 issue 3Research & Reviews: Journal of Statistics vol 5 issue 3
Research & Reviews: Journal of Statistics vol 5 issue 3
 
USO DEL TWITTER
USO DEL TWITTERUSO DEL TWITTER
USO DEL TWITTER
 

Similar to Process Plant Startup Expert Training

Safety Health and Environment, Lagos
Safety Health and Environment, LagosSafety Health and Environment, Lagos
Safety Health and Environment, LagosIfeoma Onyemachi
 
Safety health and environment lagos
Safety health and environment lagosSafety health and environment lagos
Safety health and environment lagosIfeoma Onyemachi
 
Safety Health and Environment, Lagos
Safety Health and Environment, LagosSafety Health and Environment, Lagos
Safety Health and Environment, LagosIfeoma Onyemachi
 
Safety health and environment may, lagos
Safety health and environment may, lagosSafety health and environment may, lagos
Safety health and environment may, lagosPetro Nomics
 
Safety, Health and Environment, Lagos
Safety, Health and Environment, LagosSafety, Health and Environment, Lagos
Safety, Health and Environment, LagosIfeoma Onyemachi
 
PetroEdge Training Directory - Oil & Gas Training
PetroEdge Training Directory - Oil & Gas TrainingPetroEdge Training Directory - Oil & Gas Training
PetroEdge Training Directory - Oil & Gas TrainingpetroEDGE
 
Management of Change Training Course
Management of Change Training Course Management of Change Training Course
Management of Change Training Course Karl Kolmetz
 
Resume of Mr.Wirat Kungwansomwong updated on 28 Oct 2015
Resume of Mr.Wirat Kungwansomwong updated on 28 Oct 2015Resume of Mr.Wirat Kungwansomwong updated on 28 Oct 2015
Resume of Mr.Wirat Kungwansomwong updated on 28 Oct 2015wirat kungwansomwong
 
Arnel Z. Gupit CV HSE Manager
Arnel Z. Gupit CV HSE ManagerArnel Z. Gupit CV HSE Manager
Arnel Z. Gupit CV HSE ManagerARNEL GUPIT
 
Ahmed M. Lajhar CV,UPDATED
Ahmed M. Lajhar CV,UPDATEDAhmed M. Lajhar CV,UPDATED
Ahmed M. Lajhar CV,UPDATEDahmedlajhar
 
Terry Moses Lupupa CV Administration
Terry Moses Lupupa CV AdministrationTerry Moses Lupupa CV Administration
Terry Moses Lupupa CV Administrationterry moses LUPUPA
 

Similar to Process Plant Startup Expert Training (20)

Hazop, Accra
Hazop, AccraHazop, Accra
Hazop, Accra
 
Hazop accra
Hazop accraHazop accra
Hazop accra
 
Hazop, Accra
Hazop, AccraHazop, Accra
Hazop, Accra
 
Hazop, Accra
Hazop, AccraHazop, Accra
Hazop, Accra
 
Hazop, Accra
Hazop, AccraHazop, Accra
Hazop, Accra
 
Safety Health and Environment, Lagos
Safety Health and Environment, LagosSafety Health and Environment, Lagos
Safety Health and Environment, Lagos
 
Safety health and environment lagos
Safety health and environment lagosSafety health and environment lagos
Safety health and environment lagos
 
Safety Health and Environment, Lagos
Safety Health and Environment, LagosSafety Health and Environment, Lagos
Safety Health and Environment, Lagos
 
Garcia ramiro 2016
Garcia ramiro 2016Garcia ramiro 2016
Garcia ramiro 2016
 
Safety health and environment may, lagos
Safety health and environment may, lagosSafety health and environment may, lagos
Safety health and environment may, lagos
 
Safety, Health and Environment, Lagos
Safety, Health and Environment, LagosSafety, Health and Environment, Lagos
Safety, Health and Environment, Lagos
 
Circulem viate
Circulem viateCirculem viate
Circulem viate
 
UNM CV
UNM CVUNM CV
UNM CV
 
chukwuma ahiakwo cv
chukwuma ahiakwo cvchukwuma ahiakwo cv
chukwuma ahiakwo cv
 
PetroEdge Training Directory - Oil & Gas Training
PetroEdge Training Directory - Oil & Gas TrainingPetroEdge Training Directory - Oil & Gas Training
PetroEdge Training Directory - Oil & Gas Training
 
Management of Change Training Course
Management of Change Training Course Management of Change Training Course
Management of Change Training Course
 
Resume of Mr.Wirat Kungwansomwong updated on 28 Oct 2015
Resume of Mr.Wirat Kungwansomwong updated on 28 Oct 2015Resume of Mr.Wirat Kungwansomwong updated on 28 Oct 2015
Resume of Mr.Wirat Kungwansomwong updated on 28 Oct 2015
 
Arnel Z. Gupit CV HSE Manager
Arnel Z. Gupit CV HSE ManagerArnel Z. Gupit CV HSE Manager
Arnel Z. Gupit CV HSE Manager
 
Ahmed M. Lajhar CV,UPDATED
Ahmed M. Lajhar CV,UPDATEDAhmed M. Lajhar CV,UPDATED
Ahmed M. Lajhar CV,UPDATED
 
Terry Moses Lupupa CV Administration
Terry Moses Lupupa CV AdministrationTerry Moses Lupupa CV Administration
Terry Moses Lupupa CV Administration
 

More from petroEDGE

2020 training calendar
2020 training calendar2020 training calendar
2020 training calendarpetroEDGE
 
Case Study : National Oil Company - Indonesia
Case Study : National Oil Company - IndonesiaCase Study : National Oil Company - Indonesia
Case Study : National Oil Company - IndonesiapetroEDGE
 
Case Study : National Oil Company - Malaysia
Case Study : National Oil Company - MalaysiaCase Study : National Oil Company - Malaysia
Case Study : National Oil Company - MalaysiapetroEDGE
 
Case study - EnQuest Malaysia
Case study - EnQuest MalaysiaCase study - EnQuest Malaysia
Case study - EnQuest MalaysiapetroEDGE
 
Deepwater Depositional Systems
Deepwater Depositional SystemsDeepwater Depositional Systems
Deepwater Depositional SystemspetroEDGE
 
API 570 Piping and Pipeline Inspectors Preparatory Course
API 570 Piping and Pipeline Inspectors Preparatory CourseAPI 570 Piping and Pipeline Inspectors Preparatory Course
API 570 Piping and Pipeline Inspectors Preparatory CoursepetroEDGE
 
Strategic Innovation In Oil & Gas
Strategic Innovation In Oil & GasStrategic Innovation In Oil & Gas
Strategic Innovation In Oil & GaspetroEDGE
 
Distributed Control System (DCS) Applications, Selection & Troubleshooting
Distributed Control System (DCS) Applications, Selection & TroubleshootingDistributed Control System (DCS) Applications, Selection & Troubleshooting
Distributed Control System (DCS) Applications, Selection & TroubleshootingpetroEDGE
 
Pipe Work Design & Fabrication
Pipe Work Design & FabricationPipe Work Design & Fabrication
Pipe Work Design & FabricationpetroEDGE
 
Petronas activity outlook 2018 - 2020
Petronas activity outlook 2018 - 2020Petronas activity outlook 2018 - 2020
Petronas activity outlook 2018 - 2020petroEDGE
 
Advanced Heat Exchanger Design, Inspection and Troubleshooting
Advanced Heat Exchanger Design, Inspection and TroubleshootingAdvanced Heat Exchanger Design, Inspection and Troubleshooting
Advanced Heat Exchanger Design, Inspection and TroubleshootingpetroEDGE
 
Liquid & Gas Flowmetering & Custody Measurement
Liquid & Gas Flowmetering & Custody MeasurementLiquid & Gas Flowmetering & Custody Measurement
Liquid & Gas Flowmetering & Custody MeasurementpetroEDGE
 
Sand Control Operations
Sand Control OperationsSand Control Operations
Sand Control OperationspetroEDGE
 
Webinar: Scenario planning for long term decision making
Webinar: Scenario planning for long term decision makingWebinar: Scenario planning for long term decision making
Webinar: Scenario planning for long term decision makingpetroEDGE
 
Risk volume assessment in exploration
Risk  volume assessment in explorationRisk  volume assessment in exploration
Risk volume assessment in explorationpetroEDGE
 
ADVANCED WELL ENGINEERING PROGRAM (AWEP)
ADVANCED WELL ENGINEERING PROGRAM (AWEP)ADVANCED WELL ENGINEERING PROGRAM (AWEP)
ADVANCED WELL ENGINEERING PROGRAM (AWEP)petroEDGE
 
Rig Safety Awareness
Rig Safety AwarenessRig Safety Awareness
Rig Safety AwarenesspetroEDGE
 
Well reservoir and management
Well reservoir and managementWell reservoir and management
Well reservoir and managementpetroEDGE
 
Safety awareness
Safety awarenessSafety awareness
Safety awarenesspetroEDGE
 
Major changes in 2020 for the global refining industry
Major changes in 2020 for the global refining industryMajor changes in 2020 for the global refining industry
Major changes in 2020 for the global refining industrypetroEDGE
 

More from petroEDGE (20)

2020 training calendar
2020 training calendar2020 training calendar
2020 training calendar
 
Case Study : National Oil Company - Indonesia
Case Study : National Oil Company - IndonesiaCase Study : National Oil Company - Indonesia
Case Study : National Oil Company - Indonesia
 
Case Study : National Oil Company - Malaysia
Case Study : National Oil Company - MalaysiaCase Study : National Oil Company - Malaysia
Case Study : National Oil Company - Malaysia
 
Case study - EnQuest Malaysia
Case study - EnQuest MalaysiaCase study - EnQuest Malaysia
Case study - EnQuest Malaysia
 
Deepwater Depositional Systems
Deepwater Depositional SystemsDeepwater Depositional Systems
Deepwater Depositional Systems
 
API 570 Piping and Pipeline Inspectors Preparatory Course
API 570 Piping and Pipeline Inspectors Preparatory CourseAPI 570 Piping and Pipeline Inspectors Preparatory Course
API 570 Piping and Pipeline Inspectors Preparatory Course
 
Strategic Innovation In Oil & Gas
Strategic Innovation In Oil & GasStrategic Innovation In Oil & Gas
Strategic Innovation In Oil & Gas
 
Distributed Control System (DCS) Applications, Selection & Troubleshooting
Distributed Control System (DCS) Applications, Selection & TroubleshootingDistributed Control System (DCS) Applications, Selection & Troubleshooting
Distributed Control System (DCS) Applications, Selection & Troubleshooting
 
Pipe Work Design & Fabrication
Pipe Work Design & FabricationPipe Work Design & Fabrication
Pipe Work Design & Fabrication
 
Petronas activity outlook 2018 - 2020
Petronas activity outlook 2018 - 2020Petronas activity outlook 2018 - 2020
Petronas activity outlook 2018 - 2020
 
Advanced Heat Exchanger Design, Inspection and Troubleshooting
Advanced Heat Exchanger Design, Inspection and TroubleshootingAdvanced Heat Exchanger Design, Inspection and Troubleshooting
Advanced Heat Exchanger Design, Inspection and Troubleshooting
 
Liquid & Gas Flowmetering & Custody Measurement
Liquid & Gas Flowmetering & Custody MeasurementLiquid & Gas Flowmetering & Custody Measurement
Liquid & Gas Flowmetering & Custody Measurement
 
Sand Control Operations
Sand Control OperationsSand Control Operations
Sand Control Operations
 
Webinar: Scenario planning for long term decision making
Webinar: Scenario planning for long term decision makingWebinar: Scenario planning for long term decision making
Webinar: Scenario planning for long term decision making
 
Risk volume assessment in exploration
Risk  volume assessment in explorationRisk  volume assessment in exploration
Risk volume assessment in exploration
 
ADVANCED WELL ENGINEERING PROGRAM (AWEP)
ADVANCED WELL ENGINEERING PROGRAM (AWEP)ADVANCED WELL ENGINEERING PROGRAM (AWEP)
ADVANCED WELL ENGINEERING PROGRAM (AWEP)
 
Rig Safety Awareness
Rig Safety AwarenessRig Safety Awareness
Rig Safety Awareness
 
Well reservoir and management
Well reservoir and managementWell reservoir and management
Well reservoir and management
 
Safety awareness
Safety awarenessSafety awareness
Safety awareness
 
Major changes in 2020 for the global refining industry
Major changes in 2020 for the global refining industryMajor changes in 2020 for the global refining industry
Major changes in 2020 for the global refining industry
 

Recently uploaded

AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........LeaCamillePacle
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Jisc
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.arsicmarija21
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 

Recently uploaded (20)

Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
Rapple "Scholarly Communications and the Sustainable Development Goals"
Rapple "Scholarly Communications and the Sustainable Development Goals"Rapple "Scholarly Communications and the Sustainable Development Goals"
Rapple "Scholarly Communications and the Sustainable Development Goals"
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 

Process Plant Startup Expert Training

  • 1. PROCESS PLANT START UP & COMMISSIONING Your Expert Course Director: MAX ZORNADA B.E. (MECH), HONS. M.B.A. Max was a Commissioning Engineer on the largest onshore petrochemical project, which included commissioning of Power House, Crude Stabilisation Plant, Gas Sweetening, NGL and LNG plan. He has also had experience in construction and commissioning of plant in the Fertiliser and Cement Industries. He has been running his “flagship” program on Process Plant Start-Up and Commissioning in the Middle East for some 15 years both as a public program and on an in-house basis. www.petroEDGEasia.net
  • 2. PROCESS PLANT START UP AND COMMISSIONING Conduct this training course in-house for more effective savings! Call us at +65 6579 1293 or email to yong@asiaedge.net. For more information, visit us at www.petroedgeasia.net Course Objectives This program addresses in an integrated manner the key activities involved in the safe, effective and timely commissioning and start-up of a new plant or facility. Start Up and Commissioning of new plant and equipment presents both a major technical and management challenge. An organisation’s personnel must familiarise themselves with new equipment, processes and technologies, develop the relevant operating and safety procedures. At the same time there is the requirement to execute an exceptionally large scope of work – much of it complex when compared to routine operations - over a short period of time, with equipment and plant which is as yet unproven and that may pose significant risks to personnel, environment and profitability. This 5 day training course addresses the technical issues of commissioning and starting up various equipment and asset types commonly found in processing plant environments, the development of specific commissioning procedures, process and facility wide commissioning strategies. The course will also address the broader managerial issues of commissioning and start up planning, resourcing, budgeting and cost control, risk management – safety, environmental, financial and operational, problem solving and trouble shooting. Learning Objectives The objectives of this program are to provide participants with an awareness of the unique challenges associated with plant start-up and commissioning situations.  Gain an understanding of the key concepts, tools and techniques that can be used to facilitate the effective planning, execution, control and management of these situations, including performance testing and acceptance into operation.  Contribute confidently to the planning and execution of effective strategies for plant commissioning and start-up in their own specific work and process plant situations. Who Should Attend? This program addresses the needs of a diverse audience with an interest in Plant Start-up and Commission, including:  General Managers who have oversight responsibility for Plant Start-up and Commissioning;  Operations and Maintenance Managers with direct line responsibility as well as staff support responsibility for delivering on effective Plant Start-up and Commissioning;  Plant Start-up and Commissioning Managers and Engineers;  Technical personnel involved in supporting Plant Start-up and Commissioning activities;  Supervisors and Engineers, both operations and maintenance who are involved or likely to be involved in Plant Start-up and Commissioning situations. Training Methodology Process Plant Start-up and Commissioning is a hands-on, stimulating learning experience. The program will be highly interactive, with opportunities to advance your opinions and ideas. Participation is encouraged in a supportive environment. To ensure the concepts introduced during the program are understood, they will be reinforced through a mix of learning methods, including lecture style presentation, open discussion, case studies, simulations and group work.
  • 3. PROCESS PLANT START UP AND COMMISSIONING Conduct this training course in-house for more effective savings! Call us at +65 6579 1293 or email to yong@asiaedge.net. For more information, visit us at www.petroedgeasia.net Organisational Impact The need for Plant Start Up and Commissioning is ongoing in any business that is growing, as new plant is added to expand capacity and to replace obsolete technology. This program aims to develop employees through exposure to the training and development experience provided by this program, to build a “cadre” of knowledgeable and skilled staff who will be able to add value through their contributions to any situations involving plant start-up and commissioning. They will be able to contribute in leadership or operational roles, both with knowledge and skills to ensure such projects are effectively and efficiently managed in a manner consistent with recognised best practices. A spin off benefit will be their ability to coach and impart learning to their peers and subordinates to the mutual benefit of individuals and organisation. About your Expert Trainer: Max Zornada B.E. (Mech), Hons. M.B.A. Max spent several years with the London based international management and technology consultancy PA Consulting Group, after holding various managerial and professional engineering positions in the chemicals processing and petrochemicals industry with Adelaide and Wallaroo Fertilisers, ICI and Santos. During his time working in the Petrochemical Industry, Max developed specific expertise in Operational Excellence, Maintenance Management, Shutdown and Turnaround Management, Process Plant Start-up and Commissioning through hands-on involvement in commissioning of new plant, as a Shutdown/Turnaround Manager and implementing computerised maintenance management systems. Max was a Commissioning Engineer on the largest onshore petrochemical project, which included commissioning of Power House, Crude Stabilisation Plant, Gas Sweetening, NGL and LNG plan. He has also had experience in construction and commissioning of plant in the Fertiliser and Cement Industries. He has been running his “flagship” program on Process Plant Start-Up and Commissioning in the Middle East for some 15 years both as a public program and on an inhouse basis. Max maintains an active international consulting and education practice, with a focus on the management of capital intensive (petrochemical, energy and chemicals) businesses in the Middle East, Europe and Asia. Max Zornada is also an Adjunct Lecturer at the University of Adelaide Business School where he currently teaches the Operations Management and Business Improvement in the MBA Program. He delivers various Executive Education Programs including Yellow Belt, Green Belt and Black Belt level Lean Six Sigma programs. He has presented programs for the University of New South Wales, Southern Cross and was a Visiting Professor at the Consorzio MIP at the Politecnico di Milano.
  • 4. PROCESS PLANT START UP AND COMMISSIONING Conduct this training course in-house for more effective savings! Call us at +65 6579 1293 or email to yong@asiaedge.net. For more information, visit us at www.petroedgeasia.net 5-DAY COURSE AGENDA DAY ONE INTRODUCTION AND PREPARATION  Introduction to Process Plant Start Up and Commissioning o The Commissioning Process o The Operating Instruction Manual o The Role of Simulators  Commissioning Team Organisation and Roles o Commissioning Team Structure o Roles and Responsibilities  Support Function o Maintenance Department Involvement o Documentation and Information Management o Laboratory Involvement  Cost Estimation and Budgeting  Commissioning and Start Up Logistics Issues o Determining Spare Parts and Consumables Requirements for Commissioning o Determining Spare Parts Stocks Requirements for ongoing support DAY TWO COMMISSIONING STRATEGY  Overall Commissioning Strategy Development  The Six Key Stages of Process Plant Start Up and Commissioning  Preparation, Planning and Commissioning strategy Mechanical completion, integrity checking, P&ID checking and verification o Piping and Spring Supports o Pressure Testing o Cleaning and Flushing  Pre-commissioning and operational testing o Commissioning Utilities o Electrical Sytems o Operational Testing o Dynamic Testing  Start-up and Initial operation; o Start-Up and Initial Operation o Troubleshooting  Performance testing and acceptance;  Post-commissioning DAY THREE PROCESS PLANT AND MACHINERY SPECIFIC ISSUES  Process Plant and Machinery Commissioning o General Machinery Commissioning Principles o Pumps o Compressors o Turbines o Distillation Columns  Instrumentation and Control Systems o Distributed Control System Commissioning o Field Instrumentation Commissioning  Preparing and Isolating Process Plant o Preparation and Isolation of Plant o Electrical Isolation o Removal of Hazardous Substances o Testing and Access DAY FOUR MANAGEMENT, PLANNING AND CONTROL  The Start Up and Commissioning Planning and Control  Developing Commissioning Scope of Work  The Critical Path Method of Planning and Control  A Short-cut Approaches to Planning  Progress Monitoring and Control o Budget Development and Cost Control o Earned Value Analysis o Earned Hours Analysis DAY FIVE MANAGING RISKS DURING COMMISSIONING  OH&S and Risk Management o Safety Management o Safety Audits and Inspections o Permit to work system o Formal Safety Analysis Techniques - Take 5 Analysis - Job Safety Analysis - Qualitative Risk Assessment o Accident Prevention and Investigation  Trouble shooting and problem solving o Trouble shooting and problem solving o Trouble shooting instrumentation systems  Trouble Shooting and Problem Solving  Managing Quality  Conclusion
  • 5. PROCESS PLANT START UP AND COMMISSIONING Conduct this training course in-house for more effective savings! Call us at +65 6579 1293 or email to yong@asiaedge.net. For more information, visit us at www.petroedgeasia.net DELEGATE DETAILS Delegate 1 Please note - Indicate if you have already registered by Phone +Fax +Email +Web - If you have not received an acknowledgement before the training course, please call us to confirm your booking. - Photocopy this form to register multiple delegates. PAYMENT METHODS By Cheque/ Bank Draft Make Payable to Asia Edge Pte. Ltd. By Direct Transfer Please quote your invoice number with the remittance advise Account Name: Asia Edge Pte. Ltd. Bank Number: 508 Account Number: 762903-001 Swift Code: OCBCSGSG All bank charges to be borne by payer. Please ensure that Asia Edge Pte Ltd receives the full invoiced amount. PAYMENT POLICY Payment is due in full at the time of registration. Full payment is mandatory for event attendance. By submitting this registration form, you have agreed to Asia Edge Pte Ltd’s payment terms CANCELLATIONS & SUBSTITUTIONS You may substitute delegates at any time. ASIA EDGE PTE LTD does not provide refunds for cancellations. For cancellations received in writing more than seven (7) days prior to the training course you will receive a 100% credit to be used at another ASIA EDGE PTE LTD training course for up to one year from the date of issuance. For cancellations received seven (7) days or less prior to an event (including day 7), no credits will be issued. In the event that ASIA EDGE PTE LTD cancels an event, delegate payments at the date of cancellation will be credited to a future ASIA EDGE PTE LTD event. This credit will be available for up to one year from the date of issuance. In the event that ASIA EDGE PTE LTD postpones an event, delegate payments at the postponement date will be credited towards the rescheduled date. If the delegate is unable to attend the rescheduled event, the delegate will receive a 100% credit representing payments made towards a future ASIA EDGE PTE LTD event. This credit will be available for up to one year from the date of issuance. No refunds will be available for cancellations or postponements. ASIA EDGE PTE LTD is not responsible for any loss or damage as a result of a substitution, alteration or cancellation/postponement of an event. ASIA EDGE PTE LTD shall assume no liability whatsoever in the event this training course is cancelled, rescheduled or postponed due to a fortuitous event, Act of God, unforeseen occurrence or any other event that renders performance of this training course impracticable or impossible. For purposes of this clause, a fortuitous event shall include, but not be limited to: war, fire, labor strike, extreme weather or other emergency. PROGRAM CHANGE POLICY Please note that speakers and topics were confirmed at the time of publishing; however, circumstances beyond the control of the organizers may necessitate substitutions, alterations or cancellations of the speakers and/or topics. As such, ASIA EDGE PTE LTD reserves the right to alter or modify the advertised speakers and/or topics if necessary. Any substitutions or alterations will be updated on our web page as soon as possible. ASIA EDGE PTE. LTD. Company Registration No: No. 200710561C Copyright@ 2005 ASIA EDGE PTE LTD. All rights reserved.  Mr  Ms  Mrs  Dr  Others: Name : Job Title : Department : Telephone No. : Email : Delegate 2  Mr  Ms  Mrs  Dr  Others: Name : Job Title : Department : Telephone No. : Email : Company : Address : Country : Postcode: Attention Invoice to : Telephone No. : Fax No. : 4 EASY WAYS TO REGISTER  Online: www.petroedgeasia.net  Email: yong@asiaedge.net  Phone: +65 579 1293  Fax: +65 6747 8737 This brochure may not be copied, photocopied, reproduced, translated, or converted to any electronic or machine-readable form in whole or in part without prior written approval of ASIA EDGE PTE LTD PROCESS PLANT START UP AND COMMISSIONING R E G I S T R A T I O N F O R M